heerema marine contractors presentation - iroheerema marine contractors. 2019. heerema marine...
TRANSCRIPT
2019HEEREMA MARINE CONTRACTORS
Heerema Marine Contractors PresentationAlgemene Ledenvergadering IRO
28 NOVEMBER 2019
Index
010203
IRO
–28
NO
VEM
BER
2019
02SLEIPNIR LNG BUNKERING
04
Organization
Assets
Project Leviathan
Offshore Wind05
Simulation Center
03IR
O –
28 N
OVE
MBE
R 20
19
Heerema: Dedicated Business Units
•Jackets - Topsides•TLP’s•Floaters•Float-overs•Subsea developments
•Removal & Decommissioning•Engineering, Procurement, Removal and Disposal services [EPRD]
•Integrated Decommissioning Services
•Turbine Foundations•Turbines•AC Substations•DC Substations•Integrated Installation Services
•Removal & Decommissioning•Engineering, Procurement, Removal and Disposal services [EPRD]
•Integrated Decommissioning Services
Assets
HEER
EMA
MAR
INE
CON
TRAC
TORS
05IR
O –
28 N
OVE
MBE
R 20
19
Sleipnir’s maiden lifts: Noble Energy Leviathan Project
•Jackets - Topsides•TLP’s•Floaters•Float-overs•Subsea developments
•Removal & Decommissioning•Engineering, Procurement, Removal and Disposal services [EPRD]
•Integrated Decommissioning Services
•Turbine Foundations•Turbines•AC Substations•DC Substations•Integrated Installation Services
World Record: 15,300 T module lifted by Sleipnir
For the Leviathan development Sleipnir installed its two main topsides with a total weight of 24,500 T in less than 20 hours.
Real Time practice
Simulation Centre
IRO
–28
NO
VEM
BER
2019
07
1. Create2. Challenge3. Crew training4. Check & Control
08IR
O –
28 N
OVE
MBE
R 20
19
First Wind Turbine Generators Installation making use of a floating Vessel
•Jackets - Topsides•TLP’s•Floaters•Float-overs•Subsea developments
•Removal & Decommissioning•Engineering, Procurement, Removal and Disposal services [EPRD]
•Integrated Decommissioning Services
•Turbine Foundations•Turbines•AC Substations•DC Substations•Integrated Installation Services
2019HEEREMA MARINE CONTRACTORS28 NOVEMBER 2019