guidelines for: release maintenance, small enhancement and feature work items group name: tp15...

9
Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items oup Name: TP15 urce: Mow Convenor, (Scarrone Enrico, Telecom Italia) eting Date: 2015-01-21

Upload: martin-parker

Post on 04-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)

Guidelines for:Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)Meeting Date: 2015-01-21

Page 2: Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)

Maintenance: CorrectionsProposal: •use a default “predefined” WI code “MNT”, without a WID, for all the releases•Correction should be (optionally) associated with the original WI (in addition to “MNT”) ex: MNT/WI-0004 •“MNT” alone should be used only for corrections that can not be associated to a proper WI

Page 3: Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)

Small Technical Enhancements:

Proposal part 1:• use a default “predefined” WI code “STE”, without a WID

Page 4: Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)

Small Technical Enhancements:

OPEN POINT:Option A: The “STE” code is applicable ONLY to the current new release(s) under developmentOROption B: The “STE” code is applicable to the current new release(s) under development AND to previous releasesOption A will be applicable until the TP comes across the need to use option B.

Page 5: Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)

Small technical enhancements:Proposal part 2: •It is a responsibility of the proposing company(s) to justify why the proposed change it should be considered a small technical enhancements•the Chairs, VC chairs, the editors and rapporteurs are responsible to highlight to the WG/TP and the proposing companies when they think a CR is not a small technical enhancements•In case of doubt it should not be considered a small technical enhancements.

Page 6: Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)

Examples of Small technical enhancements:• What can be a small technical enhancement?

• A small modification of an existing mechanism• A small update of an existing entity• An extension in range of a parameter• A new “informational” parameter not requiring dedicated additional

functionality in architecture or protocol• Etc …

• What is surely not a small technical enhancements?• New architectural elements• New functionality• New resources• A new parameter implying additional CSE functionalities• A small change in stage 1 or 2 that implies any of the above• Etc…

Page 7: Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)

New features and leftover to be completed• The spirit of the Working Procedures and

MoW applies: each feature should have its own WI Description, when appropriate the WI description should detail the expected work in the different stages/WGs.

• The Work plan will trace the development of the features among the different stages

Page 8: Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)

Additional actions• Organize call with Chairs/VC/rapporteurs/editors to clarify

the concept of small technical enhancement and to assure homogeneous interpretations

• Update the CR template to :– Include the “MNT” and “STE” code– Include the Release to which the CR applies– Clarify that a change to multiple releases require a CR to each

release, Each CR needs to have its own CR number (i.e each CR needs to have a different document number

– Include the concept of “mirror” CR when a change apply to multiple CR

– Include the version of the template

Page 9: Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)

Additional actions• Create a list on the portal associating each

permanent document with its editor(s)• Update the WID template to:– Include the targeted release– Support the inclusion the multistage/multi WG information– Support the inclusion of multiple rapporteurs