final presentation estec date: 23 january 2020 - taoglas.pdf · final presentation –estec date:...

18
Confidential - Not to be released without prior permission from Taoglas Confidential - Not to be released without prior permission from Taoglas MISSATO PROJECT Final Presentation – ESTEC Date: 23 rd January 2020

Upload: others

Post on 09-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Confidential - Not to be released without prior permission from Taoglas

MISSATO PROJECT

Final Presentation – ESTEC Date: 23rd January 2020

Page 2: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Taoglas - Worldwide Facility Locations

Munich,

GermanyFull RF Test Lab

Engineering &

Sales

Gdansk,

PolandEngineering

Dublin,

IrelandR&D Test Lab

Engineering &

Sales Finance

Minneapolis,

USAR&D Test Lab

Engineering &

Sales

San Diego,

USAFull RF Test Lab

Local Assembly

Engineering &

Sales

Florida,

USAEngineering

Enniscorthy,

IrelandFull RF Test Lab

Engineering &

Sales Local

Assembly

Shenzhen,

ChinaFull RF Test Lab

Engineering &

Sales Local

Assembly

Taoyuan,

TaiwanFull RF Test Lab

Environmental Test

Lab Engineering &

Sales

Tainan,

TaiwanTaoglas

Manufacturing

Engineering

Confidential - Not to be released without prior permission from

Taoglas

Page 3: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Product 1 - Active Quad Helix - An Active Quad Helix Wideband receiving antenna covering E1, L1, G1, L2, G2, E6, E5a, L5, E5b, G3, B1, B1-2, B2, and B3

Product 2 - Active Polymer Composite E1, L1, G1, L2, G2, E5a, L5, B1, and B1-2 Stacked Patch - An active Polymer Composite E1, L1, G1, L2, G2, E5a, L5, B1, and B1-2 Stacked Patch

Product 3 - Active Ceramic L1, L2, and L5 Stacked Patch- An active Ceramic E1, L1, G1, L2, G2, E5a, L5, B1, B1-2 Stacked Patch

Product 4 - Passive Ceramic L2 Patch - A single pin passive ceramic patch

Product 5 - Passive Ceramic E5a (L5) Patch - A single pin Passive E5a, L5 Ceramic patch

MISSATO PROJECT GOAL

• B1 BeiDou centre frequency 1561.1 MHz• B2 BeiDou centre frequency 1207.14 MHz• B3 BeiDou centre frequency 1268.52 MHz• E1 Upper L-Band 1559 MHz - 1591 MHz (Galileo)• E5a Lower L-Band 1164 MHz - 1189 MHz (Galileo)• E5b Lower L-Band 1189 MHz - 1214 MHz (Galileo)• E6 Lower L-Band 1260 MHz - 1300 MHz (Galileo)• G1 Upper L-Band 1593 MHz - 1610 MHz (GLONASS)• G2 Lower L-Band 1237 MHz - 1254 MHz (GLONASS)• G3 Lower L-Band 1189 MHz - 1214 MHz (GLONASS)• L1 Upper L-Band 1564 MHz - 1587 MHz (GPS)• L2 Lower L-Band 1215 MHz - 1239.6 MHz (GPS)• L5 Lower L-Band 1164 MHz - 1189 MHz (GPS)

To develop a series of precision GNSS receiving antennas for the mobility applications, asset tracking and general IoT

Page 4: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Active Quad Helical

RHCP @ 1176 MHz

RHCP @ 1227 MHzRHCP @ 1575 MHz

Page 5: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Active Polymer Composite

RHCP @ 1176 MHz

RHCP @ 1227 MHzRHCP @ 1575 MHz

Page 6: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Active Ceramic Stack

RHCP @ 1176MHzRHCP @ 1215MHz

RHCP @ 1575MHz

Page 7: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

L5 Passive Patch

RHCP @ 1176 MHz

Page 8: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

L2 Passive Patch

RHCP @ 1227MHz

Page 9: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Target KPIs

Verify Carrier to noise density ratio (C/No) when satellite in view Above 10 dB-Hz

Deviation from location influenced by Doppler effect – location deviation by degree of elevation – We will compare to SBAS post processing to assess accuracy

Between +/- 3 meters

Number of satellites in view Minimum of 3

Verify Satellite visibility (azimuth, elevation)% visibility at 300 above

horizon

Page 10: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Verifying antenna performance

Using the multi-band Septentrio Receivers (Stacked Ceramic Examples)

Page 11: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Carrier to Noise ratio > 40dB/Hz

Page 12: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

* SBAS services not available at US test location

*

Deviation of location

Page 13: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Mean Number of satellites in view by Constellation

0 2 4 6 8 10 12 14 16 18 20

L2 Antenna

L5 Antenna

Stacked Ceramic Antenna

Quad Helical Antenna

Stacked Polymer Antenna

Mean Number of satellites in view by constellation

Beidou Galileo GLONASS GPS

Page 14: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Mean Satellite Visibility above and below 30 degrees

Page 15: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

The effects of heavy rain on location accuracy

Mean Deviation With SBAS (Meters)

Deviation with SBAS during heavy Rain

(Meters) Deviation factor

L2 0.66 1.3 1.97

L5 0.77 1.49 1.94

Stacked Ceramic 1.5 8.4 5.60

• In general, the Stacked Ceramic has performed better than the other active antennas• Despite the results we found that heavy rain significantly affected its performance

Page 16: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Next Steps and commercialization planning

Target Markets

• Mobility/Automotive • Tier 1 Automotive suppliers• Micro-mobility market (precision tracking of e-scooters/e-bikes/communal vehicles)• Address V2X market – (to include eCall regulation) • Fleet management • Vehicle Asset tracking • UAVs and Drone market • Precision tracking (high value & with augmentation services)• Agri-market • Maritime market

• Channel Sales

• Channels & Partners (Digi-key, Mouser, EBV) • Web and CRM sales

Page 17: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

Benefits derived through the NAVISP programme

• The funding allowed us explore the use of state of the art multi-band receivers resulting in the use of the Septentrio products which proved to be very useful and versatile in the reception of multi-band GNSS signals

• The funding allows us develop and test the multi-band antennas with specific reference to potential precision GNSS applications

• The funding allowed us verify the effects of satellite based augmentation services in three countries and four deployment environments

• The funding will allow us register IPR for specific design outcomes

Page 18: Final Presentation ESTEC Date: 23 January 2020 - Taoglas.pdf · Final Presentation –ESTEC Date: 23rd January 2020. Confidential - Not to be released without prior permission from

Confidential - Not to be released without prior permission from

Taoglas

www.taoglas.co

m

Any unauthorized use, reproduction, dissemination, distribution or other disclosure of the contents is strictly

prohibited. All copyrights, trademarks and any other intellectual property rights related are owned by Taoglas

Group Holding Limited.