I-49 North Segment K Project – Segmental Concrete Girder Design
2013 Louisiana Transportation Conference – Session 58
Craig Finley, P.E., Finley Engineering Group, Inc., Tallahassee, FL
Durk Krone, P.E., TRC Engineers, Inc., Baton Rouge, LA
I-220 at Russell Road
I-49 over MLK Drive
Ramp SE
Ramp EN
Ramp WN
![Page 2: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/2.jpg)
Results you can rely on
AGENDA
2
• Site Location
• Corridor
• Project Team
• Timeline for Development of Segment K
• Site Plan – Bridges to be Designed in Segmental
• Segmental Design
• Project Specific Design Features
• Segmental Construction Details
• Closing Remarks & Questions
![Page 3: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/3.jpg)
Results you can rely on
ARKANSAS
SITE LOCATION
3
185 MILES TO
DALLAS, TX
T
E
X
A
S
M
I
S
S
I
S
S
I
P
P
I
PROJECT
SITE
LAFAYETTE BATON
ROUGE
NEW
ORLEANS
![Page 4: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/4.jpg)
Results you can rely on
CORRIDOR
4
SEGMENTS A – J
ALL UNDER
CONSTRUCTION
OR COMPLETED
SEGMENT K
![Page 5: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/5.jpg)
Results you can rely on
PROJECT TEAM
5
• Louisiana DOTD – Baton Rouge, LA o Joachim C. Umeozulu, P.E. – Project Manager
o Paul Vaught, III, P.E. – Bridge Design Project Manager
• TRC Engineers – Baton Rouge, LA o Durk Krone, P.E. – Principal / Project Manager
o Michael Paul, P.E. – Deputy Project Manager
• Finley Engineering Group – Tallahassee, FL o Craig Finley, P.E. – Project Principal
o Jerry Pfuntner, S.E., P.E. – Project Manager / Designer
• Touchstone Architects – Tallahassee, FL o Bradley Touchstone, AIA - Principal
• NTB Associates – Shreveport, LA o Paul Rossini, PLS – President/CEO
o Dexter Grogan, P.E. – Bridge Design
• AFJM, Inc. – Shreveport, LA o E.L. “Skip” James, Jr. – Director of Transportation
o Elba Hamilton, P.E. – Project Engineer
BRIDGE
DESIGN
ROADWAY DESIGN
![Page 6: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/6.jpg)
Results you can rely on
TIMELINE FOR DEVELOPMENT OF SEGMENT K
DATE
JUNE 6, 2006
MAY 25, 2007
AUGUST 2, 2010
JULY 7, 2011
JANUARY 5, 2012
JANUARY 2, 2013
EVENT
TRC received Notice-to-Proceed for Preliminary
Bridge Design
Project placed on-hold
Supplement No. 1 – Notice-to-Proceed
DOTD, ASBI, TRC – Discuss potential
implementation of segmental bridge construction
DOTD/TRC – Discussed the steps needed to
develop final plans for the implementation of
segmental bridge design for 3 ramp structures.
DOTD issued Advanced Notice-to-Proceed to TRC
6
![Page 7: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/7.jpg)
Results you can rely on
Site Plan – Bridges to be Designed in Segmental
7
I-220 at Russell Road
I-49 over MLK Drive
Ramp SE
Ramp EN
Ramp WN
![Page 8: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/8.jpg)
Results you can rely on
A SEGMENTAL BRIDGE
8
Is A Construction Technique…
….…with Design Implications
SEGMENTAL DESIGN
![Page 9: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/9.jpg)
Results you can rely on
SEGMENTAL DESIGN
9
• 3 Bridges, 700 Segments, 271,000 sf. Deck Area
• Span for Lengths 120’ to 260’, radius 550’ (Ramp WN)
• 3 Roadway Cross Sections 31.5’, 35.5’, and up to 52’ wide
• Pier Heights of 20’ to 90’
• Foundations and Access
• Aesthetics Without Cost
• Best Practices Approach
SEGMENTAL DESIGN CHALLENGES
![Page 10: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/10.jpg)
Results you can rely on
SEGMENTAL DESIGN
10
• Precast Segmental
• Balanced Cantilever, Erected by Cranes
• Combination of Haunched and Constant Depth Segments
• One Set of Casting Machines
• External Post-Tensioning with Diabolos
• Best Practices – Good Experience
SEGMENTAL DESIGN SOLUSTIONS
![Page 11: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/11.jpg)
Results you can rely on
PROJECT SPECIFIC DESIGN FEATURES
11
• Project Design Criteria
– LADOTD BDM with some “extras”
– Principal Stress Requirement 3f’c
– Shear – AASHTO LRFD and Segmental Guide Specifications
• Analysis Software
– 3-D Time Dependent
• Serviceability and Maintainability
• Tendon Replacement and Bearing Replacement
• Load Rating
FEATURES-SEGMENTAL DESIGN
![Page 12: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/12.jpg)
Results you can rely on
SEGMENTAL CONSTRUCTION DETAILS
12
Precast Segmental Construction
PRECASTING
![Page 13: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/13.jpg)
Results you can rely on
SEGMENTAL CONSTRUCTION DETAILS
13
Forms to Accommodate Width and Depth Differences
PRECASTING MACHINES
![Page 14: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/14.jpg)
Results you can rely on
SEGMENTAL CONSTRUCTION DETAILS
14
5 Segment Types – 1 Form Set
SEGMENT TYPES
![Page 15: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/15.jpg)
Results you can rely on
SEGMENTAL CONSTRUCTION DETAILS
15
Balanced Cantilever Construction
SEGMENT ERECTION
![Page 16: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/16.jpg)
Results you can rely on
SEGMENTAL CONSTRUCTION DETAILS
16
External Post-Tensioning and Diabolos
EXTERNAL PT
zzzz
![Page 17: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/17.jpg)
Results you can rely on
SEGMENTAL CONSTRUCTION DETAILS
17 COMPLETED BRIDGE
![Page 18: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/18.jpg)
Results you can rely on
CLOSING REMARKS & QUESTIONS
• Site Location
• Corridor
• Timeline for Development of Segment K
• Project Team
• Site Plan – Bridges to be Designed in Segmental
• Segmental Design
• Project Specific Design Features
• Segmental Construction Details
18
![Page 19: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/19.jpg)
Results you can rely on
QUESTIONS
19
![Page 20: I-49 North Segment K Project Segmental Concrete Girder Design North Segment K... · I-49 North Segment K Project – Segmental Concrete Girder Design 2013 Louisiana Transportation](https://reader031.vdocument.in/reader031/viewer/2022022518/5b14234e7f8b9a347c8b7973/html5/thumbnails/20.jpg)
Results you can rely on 20
Durk Krone, P.E., Principal
TRC Engineers, Inc.
8550 United Plaza Boulevard, Suite 502
Baton Rouge, LA 70809
T: 225.216.7483
Follow us LinkedIn Twitter
www.trcsolutions.com
Craig Finley, Jr., P.E., Principal
Finley Engineering Group, Inc.
1589 Metropolitan Boulevard
Tallahassee, FL 32308-3776
T: 850.894.1600