gujarat energy transmission … office/00000001/17...gujarat energy transmission corporation ltd....

17
GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029 Tender No:PTN-41 Technical - Bid Tender issued to: M/s. ____________________________ ____________________________ ____________________________ Tender fee Rs:__________ Vide DD No. __________ Dt _________ Name Bank:_____________ EMD FEE Rs.____________Vide DD No. __________ Dt _________ Name Bank:_____________ Tender for the Work of Construction of Compound wall & G.I.Sheet Roofing at 66kv Harij s/s. under Patan TR Division . Estimated cost Earnest money (1 % of the Tender value) Security Deposit 499227 5000.00 (a) 5 % of the tender value …25000.00 04.05..2012up to 14.00hrs 04.05.2012up to 15.00hrs Percentage rate 500.00 Last Date for Receipt of Tender (By RPAD) Date of Opening the Tender (If Possible) Type of tender Price of Tender (Non refundable) Time Limit 3 Months The Earnest money should pay by Demand Draft only in favor of G.E.T.C.O. any schedule BANK AT Patan. E.M.D. will be accepted onup to 2-00 P.M. up to the date opening of the Tenders without EMD will not be opened or considered. The details of EMD paid should submitted separately in a letter giving details of payment of EMD i.e. Demand Corporation Draft money receipt No. is no demand draft for EMD should be in side the cover containing tender if this is done the tender will not be opened or considered. EMD will be refunded if the officers are not accepted within the validity period, In case of successful tendered this will be kept as Security deposit and will be refund after completion of the contract by the tender in all respects. If the Tender fails to accept the order or fails to fulfill the conditions of the tender, the amount of EMD will be forfeited by the corporation. Gujarat Energy Trans. Corp. reserves the right to reject all the entire tender without assigning reason. Tender will be opened in presence of those contractors who wish for remain present on the date of opening of the Tenders. 1

Upload: duongque

Post on 18-Apr-2018

254 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

Tender No:PTN-41

Technical - Bid

Tender issued to: M/s. ____________________________ ____________________________ ____________________________

Tender fee Rs:__________ Vide DD No. __________ Dt _________ Name Bank:_____________

EMD FEE Rs.____________Vide DD No. __________ Dt _________ Name Bank:_____________

Tender for the Work of Construction of Compound wall & G.I.Sheet Roofing at 66kv Harij s/s. under Patan TR Division .

Estimated cost Earnest money (1 % of the Tender value) Security Deposit

499227 5000.00 (a) 5 % of the tender value …25000.00 04.05..2012up to 14.00hrs 04.05.2012up to 15.00hrs Percentage rate 500.00

Last Date for Receipt of Tender (By RPAD) Date of Opening the Tender (If Possible) Type of tender Price of Tender (Non refundable)

Time Limit 3 Months

The Earnest money should pay by Demand Draft only in favor of G.E.T.C.O. any schedule BANK AT Patan. E.M.D. will be accepted onup to 2-00 P.M. up to the date opening of the Tenders without EMD will not be opened or considered. The details of EMD paid should submitted separately in a letter giving details of payment of EMD i.e. Demand Corporation Draft money receipt No. is no demand draft for EMD should be in side the cover containing tender if this is done the tender will not be opened or considered. EMD will be refunded if the officers are not accepted within the validity period, In case of successful tendered this will be kept as Security deposit and will be refund after completion of the contract by the tender in all respects. If the Tender fails to accept the order or fails to fulfill the conditions of the tender, the amount of EMD will be forfeited by the corporation. Gujarat Energy Trans. Corp. reserves the right to reject all the entire tender without assigning reason. Tender will be opened in presence of those contractors who wish for remain present on the date of opening of the Tenders.

1

Page 2: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

NOTE:

(1) (2)

All the columns in the schedule should be filled in ink. Rate quoted should include clearance of size (prior of commencement of work and after completion of work) in all respects and hold good for working all condition or moisture weather etc. The quantities given in Schedule B are approximate. Certain minor Changes may be incorporated during construction and as result there may be increase or decrees in the quantity in such as event if should noted that the contractor should not charge any thing the will be paid on the basis of actual quantities executed & no claim shall be entertained on account of variation whatsoever. The rate shall be quoted both in words and figures and as per units specified schedule “B” if there be any discrepancy between the rate quoted in works figures Rate quoted in words shall prevail. The Board will not supply free electricity for polishing tiles welding or for using any electrical machinery for the work. The tendered can refer the following booklets if not attached with this tender) In circle office at Mehsana during office hours and the some will be binding to the tendered. (i)General specifications for civil works a (ii)General rules and Directions for the guidance of Contractor (applicable for works contracts (Tender and contract for works booklet)

(3) (4)

(5)

(6)

(7)

VALIDITY PERIOD:

The rate quoted by me/us will be valid up to six month is

I/we agree to abide by the above.

Signature of Contractor

With Rubber stamp

2

Page 3: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

SPECIAL NOTE

“General Specification for Civil / Electrical Works”

Which is not with the tender but as this booklet forms part of the contract may refer this works contract for Civil/Electrical booklet from the office of EE (TR), GETCO, PATAN & he is required to study the terms, conditions & Specifications laid down in this booklet before quoting the rates in the tender.

No claim whatsoever on account of not referring the booklet shall be entertained.

Signature of Contractor with rubber stamp

Ex. Engr. (TR) GETCO, Patan

3

Page 4: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

SPECIAL NOTES FOR PRE QUALIFICATION

The tender documents are for two separate bids i.e. Technical bid (i.e. qualifying bid) and Price bid (i.e. commercial bid). Following credentials shall be submitted with the technical bid dully attested for qualification.

1. Registration: Bidder quoting for the bid shall have registration in appropriate class with GETCO / Central / State Government / Railway / Semi. Govt.

2. Experience: Contractor should produce evidence of having experience in executing similar nature & magnitude of jobs preferably photo copy of orders secured from GETCO / Central / State Government / Railway / Semi – Government and satisfactory completion certificate from respective department.

3. Latest bank solvency certificate duly showing date of validity from any schedule / nationalized bank of a sum minimum 20 % of the estimated cost shown in the tender.

4. Separate P.F. Registration No. (Works) towards your firm registered with Regional P. F. Commissioner & last paid P.F. challan copy

5. Income Tax No. with PAN card and Service Tax. Registration.

6. Details of EMD paid with MR No. & date or DD had drawn in favor of Gujarat energy Transmission Corporation Ltd.

7. Contractor should produce audited copy of the Balance sheet with profit and loss account of last three Years.

8. Attested copy of Power of Attorney, if any, for signing the bid documents.

9. Terms & condition & other relevant documents if required.

10. List of supervisory staff & skilled persons.

11. Partnership deed or power of attorney if not proprietary firm.

12. Sign. Of tenderer with rubber stamp must be required on all document wherever is applicable.

13. List of Safety Articles.

Signature of the Contractor (With rubber stamp & Date)

4

Page 5: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

PRICE BID

Following documents shall be required in price bid. 1. Schedule ‘B’ with terms & conditions duly quoted percentage rates along with all applicable taxes & signed with rubber stamp. Rate should be quoted in figures & words both compulsory.

N.B: Contractor should compulsory submitted all the documents in technical bid only, otherwise competent authorities are empowered to reject technical bid. Price bid of rejected technical bid should not be opened please be noted seriously

The contractor will have to submit their offer in two bid [1] Technical bid & [2] Price bid. They have to put price bid sealed cover in to the Technical bid sealed cover. Otherwise offer will be rejected.

The technical bid shall be opened at 03:00 pm. if possible on due date. After scrutinizing of the technical bid, if party fail to fulfill the above requirement for qualification. The price bids of such parties will not be opened. The price bid of qualifying parties thereafter shall be opened on the date and time communicated to qualified parties afterwards in the presence of parties.

The bid should be clearly subscribe with our reference number, due date and title of work. The offer should be valid for acceptance for a minimum period of 6 month from the date of opening of technical bid.

Ex. Engr. (TR) GETCO, Patan

Signature of the Contractor (With rubber stamp & Date)

5

Page 6: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

1.0 GENERAL TERMS AND CONDITTION

1.1 INVITATION OF TENDER:

The Ex. Engr. (TR), GETCO Patan. for and on behalf of "GUJARAT ENERGY TRANSMISSION CORPORATION LTD", having its Corporate Office at Vidyut Bhavan, Race Course, Vadodara - 390 007, hereafter called the "GETCO" intends to invite Tender as detailed in this specification.

1.2 DEFINITION:

1. The "GETCO" shall mean the Gujarat Energy Transmission Corporation Ltd, Vadodara and

shall include their authorized representatives.

2. The “Contractor’’ shall mean the bidder, whose tender has been accepted by the GETCO for

award of the contract and shall include his authorized representatives.

3. The "Engineer-in-Charge" shall mean the authorized officer of the GETCO to act as

Engineer-in-Charge to supervise the work for the purpose of the contract.

4. The "Specification" shall mean the tender forming a part of the contract along with

Performa, Schedules and Drawings.

5. The "Order” shall mean the official letter issued by the GETCO, informing the bidder that

his tender has been accepted.

6. The “Contract” shall mean the agreement to be entered into by the GETCO with the

contractor and shall include the commercial, technical and general conditions, schedules,

drawings and any other conditions specifically agreed between the parties forming a part of

the contract.

7. The “Contract Value” shall mean the total amount indicated in the contract agreement as per

order placed by the GETCO and calculated from the provisional quantities indicated in the

tender.

8. The "Completion Period" shall mean the period starting from the date of issue of

commencement given by executing authority and required to complete the work.

Signature of the Contractor (With rubber stamp & Date)

6

Page 7: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

1.3 AMENDMENT OF TENDER:

At any time prior to the submission of tenders, the GETCO may, for any reason, whether at his own initiative or response to a clarification requested by bidder, modify the Tender conditions by amendment.

The amendment will be issued in writing or by fax or cable to all bidders, who have

purchased the tender, which will be binding to them.

1.4

1.

THE TENDER:

The tender should be submitted only in the printed cover issued by the GETCO duly signed

and sealed by the tenderer.

2. The tenders must be sent by Registered Post / Speed Post only so as to reach this office on

or before specified date & time. Due care should be taken to see hat the tenders sent are

posted early enough to ensure their delivery by the prescribed date or even earlier.

3. E.M.D. at the rate of 1% of the value of the items offered is payable. The EMD is payable

by Demand Draft in favors of the Gujarat Energy Transmission Corp .Ltd on any Schedule /

Nationalized Banks in PATAN. It can also be furnished by way of an irrecoverable Bank

Guarantee from any nationalized Bank in a standard format prescribed by the GETCO (Copy

Enclosed). And if this amount is more in respect of tender value of Rs.1 Crore, it should be

partially (50%) by DD in favor of Gujarat Energy Transmission Corporation Ltd on any

Scheduled Bank in PATAN and balance by Bank Guarantee from any Nationalized Bank in a

standard format prescribed by the GETCO (copy enclosed). Cheques are not acceptable.

CORPORATE BANK GUARANTEES NOT ALLOWED.

4. No Interest will be allowed against payment of E.M.D. Documents towards

payment of Earnest Money Deposit (EMD) may please be kept in the enclosed EMD cover

only, which is attached along with this tender document. First the EMD cover will be opened

and if the documents towards payment of EMD are found OK then only Tender Cover will be

opened which may please be noted. EMD will be forfeited (i) if the tender whom it covers is

withdrawn during the validity of the offer and (ii) the Tenderer fails to furnish / deposit the

security deposit. EMD of the unsuccessful tenderer will be refunded within 180 days of

placing of the order with the successful Tenderer and when the Tenderer asked for refund

to the Ex. Engr. (TR) GETCO, PATAN the original receipt of the EMD together with the

advanced stamped receipt should be furnished along with application for refund of EMD.

7

Page 8: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

5. The tenderer must ensure that all the Schedules are completely filled up in their tenders and

that complete information called for is given. Failure to furnish full and complete details or

furnishing vague information would make the tender liable for rejection.

6. The offer should be valid for a minimum period of 180 days from the date of opening of

tender.

7. The bidder shall be deemed to have satisfied himself with all the conditions and

circumstances affecting the prices and possibility of executing the work. The bidder shall

fix his prices taking into account the site & its surroundings, approach roads etc. No idling /

mobilizing / demobilizing / remobilizing OR any other type of claim shall be admitted and paid

on any part of the work.

8. The tenderer should fill in all schedules and submit all the details called for in this

specification in prescribed Performa only.

9. The tenderer should submit attested copies of The GETCO Resolution of firm/ power of

attorney authorizing particular person to sign tender and related documents.

1.5 AUTHORISED REPRESENTATIVE:

1. All the tenderers are requested to mention the name of their authorized representative with

full address in the tender documents.

In case the representative is changed during the course of execution of the contract, such

changes shall be notified by the successful tenderer, failing to which, The GETCO shall not

accept any responsibility.

1.6

1.

REJECTION OF TENDER:

The bidder is expected to examine all instructions, terms, conditions, schedules and other

details called for in this specification and fully informed himself to all which may in any way

affect the work or cost thereof. Failure to furnish the required information or submission of

tender not substantially responsive to specification will be at the bidder's risk and may result

in rejection.

Signature of the Contractor (With rubber stamp & Date)

8

Page 9: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

2. The offer is liable to be out rightly rejected in case the bidding schedules are not filled in

and the prices and particulars are given in other format. Further the offer containing -

a) Different rates for the same items i.e. rates quoted in the slabs.

b) Deviation / Addition / Alterations / Omissions in bidding Schedules.

Deviation and contradictions to the terms and conditions specified in this tender are liable to

be summarily rejected.

1.7

1.

GETCO'S RIGHT:

The GETCO reserves the right of terminating this contract or part thereof at

its tendency without giving notice of Termination or the reasons thereof.

time during

2. The GETCO will be entitled to deduct directly from the bills, to be paid to the contractor any

sum or sums payable by him and which sum / sums the GETCO is required to pay as a principal

employer on account of contractor default in respect of all liabilities referred to.

3. The bidders shall specifically note that any overwriting or corrections or manuscript in the bid

shall be ignored and will not be considered authentic unless the same are signed with Bidder's

Stamp / Seal.

4. The GETCO reserves the right to split the contract into two or more bidders for the lines

covered in the specification or for particular line. In such cases, the term for completion

period will be negotiated.

5. In case of any doubt or interpretation of the terms and condition, the decision of the

Superintending Engineer (TR), Gujarat Energy Transmission Corporation Ltd, Mehsana will be

final and binding to the bidder and no dispute in this regard will be entertained.

6. The GETCO reserves the right to accept any bid or reject any or all bids or cancel withdraw

invitation to bid without assigning any reason. Such decision of the GETCO shall not be

subject to question by any bidder or the GETCO shall bear no liability whatsoever for such

decision.

1.8 MATCHING OF END COST:

In case the GETCO decide to award CONTRACT on matching end cost basis, the bidder has

to reduce all the quoted rates proportionately. The reduction on overall basis will not be

accepted (i.e. all unit rates of erection schedule shall be reduced proportionately by

difference in percentage).

Signature of the Contractor (With rubber stamp & Date)

9

Page 10: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

1.9 CONTRACT:

1. The work covered by this Specification shall be carried out and governed by the GETCO's /

GEB’s Booklet of "General Terms and Condition of Contracts" appended herewith excepting

where conditions specified in this Specification conflict with similar conditions in the Booklet.

The tenders will be deemed to be fully aware of this Booklet and any ignorance of the same

will not exempt the contractor from his liability to abide the same.

2. The Contractor shall not execute any part of the shifting work through sub- contract

without obtaining prior written permission from the GETCO.

3. Such permission given by the GETCO will not relieve the contractor from any liability or

obligation under the contract. The contractor shall be responsible for workmanship, quantity

and quality of the work done by the sub-contractor or his workmen.

4. The GETCO shall have right to obtain the agreement, order and other conditions entered into

by the contractor with any of the sub-contractor/s. The technical particulars of the work to

be executed by sub-contractor shall be subject to approval of the GETCO.

1.10 EFFECT AND JURISDICTION OF CONTRACT:

1. The contract shall be considered as having come into force from the date of issue of order,

which is accepted by the Contractor.

2. The laws applicable by the contract shall be the laws in force in India. The courts of

DEESA shall have exclusive jurisdiction in all the matters arising under this contract.

1.11

1.

FORCE MAJEURE:

The following clauses which substantially affect the performance of the contract shall only

be considered as force majors conditions.

a) Natural phenomena, including but not limited to floods, droughts, earthquakes epidemics.

b) Acts of any Government, domestic or foreign, including but not limited to war,

declared or undeclared, priorities, guarantees, and embargoes.

Provided the party affected by the 'Force Major' shall within fifteen (15) days from the

occurrence of such a cause, notify the other party in writing of such cause with sufficient

documentary proof.

2 Notwithstanding any provision mentioned above, the GETCO shall not be in any way be liable

for non-performance either in whole or in part of any contract or for any delay in

performance thereof in consequence of strikes, shortages, combination of Labor or workman

or lockout, breakdown or accident to machinery or accidents of whatever nature.

and

10

Page 11: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

3. The Contractor or the GETCO shall not be liable for delays in performing their respective

obligations resulting from any force major causes as defined above. The date of completion

will be extended by a reasonable time by mutual agreement.

4. In case of damage or destruction of any property or equipments belonging

Contractor due to force major causes, the GETCO shall not be liable for the same.

to the

1.12

1.

ARBITRATION:

All questions, disputes or differences whatsoever, which may, at any time, arise between the

parties i.e. the GETCO and the Contractor upon, or in relation to or in

Connection with the contract shall be referred to sole Arbitrator appointed by the

Chairman, GETCO, for that purpose, who shall be a retired High Court Judge or a retired

District Judge and the decision of the said Arbitrator shall be final and binding upon the

parties. Reference to the Arbitrator shall be governed by the provisions of The Arbitration

& Conciliation Act, 1996 as amended from time to time and the Rules made there under.

The arbitration proceedings shall be conducted at Vadodara, Head Office of GETCO or at

any such place as the sole Arbitrator may determine. The award of the sole Arbitrator

shall be final and binding upon the parties.

2. Performance under this contract shall, if reasonably possible, continue during the arbitration

proceedings, and no payments due or payable by the GETCO shall be withheld unless they are

the subject matter of the arbitration proceedings.

1.13

1.

LABOUR LAWS:

The Contractor shall observe, comply with and abide by the conditions of labour laws.

The Contractor shall have to submit a document showing allotment of PF code No. received

from Regional Provident Fund Commissioner

1.14 All Electrical rules should be observed by the contractor while work. 1.15 To be taken the care. No any damage should be allowed to property of the GETCO while the work. 1.16 If any occurrence to be taken place while the work the contractor should held fully responsible 1.17 No any extra payment to be given if required while the work. 1.18 The work should be carried out as per instruction & desire of Engineer I/C. 1.19 The disposal materials should be thrown out side premises of GETCO

Ex. Engr. (TR) GETCO Patan

Signature of the Contractor

(With rubber stamp & Date)

11

Page 12: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

2. COMMERCIAL TERMS AND CONDITIONS

2.1 VAT on works Contract:

This is works contract & VAT / SALES TAX etc. not applicable for the same. No any reimbursement will be paid to the contractor for the same.

2.2 Service Tax:

Service Tax as applicable presently to this Contract will be 10.30 % on works amount. The

registration for the same is compulsory and shall be treated as one of the prerequisite. The

same will be reimbursing on production of the proof of payment made.

2.3 PENALTY FOR DELAY:

If the contractor fails to complete the work on or before the extended date(s) / period(s)

of completion of work, he shall without prejudice to any other right or remedy of the GETCO

on account of such breach, pay as penalty an amount equal to half percent (1/2)% of the

contract value per week or part thereof ( of delayed erection ), provided that the total

amount of penalty, to be paid under this condition shall not exceed Five percent (5%) of the

final contract value.

The amount of penalty may be adjusted or set off against any sum payable to the

contractor, under this contract including other lots.

2.4 PRICES:

Tenderers must quote their rates on FIRM PRICE basis.

2.5

1.

INCOME TAX:

Income tax at source at the prevailing rate will be deducted from contractor’s bill in

accordance with the provisions of Income tax Laws and to that effect a certificate will be

issued to the Contractor.

2. The bidder will have to submit latest income-tax clearance certificate along with the offer.

Ex. Engr. (TR) GETCO, Patan

Signature of the Contractor (With rubber stamp & Date)

12

Page 13: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

Payment of Earnest money Deposit and Security Deposits:

I. Earnest money Deposit:

1. Bidders are requested to pay an Earnest Money Deposit (1 % of estimated cost) at Office of Ex. Engr. (TR) GETCO, Patan by Demand Draft of any Nationalized Bank only situated at “PATAN”, drawn in favor of “Gujarat Energy Transmission Corporation Ltd.”. Tender without EMD shall be rejected. DD for EMD should be submitted with technical bid. 2. Payment of EMD in form of Cheque or any other form shall not be accepted. 3. The EMD shall be submitted along with submission of Technical bid only by Demand Draft before opening of Tender. In no case it shall be submitted with sealed cover of Price Bid. 4. Tenders not accompanied by EMD shall be rejected as non- responsive. 5. If during the tender validity period, i.e. 180 days, the tenderer withdraws his tender, the EMD shall be forfeited and the tenderer may be disqualified from tendering for further works. 6. The EMD will be returned promptly to the unsuccessful tenderer. The EMD will be returned to the successful tenderer after he furnishes the Security Deposit for performance and duly enters in to the contract. If he fails to furnish the SD or to execute the contract for the work offered to him, his EMD shall be forfeited and the tenderer may be disqualified from tendering for further work.

II. SECURITY DEPOSIT:

As per prevailing rules of the Corporation, 5% of the contract value shall be paid as ‘Security Deposit’. Out of this, 50 % of S. D. shall be paid at Transmission Division- PATAN within 10 days from receipt of letter of intent either

a) In form of FDR in favor of "Gujarat Energy Transmission Corporation Ltd. " of any Nationalized Bank OR b) In form of Bank Guarantee of any Nationalized Bank as per the approved format of the Corporation.

The balance 50 % Security Deposit shall be recovered from first two R.A. Bills in equal installments. Alternatively 100 % S. D. in form of FDR or B. G. may be submitted on receipt of LOI. The security deposit will be refunded only after the completion of guarantee period of 06 month of work completed or finalization of final bill whichever is later. If Security Deposit is not paid within 10 days of issue of LOI, EMD paid will be forfeited and Corporation will not deal with party for the period of two years.

Ex. Engr. (TR) GETCO, Patan

Signature of the Contractor (With rubber stamp & Date)

13

Page 14: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

TAKING DELIVERY AND INSURANCE :

stage during The contractor has keep tower materials & line materials in safe custody and transport to the respective sites and will be fully responsible for any damage to or loss of all materials at any transportation or taking over of the line by GETCO.

1.2 The contractor has to open site store nearby the route of the line and ensure fpr safe custody of all the stored materials at his own cost . 1.3 The contractor shall have total responsibility for the entire materials stored, loose, smi assembled and /or erected by him at site in his custody. the contractor shall make suitable security arrangements at his own cost to ensure the protection of all materials, equipment and works from theft .fire pilferage and any other damages and loss. it shall be the responsibility of the contractor to arrange for security till the works are finally taken over by the corporation. 1.4 STORAGE-CUM-INSURANCE:- The contractor shall take suitable storage-cum-erection insurance cover at his cost to the extenl of 60% cost of line materials ,which are required to complete the line. contractor shall have to take comprehensive insurance policy against any loss, damage, theft, pilferage, fire etc. for the complete period of storage, erection and commissioning up to the time of taking over of the transmission line by the board .The contractor shall deal directly and pursue the claim with the insurance company and shall be responsible in regard to maintenance of all insurance coverage as well as for settlement of claim. The proof of insurance policy taken by the successful contractor shall be furnished to Engineer-in-Charge. In absence of the above insurance policy, R.A. Bill payment will be with held. In the event of any damage, theft, loss, pilferage, fire etc. contractor will be responsible to loddge, pursue and settle all the claims with the Insurance Company for all items, materials and the Corporation shall kept informed about it. Contractor shall replace the lost/damaged materials/items promptly irrespective of the settlement of the claims by underwriter are that the work progress is as per agreed schedule. The loss if any, such replacement will have to be borne by the Contractor all not entertain any, claim / representation in this regard. However it will be contractor’s responsibility to insure the entire project till the line is taken over by the Board.

2.0 PENALTY FOR DELAY: 2.1The tenderer should note that the completion time allowed for carrying out the work should bestrictly observed. Any delay that may take place in supply and erection beyond contractual cut off date stated as per stipulated delivery period shall be subject to the penalty at the rate of 1/2 % of the contract value per week on delayed work (supply and erection work) with a celling of 10 % of the total contract value.

You are requested to advise all filed offices to incorporate the above clauses in the tender invited by them.

Ex. Engr. (TR) GETCO, Patan

Seal & Signature (Party’s Authorized Person)

Seal & Signature (Party’s Authorized Person)

14

Page 15: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: [email protected] Ph.No.02766-230029 FAX: 02766-230029

INTEGRETY PACT OUR ENEAVOUR

To create environment where business confidence is built through best business practices and is fostered in an atmosphere of trust and respect between provider of goods and services and their users for the ultimate benefit of society a the nation.

GETCO COMMITMENT To maintain the highest ethical standards in business and professional. Ensure maximum transparency to the satisfaction of stockholder.

PARTY’S COMMITMENT Not to bring pressure / recommendation outside GETCO to influence its decision. Not to use intimidation, threat, inducement or pressure of any kind on GETCO or any of it’s employees under any circumstances. To be prompt and reasonable in fulfilling the contract, agreement, legal obligation.

To ensure to full fill the terms of agreement /contract and to consider objectively the viewpoint of parties. To ensure regular and timely release of payment on due dates for work done.

To ensure that no improper demand is made by employees or by anyone on our behalf. To give maximum possible assistance to all the vendors / Suppliers / Service providers and other to enable them to complete the contract in time. To provide all information to Suppliers / contractors relating to contract / Job which facilitate him to complete the contract / Job successfully in time. To ensure minimum hurdles to vendors / suppliers / contractors in complete of agreement / contract / work order.

To provide good’s and / or services timely as per agreed quality and specifications at minimum cost of GETCO. To abide by the general discipline to be maintained in our dealings.

To be true and honest in furnishing information including payment to agent / sub- agent.

Not to divulge any information, business details available during the course of business relationship to other without the written consent of GETCO. Not to enter into carter / syndicate / understanding whether formal / non- formal so as to influence the price.

Ex. Engr. (TR) GETCOPatan

Seal & Signature (Party’s Authorized Person)

Page 16: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED

TRANSMISSION DIVISION - PATAN

SCHEDULE : " B "

Name of work : Construction of Compound wall & G.I.Sheet Roofing at 66kv Harij s/s..

Sr. No

1

DESCRIPTIONS

Removing existing plaster work including scaffolding and throwing the stuff to a lead of 500Mtadious etc. complete as directed by EIC. (GEB SOR Page No 4 , Item No. 19) + Add 20%

Demolition of brick work and stone masonry including stacking of serviceable materials and disposal of unserviceable materials with all lead and lift. in cement mortar[SOR P. No: 74, I. No: 1.20.1] Excavation for foundation up to 1.5 M depth including sorting out and stacking of useful materials & disposing of the excavated stuff up to 50M lead. (b) Loose and soft. [SOR P. No: 17, I. No: 1.0.0] Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand : 8 hand broken stone aggregate 40mm nominal size) and curing complete excluding the cost Of form work in:(a) Foundation and plinth[SOR P. No: 19, I. No: 4.5.3.3] Providing and laying ordinary cement concreate 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregates 20mm nominal size) and finishing smooth with curring etc. complete including the cost of fromwork but exculding the cost of Reinforcement for R.C.C. work in Beam Providing Thermo Mechanically treated bars (TMT bars) confirmed to IS 1786 FE 415 for RCC work including bending, binding and placing in position etc. completed for RCC work... Brick work using common burnt clay building bricks having crushing strength not less than 35 Kg/Sqm in cement mortar 1:6 (1 cement : 6 fine sand) for foundation and plinth. Conventional bricks.[SOR No: 27, I. No: 2.6.13] Brick work using common burnt clay building bricks having crushing strength not less than 35 Kg/Sqm in cement mortar 1:6 (1 cement : 6 fine sand) for super structure above plinth level up to floor two level. For Conventional Bricks.[SOR No: 27, I. No: 2.6.13 + 6.0.0]. Providing 15 mm thick single coat plaster on fair side of brick/concrete wall for interior plastering upto floor two level and finished even and smooth in Cement mortar 1:3 including finishing with a floating coat of neat cement slurry.{SOR P. No: 65, I. No: 2.17.60}

Labour charges for fixing fabricated M.S.Angle posts in concretein line & plumb including 3 coats of oil painting etc. complete as directed by EIC. [GEB SOR P.No. 3, Item No. 16 + 20% add] Providing & fixing G.I. Barbed wire fencing (12/14 Gauge) having mass and uniformity of Zinc coating & specifications shall be as perIS 2140 – 1978 & IS 4826 – 1979 code with minimum 70 micron coating having 3horizontal rows, fixing with angle posts by means of G.I. U pins or with R.C.C. poles by 14 Gauge G.I. Wire as per drawing etc, complete as directed by EIC. [As per project work item]

APP. QTY

33.00

UNIT

18.00

RAT E

SMT

AMOUNT

594.00

2 1.00 172.00 CMT 172.00

3 50.00 61.00 CMT 3050.00

4 6.00 2478.0 0

CMT 14868.00

5 4.00 3485.0 0

CMT 13940.00

6 0.30 48100. 00

2603.0 0

MT 14430.00

7 21.00 CMT 54663.00

8 27.00 2687.0 0

CMT 72549.00

9 160.00 130.00 SMT 20800.00

10 25.00 42.00 NO 1050.00

11 45.00 26.00 RMT 1170.00

Page 17: GUJARAT ENERGY TRANSMISSION … Office/00000001/17...GUJARAT ENERGY TRANSMISSION CORPORATION LTD. DIVISION OFFICE (TR), PATAN JANTA HOSPITAL ROAD GANDHI BAUG,Patan Email: eetrpatan.getco@gebmail.com

12

13

14

15

16

Providing and fixing approved quality sliding gate of 40mm dia mild steel pipe B class all round and 20mm dia Mild steel pipe at 200mm C/C and 12mm mild steel square bars at 200mm C/C alternatively (I.e. One between two pipes) vertically welded to 40mm dia pipe frame as per drawing and design with necessary brackets, hold fasts, locking arrangement on top & aldrop on both the side including base rail for sliding the gate having ball bearing, rollers & guide tracks of 50x6mm M.S. flat with hold fast, fabrication of side supports including fixing GETCO letter on front side etc. comp. with three coats of approved oil painting & one coat of red oxide primer as directed by EIC (The cost does not include the cost of reinforcement) Providing corrugated G.I.Sheets roofing fixed with Galvanised iron 'J' or 'L' hooks bolts and nut 8 mm.diameter with bitumen and G.I.Limpet washers filled with white lead completed excluding the cost of purling,rafters and trusses 0.80mm thick sheet{SOR P. No: 61, I. No: 1.15.1} Steel work welded, in built up sections, framed work including cutting hositing, fixing in position and applying a priming coat of red lead paint. (A)In beams and joists, channels, angles, tees,flats with connection cleats as in main and cross beems,hip and jack raffers, purlins connected to common raffers and the like. Providing and applying 2 coats of EPCOLITE APEX or its equivalent ACRYLIC EXTERIOR paint on existing plastered surface or approved makes & shade including applying putty and primer coat ,finishing & thinning as per manufacturer’s instruction, a gap of 6 hours should be given between 2 subsequent coats. The work should be carried out strictly as per manufacturer’s specifications and requirement, etc complete as directed by EIC. Providing Three coats of white wash on wall including throughly brooming the surface to remove all dirt and dust mortar drops & other foreign matters.

Estimated Cost RS

13.00 1152.0 0

SMT 14976.00

235.00 779.00 SMT 183065.00

1600.0 0

60.00 KG 96000.00

100.00 66.00 SMT 6600.00

250.00 5.20 SMT 1300.00

( Four lacs ninety nine thousand two hundred twenty seven Rs Only) 499227.00

I/we am/are willing to carry out the work / should be written in figures and words.

A) B) C)

At the estimated rates mentioned above. At_______% above the estimate. At_______% below the estimate.

.

Thus the amount of my/our tender works out to Rs In words Rs.

Signature of the contractor With rubber stamp

Executive Engineer (TR) PATAN