Form-1 For Environmental Clearance Page 1 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara FORM - 1 (I) Basic Information 1 Name of the Project : SHILPAN BLISS2 Sr. No. in the Schedule : 8 (a) - B 3 Proposed capacity / area / length / tonnage to be handled / command area / lease area/number of wells to be drilled : PLOT AREA: 10,684.20 SQM. BUILT UP AREA : 37,770.98 SQM. 4 New/Expansion/Modernization : NEW 5 Existing capacity / Area etc. : -- 6 Category of project .i.e. ‘ A’ or ‘B’ : B 7 Does it attract the general condition? If Yes please Specify. : NO 8 Does it attract the Specific condition? If Yes please Specify. : NO 9 Location : Plot/Survey/Khasra No. : SURVEY NO. 1790, F.P. /OP NO. 1790, VILLAGE. BHAYLI, TAL. VADODARA, DIST. VADODARA 391410. Village : BHAYLI [TP SCHEME OF VADODARA URBAN DEVELOPMENT AUTHORITY(VUDA)] Tehsil : CITY VADODARA District : VADODARA State : GUJARAT 10 Nearest railway Station / air port With Distance in kms : VADODARA RAILWAY STATION @ 6.5 KM, NE VADODARA DOMESTIC AIRPORT @ 11 KM, NE 11 Nearest Town, City, District Headquarters along with distance in kms. : THE PROPOSED PROJECT SITE COVERED UNDER VADODARA URBAN DEVELOPMENT AUTHORITY (VUDA). 12 Village Panchayat, Zilla Parishad, Municipal Corporation, Local body : VILLAGE: BHAYLI (TP SCHEME OF VUDA) TALUKA: CITY VADODARA, VADODARA, GUJARAT

Upload: duongtram

Post on 20-Jan-2019

219 views

Category:

Documents


0 download

TRANSCRIPT

Form-1 For Environmental Clearance Page 1 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

FORM - 1

(I) Basic Information

1 Name of the Project : ‘SHILPAN BLISS’

2 Sr. No. in the Schedule : 8 (a) - B

3 Proposed capacity / area / length / tonnage to be handled / command area / lease area/number of wells to be drilled

: PLOT AREA:

10,684.20 SQM.

BUILT UP AREA:

37,770.98 SQM.

4 New/Expansion/Modernization : NEW

5 Existing capacity / Area etc. : --

6 Category of project .i.e. ‘ A’ or ‘B’ : B

7 Does it attract the general condition? If Yes please Specify.

: NO

8 Does it attract the Specific condition? If Yes please Specify.

: NO

9 Location :

Plot/Survey/Khasra No. : SURVEY NO. 1790, F.P. /OP NO. 1790, VILLAGE. BHAYLI, TAL. VADODARA, DIST. VADODARA – 391410.

Village : BHAYLI [TP SCHEME OF VADODARA URBAN DEVELOPMENT AUTHORITY(VUDA)]

Tehsil : CITY VADODARA

District : VADODARA

State : GUJARAT

10 Nearest railway Station / air port With Distance in kms

: VADODARA RAILWAY STATION @ 6.5 KM, NE VADODARA DOMESTIC AIRPORT @ 11 KM, NE

11 Nearest Town, City, District Headquarters along with distance in kms.

: THE PROPOSED PROJECT SITE COVERED UNDER VADODARA URBAN DEVELOPMENT AUTHORITY (VUDA).

12 Village Panchayat, Zilla Parishad, Municipal Corporation, Local body

: VILLAGE: BHAYLI (TP SCHEME OF VUDA) TALUKA: CITY VADODARA, VADODARA, GUJARAT

Form-1 For Environmental Clearance Page 2 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

13 Name of the Applicant : MR. ATUL ESOTIA

14 Registered Address

: SHILPAN BLISS, NR. NAVRACHNA UNIVERSITY, BESIDE NILAMBER SERENE, VASNA – BHAYLI, VILLAGE. BHAYLI, TAL. VADODARA, DIST. VADODARA – 391410

15 Address for correspondence : SHILPAN BLISS, NR. NAVRACHNA UNIVERSITY, BESIDE NILAMBER SERENE, VASNA – BHAYLI, VILLAGE. BHAYLI, TAL. VADODARA, DIST. VADODARA – 391410

Name : ATUL ESOTIA

Designation (Owner/Partner/CEO) : PARTNER

Address : SHILPAN BLISS, NR. NAVRACHNA UNIVERSITY, BESIDE NILAMBER SERENE, VASNA – BHAYLI, VILLAGE. BHAYLI, TAL. VADODARA, DIST. VADODARA

Pin Code : 391410

E-Mail : [email protected]

Telephone No. : 9879724822

Fax No. : --

16 Detail of alternative sites examined, if any. Location of these sites should be shown on a topo sheet.

: NO ALTERNATIVE SITE HAS BEEN EXAMINED.

17 Interlinked Projects : NO

18 Whether Separate Application of interlinked project has been Submitted?

: NOT APPLICABLE

19 If Yes, date of submission : NOT APPLICABLE

20 If no, reason : NOT APPLICABLE

21 Whether the proposal involves approval/clearance under: if yes details of the Same and their Status to be given. a) The Forest (Conservation) Act, 1980? b) The Wildlife (protection) Act, 1972? c) The C.R.Z Notification, 1991?

: NOT APPLICABLE

22 Whether there is any Government order/policy relevant/ relating to the site?

: NO

Form-1 For Environmental Clearance Page 3 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

23 Forest land involved (hectares) : NO

24 Whether there is any litigation pending against the project and or land in Which the project is propose to be set up? (a) Name of the Court (b) Case no. (c) Order/directions of the court, if any

and its relevance with the proposed project.

: NO

(II) ACTIVITY

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sr. No.

Information/ Checklist confirmation

Yes / No

Details thereof (with approximate quantities / rates, wherever possible)

with source of information data

1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)

YES

THE PROPOSED PROJECT WILL BE DEVELOPED ON THE N.A. LAND OF BHAYLI AND IN DEVELOPING AREA OF VADODARA CITY WITH CONSTRUCTION OF RESIDENTIAL BUILDING.

THE CONSTRUCTION WILL BE IN CONFORMITY WITH THE REQUIREMENTS OF VADODARA URBAN DEVELOPMENT AUTHORITY (VUDA).

1.2 Clearance of existing land, vegetation and buildings?

NO

THE PROPOSED PROJECT WILL BE DEVELOPED ON BARREN LAND.

1.3 Creation of new land uses?

NO

THE SITE LOCATION WILL BE LOCATED ON N.A. LAND FOR BUILDING CONSTRUCTION PROJECT AND PROJECT WILL BE DEVELOPED IN ACCORDANCE WITH LOCAL DEVELOPMENT PLAN OF VUDA.

1.4 Pre-construction investigations e.g. bore houses, soil testing?

YES

SOIL SAMPLES IS COLLECTED AND ANALYZED FROM DIFFERENT LOCATIONS AT SITE AND THE COPY OF SAME IS ATTACHED IN CONCEPTUAL PLAN.

1.5 Construction works?

YES THE CONSTRUCTION AND BUILDING PROJECT WILL COMPRISE OF RESIDENTIAL UNITS.

Form-1 For Environmental Clearance Page 4 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

1.6 Demolition works? NO

THE SITE IS BARREN LAND. HENCE THERE WILL NOT BE ANY DEMOLITION WORK REQUIRED FOR THE PROJECT.

1.7 Temporary sites used for construction works or housing of construction workers?

NO MOSTLY LOCAL WORKERS WITHIN PROXIMITY OF SITE WILL BE EMPLOYED FOR THE CONSTRUCTION ACTIVITIES.

HOWEVER, SITE OFFICE FOR ABOUT 10 STAFF INCLUDING SECURITY PERSONS WILL BE DEVELOPED WITH SANITATION FACILITIES WITHIN PLOT PREMISES.

NO TEMPORARY RESIDENTIAL FACILITIES REQUIRED FOR THE WORKERS, AS ALL THE WORKERS WERE COMING FROM NEARBY AREA.

1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations

YES THE BUILDING WILL BE COMPRISED OF 7 FLOORS ABOVE THE GROUND.

THE TOTAL BUILT- UP AREA ABOVE GROUND IS 37,770.98 SQM. THESE BUILDING WILL BE LOW RISE BUILDINGS AS PER GDCR AND HAVE MAXIMUM HEIGHT OF 23.80 M.

TOTAL MAXIMUM HEIGHT OF THE BUILDING WILL BE 29.31 M INCLUDING STAIR CABIN AND OHWT.

1.9 Underground works including mining or tunneling?

NO NOT APPLICABLE

1.10 Reclamation works? NO NOT APPLICABLE

1.11 Dredging? NO NOT APPLICABLE

1.12 Offshore structures? NO NOT APPLICABLE

1.13 Production and manufacturing processes?

NO THIS IS CONSTRUCTION ACTIVITY HENCE NO MANUFACTURING PROCESS WILL BE INVOLVED.

1.14 Facilities for storage of goods or materials?

YES CONSTRUCTION MATERIAL LIKE STEEL, CEMENT, SAND, STONE, AAC BLOCKS (AUTOCLAVED AERATED CONCRETE) BLOCKS ETC WILL BE PROCURED FROM LOCAL MARKET, AS AND WHEN REQUIRED AND WILL BE TEMPORARILY STORED AT SITE.

Form-1 For Environmental Clearance Page 5 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

1.15 Facilities for treatment or disposal of solid waste or liquid effluents?

YES WASTEWATER: THE DOMESTIC SEWAGE GENERATED DURING CONSTRUCTION PHASE WILL BE DISPOSED INTO SOAK PIT VIA SEPTIC TANK.

DURING OPERATIONAL PHASE, ESTIMATED TOTAL SEWAGE GENERATED @ 170.0 KLD WILL BE TREATED IN OWN STP OF 190 KLD CAPACITY. TREATED SEWAGE WILL BE REUSED FOR GARDENING @ 5.0 KLD AND 72.5 KLD WILL BE REUSED FOR FLUSHING ACTIVITIES. REMAINING TREATED SEWAGE @ 92.5 KLD WILL BE DISPOSED OFF INTO VUDA DRAINAGE LINE.

SOLID WASTE: THE SOLID WASTE GENERATED DURING OPERATION PHASE WILL BE SEGREGATED INTO RECYCLABLE, NON-RECYCLABLE & HORTICULTURE WASTE. RECYCLABLE WASTE WILL BE SOLD TO SCRAP VENDORS/ RECYCLERS AND REMAINING SOLID WASTE WILLL BE TRANSPORTED DAILY/ REGULARLY TO THE NEAREST COLLECTION POINT DESIGNATED BY VUDA.

STP SLUDGE GENERATED DURING OPERATION PHASE WILL BE USED AS MANURE AFTER COMPOSTING IN HORTICULTURAL ACTIVITY.

1.16 Facilities for long term housing of operational workers?

NO DURING CONSTRUCTION PHASE, WORKERS WILL COME FROM NEARBY AREA. THUS, THERE WILL BE NO NEED OF FACILITIES OF SHORT TERM HOUSING FOR OPERATIONAL WORKER.

1.17 New road, rail or sea traffic during construction or operation?

NO THE PROJECT SITE WILL BE WELL CONNECTED BY 18.0 M WIDE TP ROAD ON SOUTH AND 24 M TP ROAD ON EAST. INTERNAL ROADS HAVING WIDTH OF ABOUT 7.50 M WILL BE PROVIDED DFOR BETTER ACCESS TO PARKING AREA.

THUS, THERE WILL BE NO REQUIREMENT OF NEW ROAD FOR THE PROPOSED PROJECT.

1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes

NO THE SITE IS SITUATED AT BHAYLI VIILAGE IN DEVELOPING AREA OF VADODARA CITY. TP ROADS PROPOSED ON ONE SIDES

Form-1 For Environmental Clearance Page 6 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

and stations, ports, airports etc? OF THE PROJECT SITE WITH 18.0 M. IT WILL BE SUFFICIENT TO TAKE CARE OF THE TRAFFIC INCREASE DUE TO THE PROJECT.

1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?

NO THERE WILL NOT BE ANY CLOSURE OR DIVERSION OF EXISTING TRANSPORT ROUTES OR INFRASTRUCTURE CHANGES DUE TO PROPOSED PROJECT.

1.20 New or diverted transmission lines or pipelines?

NO THERE IS NO NEED TO DIVERT ANY TRANSMISSION LINES OR PIPELINES.

1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?

NO

THERE WILL BE NO MAJOR CHANGE TO THE HYDROLOGY OF WATER COURSES OR AQUIFIERS.

1.22 Stream crossings? NO NOT REQUIRED

1.23 Abstraction or transfers of water form ground or surface waters?

NO DURING CONSTRUCTION AND OPERATION PHASE, WATER SUPPLY WILL BE MET THROUGH PRIVATE TANKERS.

1.24 Changes in water bodies or the land surface affecting drainage or run-off?

NO THE PROJECT WILL BE INVOLVED IN CONSTRUCTION OF PAVED AREAS AND HENCE THE QUANTITY OF RUNOFF INCREASED DUE TO REDUCED INFILTRATION. THIS RUNOFF WILL BE COLLECTED THROUGH A WELL-DESIGNED NETWORK OF STORM/SURFACE WATER DRAIN AND USED FOR ARTIFICIAL RECHARGE OF AQUIFERS WITHIN THE PREMISES. THUS, STORM WATER DRAINAGE WILL NOT BE AFFECTED.

1.25 Transport of personnel or materials for construction, operation or decommissioning?

YES TRUCKS / TEMPOS WILL BE USED FOR TRANSPORTING CONSTRUCTION MATERIAL DURING CONSTRUCTION PHASE.

1.26 Long-term dismantling or decommissioning or restoration works?

NO NOT APPLICABLE

1.27 Ongoing activity during decommissioning which could have an impact on the environment?

NO NOT APPLICABLE

Form-1 For Environmental Clearance Page 7 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

1.28 Influx of people to an area in either temporarily or permanently?

YES DURING CONSTRUCTION PHASE, APPROX 60 WORKERS PER DAY WILL BE EMPLOYED TEMPORARILY AND WILL BE MOSTLY HIRED WITHIN PROXIMITY OF THE SITE THROUGH CONTRACTOR. AS THE PROJECT WILL INVOLVE CONSTRUCTION OF RESIDENTIAL UNITS, DURING OPERATION PHASE IT WILL CAUSE TEMPORARILY INFLUX OF VISITORS.

1.29 Introduction of alien species? NO NOT APPLICABLE.

1.30 Loss of native species or genetic diversity?

NO NONE

1.31 Any other actions? NO NONE

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Sr. No.

Information / checklist confirmation

Yes/ No Details thereof (with approximate

quantities /rates, wherever possible) with source of information data

2.1 Land especially undeveloped or agricultural land (ha).

NO

ON THE BARREN N.A. LAND THE PROJECT SITE WILL BE LOCATED ON SURVEY NO: 1790, F.P./ OP NO. 1790, VILLAGE. BHAYLI, TAL. VADODARA, DIST. VADODARA - 391410 AND DEVELOPED IN ACCORDANCE WITH VUDA.

2.2 Water (expected source & competing users) unit: KLD

YES DURING CONSTRUCTION PHASE WATER REQUIREMENT @ 42.0 KLD WILL BE MET THROUGH OWN PRIVATE TANKERS WHILE DURING OPERATION PHASE FRESH WATER REQUIREMENT @ 141.5 KLD WILL BE MET THROUGH BORE WELL TILL IT GET PERMISSION FROM VUDA, ONCE IT GETS PERMISSION FROM VUDA, BORE WELL WILL BE CONVERTED INTO RECHARGE WELL.

2.3 Minerals (MT) NO NOT APPLICABLE

Form-1 For Environmental Clearance Page 8 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

2.4 Construction material: stone, aggregates, sand / soil (expected source – MT)

YES ALL THE CONSTRUCTION MATERIALS WILL BE PROCURED FROM THE LOCAL MARKET AND TRANSPORTED BY ROAD.

STEEL, MT : 1600

CEMENT, MT : 2300

AGGREGATE, MT : 7600

SAND, MT : 2800

2.5 Forests and timber (source – MT) NO NO TIMBER WAS USED IN THE CONSTRUCTION.

2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)

YES DURING OPERATION PHASE POWER REQUIREMENT IS ESTIMATED TO BE 2500 KVA

THE POWER RQEQUIREMENT WILL BE SOURCED FROM MADHYA GUJARAT VIJ CO. LTD. (MGVCL).

EMERGENCYPOWER REQUIREMENTS WILL BE MET THROUGH ONE D.G. SET OF 250 KVA WHERE DIESEL WILL BE UTILIZED @ 50 LIT/HR.

2.7 Any other natural resources (use appropriate standard units)

YES SOLAR PANELS WILL BE INSTALLED OF 92 KW.

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sr. No.

Information / Checklist confirmation

Yes/ No Details thereof (with approximate

quantities/rates, wherever possible) with source of information data

3.1

Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

NO AS THE PROPOSED PROJECT IS FOR CONSTRUCTION OF RESIDENTIAL BUILDING THERE WILL BE NO STORAGE OF HAZARDOUS CHEMICALS AS PER MSIHC RULES.

3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)

NO THERE WILL BE NO CHANCE OF OCCURRENCE OF DISEASES AS THE SOLID WASTE GENERATED HAS BEEN MANAGED AS PER MUNICIPAL SOLID WASTE (MANAGEMENT AND HANDALLING) RULES 2000.

THE CONSTRUCTION AREA WILL BE KEPT CLEAN AND FREE FROM DISEASE VECTORS.

Form-1 For Environmental Clearance Page 9 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

3.3 Affect the welfare of people e.g. by changing living conditions?

YES DURING CONSTRUCTION PHASE, TEMPORARY EMPLOYMENT OPPORTUNITY WILL BE GENERATED WITHIN PROXIMITY OF THE SITE.

DURING OPERATION PHASE COMMUNITY WILL GET WELL DEVELOPLED LIVING ATMOSPHERE, WHICH WILL ENHANCE THE SOCIO-ECONOMIC UPLIFTMENT OF THE AREA.

3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.,

NO NOISE AND AIR POLLUTION CONTROL MEASURES WILL BE TAKEN SO AS TO CAUSE NO HARM TO NEAR BY RESIDENTS.

3.5 Any other causes

NO --

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sr. No.

Information / Checklist confirmation

Yes / No

Details thereof (with approximate quantities/rates, wherever possible)

with source of information data

4.1 Spoil, overburden or mine wastes YES SOIL GENERATED DURING THE EXCAVATION FOR FOOTINGS AND FOUNDATION @ 7,000 m

3 WHICH WILL

BE BACKFILLED, WHEREVER REQUIRED, WITHIN THE PROJECT SITE OR IN THE NEARBY LOW LAYING AREA WITH PRIOR PERMISSION FROM LAND OWNER.

TOP COVER OF THE SOIL WILL BE PRESERVED AND USED FOR DEVELOPING GREEN COVER.

4.2 Municipal waste (domestic and or commercial wastes)

YES THE MUNICIPAL SOLID WASTE GENERATED DURING OPERATION PHASE WILL CONSIST OF

ORGANIC WASTE:

HORTICULTURE WASTE

INORGANIC WASTE:

PAPERS, CARTONS, THERMOCOL, PLASTIC, POLYTHENEBAGS AND GLASSES ETC

THE SOLID WASTE GENERATED WILL BE APPROXIMATELY 252 KGS/DAY EXCLUDING STP SLUDGE. APPROXIMATELY 500 KG/DAY OF STP

Form-1 For Environmental Clearance Page 10 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

SLUDGE WILL BE GENERATED.

THE RECYCLABLE INORGANIC WASTE WILL BE SOLD OFF TO RECYCLERS AND NON RECYCLABLE SOLID WASTE GENERATED WILL BE DAILY / REGULARLY TRANSFERRED TO THE NEAREST DESIGNATED COLLECTION POINT OF VUDA FOR DISPOSAL.

4.3 Hazardous wastes (as per Hazardous Waste Management Rules)

YES THE ONLY HAZARDOUS WASTES IN THE PROJECT WILL BE USED/SPENT OIL FROM STANDBY DG SET, WHICH IS CLASSIFIED AS HAZARDOUS WASTE CATEGORY 5.1 AS PER HAZARDOUS WASTES (MANAGEMENT AND HANDLING) AMENDMENT RULES, 2016. THE QUANTITY OF SPENT OIL WILL BE APPROX. 0.1 KL/YEAR. THE SPENT OIL WILL BE CAREFULLY STORED IN HDPE DRUMS UNDER ISOLATED STORAGE, AND PERIODICALLY SOLD TO AUTHORIZE RECYCLERS. ALL PRECAUTIONS WILL BE TAKEN TO AVOID SPILLAGE DURING THE STORAGE & HANDLING.

4.4 Other industrial process wastes NO NOT APPLICABLE

4.5 Surplus product NO NOT APPLICABLE

4.6 Sewage sludge or other sludge from effluent treatment

NO DURING CONSTRUCTION PHASE THERE WILL BE NO GENERATION OF SEWAGE SLUDGE AS THE ENTIRE QUANTITY OF THE DOMESTIC WASTEWATER GENERATED WILL BE DISPOSED INTO SOAK PIT THROUGH SEPTIC TANK. DURING OPERATION PHASE, ENTIRE SEWAGE WILL BE TREATED INTO STP. SLUDGE GENERATED FROM STP WILL BE USED AS MANURE AFTER COMPOSTING IN HORTICULTURE ACTIVITY.

Form-1 For Environmental Clearance Page 11 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

4.7 Construction or demolition wastes YES THE CONSTRUCTION WASTE WILL CONSIST OF EXCESS EARTH AND CONSTRUCTION DEBRIS ALONG WITH CEMENT BAGS, STEEL IN BITS AND PIECES, INSULATING AND PACKAGING MATERIALS ETC. EXCESS EARTH AND CONSTRUCTION DEBRIS WILL BE REUSED FOR BACKFILLING IN THE SAME PREMISES OR IN THE NEARBY LOW LAYING AREA WITH PRIOR PERMISSION FROM LAND OWNER. CEMENT BAGS, WASTE PAPER AND CARDBOARD PACKING MATERIAL WILL BE SOLD OFF TO RECYCLERS. UNUSABLE STEEL SCRAP WERE ALSO COLLECTED AT SITE AND SOLD TO RECYCLERS.

4.8 Redundant machinery or equipment

NO NOT APPLICABLE

4.9 Contaminated soils or other materials

NO NOT APPLICABLE

4.10 Agricultural wastes

YES THE HORTICULTURAL WASTE GENERATED BY LAWN & TREES TRIMMING DURING THE OPERATION PHASE WILL BE DAILY / REGULARLY TRANSFERRED TO THE NEAREST DESIGNATED COLLECTION POINT OF VUDA FOR DISPOSAL.

4.11 Other solid wastes NO NOT APPLICABLE

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Sr. No.

Information/Checklist confirmation

Yes / No

Details thereof (with approximate quantities/rates, wherever possible)

with source of information data

5.1 Emissions from combustion of fossil fuels from stationary or mobile sources

YES THERE WILL BE GENERATION OF FLUE GAS EMISSION FROM DIESEL OPERATED MACHINERY IN CONSTRUCTION PHASE.

THERE WILL BE FLUE GAS EMISSION FROM THE STACKS ATTACHED TO STAND BY D.G.SET. HOWEVER, ADEQUATE STACK HEIGHT OF 9.0 M FOR DG SET OF CAPACITY 250 KVA FOR PROPER DISPERSION OF POLLUTANT INTO

Form-1 For Environmental Clearance Page 12 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

THE ATMOSPHERE WILL BE PROVIDED.

5.2 Emissions from production processes.

NO AS THE PROPOSED PROJECT IS A BUILDING CONSTRUCTION PROJECT, NO PRODUCTION ACTIVITY WILL BE INVOLVED.

5.3 Emissions from materials handling including storage or transport

YES THERE WILL BE CHANCES OF FUGITIVE EMISSION DURING THE VARIOUS ACTIVITIES IN CONSTRUCTION PHASE.

HOWEVER, ADEQUATE CONTROL MEASURES LIKE WATER SPRINKLING, PROVISION OF WIND CURTAIN COVERED STORAGE ETC. WILL BE ADOPTED TO REDUCE THE CHANCES OF FUGITIVE EMISSION.

5.4 Emissions from construction activities including plant and equipment

YES

THE EMISSION FROM THE CONSTRUCTION ACTIVITIES HAS BEEN ESTIMATED USING AN EMISSION FACTOR OF 1.2 TONS OF SPM/MONTH/ACRE AS PER AP-42 SECTION 13.2.3.3 (US EPA-1995).

WATER SPRINKLING WILL BE CARRIED OUT AND WIND CURTAIN WILL BE PROVIDED FOR DUST SUPPRESSION.

5.5 Dust or odours from handling of materials including construction materials, sewage and waste

YES THERE WILL BE FORMATION OF DUST DURING LOADING/ UNLOADING AND HANDLING OF CONSTRUCTION MATERIAL. HOWEVER, ADEQUATE CONTROL MEASURES AS MENTIONED ABOVE WILL BE ADOPTED

NO ODOUR FROM THE SOLID WASTE AS THERE WILL BE NO STACK /STORAGE OF SOLID WASTE GENERATED FROM THE PROJECT.

5.6 Emissions from incineration of waste

NO

NOT APPLICABLE

5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris)

NO NO OPEN BURNING WILL BE CARREID OUT WITHIN THE PREMISES.

5.8 Emissions from any other sources NO NOT ENVISAGED

Form-1 For Environmental Clearance Page 13 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

6. Generation of Noise and Vibration and Emissions of Light and Heat:

Sr. No.

Information/Checklist confirmation

Yes / No

Details thereof (with approximate quantities/rates, wherever possible)

with source of information data

6.1 From operation of equipment e.g. engines, ventilation plant, crushers

YES THE MAIN SOURCE OF NOISE WILL BE STANDBY DG SETS WHICH WILL BE OPERATED ONLY IN CASE OF POWER FAILURE.

THE ADVANCED & LOW NOISE DG SETS WILL BE INSTALLED.

THE PROPOSED D.G. SETS WILL BE LOCATED STRATEGICALLY AND HOUSED IN ACOUSTIC ENCLOSURES SO THAT NO ADVERSE IMPACT WILL BE CAUSED.

6.2 From industrial or similar processes

NO NOT APPLICABLE

6.3 From construction or demolition YES NOISE WILL BE GENERATED DURING CONSTRUCTION AND TRANSPORTATION ACTIVITIES BUT IT WILL BE FOR SHORT TERM ONLY. THE NOISE LEVELS LIKELY TO BE GENERATED FROM THE CONSTRUCTION EQUIPMENT AT A DISTANCE OF 50 FT FROM THE SOURCE ARE GIVEN BELOW:

CONCRETE MIXER TRUCK

: 82- 87 dB

MOBILE CRANES : 80-85 dB

HAMMERING : 85-90 dB

LOADER : 79-86 dB

6.4 From blasting or piling NO NO BLASTING OR PILING WILL BE CARRIED OUT AT PROJECT SITE.

6.5 From construction or operational traffic

YES

DURING CONSTRUCTION NOISE WILL BE GENERATED DUE TO CONSTRUCTION ACTIVITY BUT IT WILL BE SHORT TERM.

DURING OPERATIONAL ACTIVITIES NOISE WILL BE GENERATED DUE TO TRAFFIC BUT THERE WILL NOT BE ANY SIGNIFICANT INCREASE IN THE NOISE DUE TO THE PROPOSED PROJECT.

6.6 From lighting or cooling systems NO NOT ENVISAGED

Form-1 For Environmental Clearance Page 14 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

6.7 From any other sources NO NOT ENVISAGED

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Sr. No.

Information/Checklist confirmation

Yes / No

Details thereof (with approximate quantities / rates, wherever possible)

with source of information data

7.1 From handling, storage, use or spillage of hazardous materials.

YES THE ONLY HAZARDOUS WASTES IN THE PROJECT WILL BE USED/WASTE OIL FROM STANDBY DG SETS. THE USED OIL WILL BE CAREFULLY STORED IN HDPE DRUMS UNDER ISOLATED STORAGE, AND PERIODICALLY SOLD TO REGISTERED RECYCLERS.

ALL PRECAUTIONS WILL BE TAKEN TO AVOID SPILLAGE DURING STORAGE & HANDLING.

7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)

NO THERE WILL BE NO RISK OF LAND/WATER CONTAMINATION BECAUSE THE DOMESTIC WASTEWATER DURING CONSTRUCTION PHASE WILL BE DISPOSED INTO SOAK PIT AND DURING OPERATION PHASE SEWAGE WILL BE TREATED INTO OWN STP AND TREATED SEWAGE WILL BE REUSED FOR GARDENING AND FLUSHING ACTIVITIES. REMAINING TREATED SEWAGE @ 79.5 KLD WILL BE DISPOSED OFF INTO VUDA DRAINAGE LINE.

7.3 By deposition of pollutants emitted to air into the land or into water

NO ONE DG SET OF 250 KVA WILL BE PROVIDED WITH STACK (HEIGHT @ 9.0 M) IN CASE OF MAIN POWER FAILURE. THESE STACKS HEIGHT IS ADEQUATE TO DISPERSE THE POLLUTANTS EFFECTIVELY IN THE ATMOSPHERE.

7.4 From any other sources NO NO ENVISAGED

7.5 Is there a risk of long term build up of pollutants in the environment from these sources?

NO NO ENVISAGED

Form-1 For Environmental Clearance Page 15 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Sr. No.

Information/Checklist confirmation

Yes / No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data

8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances

NO THERE WILL NOT BE ANY CHANCE OF EXPLOSION & FIRE DUE TO HAZARDOUS SUBSTANCE EXCEPT ACCIDENTAL SPILLAGES OF DIESEL USED IN DG SET OPERATION DURING EMERGENCY.

ADEQUATE SAFETY MEASURE AND ADEQUATE FIRE FIGHTING SYSTEM WILL BE PROVIDED. DURING CONSTRUCTION ACTIVITY SOME PRIMARY MEASURES WILL BE TAKEN AND ALSO PROVIDE FIRST AID BOX AT SITE AS PER NORMS IN NATIONAL BUILDING CODE OF INDIA, PART IV 2005.

8.2 From any other causes NO --

8.3 Could the project be affected by natural disasters causing environmental damage (e.g. Floods, earthquakes, landslides, cloudburst etc)?

YES

AS PER THE EARTHQUAKE SENSITIVITY INDEX, THE PROJECT AREA IS SITUATED IN ZONE- III HAVING MODERATE DAMAGE RISK ZONE (MSK- VII).

THE STRUCTURE DESIGN WILL BE AS PER CODES TO NEGATE THE THREAT OF ENVIRONMENTAL AND OTHER DAMAGES.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Sr. No.

Information/Checklist confirmation

Yes / No

Details thereof (with approximate quantities/rates, wherever possible)

with source of information data

9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.:

YES

AS THIS IS BUILDING CONSTRUCTION PROJECT FOR RESIDENTIAL PURPOSE, IT LEADS TO FURTHER DEVELOPMENT OF SURROUNDING AREA. BUILDING INFRASTRUCTURE AND

Form-1 For Environmental Clearance Page 16 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

• Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)

• Housing development • Extractive industries • Supply industries • Others

INTERNAL INFRASTRUCTURE WILL BE DEVELOPED AS PER THE GDCR NORMS TO EMIT MINIMUM POLLUTION INTO THE ATMOSPHERE.

9.2 Lead to after-use of the site, which could have an impact on the environment

NO NOT APPLICABLE

9.3 Set a precedent for later developments

YES AS THIS IS BUILDING CONSTRUCTION PROJECT FOR THE RESIDENTIAL PURPOSE WHICH LEADS TO FURTHER DEVELOPMENT OF SURROUNDING AREA.

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

NO THE PROJECT SITE WILL BE LOCATED ON SURVEY NO: 1790, F.P. NO./OP NO. 1790, VILLAGE. BHAYLI, TAL. VADODARA, DIST. VADODARA – 391410 AND DEVELOPED IN ACCORDANCE WITH VUDA.

(III) ENVIRONMENTAL SENSITIVITY

Sr. No.

Areas Name / Identity

Aerial distance (within 15 km.) Proposed project location boundary

1 Areas protected under international conventions, national/ local legislation for their ecological, landscape, cultural or other related value.

NONE NOT CONCERNED

2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

NONE NOT CONCERNED

3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

NONE NOT CONCERNED

Form-1 For Environmental Clearance Page 17 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara

4 Inland, coastal, marine or underground waters

YES VISHWAMITRA RIVER @ 6.0 KM SW

5 State, National boundaries

NONE NO STATE OR NATIONAL BOUNDARIES FALL WITHIN 15 KM OF THE PROJECT SITE.

6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas

NONE NOT CONCERNED

7 Defense installations NONE NOT CONCERNED

8 Densely populated or built-up area YES THE PROJECT SITE ITSELF IS SITUATED WITHIN THE DENSELY POPULATED AREA OF VADODARA CITY.

9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)

YES LAKSHMI VILLAS PALACE @ 7.0 KM,

EAST

10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

NONE NOT CONCERNED

11 Areas already subjected to pollution or environmental damage. (Those where existing legal environmental standards are exceeded)

NONE NOT CONCERNED

12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

NONE PROJECT AREA IS CATEGORIZED IN THE SEISMIC ZONE III, WHICH IS CLASSIFIED AS HAVING A FAIRLY MEDIUM PROBABILITY OF EARTHQUAKE SHOCKS MEASURING 4 - 6 ON THE RICHTER SCALE. THE STRUCTURE DESIGN IS AS PER CODES TO NEGATE THE THREAT OF ENVIRONMENTAL AND OTHER DAMAGES.

"I hereby given undertaking that the data and information given in the

application and enclosures are true to the best of my knowledge and belief and

I'm aware that if any part of the data and information submitted is found to be

false or misleading at any stage, the project will be rejected and clearance give,

if any to the project will be revoked at our risk and cost."

PAVITRA INFRA Place

Date

VADODARA

09/01/2019

Signature

DeSignation

~~artner PARTNER

Name of Applicant ATUL ISOTIYA

Form-1 For Environmental Clearance Page 18 of 18 SHILPAN BLISS, Developer: Pavitra Infra, Vadodara