fam - highlights

10
Förderanlagen Magdeburg Highlights of 2006

Upload: chandra-marbun

Post on 13-Apr-2015

20 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: FAM - Highlights

Förderanlagen Magdeburg

Highlights of 2006

Page 2: FAM - Highlights

Shiploader for cement bags in Vietnam

Telescopic spiral shoots for FAM barge shiploaders in Thailand

JanuaryThe FAM Group begins the business year 2006 with the hitherto highest level of orders on hand amounting to EUR 172.3 million.

February

Commissioning ofthe 25th compact-type ball mill

for wet grinding of limestone used for flue gas desulphurization in coal-fired

power stations in China.

Thailand awardsFAM the contract for the delivery of a series

of 4 barge shiploaders withtelescopic spiral shoot designed

for 50 kg bags with a loading capacityof 2,400 bags/hr per unit.

Page 3: FAM - Highlights

www.fam.de

Radial travel-type shiploader for seagoing

vessels with a deadweight capacity of

up to 45,000 dwtLos Pelambres Project,

Chile

MarchDr. Lutz Petermann,

Chairman and Managing Director of the FAM Boardof Management, uses the opportunity

of a promotion trip to China toestablish numerous new

business contacts with potential clients.

FAM is awarded a contract by Compañía Minera del Pacífico for a radial travel-type shiploader with a capacity of 5,500 tonnes/hr for loading iron ore concentrate on seagoing vessels with a deadweight capacity of up to 200,000 dwt. The shiploader is intended for the Chilean port of Totoralillo.

Page 4: FAM - Highlights

April

Commissioning of the turnkey nickel ore conveying system in Pinares de Mayarí in Cuba and handover to Cubaniquel, the operator. Covering a total distance of 11 kilometres, two horizontally and vertically curved long distance conveyors continuously transport the ore from the mine to the automatic train loading station.

The Chilean Compañía Minera del Pacífico awards the contract for the delivery of a stacker for an iron ore

stockpile to FAM. The stacker is designed for a capacity

of 1,500 tonnes/hr.

Page 5: FAM - Highlights

www.fam.de

Dynamic Leach-Pad System for copper oreSpence project, Chile

May

The FAM team hands-overthe second portal scraperfor coal with a track gaugeof 69 m and 2,000 tonnes/hrreclaiming capacity tothe Mai Liao power station in Taiwan.

FAM highlights its success on the Chilean market by exhibiting

the company’s latest product developments at the “Expomin”

mining fair in Santiago.

MIBRAG Mitteldeutsche Braunkohlengesellschaft puts into

operation the second development stage of the new FAM mass distribution

system for overburden and coal at the Profen-Süd opencast mining field

in Germany.

Page 6: FAM - Highlights

Surge facilityfor oil sand in Canada

Heavy-duty apron feeders for oil sand in Canada

FAM is awarded the contract for the delivery of a complex oil sand surge facility

with a storage capacity of 9,200 tonnes by Shell Canada Ltd. / Albian Sands Energy.

Two heavy-duty apron feeders of 7,000 tonnes/hr handling capacity,

3 meters wide and a center-to-center distance of 22 meters are the core of the facility.

JuneRWE Power AG awards FAM the contract for setting up a complex conveying system for stockpiling and reclaiming REA gypsum as well as for storage and disposal of wet and dry ashes in the Neurath power station, Germany.

Commissioning of the complexmachinery and equipment for supplying limestone tothe flue gas desulphurization plant of the Maritza East 3 power station in Bulgaria. The system includes a wagon unloading station, a longitudinal limestone stockyard and a mineral crushing and grinding plant.

Page 7: FAM - Highlights

www.fam.de

Blending bed withbridge-type reclaimerfor limestone-clay mixturein Pakistan

AugustKHI Kawasaki Heavy Ind. Ltd. awards FAM the contract

for the complex materials handling and mineral processing system for the But Son Cement Plant in Vietnam. The

system is complete with the specific stockyard equipment for storage and reclamation of limestone, clay, coal and

additives.

July

OAO Mordovzement orders a direct dumping spreader for overburden with a 140 m discharge boom and two mobile crushing plants for overburden and chalk for a total capacity of 1,700 tonnes/hr for the Wakinskij opencast mine in Russia from FAM.

Due to FAM’s modern concept for single-stage crushing, Lafarge Zement Karsdorf, Germany, awards the contract for reconstructing and upgrading the capacity of a heavy-duty mobile crushing plant on crawlers to FAM.

Commissioning of the Minera Escondida project by BHP Billiton, Chile, comprising FAM compact-type spreader

and transfer conveyor bridge on crawlers.

Page 8: FAM - Highlights

SeptemberRWE Power AG, Germany, renews the servicing contracts

concluded with FAM for the company’s opencast mining equipment installed in the Garzweiler opencast mine and the

FAM stockyard equipment in the Niederaussem power station until September 30, 2007

and December 31, 2009, respectively.

The new crawler-mounted conveying system for stockpiling copper oxides and sulphides and for reclaiming leached copper ore (Ripios), erected turnkey for Minera Spence by BHP Billiton Chile, is accepted by the client free of any defects. Having furnished all proofs of performance, including the proof of meeting the specified capacity of 4,000 tonnes/hr, the system is put into service.

FAM successfully commissions a portal scraper supplied to Inacesa

cement plant in Chile. This scraper is designed as a combined stockyard

equipment allowing both stockpiling and reclaiming of coal.

FAM is awarded 5 contracts for the delivery of scraper reclaimers to be used in the potash industry of Russia.

Page 9: FAM - Highlights

www.fam.de

The FAM Service-Team for the Spence project

in Chile

Scale model of theZhejiang Guohua Ninghai power plant, China

Power plant Staudinger, Germany

Photo-mountingby E.ON

NovemberA three-year full maintenance contract for the Spence project in Chile is conclued between FAM América Latina Ltda. and BHP Billiton. This contract, which covers the planning and implementation of all maintenance and repair work of the turnkey dynamic leach pad system for copper ore processing, is of major importance to the FAM Group’s international commitment.

October

Again, FAM is successful in bidding for delivery of stockyard equipment in China. The company is awarded the contract for two circular stockyards for coal with a diameter of 120 m each for the Zhejiang Guohua Ninghai power plant.

MIBRAG Mittel-deutsche Braun-kohlengesellschaftputs intooperation the thirdexpansion stageof the FAM massdistributionsystem foroverburden andcoal at theProfen-Südopencast minein Germany.

FAM is awarded the contract for two circular stockyards of 125 m diameter

each for the coaling system of the E-ON power station Staudinger

in Germany.

EPS awards the contract for a complex overburden conveyor system for the opencast mine Tamnava-West in Serbia to FAM. The system’s conveying capacity is 8,000 tonnes/hr.

Page 10: FAM - Highlights

DecemberThe successful development of continuous FAM-made

ship unloading equipment, which began with the Europoort Rotterdam project, was confirmed and continued by an

order for the STEAG power station Walsum 10 in Duisburg, Germany. Besides the coaling system, which again has

to be supplied as a turnkey installation, the order also comprises proven FAM stockyard equipment and two FAM

CONTI ship unloaders for inland vessels.

In the business year 2006 the FAM Group records its hitherto

highest volume of incoming orders amounting to more than

EUR 180 million.

MIBRAG Mitteldeutsche Braunkohlen AG awards the contracts for complete delivery of new bucket wheel heads

for three bucket wheel excavators of Type SR1300/1301 for the Profen and Schleenhain opencast mines to FAM.

FAM successfully commissions the circular coal stockyard at Yuneng power station in Luoyang/Henan, the first one in China.

For the first time FAM is successful with its bid for stockyard equipment

in Brasil. The company is awarded a contract for supplying the equipment

for a nickel ore stockyard with 490,000 tonnes capacity.