    Sch Awd Page 1 of 22JHANSI DIVISION

    SN Description Unit Qty Rate Amount Inspection by

    Cable route survey, trenching, laying of cables etc.

    1 Final location survey of cable route, preparation of proposed

    cable route plan (in 3 dimensional plan showing distance from

    track as well as depth of cable), termination plan, jointing

    schedules and tapping charts etc. on autocad for the entire

    section. These plans will be submitted to Railways in duplicate

    along with their softcopies for any correction. This also includes

    supply of final as built cable plan and necessary documents on

    CD (5 nos.) as well as on tracing paper along with five prints of

    cable route plan, jointing schedule, cable hut wiring diagram etc.

    Job 1 110110.89 110110.89 CONSIGNEE

    2 Excavation of trench 1.2 m deep, 300mm wide at the bottom

    along main line/suburban track, in all types of soil including

    cleaning of bushes etc refilling by excavated soil and ramming

    after laying of required quantity of cable as per instruction of

    railway engineer incharge at site.

    Km 95 26286.15 2497184.25

    3 Preparation of cable duct for laying of cable in rocky area and

    refilling the duct (after cable laying) with concrete mixture of

    proportion 1:3:6 and grouting the ends at either side of the rocky

    portion using concrete mixture with Contractor's own cement and

    other materials.

    cu

    Mtrs

    500 7132.32 3566160.00

    4 Excavation of cable trench 300mm wide at the bottom, 1.0mtr.

    Deep on Platform. refilling and restoring the platform surface to

    its original condition including necessary plastering work with

    contractor's own materials.

    Mtr 1200 177.07 212484.00

    5 Excavation of cable trench 1m deep and 300mm wide across the

    track, for track crossing and refilling after laying of DWC pipes.

    The work shall be done as per extant practice on the division &

    instruction of Rly engineer at site

    Mtr. 200 91.08 18216.00

    6 Horizontal boring under Railway track / roads etc. for laying

    120mm dia DWC (Double walled corrugated) pipes at the depth

    of 1.4 mtr to 2.1 mtrs from formation level (level of earth below

    ballast) as per drg. and directed by engineer incharge by

    trenchless technology excluding the cost of DWC pipes.

    a. The cost shall include horizontal boring through any intermediate

    obstruction, either natural or manmade or any boundary etc..

    b. The rate is inclusive of all the materials, equipments and labour

    required for doing trenchless horizontal boring under the railway

    NORTH CENTRAL RAILWAY

    Schedule for the work of "Survey of cable route, Trenching, Laying, Jointing, and part supply of

    items, Installation, wiring, testing & commissioning of Optical Fibre cable in connection with the

    work of "Idgah-Bayana - Strengthening of communication backbone through optic fibre cable &

    associated networking."

    No. JHS/N/W/11/11/OFC IDGAH-BAYANA dtd .

    Mtr 100 2631.31 263131.00

    Rs.One Lacs Ten Thousand One Hundred Ten and Paise Eighty Nine Only.

    Rs.Twenty Six Thousand Two Hundred Eighty Six & Paise Fifteen Only.

    Rs.Seven Thousand One Hundred Thirty Two & paise Thirty Two Only.

    Rs.One Hundred Seventy Seven & paise Seven Only.

    Rs Ninety one & paise Eight Only.

  • 8/12/2019 Final Varia OFC IDH-Bayana

    2/22

    Sch Awd Page 2 of 22SN Description Unit Qty Rate Amount Inspection by

    d. The rates shall be inclusive of detection and protection of

    underground utilities encountered during boring.

    e. The payment for boring shall be made only when DWC pipes

    provided in item ae laid in the bore

    Works to be carried out during trenchless boring

    i. Horizontal boring under railway track / roads etc. for laying

    120mm dia DWC pipes at the depth of 1.4 mtrs to 2.1 mtrs from

    formation level (level of earth below ballast).

    ii. Horizontal boring through any intermediate obstruction, either

    natural or manmade or any boundary etc.

    iii. The DWC pipes are to be laid under Railway track/road. All

    necessary arrangements are to be provided and all precautions

    are to be taken, so that bore coming out at other end is not

    deviated from horizontal level line by more than 250mm in

    horizontal or vertical direction.iv. Detection and protection of underground utilities encountered

    during boring.

    T&P required

    i. Horizontal drilling machine fitted on belted mechanism for

    locomotion, or any suitable method.

    ii. Accessories required for operation of machine & execution of

    work.

    iii. Tools for maintenance of machine

    iv. Proper protection of worksite.

    7 Supply & fixing of GI pipe, 100mm dia.B-class as per spec. No.IS

    1239 PT. 1/1990. This includes fixing of GI pipes for crossing the

    culverts, bridges etc. and concreting of ends with brick masonry at

    both ends. The GI Pipes has to be perforated at every 20 cms on

    four sides of pipe. All the necessary accesories required for fixing

    including clamp, nuts, bolts etc, at every 2M at girder bridge. have

    to be provided by contractor at his own cost. All the fixing

    accesories to be hot deep galvanised before using. The work is

    required to be done as per the instruction of Rly engineer at site.

    Mtr 1000 551.38 551380.00 RITES

    8 Supply of Double Walled Corrugated pipe made up of

    Polyethylene of Size 103.5 mm inner dia and 120mm outer dia in

    6M straight length as per british standard No BSEN 50086-1 and

    BSEN 50086-2-4 and BIS draft spec Doc No ETD 14 (5071) AND

    etd 14(5072) along with one coupler per every 6 meters.

    Mtr 10000 156.62 1566200.00 RITES

    9 Supply and laying of well burnt second class bricks of

    size(225mm x 112mm x 75mm) inside the trench breadth wise

    after laying of cable in station area from distant to distant signal.

    Sample of bricks shall be got approved by engineer incharge

    before supply & laying. 9-10 bricks per meter shall be laid

    depending upon width of the bricks. In case the brick size is at

    variance with the size given in tender schedule then proportionate

    rates in Cum shall be given subject to the max rate of standard

    size

    Mtr 27000 14.45 390150.00 CONSIGNEE

    Rs.Five Hundred Fifty One & Paise Thirty Eight Only.

    Rs.One Hundred Fifty Six & Paise Sixty Two Only.

    Rs.Two Thousand Six Hundred Thirty one and paise Thirty One Only.

  • 8/12/2019 Final Varia OFC IDH-Bayana

    3/22

    Sch Awd Page 3 of 22SN Description Unit Qty Rate Amount Inspection by

    Cable jointing

    11 Supply of 24 fibre optic fibre straight joint enclosure (SJC)

    complete with all accessories of make TVSE R&M model no.1500

    L183-XX or Raychem make model no.FOSC100-BH-A-SJN-2L34

    or 3M make model no.BPEO-Type 1-24F or 2179CS-24F.

    Set 80 3475.73 278058.40 RDSO

    12 Splicing of 24 fibre optic fibre cable and making the splice joint

    with contractor's own splicing machine and tools. Joint should be

    prepared in such a way that the top of the enclosure shall be at a

    depth of 1.65M and the enclosure should be covered with soft soil

    and then bricks.

    No. 80 10214.46 817156.80

    13 Supply of FCPC type connecors of 5/10/20 db and multiple of 5

    db upto 20 db.

    No. 20 173.00 3460.00 CONSIGNEE

    14 Supply & installation of fibre management system with all

    installation material, splicing, termination & testing of 2 X 24 fibre

    of cable with all connectors material as per instructions of site

    engineer.

    No. 10 21708.50 217085.00 CONSIGNEE

    15 Supply of patch cords/OFC jumper cable 10 Mtr. Long with FC/PC

    connects on both sides.

    No. 110 621.00 68310.00 CONSIGNEE

    16 Supply of Walco tape - self winding, anti-corrosive - 40mm (W) X

    10M (L).

    Rolls 90 937.47 84372.30 CONSIGNEE

    Testing & measuring instruments

    17 Supply of main frame OTDR it shall be suitable for operating at

    1310/1550 mm wavelength, having Dynamic range of more than

    30 db with 1 meter minimum resolution.

    Set 1 994000.00 994000.00 RDSO

    (a) Ink jet printer

    (b) DC power supply.

    (c ) Touch. Screen- It shall be modular in construction and shall be

    capable of bidirectional Analysis.

    18 Supply of Mini Optical Time Domain Reflectometer (OTDR)

    operating at 1550nm & 1310nm for working on single mode fibre

    as per specification No. GR/OTD-2/02 Jan 2005 with latest

    amendment Model No. AQ-7260+AQ- 7261 make YokogawaElectric Corporation, Japan or similar.

    Set 2 270220.00 540440.00 RDSO

    19 Supply of Optical power meter type B as per TEC specification

    No.GR/OPM-01/03 Feb-2005 or latest.

    Set 2 11757.60 23515.20 CONSIGNEE

    20 Supply of optical laser dual source (1550nm/1310nm) as per TEC

    GR no.GR/SLS-01/03 Feb-05 Type C (Dual wavelength) or latest.

    Set 2 77699.52 155399.04 CONSIGNEE

    Rs.Nine Hundred Thirty Seven & Paise Forty Seven Only.

    Rs. Nine Lakhs Ninety Four Thousand Only.

    Rs. Two Lakhs Seventy Thousand Two Hundred Twenty Only.

    Rs. Eleven Thousand Seven Hundred Fifty Seven & Paise Sixty Only.

    Rs.Six Hundred Twenty one only.

    Rs Three Thousand Four Hundred Seventy Five & paise Seventy Three Only.

    Rs Ten Thousand Two Hundred Fourteen & paise Forty Six Only.

    Rs One Hundred Seventy Three only.

    Rs.Twenty One Thousand Seven Hundred Eight & Paise Fifty Only.

  • 8/12/2019 Final Varia OFC IDH-Bayana

    4/22

    Sch Awd Page 4 of 22SN Description Unit Qty Rate Amount Inspection by

    22 Supply of Automatic Fusion splicer for single mode Optical Fibre

    cable with accessories as per TEC specification No. G/OSM/-

    01/03 April 05 with latest amendment (Model-A Make Furukawa

    Electric Corporation, Japan or similar.

    Set 2 414793.60 829587.20 RDSO

    23 Supply of maintenance tools kit one set consisting of following: Set 3 125126.10 375378.30 CONSIGNEE

    (a) Digital multimeter 4 1/2 digit with LC & display 1 No. of

    philips/Motwani make

    (b) Bare fibre adopter 1 No.

    (c) High precision stripper.

    (d) Mechanical splice joint set-1 set consisting of 06 Nos.

    (e) Ceramic scissor CSI -1 No.

    (f) RC/PC Adopter with 0 db loss -10 Nos.(g) Optical fibre terminal block V Groove - 2 Nos.

    (h) Earth resistance measuring instrument with all accessories

    suitable for measuring earth resistance other range 0.1/ohms to

    10 ohms.

    (i) Megger - 1 No.

    (j) Loose tube stripper- 1 No.

    (k) Soldering iron - 1 No.

    (l) Earth Resistance Meter - 2 nos.

    (m) Heavy duty electric drill machine - 1 no.

    Indoor eqipments & housing arragements

    24 Supply of prefabricated signaling and equipment housing having

    outer dimension of 6000x3000x3080 mm made of 80 mm thick

    polyurethane foam sandwich panel for equipment/Relay room

    complete with doors elestomeric waterproofing, ventilators,

    exhaust fans etc. sun/rain guard, PVC flooring, Twin tube lights,

    fans etc. as per technical specification mentioned in Annexure-2.

    Manufacturers test and guarantee certificate to be submitted by

    the contractor. This also includes excavation of trenches forfoundation and construction of foundation as per technical

    specification, erection, fixing of pre-fabricated building with all

    accessories supplied in items above on the foundation erected.

    All materials, including cement & steel to be supplied by the

    contractor. Double locking arrangement to be provided in the door

    of relay room. Inspection will be done by consignee.

    Set 9 418500.00 3766500.00 RITES

    25 Supply of managed expandable rack type STM -1, ADM as pertechnical spec no.TEC GR no.GR/SDH-04/02 Mar-02 with latest

    amendment with STM-1 aggregate interface, 21 E1s & 4 nos. of

    10/100 base T ethernet port, order wire, power supply unit, sub

    racks, installation material & accessories manual etc. The

    equipment should be fully wired for its ultimate capacity & provide

    redundancy for power supply & synchronisation and other details.

    No. 10 98237.74 982377.40 RDSO

    26 S l f 4 Di it l t (STM 1) t hi l N 1 124973 12 124973 12 CONSIGNEE

    Rs.Four Lakhs Fourteen Thousand Seven Hundred Ninety Three & Paise Sixty Only.

    Rs.One Lakh Twenty Five Thousand One Hundred Twenty Six & Paise Ten Only.

    Rs. Ninet Ei ht Thousand Two Hundred Thirt Seven & Paise Sevent Four Onl .

    Rs.Four Lakhs Eighteen Thousand Five Hundred Only.

  • 8/12/2019 Final Varia OFC IDH-Bayana

    5/22

    Sch Awd Page 5 of 22SN Description Unit Qty Rate Amount Inspection by

    27 Supply of 2 Mb programmable primary digital Drop insert

    Multiplexer with conference facility as per specification RDSO/TC

    68/2004 with latest amendments, fully wired for 30 channels

    complete with power supply unit, remote control supervisory

    facility & all other accessories, installation material, technical

    manuals etc. All accessories as per RDSO spec no.IRS-TC-68/2004 to be supplied.

    No. 10 84961.08 849610.80 RDSO

    The MUX should be equipped with following:-

    a) 2W/4W E&M VF interface cards, for 16 ckts/Mux.

    b) Subscriber loop interface cards for 8 ckts/Mux

    c) 64 Kbps co-directional data interface cards 4 ckts/Mux.

    d) Exchange loop interface cards for 4 ckts/Mux

    Note : The existing NMS software is WEBFIL super-net

    Management system ver.3-0. If the existing NMS software can

    support for its all functionality with the make of the above itemsupplied by the contractor then it is O.K. otherwise the item shall

    also include arrangement for patching between two systems.

    28 Supply of composite racks covered with front transparent doors

    and suitable to house 2 SDH-STM-1, 2PD Mux, along with PDP,

    DDF cooling fans, Krone MDF for 100/200 pairs with antisurge

    protection through fast acting fuses & GD tubes for all channels to

    provide Z protection.

    No. 10 23862.96 238629.60 CONSIGNEE

    29 Supply of Exchange loop interface cards ( 4 circuits per cards)

    compatible with Webfil Mux or as per requirement of the Railways

    given lateron at the time of supply.

    No. 12 4312.22 51746.64 CONSIGNEE

    30 Installation and wiring of SDH ADMs primary drop insert

    Multiplexers, DDF with all accessories, surge and lightening

    protection arrangement FDF racks, runway ladders etc. This

    includes connecting all pigtails, optical patch cords etc to the SDHequipment. This also includes connecting the SDH and primary

    MUX equipment with all interface cards to the 48V bus including

    supply of wires & connectors, termination of all E1s on DDF,

    transferring of circuits including taking PVC cable over runway or

    a wall, krone type DP with all surge and lightening protection

    complete fr 30 circuits derived from primary MUX covered in

    earlier items of the schedule will be used for this work. All other

    miscellaneous materials including switch board cable, PVC

    conduits etc. should also be provided on this rack for testing &

    isolation of faults transferring of circuit at all sites.

    Job/st

    n

    10 16974.00 169740.00

    Network management system & surge protection arrangement

    31 Supply of Network Monitoring System (NMS) including associated

    application software as per Railway's requirement complete with

    all accessories, including power supply for STM, ADM i.e. STM-1

    (L1.2) & STM-1 (L1.1) both end primary digital drop insert MUX as

    No. 1 771257.82 771257.82 CONSIGNEE

    Rs. Eighty Four Thousand Nine Hundred Sixty One & Paise Zero Eight Only.

    Rs.Twenty Three Thousand Eight Hundred Sixty Two & Paise Ninety Six Only.

    Rs.Four Thousand Three Hundred Twelve & Paise Twenty Two Only.

    Rs.Sixteen Thousand Nine Hundred Seventy Four Only.

  • 8/12/2019 Final Varia OFC IDH-Bayana

    6/22

    Sch Awd Page 6 of 22SN Description Unit Qty Rate Amount Inspection by

    32 Supply of ultra isolation transformer 230V AC/230 V AC-1.5 KVA

    with MOVR protection etc.on either side to provide 'X' protection

    and supply of crow bar surge protection circuit for 48 V DC side to

    provide 'Y' protection.

    No. 12 12110.49 145325.88 CONSIGNEE

    33 Supply of Remote service terminal (portable) fully compatible withNMS, service terminal shall be for any location of Net work. It

    should also be possible to read fault status of STM, MUX, cross

    connect in the Network from service terminal/Node manager in

    case of same address is being accessed by central NMS &

    remote service terminal simultaneously, the access will be denied

    to the remote service terminal. It should be compatible to NMS

    software FIBCOM make NM 2100 element manager ver 4.10.

    No. 2 39578.40 79156.80 CONSIGNEE

    34 Supply, installation, testing & commissioning of encapsulated type

    class B (as per VDE-0675-6) lightening current arrestors as per

    RDSO spec no.RDSO/SPN/144/2004 or similar.

    No. 10 45829.80 458298.00 RDSO

    Power supply & earthing arrangement

    35 Supply & installation of Battery charger 48V/25A in N+1

    configuration using 3 modules 25A with automatic switching

    between the modules as per technical specn.

    (RDSO/SPN/11/23/99 or latest)

    No. 12 43810.31 525723.72 RDSO

    36 Supply of low maintenance tubular type battery confirming to IRS-

    88/93 or latest, complete with inter cell connector, microporous

    ceramic vent plug set, voltage 48V,300 AH at 10 hrs rate fully

    charged, complete with accessories and two copies of manuals of

    instructions with each set. This includes Installation, wiring

    commissioning of power supply equipments i.e. battery charger

    and batteries at each station including AC/DC distribution and

    protection arrangement.This item also includes battery rack

    runway PVC channels, battery cable connectors and other

    required items for making power supply arrangements.

    No. 10 117000.00 1170000.00 RDSO

    37 Supply & installation of basic material to construct unit

    maintenance free earth consisting as per RDSO Spec. no.

    RDSO/SPN/197/2008 consisting of following items :-

    Job 12 21285.00 255420.00 CONSIGNEE

    a) Copper bonded steel electrodes of 3.0m long, 17.2mm dia with

    copper bonding thickness of min 250 micron and UL listed and

    marked.1 nob) Earth enhancement material supplied in sealed bags of minimum

    10 kgs. 3nos

    c) Copper strip 150X25X6mm to terminate earth end -1nos.

    d) Copper strip 300X25X6mm (MEEB).1nos.

    e) Copper strip 150X25X6mm (SEEB).1nos.

    Rs.Twelve Thousand One Hundred Ten & Paise Forty Nine Only.

    Rs. Thirty Nine Thousand Five Hundred Seventy Eight & Paise Forty Only.

    Rs. Forty Five Thousand Eight Hundred Twenty Nine and Paise Eighty Only.

    Rs.Forty Three Thousand Eight Hundred Ten and Paise Thirty One Only.

    Rs. One Lakh Seventeen Thousand Only.

  • 8/12/2019 Final Varia OFC IDH-Bayana

    7/22

    Sch Awd Page 7 of 22SN Description Unit Qty Rate Amount Inspection by

    This includes digging the earth to the required depth, insertion of

    electrode, Filling of earth enhancing compound (30 Kg), provision

    of exothermic weld connection on copper tape of 25mm X 6mm X

    150mm to the earth electrode, all the material tools & features

    required for the weld to be arranged by the contractor, Provision

    of exothermic weld connecting, one to connect 35sqmm multistrand single core PVC insulated copper cable welded to the

    copper tape welded to the earth electrode and another to the

    copper tape to be fixed inside the equipment.relay rack/apparatus

    room. (features for mounting the copper tape inside the relay

    room, weld materials, tools & features required for the weld to be

    arranged by the contractor, Electrodes termination in a concrete

    sink and routing the cadmium cable to bus bar in equipment

    room. (All other materials required for the work shall be borne by

    the contractor).

    This also includes supply & provision of 35sqmm multi strand

    single core PVC insulated copper cable as per IS:694 for

    connecting main earth elecrode to MEEB in the equipment room

    in duplicate and 16 sq mm multi strand single core PVC insulated

    copper cable as per IS:694 for connecting MEEB to SEEB and

    SPDs to MEEB in duplicate.

    Testing & commissioning

    38 Testing & commissioning of entire OFC link with NMS. This work

    includes testing of all fibre of the optical fibre cable in each cable

    hut as per test protocol for optic fibre as detailed in technical

    specification. Testing of all emergency communication end to end

    and transfer of existing control circuits working on Railway quad to

    the OFC by remaining existing tail cables and way station

    equipments. Interfacing of the link with Railway / DOT owned

    communication system as per technical specification and

    stipulations in the tender document and final commissioning of all

    equipments confirming with the approved system design alongwith the commissioning of NMS. The work includes submission of

    all technical documents manuals. All miscellaneous materials

    required for the final testing and commissioning of the system

    should be supplied by the contractor. This also includes training of

    Railway officials in optical fibre & instruments. Exact details of no.

    of railway trainees & duration of training will be provided by

    railway at the time of training.

    Job 1 67896.00 67896.00

    39 Supply of thermo shrink jointing kit for 6 quad cable as per IRS TC

    77/2006 or latest with latest amendment.

    No. 100 965.40 96540.00 RDSO

    40 Supply of PVC conduit pipe 25 mm of any reputed make.

    Contractor will have to get the sample approved by the Railway

    engineer prior to making bulk supply.

    Mtr. 500 24.19 12095.00 CONSIGNEE

    Indoor cable, cable termination & cable route marker

    Rs.Twenty One Thousand Two Hundred Eighty Five Only.

    Rs.Twenty Four and Paisa Nineteen Only.

    Rs.Sixty Seven Thousand Eight Hundred Ninety Six Only.

    Rs.Nine Hundred Sixty Five and Paisa Forty Only.

  • 8/12/2019 Final Varia OFC IDH-Bayana

    8/22

    Sch Awd Page 8 of 22SN Description Unit Qty Rate Amount Inspection by

    a Supply of Switch board cable 05 pair 0.63 mm Mtr. 1000 16.82 16820.00 CONSIGNEE

    b Supply of Switch board cable 10 pair 0.63 mm Mtr. 1000 31.55 31550.00 CONSIGNEE

    c Supply of Switch board cable 20 pair 0.63 mm Mtr. 1000 63.07 63070.00 CONSIGNEE

    42 Supply of Battery wire in Red & Black Colour of 7 strand, each

    strand of 0.75mm dia of any reputed make. Contractor will have to

    get the sample approved by the Railway engineer prior to makingbulk supply.

    Mtr. 400 17.27 6908.00 CONSIGNEE

    43 Supply & installation of DP boxes & termination of cables for 20

    pair Krone DP along with supply of required fixing material

    No. 5 362.66 1813.30 CONSIGNEE

    44 Supply & installation of DP boxes & termination of cables for 10

    pair Krone DP along with supply of required fixing material

    No. 10 317.21 3172.10 CONSIGNEE

    45 Supply of Krone Tool of any reputed make. Contractor will have toget the sample approved by the Railway engineer prior to making

    bulk supply.

    No. 30 778.32 23349.60 CONSIGNEE

    46 Supply, fixing and installation of RFID electronic marker for S&T

    under ground cables with programmable memory for saving the

    user specific data in side the RFID Electronic marker memory

    chip, later recordable by electronic marker locator during locating

    (10cm diameter with floating coil to keep detection circuit always

    horizontal for better direction) which can be buried upto depth of 5ft.

    No. 475 2080.00 988000.00 RITES

    47 Supply of TEC approved electronic cable marker locator for

    locating OFC/quad cable as per TEC spec. no.G/TIE-07/01 Jun-

    98 along with latest amendment.

    No. 1 139725.00 139725.00 RITES

    DTMF type control equipment, magneto phone

    48 Supply and installation of Desk type Electronic Magneto

    Telephone as per RDSO spec No IRS:TC 79/2000 withAmendment no.2 or latest.

    Nos. 10 2126.52 21265.20 CONSIGNEE

    49 Supply & installation of 4 wire DTMF type control HQ equipment

    with microphone and loudspeaker along with 12V dual battery

    backup & charging system. It should also comprise of mounting

    arrangement.

    No. 1 38221.31 38221.31 CONSIGNEE

    50 Supply & installation of 4 wire DTMF signaling based way station No 10 13121 32 131213 20 RDSO

    Rs.Seven Hundred Seventy Eight & Paise Thirty Two Only.

    Rs.Two Thousand Eighty Only.

    Rs. One Lakh Thirty Nine Thousand Seven Hundred Twenty Five Only.

    Rs.Two Thousand One Hundred Twenty Six & Paise Fifty Two Only.

    Rs. Thirty Eight Thousand Two Hundred Twenty One & Paise Thirty One Only.

    Rs.Thirty One & Paise Fifty Five Only.

    Rs. Sixty Three & Paise Zero Seven Only.

    Rs. Seventeen & Paise Twenty Seven Only.

    Rs.Three Hundred Sixty Two & paise Sixty Six Only.

    Rs.Three Hundred Seventeen & Paise Twenty One Only.

    Rs.Sixteen & Paise Eighty Two Only.

  • 8/12/2019 Final Varia OFC IDH-Bayana

    9/22

    Sch Awd Page 9 of 22SN Description Unit Qty Rate Amount Inspection by

    51 Supply of Universal way side DTMF control phone as per RDSO

    specification no. IRS:TC:82/2005 (Amdt.1) or latest with latest

    amendment.

    Nos. 40 4347.81 173912.40 RDSO

    52 Supply of Light weight Portable Telephone 4 /2 wire as per spec

    IRS-TC-78/2000 or latest (Superceded RDSO/SPN/TC/32/99 ver-

    1)

    Nos. 10 1555.62 15556.20 CONSIGNEE

    Office Furniture & Miscellanous

    53 Supply of Chair Model PCH 7001 (Godrej)or similar Nos. 10 9123.23 91232.30 CONSIGNEE

    54 Supply of chair supior quality with arm and can seated of size 57D

    X 58W X 88H & Seat height of 45mm [Godrej Make & model

    no.Classic CH-7 or similar].

    Nos. 10 2109.76 21097.60 CONSIGNEE

    55 Supply of Table Model of size 1370W x 690D x 740H mm as per

    model no.T-9 of Godrej make or Similar.

    Nos. 20 8851.57 177031.40 CONSIGNEE

    56 Supply of Lateral Filing Cabinet 3ft to store cable route plan,

    jointing details etc.[Godrej Make].or similar .

    Nos. 5 10698.48 53492.40 CONSIGNEE

    57 Supply of Office Almirah of size 900W x 1168.5H X 450D mm as

    per model no.KD minor with metal top of Godrej make or Similar.

    Nos. 10 19027.25 190272.50 CONSIGNEE

    58 Transportation/Carriage by truck of various signalling materials

    including loading, unloading, operation & Stalling at specific

    depots/locations from AGC, ALD or any other station/Location to

    Jhansi and other stations of Jhansi Division.(For each trippayment for minimum 10 MT shall be given irrespective of load, if

    the load is less than 10MT.)

    Per

    Ton

    Per

    Km

    18000 1.98 35640.00

    59 Supply of CAT-5E UTP cable in 305 Mtr box (D link make or

    similar)

    Box 3 1450.00 4350.00 CONSIGNEE

    Total 26058006.97

    2.1% Below quoted by Contractor -547218.15

    TOTAL COST OF WORK 25510788.82

    (Rs.Two Crore Fifty Five LacsTen Thousand Seven Hundred Eighty Eight and Paise Eighty Two only.)

    Rs.Four Thousand Three Hundred Forty Seven & Paise Eighty One Only.

    Rs. One and Paise Ninety Eight Only.

    Rs.One Thousand Four Hundred Fifty Only.

    Rs. One Thousand Five Hundred Fifty Five & Paise Sixty Two Only.

    Rs.Nine Thousand One Hundred Twenty Three & Paise Twenty Three Only.

    Rs. Two Thousand one Hundred Nine & Paise Seventy Six Only.

    Rs. Eight Thousand Eight Hundred Fifty One & Paise Fifty Seven Only.

    Rs. Ten Thousand Six Hundred Ninety Eight & Paise Forty Eight Only.

    Rs. Nineteen Thousand Twenty Seven & Paise Twenty Five Only.

  • 8/12/2019 Final Varia OFC IDH-Bayana

    10/22

    F VAr Correction

    Remarks.+Ve .- Ve .+Ve .- Ve Amount Qty

    Cable route survey, trenching, laying of cables etc.

    1 Final location survey of cable route,

    preparation of proposed cable route

    Job 1 1 110110.89 110110.89 110110.89 - - - - 0.00% 0.00%

    2 Excavation of trench 1.2 m deep,

    300mm wide at the bottom along

    main line/suburban track, in all types

    Km 95 83.386 26286.15 2497184.25 2191896.90 - 11.614 - 305287.35 -12.23% -12.23% When physically work was done,trench was less as per site

    condition.

    3 Preparation of cable duct for laying of

    cable in rocky area and refilling the

    duct (after cable laying) with concrete

    cu

    Mtrs

    500 511.58 7132.32 3566160.00 3648752.27 11.58 - 82592.27 - 2.32% 2.32% When physically work was done,cable dust was more as per stie

    condition.4 Excavation of cable trench 300mm

    wide at the bottom, 1.0mtr. Deep on

    Platform. refilling and restoring the

    Mtr 1200 1232 177.07 212484.00 218150.24 32 - 5666.24 - 2.67% 2.67% When physically work was done,trench was more as per site

    position.

    5 Excavation of cable trench 1m deep

    and 300mm wide across the track, for

    track crossing and refilling after laying

    of DWC pipes. The work shall be

    Mtr. 200 218 91.08 18216.00 19855.44 18 - 1639.44 - 9.00% 9.00% When physically work was done,trench across track was less since

    engineering dept. did not allow open

    trenching.

    6 Horizontal boring under Railway track

    / roads etc. for laying 120mm dia

    DWC (Double walled corrugated)

    pipes at the depth of 1.4 mtr to 2.1

    mtrs from formation level (level of

    Mtr 100 247 2631.31 263131.00 637882.17 147 - 374751.17 - 142.42% 147.00% When physically work was done,Horizontal boring was more as per

    site condition since engineering

    dept. Did not allow open trenching.

    Payment to be done as per C.A. (100%)

    Upto 25% of sch. Qty.

    100 25 2631.31 - *65782.75

    Payment to be done as per C.A. (98%)

    beyond 25% of sch. Qty.

    100 15 2578.68 - *38680.26

    Payment to be done as per C.A. (96%)

    beyond 40% of sch. Qty.

    100 107 2526.06 - *270288.16

    a. The cost shall include horizontal

    boring through any intermediate

    b. The rate is inclusive of all thematerials, equipments and labour

    c. The pipes are to be laid under

    Railway track/road. All necessary

    d. The rates shall be inclusive of

    detection and protection of

    e. The payment for boring shall be made

    only when DWC pipes provided in

    Works to be carried out during trenchless boring

    i. Horizontal boring under railway track /

    roads etc. for laying 120mm dia DWC

    ii. Horizontal boring through anyintermediate obstruction, either

    iii. The DWC pipes are to be laid under

    Railway track/road. All necessary

    Sch. Amount Exec' Amount Diff' in Amt VAR' in %Diff' in QtySN Brief Description of item:- Unit SchQty

    Statement showing Final Variation in connection with the work of

    "Survey of cable route, Trenching, Laying, Jointing, and part supply of items, Installation, wiring, testing & commissioning of Optical Fibre cable in connection with the work of "Idgah-Bayana -

    Strengthening of communication backbone through optic fibre cable & associated networking."

    CA No.JHS/N/W/11/ 11/OFC/ Idgah-Bayana dtd 19.12.2011 with M/s Swaran Construction,Bharatpur.

    RateExec.'Qty

    217941410.xlsx.ms_office 10 of 28

  • 8/12/2019 Final Varia OFC IDH-Bayana

    11/22

  • 8/12/2019 Final Varia OFC IDH-Bayana

    12/22

    F VAr Correction

    Remarks.+Ve .- Ve .+Ve .- Ve Amount Qty

    Sch. Amount Exec' Amount Diff' in Amt VAR' in %Diff' in QtySN Brief Description of item:- Unit SchQty

    Statement showing Final Variation in connection with the work of

    "Survey of cable route, Trenching, Laying, Jointing, and part supply of items, Installation, wiring, testing & commissioning of Optical Fibre cable in connection with the work of "Idgah-Bayana -

    Strengthening of communication backbone through optic fibre cable & associated networking."

    CA No.JHS/N/W/11/ 11/OFC/ Idgah-Bayana dtd 19.12.2011 with M/s Swaran Construction,Bharatpur.

    RateExec.'Qty

    19 Supply of Optical power meter type B

    as per TEC specification No.GR/OPM-

    Set 2 2 11757.60 23515.20 23515.20 - - - - 0.00% 0.00%

    20 Supply of optical laser dual source

    (1550nm/1310nm) as per TEC GR

    Set 2 2 77699.52 155399.04 155399.04 - - - - 0.00% 0.00%

    21 Supply of optical variable attenuator

    range -0 db to 70 db selectable step

    Set 1 1 186534.40 186534.40 186534.40 - - - - 0.00% 0.00%

    22 Supply of Automatic Fusion splicer for

    single mode Optical Fibre cable with

    Set 2 2 414793.60 829587.20 829587.20 - - - - 0.00% 0.00%

    23 Supply of maintenance tools kit one

    set consisting of following:

    Set 3 3 125126.10 375378.30 375378.30 - - - - 0.00% 0.00%

    (a) Digital multimeter 4 1/2 digit with LC &

    display 1 No. of philips/Motwani make(b) Bare fibre adopter 1 No.

    (c) High precision stripper.

    (d) Mechanical splice joint set-1 set

    consisting of 06 Nos.

    (e) Ceramic scissor CSI -1 No.

    (f) RC/PC Adopter with 0 db loss -10(g) Optical fibre terminal block V Groove

    (h) Earth resistance measuring

    (i) Megger - 1 No.

    (j) Loose tube stripper- 1 No.

    (k) Soldering iron - 1 No.

    (l) Earth Resistance Meter - 2 nos.

    (m) Heavy duty electric drill machine - 1

    Indoor eqipments & housing arragements

    24 Supply of prefabricated signaling and

    equipment housing having outer

    Set 9 9 418500.00 3766500.00 3766500.00 - - - - 0.00% 0.00%

    25 Supply of managed expandable rack

    type STM -1, ADM as per technical

    No. 10 10 98237.74 982377.40 982377.40 - - - - 0.00% 0.00%

    26 Supply of 4 way Digital cross connect

    (STM-1) to achieve loop protection

    No. 1 1 124973.12 124973.12 124973.12 - - - - 0.00% 0.00%

    27 Supply of 2 Mb programmable

    No. 10 10 84961.08 849610.80 849610.80 - - - - 0.00% 0.00%

    The MUX should be equipped with

    a) 2W/4W E&M VF interface cards,

    b) Subscriber loop interface cards for

    c) 64 Kbps co-directional data

    d) Exchange loop interface cards for 4

    Note : The existing NMS software is

    28 Supply of composite racks covered

    with front transparent doors and

    No. 10 10 23862.96 238629.60 238629.60 - - - - 0.00% 0.00%

    29 Supply of Exchange loop interface

    cards ( 4 circuits per cards)

    No. 12 12 4312.22 51746.64 51746.64 - - - - 0.00% 0.00%

    30 Installation and wiring of SDH ADMs

    primary drop insert Multiplexers, DDF

    Job/st

    n

    10 10 16974.00 169740.00 169740.00 - - - - 0.00% 0.00%

    Network management system & surge protection arrangement

    217941410.xlsx.ms_office 12 of 28

  • 8/12/2019 Final Varia OFC IDH-Bayana

    13/22

    F VAr Correction

    Remarks.+Ve .- Ve .+Ve .- Ve Amount Qty

    Sch. Amount Exec' Amount Diff' in Amt VAR' in %Diff' in QtySN Brief Description of item:- Unit SchQty

    Statement showing Final Variation in connection with the work of

    "Survey of cable route, Trenching, Laying, Jointing, and part supply of items, Installation, wiring, testing & commissioning of Optical Fibre cable in connection with the work of "Idgah-Bayana -

    Strengthening of communication backbone through optic fibre cable & associated networking."

    CA No.JHS/N/W/11/ 11/OFC/ Idgah-Bayana dtd 19.12.2011 with M/s Swaran Construction,Bharatpur.

    RateExec.'Qty

    31 Supply of Network Monitoring System

    (NMS) including associated

    No. 1 1 771257.82 771257.82 771257.82 - - - - 0.00% 0.00%

    32 Supply of ultra isolation transformer

    230V AC/230 V AC-1.5 KVA with

    No. 12 12 12110.49 145325.88 145325.88 - - - - 0.00% 0.00%

    33 Supply of Remote service terminal

    (portable) fully compatible with NMS,

    No. 2 2 39578.40 79156.80 79156.80 - - - - 0.00% 0.00%

    34 Supply, installation, testing &

    commissioning of encapsulated type

    No. 10 10 45829.80

    Supply 85% 10 10 38955.33 389553.30 389553.30 - - - - 0.00% 0.00%

    Execution 15% 10 9 6874.47 68744.70 61870.23 - 1 - 6874.47 -10.00% -10.00%Power supply & earthing arrangement

    35 Supply & installation of Battery

    charger 48V/25A in N+1 configuration

    No. 12 12 43810.31

    Supply 85% 12 12 37238.76 446865.16 446865.16 - - - - 0.00% 0.00%

    Execution 15% 12 10 6571.55 78858.56 65715.47 - 2 - 13143.09 -16.67% -16.67%

    36 Supply of low maintenance tubular

    type battery confirming to IRS-88/93

    No. 10 10 117000.00

    Supply 85% 10 10 99450.00 994500.00 994500.00 - - - - 0.00% 0.00%

    Execution 15% 10 9 17550.00 175500.00 157950.00 - 1 - 17550.00 -10.00% -10.00% Since Battery set was already

    available at Test-Room AGC.

    37 Supply & installation of basic material

    to construct unit maintenance free

    Job 12 12 21285.00 255420.00 255420.00 - - - - 0.00% 0.00%

    a) Copper bonded steel electrodes of

    b) Earth enhancement material supplied

    c) Copper strip 150X25X6mm to

    d) Copper strip 300X25X6mme) Copper strip 150X25X6mm

    This includes digging the earth to the

    This also includes supply & provision

    of 35sqmm multi strand single coreTesting & commissioning

    38 Testing & commissioning of entire

    OFC link with NMS. This work

    Job 1 1 67896.00 67896.00 67896.00 - - - - 0.00% 0.00%

    39 Supply of thermo shrink jointing kit for

    6 quad cable as per IRS TC 77/2006

    No. 100 100 965.40 96540.00 96540.00 - - - - 0.00% 0.00%

    40 Supply of PVC conduit pipe 25 mm of

    any reputed make. Contractor will

    Mtr. 500 500 24.19 12095.00 12095.00 - - - - 0.00% 0.00%

    Indoor cable, cable termination & cable route marker

    41 Supply of tinned copper conductor,

    PVC insulated cores, coloured twisted

    a Supply of Switch board cable 05 pair0.63 mm Mtr. 1000 1000 16.82 16820.00 16820.00 - - - - 0.00% 0.00%

    b Supply of Switch board cable 10 pair

    0.63 mm

    Mtr. 1000 1000 31.55 31550.00 31550.00 - - - - 0.00% 0.00%

    Lighting Arrestor was already

    available at Test-Room AGC

    Since 10 nos. of STM were installed,

    so only 10 nos. of Battery chargers

    were installed accordngly.

    217941410.xlsx.ms_office 13 of 28

    F VA C ti

  • 8/12/2019 Final Varia OFC IDH-Bayana

    14/22

    F VAr Correction

    Remarks.+Ve .- Ve .+Ve .- Ve Amount Qty

    Sch. Amount Exec' Amount Diff' in Amt VAR' in %Diff' in QtySN Brief Description of item:- Unit SchQty

    Statement showing Final Variation in connection with the work of

    "Survey of cable route, Trenching, Laying, Jointing, and part supply of items, Installation, wiring, testing & commissioning of Optical Fibre cable in connection with the work of "Idgah-Bayana -

    Strengthening of communication backbone through optic fibre cable & associated networking."

    CA No.JHS/N/W/11/ 11/OFC/ Idgah-Bayana dtd 19.12.2011 with M/s Swaran Construction,Bharatpur.

    RateExec.'Qty

    c Supply of Switch board cable 20 pair

    0.63 mm

    Mtr. 1000 1000 63.07 63070.00 63070.00 - - - - 0.00% 0.00%

    42 Supply of Battery wire in Red & Black

    Colour of 7 strand, each strand of

    Mtr. 400 400 17.27 6908.00 6908.00 - - - - 0.00% 0.00%

    43 Supply & installation of DP boxes &

    termination of cables for 20 pair

    Krone DP along with supply of

    required fixing material

    No. 5 10 362.66 1813.30 3626.60 5 - 1813.30 - 100.00% 100.00% Tall cable were to be terminated atDy.SS off ice in section. 10 nos. of

    addl. D.P's were required for

    termination of cable at station.

    44 Supply & installation of DP boxes &

    termination of cables for 10 pair

    No. 10 10 317.21 3172.10 3172.10 - - - - 0.00% 0.00%

    45 Supply of Krone Tool of any reputed

    make. Contractor will have to get the

    No. 30 30 778.32 23349.60 23349.60 - - - - 0.00% 0.00%

    46 Supply, fixing and installation of RFID

    electronic marker for S&T under

    No. 475 475 2080.00 988000.00 988000.00 - - - - 0.00% 0.00%

    47 Supply of TEC approved electronic

    cable marker locator for locating

    No. 1 1 139725.00 139725.00 139725.00 - - - - 0.00% 0.00%

    DTMF type control equipment, magneto phone

    48 Supply and installation of Desk type

    Electronic Magneto Telephone as per

    Nos. 10 10 2126.52 21265.20 21265.20 - - - - 0.00% 0.00%

    49 Supply & installation of 4 wire DTMF

    type control HQ equipment with

    No. 1 1 38221.31 38221.31 38221.31 - - - - 0.00% 0.00%

    50 Supply & installation of 4 wire DTMF

    signaling based way station control

    No. 10 10 13121.32 131213.20 131213.20 - - - - 0.00% 0.00%

    51 Supply of Universal way side DTMF

    control phone as per RDSO

    Nos. 40 40 4347.81 173912.40 173912.40 - - - - 0.00% 0.00%

    52 Supply of Light weight Portable

    Telephone 4 /2 wire as per spec IRS-

    Nos. 10 10 1555.62 15556.20 15556.20 - - - - 0.00% 0.00%

    Office Furniture & Miscellanous

    53 Supply of Chair Model PCH 7001

    (Godrej)or similar

    Nos. 10 10 9123.23 91232.30 91232.30 - - - - 0.00% 0.00%

    54 Supply of chair supior quality with arm

    and can seated of size 57D X 58W X

    Nos. 10 10 2109.76 21097.60 21097.60 - - - - 0.00% 0.00%

    55 Supply of Table Model of size 1370W

    x 690D x 740H mm as per model no.T-

    Nos. 20 20 8851.57 177031.40 177031.40 - - - - 0.00% 0.00%

    56 Supply of Lateral Filing Cabinet 3ft to

    store cable route plan, jointing details

    Nos. 5 5 10698.48 53492.40 53492.40 - - - - 0.00% 0.00%

    57 Supply of Office Almirah of size 900W

    x 1168.5H X 450D mm as per model

    Nos. 10 10 19027.25 190272.50 190272.50 - - - - 0.00% 0.00%

    58 Transportation/Carriage by truck of

    various signalling materials including

    loadin unloadin o eration &

    Per

    Ton

    Per

    18000 0 1.98 35640.00 0.00 - 18000 - 35640.00 -100.00% -100.00% Not operated since Transportationof material were not required.

    59 Supply of CAT-5E UTP cable in 305

    Mtr box (D link make or similar)

    Box 3 3 1450.00 4350.00 4350.00 - - - - 0.00% 0.00%

    Total 26058006.97 25694872.08 466462.42 829597.31

    2.1% Below quoted by Contractor -547218.15 -539592.31 -9795.71 -17421.54

    217941410.xlsx.ms_office 14 of 28

    F VAr Correction

  • 8/12/2019 Final Varia OFC IDH-Bayana

    15/22

    F VAr Correction

    Remarks

    .+Ve .- Ve .+Ve .- Ve Amount Qty

    Sch. Amount Exec' Amount Diff' in Amt VAR' in %Diff' in QtySN Brief Description of item:- Unit Sch

    Qty

    Statement showing Final Variation in connection with the work of

    "Survey of cable route, Trenching, Laying, Jointing, and part supply of items, Installation, wiring, testing & commissioning of Optical Fibre cable in connection with the work of "Idgah-Bayana -

    Strengthening of communication backbone through optic fibre cable & associated networking."

    CA No.JHS/N/W/11/ 11/OFC/ Idgah-Bayana dtd 19.12.2011 with M/s Swaran Construction,Bharatpur.

    RateExec.'

    Qty

    TOTAL COST OF WORK 25510788.82 25155279.76 456666.71 812175.76 -1.39%

    Mandatory certificates: CONTRACTOR'S CERTIFICATE :

    1) There is no loss to railway on account of above variation 1) Certified that we have no claim whatsoever for the work executed in the quantity in excess/less than 25%

    2) There is no undue benef it to the contractor on account of above var ia tion. o f schedule and add it iona l item against contract agreement.

    3) Interse position does not change as per enclosed interse position statement. 2) Certified that it is hereby agreed that this variation statement forms part of original agreement referred to above

    4) It is certified that the quantities executed are final. and on the basis of the same terms and conditions of the agreement.

    OS(Works) DSTE/S Contractor

    SUMMARY.

    Cost of excess variation. 456666.71 Cost of less variation. 812175.76

    Net Variation -355509.06 Less 1.39% on total cost of work i.e. Rs.25510788.82 25155279.76

    217941410.xlsx.ms_office 15 of 28

  • 8/12/2019 Final Varia OFC IDH-Bayana

    16/22

    Remarks

    .+Ve .- Ve .+Ve .- Ve Amount QtyCable route survey, trenching, laying of cables etc.

    1 Final location survey of cable

    route, preparation of proposed

    cable route plan (in 3

    Job 1 1 110110.89 110110.89 110110.89 - - - - 0.00% 0.00% -

    2 Excavation of trench 1.2 m

    deep, 300mm wide at the

    bottom along main

    line/suburban track, in all types

    of soil including cleaning of

    bushes etc refilling by

    excavated soil and ramming

    Km 95 83.386 26286.15 2497184.25 2191896.90 - 11.614 - 305287.35 -12.23% -12.23% When physically

    work was done,

    trench was less as

    per site condition.

    3 Preparation of cable duct for

    laying of cable in rocky area

    and refilling the duct (after

    cable laying) with concrete

    mixture of proportion 1:3:6 and

    grouting the ends at either side

    of the rocky portion using

    cu

    Mtrs

    500 511.58 7132.32 3566160.00 3648752.27 11.58 - 82592.27 - 2.32% 2.32% When physically

    work was done, cable

    duct was more as per

    stie condition.

    4 Excavation of cable trench

    300mm wide at the bottom,

    1.0mtr. Deep on Platform.refilling and restoring the

    platform surface to its original

    condition including necessary

    plastering work with contractor's

    Mtr 1200 1232 177.07 212484.00 218150.24 32 - 5666.24 - 2.67% 2.67% When physically

    work was done,

    trench was more asper site position.

    5 Excavation of cable trench 1m

    deep and 300mm wide across

    the track for track crossin and

    Mtr. 200 218 91.08 18216.00 19855.44 18 - 1639.44 - 9.00% 9.00% As per site

    requirment.

    6 Horizontal boring under Railway

    track / roads etc. for laying

    120mm dia DWC (Doublewalled corrugated) pipes at the

    depth of 1.4 mtr to 2.1 mtrs

    from formation level (level of

    earth below ballast) as per drg.

    and directed by engineer

    incharge by trenchless

    technology excluding the cost of

    DWC pipes.

    Mtr 100 247 2631.31 263131.00 637882.17 147 - 374751.17 - 142.42% 147.00% When physically

    work was done,

    Horizontal boring wasmore as per site

    condition since

    engineering dept. Did

    not allow open

    trenching.

    Statement showing Final Variation in connection with the work of

    "Survey of cable route, Trenching, Laying, Jointing, and part supply of items, Installation, wiring, testing & commissioning of Optical Fibre cable in connection with the

    work of "Idgah-Bayana - Strengthening of communication backbone through optic fibre cable & associated networking."

    CA No.JHS/N/W/11/ 11/OFC/ Idgah-Bayana dtd 19.12.2011 with M/s Swaran Construction,Bharatpur.

    SN Brief Description of item:- Unit Sch Qty Exec.'

    Qty

    Rate Sch. Amount Exec' Amount Diff' in Qty Diff' in Amt VAR' in %

  • 8/12/2019 Final Varia OFC IDH-Bayana

    17/22

    Payment to be done as per C.A.

    (100%) Upto 25% of sch. Qty.

    100 25 2631.31 - *65782.75

    Payment to be done as per C.A.

    (98%) beyond 25% of sch. Qty.

    100 15 2578.68 - *38680.26

    Payment to be done as per C.A.

    (96%) beyond 40% of sch. Qty.

    100 107 2526.06 - *270288.16

    a. The cost shall include

    horizontal boring through anyb. The rate is inclusive of all the

    c. The pipes are to be laid under

    d. The rates shall be inclusive of

    e. The payment for boring shall beWorks to be carried out during trenchless boring

    i. Horizontal boring under railway

    ii. Horizontal boring through any

    iii. The DWC pipes are to be laid

    under Railway track/road. All

    necessary arrangements are to

    iv. Detection and protection of

    underground utilities

    T&P requiredi. Horizontal drilling machine fitted

    on belted mechanism for

    i i. Accessories required for

    operation of machine &iii. Tools for maintenance of

    machineiv. Proper protection of worksite.

    7 Supply & fixing of GI pipe,

    100mm dia.B-class as per

    Mtr 1000 1000 551.38 551380.00 551380.00 - - - - 0.00% 0.00%

    8 Supply of Double WalledCorrugated pipe made up of

    Mtr 10000 10000 156.62 1566200.00 1566200.00 - - - - 0.00% 0.00%

    9 Supply and laying of well burnt

    second class bricks of

    size(225mm x 112mm x 75mm)

    inside the trench breadth wise

    after laying of cable in station

    area from distant to distant

    signal. Sample of bricks shall

    Mtr 27000 10671 14.45 390150.00 154195.95 - 16329 - 235954.05 -60.48% -60.48% When physically

    work was done less

    nos. of bricks were

    laid as per site

    position.

  • 8/12/2019 Final Varia OFC IDH-Bayana

    18/22

    10 Laying of various cables as per

    approved cable route plan in

    KM 110 100.264 2879.19 316710.90 288679.11 - 9.736 - 28031.79 -8.85% -8.85% as per site position.

    Cable jointing

    11 Supply of 24 fibre optic fibre

    straight joint enclosure (SJC)

    Set 80 80 3475.73 278058.40 278058.40 - - - - 0.00% 0.00%

    12 Splicing of 24 fibre optic fibrecable and making the splice

    joint with contractor's own

    splicing machine and tools.

    Joint should be prepared in

    such a way that the top of the

    No. 80 62 10214.46 817156.80 633296.52 - 18 - 183860.28 -22.50% -22.50% as per site position,62nos. Splicing was

    done, which were

    less than sch. Qty.

    13 Supply of FCPC type connecors

    of 5/10/20 db and multiple of 5

    No. 20 20 173.00 3460.00 3460.00 - - - - 0.00% 0.00%

    14 Supply & installation of fibre

    management system with all

    installation material, splicing,

    No. 10 21708.50 217085.00 212743.58 - 4341.42 -2.00% 0.00%

    Supply 85% 9 18452.23 *166070.3 - - -

    Supply 80% 1 17366.80 *17366.80

    Execution 15% 9 3256.28 *29306.48 - 1 - -10.00% FMS was already

    available at Test-

    Room AGC.

    15 Supply of patch cords/OFC

    jumper cable 10 Mtr. Long with

    FC/PC connects on both sides.

    No. 110 110 621.00 68310.00 68310.00 - - - - 0.00% 0.00% -

    16 Supply of Walco tape - self

    winding, anti-corrosive - 40mm

    Rolls 90 90 937.47 84372.30 84372.30 - - - - 0.00% 0.00% -

    Testing & measuring

    instruments

    -

    17 Supply of main frame OTDR it

    shall be suitable for operating

    Set 1 1 994000.00 994000.00 994000.00 - - - - 0.00% 0.00% -

    (a) Ink jet printer -

    (b) DC power supply. -

    (c ) Touch. Screen- It shall be

    modular in construction and

    -

    18 Supply of Mini Optical Time

    Domain Reflectometer (OTDR)

    Set 2 2 270220.00 540440.00 540440.00 - - - - 0.00% 0.00% -

    19 Supply of Optical power meter

    type B as per TEC specification

    Set 2 2 11757.60 23515.20 23515.20 - - - - 0.00% 0.00% -

    20 Supply of optical laser dual

    source (1550nm/1310nm) as

    Set 2 2 77699.52 155399.04 155399.04 - - - - 0.00% 0.00% -

    21 Supply of optical variable

    attenuator range -0 db to 70 db

    Set 1 1 186534.40 186534.40 186534.40 - - - - 0.00% 0.00%

    10

  • 8/12/2019 Final Varia OFC IDH-Bayana

    19/22

    22 Supply of Automatic Fusion

    splicer for single mode Optical

    Set 2 2 414793.60 829587.20 829587.20 - - - - 0.00% 0.00%

    23 Supply of maintenance tools kit

    one set consisting of following:

    Set 3 3 125126.10 375378.30 375378.30 - - - - 0.00% 0.00%

    (a) Digital multimeter 4 1/2 digit

    with LC & display 1 No. of(b) Bare fibre adopter 1 No.

    (c) High precision stripper.

    (d) Mechanical splice joint set-1 set

    (e) Ceramic scissor CSI -1 No.

    (f) RC/PC Adopter with 0 db loss -(g) Optical fibre terminal block V

    h Earth resistance measurin(i) Megger - 1 No.(j) Loose tube stripper- 1 No.

    (k) Soldering iron - 1 No.(l) Earth Resistance Meter - 2 nos.

    m Heav dut electric drillIndoor eqipments & housing arragements

    24 Supply of prefabricated

    signaling and equipment

    Set 9 9 418500.00 3766500.00 3766500.00 - - - - 0.00% 0.00%

    25 Supply of managed expandable

    rack type STM -1, ADM as per

    No. 10 10 98237.74 982377.40 982377.40 - - - - 0.00% 0.00%

    26 Supply of 4 way Digital cross

    connect (STM-1) to achieve

    No. 1 1 124973.12 124973.12 124973.12 - - - - 0.00% 0.00%

    27 Supply of 2 Mb programmable No. 10 10 84961.08 849610.80 849610.80 - - - - 0.00% 0.00%The MUX should be equipped

    a) 2W/4W E&M VF interfaceb) Subscriber loop interfacec 64 Kb s co-directional datad) Exchange loop interfaceNote : The existin NMS

    28 Supply of composite racks

    covered with front transparent

    No. 10 10 23862.96 238629.60 238629.60 - - - - 0.00% 0.00%

    29 Supply of Exchange loop

    interface cards ( 4 circuits per

    No. 12 12 4312.22 51746.64 51746.64 - - - - 0.00% 0.00%

    30 Installation and wiring of SDH

    ADMs primary drop insert

    Job/s

    tn

    10 10 16974.00 169740.00 169740.00 - - - - 0.00% 0.00%

    Network mana ement s stem & sur e rotection arran ement31 Supply of Network Monitoring

    System (NMS) including

    No. 1 1 771257.82 771257.82 771257.82 - - - - 0.00% 0.00%

    32 Supply of ultra isolation

    transformer 230V AC/230 V AC

    No. 12 12 12110.49 145325.88 145325.88 - - - - 0.00% 0.00%

    33 Supply of Remote service

    terminal (portable) fully

    No. 2 2 39578.40 79156.80 79156.80 - - - - 0.00% 0.00%

  • 8/12/2019 Final Varia OFC IDH-Bayana

    20/22

    34 Supply, installation, testing &

    commissioning of encapsulated

    No. 10 45829.80 458298.00 449132.04 - 9165.96 -2.00%

    Supply 85% 9 38955.33 *350597.97 - - - -

    Supply 80% 1 36663.84 *36663.84 - - - -

    Execution 15% 9 6874.47 *61870.23 - 1 - - -10.00%

    Power supply & earthing arrangement - -

    35 Supply & installation of Battery

    charger 48V/25A in N+1

    configuration using 3 modules

    25A with automatic switching

    No. 12 43810.31 525723.72 508199.60 - - 17524.12 -3.33% -

    Supply 85% 10 37238.76 *372387.64 - - - - - -

    Supply 80% 2 35048.25 *70096.5 - - - -

    Execution 15% 10 6571.55 *65715.47 - 2 - - - -16.67%

    36 Supply of low maintenancetubular type battery confirming

    No. 10 10 117000.00 1170000.00 1146600.00 - - - 23400.00

    Supply 85% 9 99450.00 *895050 - 1 - - - -

    Supply 80% 1 93600.00 *93600 - -

    Execution 15% 9 17550.00 *157950 - 1 - - - -10.00% Since Battery set was

    already avai lable at

    Test-Room AGC.

    37 Supply & installation of basic

    material to construct unit

    Job 12 12 21285.00 255420.00 255420.00 - - - - 0.00% 0.00% -

    a) Copper bonded steel electrodesb) Earth enhancement materialc) Copper strip 150X25X6mm to

    d Co er stri 300X25X6mme Co er stri 150X25X6mm

    This includes digging the earth

    This also includes supply &

    provision of 35sqmm multi

    Testin & commissionin38 Testing & commissioning of

    entire OFC link with NMS. This

    Job 1 1 67896.00 67896.00 67896.00 - - - - 0.00% 0.00%

    39 Supply of thermo shrink jointing

    kit for 6 quad cable as per IRS

    No. 100 100 965.40 96540.00 96540.00 - - - - 0.00% 0.00%

    40 Supply of PVC conduit pipe 25

    mm of any reputed make.

    Mtr. 500 500 24.19 12095.00 12095.00 - - - - 0.00% 0.00%

    Indoor cable cable termination & cable route marker41 Supply of tinned copper

    conductor, PVC insulated

    a Supply of Switch board cable

    05 pair 0.63 mm

    Mtr. 1000 1000 16.82 16820.00 16820.00 - - - - 0.00% 0.00%

    0.00

    Since 10 nos. of STM

    were installed, so

    only 10 nos. of

    Battery chargers

    were installed

    accordngly.

    10

    0.00Lighting Arrestor was

    already available at

    Test-Room AGC

    12

    0.00

    10

  • 8/12/2019 Final Varia OFC IDH-Bayana

    21/22

    b Supply of Switch board cable

    10 air 0.63 mm

    Mtr. 1000 1000 31.55 31550.00 31550.00 - - - - 0.00% 0.00%

    c Supply of Switch board cable

    20 pair 0.63 mm

    Mtr. 1000 1000 63.07 63070.00 63070.00 - - - - 0.00% 0.00%

    42 Supply of Battery wire in Red &

    Black Colour of 7 strand, each

    Mtr. 400 400 17.27 6908.00 6908.00 - - - - 0.00% 0.00%

    43 Supply & installation of DP

    boxes & termination of cables

    for 20 pair Krone DP along with

    supply of required f ixing

    material

    No. 5 10 362.66 1813.30 3626.60 5 - 1813.30 - 100.00% 100.00% Tall cable were to be

    terminated at Dy.SS

    off ice in sect ion. 10

    nos. of addl. D.P's

    were required for

    termination of cable

    at station.

    44 Supply & installation of DP

    boxes & termination of cables

    No. 10 10 317.21 3172.10 3172.10 - - - - 0.00% 0.00%

    45 Supply of Krone Tool of any

    reputed make. Contractor will

    No. 30 30 778.32 23349.60 23349.60 - - - - 0.00% 0.00%

    46 Supply, fixing and installation of

    RFID electronic marker for S&T

    No. 475 475 2080.00 988000.00 988000.00 - - - - 0.00% 0.00%

    47 Supply of TEC approved

    electronic cable marker locator

    No. 1 1 139725.00 139725.00 139725.00 - - - - 0.00% 0.00%

    DTMF type control equipment, magneto phone

    48 Supply and installation of Desk

    type Electronic Magneto

    Nos. 10 10 2126.52 21265.20 21265.20 - - - - 0.00% 0.00%

    49 Supply & installation of 4 wire

    DTMF type control HQ

    No. 1 1 38221.31 38221.31 38221.31 - - - - 0.00% 0.00%

    50 Supply & installation of 4 wire

    DTMF signaling based way

    No. 10 10 13121.32 131213.20 131213.20 - - - - 0.00% 0.00%

    51 Supply of Universal way side

    DTMF control phone as per

    Nos. 40 40 4347.81 173912.40 173912.40 - - - - 0.00% 0.00%

    52 Supply of Light weight Portable

    Telephone 4 /2 wire as per spec

    Nos. 10 10 1555.62 15556.20 15556.20 - - - - 0.00% 0.00%

    Office Furniture & Miscellanous53 Supply of Chair Model PCH

    7001 (Godrej)or similar

    Nos. 10 10 9123.23 91232.30 91232.30 - - - - 0.00% 0.00%

    54 Supply of chair supior quality

    with arm and can seated of size

    57D X 58W X 88H & Seat

    height of 45mm [Godrej Make &

    Nos. 10 10 2109.76 21097.60 21097.60 - - - - 0.00% 0.00%

    55 Supply of Table Model of size

    1370W x 690D x 740H mm as

    per model no.T-9 of Godrej

    make or Similar.

    Nos. 20 20 8851.57 177031.40 177031.40 - - - - 0.00% 0.00%

  • 8/12/2019 Final Varia OFC IDH-Bayana

    22/22

    56 Supply of Lateral Filing Cabinet

    3ft to store cable route plan,

    jointing details etc.[Godrej

    Nos. 5 5 10698.48 53492.40 53492.40 - - - - 0.00% 0.00%

    57 Supply of Office Almirah of size

    900W x 1168.5H X 450D mm

    as per model no.KD minor with

    Nos. 10 10 19027.25 190272.50 190272.50 - - - - 0.00% 0.00%

    58 Transportation/Carriage by

    truck of various signalling

    materials including loading,

    unloading, operation & Stalling

    at specific depots/locations

    Per

    Ton

    Per

    Km

    18000 0 1.98 35640.00 0.00 - 18000 - 35640.00 -100.00% -100.00% Not operated since

    Transportation of

    material were not

    required.

    59 Supply of CAT-5E UTP cable in

    305 Mtr box (D link make or

    similar)

    Box 3 3 1450.00 4350.00 4350.00 - - - - 0.00% 0.00%

    Total 26058006.97 25681264.42 466462.42 843204.972.1% Below quoted by Contractor -547218.15 -539306.55 -9795.71 -17707.30

    TOTAL COST OF WORK 25510788.82 25141957.86 456666.71 825497.67 -1.45%

    Mandatory certificates: CONTRACTOR'S CERTIFICATE :

    1) There is no loss to railway on account of above variation 1) Certified that we have no claim whatsoever for the work executed in the quantity in excess/less than 25%

    2) There is no undue benefit to the contractor on account of above variation. of schedule and additional item against contract agreement.

    3) Interse position does not change as per enclosed interse position statement. 2) Certified that it is hereby agreed that this variation statement forms part of original agreement referred to above4) It is certified that the quantities executed are final. and on the basis of the same terms and conditions of the agreement.

    OS/W SSO/WA Contractor SSE/T/IDH AESTE/IRPMU/JHS

    SUMMARY.

    Cost of excess variation. 456666.71 Cost of less variation. 825497.67

    Net Variation -368830.96 Less 1.45% on total cost of work i.e. Rs.25510788.82 25141957.86