DESCRIPTION

Generator Reactive Capability. Demonstration Testing Summer 2003 Rich Burke Pete Harris Steve Smith Rick Paliuca. Generator Reactive Capability Agenda. Background of the Program Communications - Who to Contact to Schedule Test Conducting a Test - Coordination and Logging Requirements - PowerPoint PPT Presentation

TRANSCRIPT

1

ISO New England Operations Training

Department Presentation

Generator Reactive CapabilityGenerator Reactive Capability

Demonstration Testing

Summer 2003

Rich Burke

Pete Harris

Steve Smith

Rick Paliuca

2

ISO New England Operations Training

Department Presentation

Generator Reactive CapabilityGenerator Reactive CapabilityAgendaAgenda

Background of the Program Communications - Who to Contact to Schedule Test Conducting a Test - Coordination and Logging

Requirements Submittal of Data - How to Send Data to Receive

Compensation Alternatives to Conducting a Test – Waivers Failure to Conduct a Test - What Happens? Reactive Program Contact List – Satellite and ISO

Contacts Supporting Documents

3

ISO New England Operations Training

Department PresentationBackground of the ProgramBackground of the Program

August 2001 – Under Schedule 2 of the NEPOOL Open Access Transmission Tariff (NOATT) Eligible Generator Reactive Capability began to be paid based on NX-12D and NX-9B claimed capability. Eligibility requirement – Generator must be in the ISO-NE

Market System and have valid NX-12D forms and NX-9B data on file. This information can be found in OP-14 and 16 at: http://www.iso-ne.com/smd/operating_procedures/

Payments are allocated to the Generator based on the claimed capability of the Generator to deliver VARS to the Transmission System. This payment is an annual flat rate (Rate for 2003, $1.00 per kVAR – yr).

4

ISO New England Operations Training

Department PresentationBackground of the ProgramBackground of the Program

Stipulation of this payment program - Within 2 years, (Summer 2003) Generators are required to conduct a demonstration test to continue to qualify for payment. New Generators receive a grace period of 2 years.

These demonstration tests will become the basis for the claimed capability data represented by the NX-12D and NX-9B documentation.

5

ISO New England Operations Training

Department PresentationBackground of the ProgramBackground of the Program

Prior to requesting a demonstration: current, verified NX-12D forms and NX-9B data must be on file with the ISO and the generator has to be in the Market system. Demonstration tests must be conducted within the following parameters: June 1st through September 15th Test must be conducted during on-peak hours

Monday through Friday, 08:00 to 22:00 Generator must be at Summer-Seasonal Claimed Capability

(S-SCC) MW output. Maximum Lagging VAR sustained for one hour.

6

ISO New England Operations Training

Department PresentationBackground of the ProgramBackground of the Program

The intent in setting these testing parameters is to closely simulate seasonal system conditions when additional Generator VAR capability would be called upon. This is a test to demonstrate VAR capability with

the Generator at S-SCC output, even though more VARs could be produced at a lower MW level.

7

ISO New England Operations Training

Department PresentationBackground of the ProgramBackground of the Program

Requested timing of the test is at the discretion of the Generator.

Max lagging VARs must be demonstrated while the Generator is at its S–SCC MW output, for 1 hour.

Generator can submit Market bids that will economically ramp and hold the Generator at the S-SCC level for the duration of the test OR self schedule. The Generator will be subject to system reliability or economic

dispatch instructions while testing. If unable to sustain the test parameters, the test will be deemed

invalid and the Generator must request to be re-scheduled.

8

ISO New England Operations Training

Department PresentationBackground of the ProgramBackground of the Program

This is not a Claimed (MW) Capability Audit.

Demonstration test will be valid for five years.

If changes (upgrade or downgrade) are made in the Generators reactive capability, a new demonstration test will be required.

For future reference. Proposed testing requirements in five years will include

multi-point demonstrations, lagging and leading. Many details yet to be drafted and NEPOOL approval must

be obtained.

9

ISO New England Operations Training

Department PresentationBackground of the ProgramBackground of the Program

New England Transmission System voltage control is under the jurisdiction of the Master Satellites. CONVEX Maine New Hampshire REMVEC

All requests for a demonstration test must be made through the Satellite in which the Generator is located.

10

ISO New England Operations Training

Department PresentationBackground of the ProgramBackground of the Program

Demonstration tests must be requested five business days in advance of the date desired. The Satellite will conduct Transmission System

Studies. The Satellite will coordinate System Studies with

the ISO for Generators at 25 MW and higher. The Satellite will respond to the Generator no later

than two days prior to the requested date. If approved the Satellite will notify the Generator. If denied the Satellite will inform the Generator of

the reason and suggest a more suitable time to request a test.

11

ISO New England Operations Training

Department PresentationCommunications Communications

Request a demonstration test from the Satellite. Current verified NX-12D and NX-9B information

must be on file with the ISO. The Satellites have access to this information and will refuse a Generator not meeting this requirement.

Demonstration Test Request Form can be found at http://www.iso-ne.com/Generator_VAR_Capability/

Complete this form and submit to the appropriate Satellite, email or fax.

Satellite contact information is included on the form. Contact ISO at [email protected] if unclear of

which Satellite your Generator is located.

12

ISO New England Operations Training

Department PresentationCommunications Communications

All Generators must send in Demonstration Test Request Form to their Satellite.

Units > 25 MW Satellite submits to ISO via Outage Scheduler. Requires Satellite and ISO approval.

Units < 25 MW Satellites submits to ISO via Appendix A Report. Requires Satellite approval only.

13

ISO New England Operations Training

Department PresentationConducting a TestConducting a Test

Well in advance (but no later than 1 hour) prior to the time scheduled for the test, contact the Satellite to confirm arrangements. This will allow the Satellite to evaluate and assure

system conditions are appropriate for the test. If required, the Satellite will contact ISO New England for coordination.

Under some conditions the Satellite may need to configure other reactive sources to accommodate your test.

14

ISO New England Operations Training

Department PresentationConducting a TestConducting a Test

Recording the Test Data During the test, the Generator is required to fill out

the “Reactive Capability Test Data Recording Form.”

This form requests VAR output data on a five minute interval for the duration of the one-hour test at several metering points (if available).

15

ISO New England Operations Training

Department Presentation

Generator

GeneratorBus

TransmissionBus

GeneratorStep Up Transformer

(GSU)

Auxiliary Load(Station Service)

1 2 3

4

Configuration #1

Reactive Capability Test Data Reactive Capability Test Data Recording Form Recording Form Corresponding VAR Metering PointsCorresponding VAR Metering Points

16

ISO New England Operations Training

Department Presentation

Reactive Capability Test Data Reactive Capability Test Data Recording Form Recording Form Corresponding VAR Metering PointsCorresponding VAR Metering Points

Generator

GeneratorBus

TransmissionBus

GeneratorStep Up Transformer

(GSU)

Auxiliary Load(Station Service)

5 6 7

8

Configuration #2

17

ISO New England Operations Training

Department PresentationConducting a TestConducting a Test

At the conclusion of the one-hour test, contact the Satellite prior to returning to normal voltage schedule. The Satellite may need to coordinate with the ISO,

and other reactive resources to return the Transmission System to normal conditions.

18

ISO New England Operations Training

Department PresentationConducting a TestConducting a Test

The Generator, Satellites and the ISO have the authority to cancel a test at anytime. Generator - to protect Generator equipment. Satellite - to protect local transmission system

reliability. ISO - to protect regional transmission system

reliability and economic dispatch.

A cancelled test must be re-scheduled by the Generator via a new Request.

19

ISO New England Operations Training

Department PresentationSubmittal of DataSubmittal of Data

Within two business days of successfully conducting a test the Generator must submit the Reactive Capability Test Data Recording Form to the ISO: via email: [email protected]

or via fax 413-535-4399

20

ISO New England Operations Training

Department PresentationSubmittal of DataSubmittal of Data

The ISO will review this information and may verify data through various means. If there are discrepancies the ISO will contact the

Generator. If the demonstration data indicates the need for

revised NX-12D forms and /or NX9-B data to be submitted the ISO will contact the Generator.

Upon validation of all required data, the ISO will inform the Generator and the demonstrated Reactive Capability will be effective with the next monthly billing cycle.

21

ISO New England Operations Training

Department Presentation

Alternatives to Conducting a Alternatives to Conducting a Test - WaiversTest - Waivers

All Generators must request a test, however the Satellites and/or the ISO may identify when waivers apply due to transmission system conditions prohibiting a test. The evaluation of Generator requests will identify cases where the waiver applies. Contingency Conditions

Typically a large Generator, where in order to conduct a demonstration test, the transmission system would be subjected to adverse conditions for the Generator to be allowed to produce max lagging VARs. This Generator would be capable of producing max lagging VARs in response to Contingency Conditions and should be compensated at this level.

The ISO will contact the Generator when this applies and request certain data necessary to simulate Generator capability in Transmission System Studies. Eligible Capability will be based on these System Studies.

22

ISO New England Operations Training

Department Presentation

Alternatives to Conducting a Alternatives to Conducting a Test - WaiversTest - Waivers

Small Generators Generators located where there is limited metering

of the surrounding Transmission System that make it difficult for the Satellite or the ISO to monitor system voltage to assure system reliability during the test.

Typically Generators that are connected to the local distribution system.

The Satellite will contact the Generator when this applies and also notify the ISO. Eligible Capability will be based on the data submitted through the NX-12D forms and NX-9B data.

23

ISO New England Operations Training

Department Presentation

Alternatives to Conducting a Alternatives to Conducting a Test - WaiversTest - Waivers

Submittal of Historical Data For the initial single point test, Reactive data

collected within the previous five (5) years will be admissible.

Data must be presented in the form of Generator recording logs (strip charts, etc.).

Must have been collected in a timeframe consistent with demonstration testing requirements (on-peak hours, June 1st to September 15th, etc.).

Submit this data directly to the ISO, by e-mail, fax or mail (see ISO contact page).

The ISO will evaluate the request and notify the Generator of acceptance or denial.

24

ISO New England Operations Training

Department Presentation

Failure to Conduct a Test – Failure to Conduct a Test – What Happens? What Happens?

The ISO will monitor all requests for a test - approved, denied or cancelled. After September 15th, the ISO will evaluate each

Generator’s status in the program. Generators that satisfied the test requirements (through

demonstration, historical data or waiver) will be established in the program for five years.

Generators that attempted to conduct a test on several occasions, yet through circumstances beyond their control (system conditions or Satellite/ISO limitations) were unable to complete a test, will continue to be compensated based on the NX-12D and NX9B data submitted until they demonstrate during the next Audit Season (i.e., 2004).

25

ISO New England Operations Training

Department Presentation

Failure to Conduct a Test – Failure to Conduct a Test – What Happens?What Happens?

Generators that do not diligently attempt to request a test or repeatedly cancel a test at their own discretion, will not be eligible for capability payment under this program until such time that they satisfactorily conduct a test.

26

ISO New England Operations Training

Department Presentation

Reactive Program Contact List Reactive Program Contact List ISO-NE ContactsISO-NE Contacts

ISO-NE Email: mvarcaptest@iso-neFax: 413-535-4399

Mailing Address: ISO New EnglandOne Sullivan Rd.Holyoke, MA 01040

Attn: Serafima Bykhovskaya

Serafima Bykhovskaya Engineer 413-535-4195 [email protected] Ingrid Canaday Scheduler 413-535-4359

[email protected]  Dave Bertagnoli Tech Lead 413-535-4330

[email protected] Peter Harris Process 413-535-4385

[email protected]

27

ISO New England Operations Training

Department Presentation

Reactive Program Contact List Reactive Program Contact List Satellite ContactsSatellite Contacts

CONVEX Transmission Coordinator 860-665-4943

[email protected] FAX 860-594-6000  

MaineArt Higgins, Control Room Supervisor [email protected] FAX 207-626-9549 

New HampshireJames McAndrew, System Ops. Cord. [email protected] FAX 603-634-3571

REMVEC REMVEC Operations 800-382-7260

800-423-6029 508-389-2491FAX 508-389-3297

28

ISO New England Operations Training

Department Presentation

Supporting Documents and Supporting Documents and Reactive Information Web LinksReactive Information Web Links

Reactive Capability Demonstration Web Site http://www.iso-ne.com/Generator_VAR_Capability

Supporting Documents NEPOOL Open Access Transmission Tariff – Schedule 2.

http://www.iso-ne.com/FERC/filings/Index_NOATT.html REACTIVE SUPPLY AND VOLTAGE CONTROL FROM

GENERATION SOURCES SERVICE BUSINESS PROCEDURE.

http://www.iso-ne.com/settlement-resettlement/Schedule_2_VAR_Billing_Procedure_SMD.doc