group 1 generationofclimateinformationfor applicationandadaptation joseboninsegna, jean-philippe...
TRANSCRIPT
Group 1GenerationofClimateInformationfor
ApplicationandAdaptation
JoseBoninsegna, Jean-Philippe Boulanger, Andrea Carril, Elvira Gentile, Hervé Le Treut, Laurent Li, Claudio Menéndez, Mario Nuñez, Pablo Ristori, Celeste Saulo, Silvina Solman
• Mainsuggestion:– Define
thestudyobject, takingintoaccountregions/sectors more vulnerable toweather/climate
• Sectors:– Hydropower– Agriculture– Tourism (snow)– Insurance
• Seamlessinformationtopredicton a varietyof time scales (weather, seasonal, decadal, CC) weather/climaterisks AND adaptationstrategies
Suggestedmethodology• Identifykeystakeholderstobuildtherationaleoftheproject
(bootom-up)
• Integratedprojectcombiningtheoreticaldevelopments (Andes), modeldevelopments/improvements (seelater), methods, social studiesandcustomizedproducts (bottom-up/top-down=interactions)
• Pilote studytobuildanintegrated/appliedmethodologyadressingclimate/weatherriskswithstakeholdersfromthestart: Theobjectiveisto define how thingsshould be done in termsofprovidingclimateservices.
SpecificModellingTopics
• Snow (pack, melt,…) + Glaciars• Inclusionofdynamicvegetation• Effectofmountain-drag convection• Snowcoverobservations (satellite+in-situ)• Addedvaluesofhigh-resolutionmodelswithrespectto
global models in thisregion• LIDAR Data (San Juan) toevaluate/calibratemodels +
CALIPSO satellite (withembarked LIDAR)• Proxies (at different time scales) ofspecificrisks (hail,
drought,…)
Project Scheme
Data Collection andhomogenization
In-situSatellite
Modeloutputs
Data Collection andhomogenization
In-situSatellite
Modeloutputs
WorkwithSpecificSectors-Needs
-Communication- Adaptation
WorkwithSpecificSectors-Needs
-Communication- Adaptation
Modelling-Theoretical
-Improvements-SeamlessForecasts (anduncertainity)
Modelling-Theoretical
-Improvements-SeamlessForecasts (anduncertainity)
Climate ServicesClimate Services
Questions
- Shallweconsider a frenchcounterpart (south Alpes)?YES (Meteo-France, IPSL, CEMAGREF) butafter a
firstdraftoftheproposalwrittenonourregion
- Chileanpartners
- Link with PPR RIVIA?
StakeholdersSan Juan, La Rioja, Mendoza, Neuquén, Río Negro (Alto Valle)
EnergyandWater Management
-Windenergy (IMPSAT, others?)- Solar in La Rioja
-Hydro:-COMAHUE -Pampa Energy-HINISA/HIDISA
-Departamento de irrigacion
Agriculture/Forest-WineyardCooperative-NationalInstituteofViticulture (qualityofthewines in Argentina-CooperativeofGarlicproducers-FruitproducerCooperatives (Mendoza, Rio Negro) +EXPOFRUT/Moño Azul/…?
- Agencia Nacional del Fuego (Fires)-SMN
Tourism-Ski resorts-Mountaintourism (summer)- Wine Touring -National Parks
Insurance-Hailandfrostinsurance (La Segunda, Sancor, …)
Mining
-??
Timeline
Mayo-Agosto: Identificacion de stakeholders
Diseño de cuestionario con identificación de los eventos de riesgo y de los lead-time necesarios para sus tomas de decisión.
Entrevistas con un grupo selecto de stakeholders para preparar una reunión más adelante.
Septiembre: Reunión con stakeholders y grupos científicos en Mendoza (propuesta de Pepe; Necesidad de apoyo
financiero CONICET/UMI para viajes, viáticos y gastos de reunión).Output esperado: Lista exhaustiva de riesgos climáticos, información esperada por los stakeholders y
claridad sobre lo que la investigación podría aportar como respuestas. Diseño del rational, de los objetivos y de la estructura general del proyecto.
Octubre-Diciembre:Elaboración de una propuesta concreta. Identificación de competencias faltantes en el grupo.
Contactos con partners en Argentina y en Francia (propuesta de transferencia de competencia más que elaboración de un Twin Project)
2012:Finalización de la propuesta y puesta en forma especifica para el llamado selecto.
Events: