informatiesessies strategisch basisonderzoek

40
agentschap voor Innovatie door Wetenschap en Technologie

Upload: liesl

Post on 18-Dec-2014

24.139 views

Category:

Documents


0 download

DESCRIPTION

IWT informatie met betrekking tot de oproep 2014-2015 voor projecten Strategisch Basisonderzoek (SBO)

TRANSCRIPT

Page 1: Informatiesessies Strategisch Basisonderzoek

agentschap voor Innovatiedoor Wetenschap en Technologie

Page 2: Informatiesessies Strategisch Basisonderzoek

agentschap voor Innovatiedoor Wetenschap en Technologie

Presentation of the SBO-programme.

This presentation contains only the key points of the SBO-programme. For the actual preparation of a proposal it is essential to consult the appropriate SBO-Handbook and Application Form.

All available information and documents relevant for the 2014-2015 SBO Call is available on : http://www.iwt.be/subsidies/sbo

Page 3: Informatiesessies Strategisch Basisonderzoek

3

Overview.

1. Key characteristics of the SBO-programme.2. Basic features.3. General outline of a project proposal.4. Evaluation process and framework.5. Output monitoring of projects.6. SBO in international collaborations.7. Practical recommendations.8. Additional information.

Page 4: Informatiesessies Strategisch Basisonderzoek

4

1. Key characteristics of the SBO-programme

Essence = realisation of strategic reseach investments.

Two key aspects:

1. High-quality strategic basic research with a dedicated focus on high-risk, inventive and original research.

2. Strategic interest and extent of the valorisation perspectives in the longer term in Flanders (economic or social/societal).

Page 5: Informatiesessies Strategisch Basisonderzoek

5

1. Key characteristics of the SBO-programme.

strategic basic research” within SBO is not a goal in itself but an essential means to allow for an important new valorisation or knowledge utilisation.

The SBO-programme is a cooperation oriented instrument; it requires an investment in the development of meaningful interactions and network building with users in the field i.e. companies (SBO-E) or social/societal actors (SBO-M).

Page 6: Informatiesessies Strategisch Basisonderzoek

agentschap voor Innovatiedoor Wetenschap en Technologie

ECONOMIC ACTORS(Companies)

SOCIAL OR SOCIETAL ACTORS (government entities, civil society

organisations, social profit etc.)

UNIVERSITIES /RESEARCH

ORGANISATIONS

Page 7: Informatiesessies Strategisch Basisonderzoek

7

1. Key characteristics of the SBO-programme.

Primary finality

= main type of actors who can take up and use the scientific project results (actors = organisations external to the research organisations)

SBO-economic finality = take up and use of the results primarily through economic actors (companies) with an economic value creation objective (i.e. employment + investments).

SBO-social finality = take up and use of the results primarily through social/societal actors (e.g. government departments and agencies, civil society organisations, social profit sector) with a social value creation objective.

Page 8: Informatiesessies Strategisch Basisonderzoek

8

1. Key characteristics of the SBO-programme.

Challenges for applicants :

1)Demonstrate scientific potential and research approach.

2)Demonstrate valorisation potential and valorisation approach.

• active effort and commitment to enable the effective utilisation and valorisation of the research results by economic or social actors.

• meaningful synergy, interaction dynamics and mobilisation across institutional boundaries (research organisations, economic actors, social actors).

i.e. substantial difference relative to “classic mechanisms” for the dissemination of academic research results

Page 9: Informatiesessies Strategisch Basisonderzoek

9

Es ist nicht genug zu wissen, man muss auch anwenden.

Es ist nicht genug zu wollen, man muss auch tun

Knowing is not enough, we must apply.

Willing is not enough we must do.

Goethe

Page 10: Informatiesessies Strategisch Basisonderzoek

10

1. Key characteristics of the SBO-programme.

Key economic valorisation strategies• Transfer of research results to existing companies;

follow-up R&D activitiesIndustrial advisory group (“begeleidingscommissie”) as an instrument

• Transfer to a new to be founded spin-off company

Key social/societal valorisation strategies.• Transfer of research results to existing organisationss;

follow-up R&D activitiesSocial/societal advisory group (“begeleidingscommissie”) as an instrument

Page 11: Informatiesessies Strategisch Basisonderzoek

11

1. Key characteristics of the SBO-programme.

Main adaptations over recent years To obtain a better valorisation orientation of the projects

- With a better alignment between the supply-driven focus (from university research groups and research organisations) and the demand or problem-driven focus (from companies, social actors)

- With earlier and more meaningful interactions and cooperations between researchers and the users (companies, social actors) from the early definition and design phase of the project proposal onwards > i.e. enabler for maintaining meaningful interaction dynamics over the lifecycle of the project

Page 12: Informatiesessies Strategisch Basisonderzoek

12

1. Key characteristics of the SBO-pro-gramme.

Broader context : policy goal of co-creation, stronger cooperations between universities and industry.

In 2014 : further finetuning of evaluation framework > feasibility of the valorisation approach

-preparation phase (“voortraject”)-during the SBO-project (involvement, interaction

dynamics)-after the SBO-project (follow-up R&D and

implementation efforts)

Page 13: Informatiesessies Strategisch Basisonderzoek

13

1. Key characteristics of the SBO-programme > Social programme part

SBO social programme part – adaptations since 2013

Background : 2012 Impact analysis SBO programme (Social/societal finality).

http://www.iwt.be/sites/default/files/SBO_impactanalyse_maatschapluik_2012.pdf

1) to strengthen the active participation of the social users community in the SBO project cycle;

2) to facilitate a more smooth transition between the end of the SBO-project and the further development and implementation pathway within the social user organisations.

Page 14: Informatiesessies Strategisch Basisonderzoek

14

1. Key characteristics of the SBO-programme. Social programme part

SBO social programme part – adaptations since 2013

• Evaluation framework : Strengthening of the importance of two-way interactions during proposal preparation,

• Handbook for the participation of social user organisations.

• Room for the active participation of social user organisations and the inclusion of more application oriented activities from the third project year onwards to bridge the gap between SBO-results and operational applications. + Advantage in selection process.

Page 15: Informatiesessies Strategisch Basisonderzoek

15

1. Key characteristics of the SBO-programme.

Tell me. I may listen.

Teach me. I may remember.

Involve me, and I will do it.

Old Chinese wisdom

Page 16: Informatiesessies Strategisch Basisonderzoek

16

1. Key characteristics of the SBO-programme.

Important Guidance document : IWT’s policy guidelines on the use and transfer of the results of IWT-supported projects

http://www.iwt.be/sites/default/files/subsidies/documenten/IWT_toelichtingsdoc_beleidslijn_resultaten_092009.pdf

Page 17: Informatiesessies Strategisch Basisonderzoek

17

2. Basic features.

- Project proposers

= open and accessable instrument for all Flemish R&D-actors (university associations, strategic research centres, other research organisations, companies etc…)

+ Optional involvement of R&D actors from abroad

Perspective : useful knowledge transfer towards Flanders (i.e. to address “missing links” in essential expertise) and with a clear added value for the SBO-project (including valorisation objectives).

Page 18: Informatiesessies Strategisch Basisonderzoek

18

2. Basic features.

- Project duration: maximum of 4 years- Project budget : see SBO-Handbook

In practice (not as a standard) average in the order of magnitude of 1.0 - 2.0 million Euro (with exceptions to the order of 3 million Euro).

IWT’s Cost model + budget template.

Non-Flemish R&D-actors : maximum 20% of the project budget.

Page 19: Informatiesessies Strategisch Basisonderzoek

19

3. General outline of a project proposal.

Part 1 Project sheet and project summary Part 2 Description of the intended valorisation and

transfer of knowledge Part 3 Scientific project descriptionPart 4 Expertise and track record of the consortiumAppendix AAppendix B

Use the application template taking into account the maximum requirements of the proposal length (i.e. eligibility criterion).

“Less is more”

Page 20: Informatiesessies Strategisch Basisonderzoek

20

3. General outline of a project proposal.

Important aspects of the application template.

• Project proposals are only submitted electronically.

• In additions further specifications have been added to the requested valorization description and to the content of Appendix B. In addition, applicants are urged not to add not wanted annexes.

• The importance of early interactions with interface and transfer services is stressed (http://www.ttoflanders.be)

-Appendix B The letter of intention of a company or organisation to participate in the advisory committee need to be duly signed by a legal representative of this company or organisation.

Page 21: Informatiesessies Strategisch Basisonderzoek

21

3. General outline of a project proposal.

Important aspects of the application template.- Appendix B includes a term sheet (“afsprakennota”)

between the partners of the consortium (i.e. mutual agreement on the budget and the personnel allocation, the management and the allocation of the IPR, and the vision and approach on the valorisation). This term sheet is prepared in close interaction with the TTO services and duly signed by a legal representative of the participating institutions .

- The letter of intention of a company or organisation to participate in the advisory committee need to be duly signed by a legal representative of this company or organisation.

Page 22: Informatiesessies Strategisch Basisonderzoek

22

3. General outline of a project proposal.For the SBO economic programme part.

Important aspects of the application template.For the SBO economic programme part:Mandatory input by all companies of the advisory committee (250 euro/year SME, 1000 euro/year for a company or other organisation). To be fulfilled at project submission and confirmed in letters of companies = eligibility requirement !

• “In kind” contribution can be accepted provided that this input is well substantiated.

• Higher input is not obligatory but can be positively assessed in the evaluation of the proposal.

• No obligation for spin-off earmarked projects.

Page 23: Informatiesessies Strategisch Basisonderzoek

23

3. General outline of a project proposal.For the SBO economic programme part.

Lesson from earlier 2011-2012 call.

Impact of the (then optional) financial input from companies in the economic programme part (excluding U2.2. evaluation criterion)

Number of

proposals submitted

Number of projects

supported

Average success

rate With input from companies

15 8 53%

Without input from companies

16 2 13%

Total 31 10 32%

Page 24: Informatiesessies Strategisch Basisonderzoek

24

3. General outline of a project proposal.For the SBO social programme part.

SBO social programme part

• NO eligibility condition for (cash/in kind) input

• But focus on active participation and commitment of social user organisations + the inclusion of more application oriented activities from the third project year onwards to bridge the gap between SBO-results and operational applications (with advantage in selection process!).

Page 25: Informatiesessies Strategisch Basisonderzoek

25

4.Evaluation process and framework.

4.1. Evaluation process

Round 1. Pre-selection.

Round 2. Evaluation of the scientific quality S. utilisation/valorisation quality U.

In each selection round : advice by the steering evaluation committees (“overkoepelende commissies OC’s) decision by IWT’s Board

Page 26: Informatiesessies Strategisch Basisonderzoek

26

4.Evaluation process and framework.

4.1. Evaluation process

Inputs for the evaluation process :

Round 1. Project proposal as submitted.

Round 2. + written expert evaluation reports + written response from applicants

+meeting and discussion with IWT staff on the valorisation/utilisation chapter

+written supplement from applicants

Page 27: Informatiesessies Strategisch Basisonderzoek

27

4.Evaluation process and framework.

4.2. Evaluation framework

Scientific quality(S ) Valorisation quality (U)

-scientific potential -valorisation potential-research approach -valorisation approach-input-output balance

-R&D capabilities -competence/track record-added value sustainability

Expert evaluation guidelines and scoring and selection methodology available on IWT-website

Page 28: Informatiesessies Strategisch Basisonderzoek

28

4.Evaluation process and framework.

Important points of attention.

-Increased attention to the specific valorisation potential : shift from “generic platforms” towards more targeted problem-driven projects (“cloud of hail” versus “precision bullets”)

-Increased attention to the intelligent composition of the (industrial or social/societal) advisory committee i.e. representative for the anticipated application areas, covering essential actors of the economic or social value chain;

-Increased attention to the project preparation phase i.e. evidence of a dedicated process involving early and meaningful two-way interactions between researchers and users during the project definition phase;

Page 29: Informatiesessies Strategisch Basisonderzoek

29

4.Evaluation process and framework.

Minimal requirements and ranking mechanism.

- Minimal “reasonable” for both scientific quality S and valorisation quality U ( 6/10).

 - Projects which meet the minimal requirements are

ranked in accordance with an equal weight for the scientific quality S and valorisation quality U scores. In case of projects with equivalent scores , a desirable diversity of application areas can be aimed for.

Page 30: Informatiesessies Strategisch Basisonderzoek

30

4.Evaluation process and framework.

Minimal requirements and ranking mechanism.

- Selection advantage for projects contributing to sustainable development. The main focus is the environmental dimension of sustainability.

 - (Maximum) quota for projects with a primary economic

finality directed at the creation of a new to be founded spin-off company : max 20% of the budget allocated to the economic part of the SBO-programme.

Page 31: Informatiesessies Strategisch Basisonderzoek

31

5.Output monitoring of projects.

Ex post project and portfolio assessment (A, B+, B-,C)

-Scientific results-User involvement during the project-Exploitable results-Status of transfer and valorisation effects-Strategic economic or social/societal perspective for

Flanders

First Output monitoring report will be presented to IWT’s Board of Directors on October 16 2014.

Page 32: Informatiesessies Strategisch Basisonderzoek

32

6. SBO in international cooperations.

•SBO internationalisation through ERANET-Joint programming actions (http://www.europrogs.be)

e.g. M-ERA.NET on materials http://www.m-era.netnext call to be launched in early 2015

Prior contact with staff of involved funding agencies strongly recommended

Page 33: Informatiesessies Strategisch Basisonderzoek

33

6. SBO in international cooperations.

New in 2014 : Cooperation opportunity between Flanders and Netherlands : STW (OTP)-IWT (SBO) projects. =opportunity for scientific and valorisation added valuee.g. complementary expertise, better coverage of value chain

Topics 1) High tech systems and materials (including ICT and

nanotechnology)2) Chemistry and Farma (including biotechnology and

biobased economy)

Page 34: Informatiesessies Strategisch Basisonderzoek

34

6. SBO in international cooperations.

New in 2014 : Cooperation opportunity between Flanders and Netherlands : STW (OTP)-IWT (SBO) projects.

• Available budget : 2,5 mio euro of IWT and STW each

• Project budget : min. 0,6- max. 1 million Euro

• Balanced/proportional research contribution and valorisation potential for Flanders and Netherlands;

• Minimum 2 Flemish and 2 Dutch companies in advisory committee; Input by companies: 25% above 500.000 Euro.

Page 35: Informatiesessies Strategisch Basisonderzoek

35

6. SBO in international cooperations.

New in 2014 : STW (OTP)-IWT (SBO) projects. • Importance of the “term sheet” • Lead agency approach : submission of proposals to

STW for Topic 1 and to IWT for Topic 2;• Evaluation process according to two-stage procedure:

• Stage 1 : Extended eligibility by both agencies;• Stage 2 : Evaluation by lead agency• Funding decisions by Board of Directors of both

agencies

• Prior contact with staff of STW and IWT is strongly recommended

Page 36: Informatiesessies Strategisch Basisonderzoek

36

7. Practical recommendations when preparing a proposal.

• “Origination process” of an SBO-proposal is different from a “classic” academic research proposal.

• Key importance of meaningful two-way dialogue and interaction between researchers from the early project conception onwards and over the entire project life cycle.

• Need to think beyond the end date of the SBO-project. Let users elaborate on follow-up R&D and implementation interests and opportunities.

• Valorisation is not just “dissemination”.

• User involvement is not just “claiming being interested”.

• .

Page 37: Informatiesessies Strategisch Basisonderzoek

37

7. Practical recommendations when preparing a proposal.

• Be prepared to invest adequate time and effort in the proposal preparation process. Start early. Adopt a project management approach.

• Interact early, systematic and according to plan with potential partners and economic or social/societal users. Discuss project scope + cooperation principles + valorisation intentions.

• Also early interactions with university interface or transfer services are essential.

• Ensure a good coherence between the scientific part and the valorisation part of your proposal.

Page 38: Informatiesessies Strategisch Basisonderzoek

38

8. Additional information.

• IWT advisors will be available for an exploratory meeting (“verkennend gesprek”) on Friday October 24 and on Monday November 3 for the various finality areas and application sectors.

• Potential applicants can make a request for an exploratory meeting at IWT until October 17 2014 for the meeting day of October 24, and until October 24 2014 for the meeting day of November 3. This can be done by E-mail to [email protected] together with a short abstract and the most important questions (max. 1 A4 p.).

Page 39: Informatiesessies Strategisch Basisonderzoek

39

8. Additional information.

• SBO contact persons http://www.iwt.be/subsidies/sbo

Paul Schreurs (SBO economic) [email protected]èle Oleo (SBO social) [email protected]

-STW contact person http://www.stw.nl

Ron Winkler (STW) [email protected]

-IWT contact persons for key domains :

Mia Callens (biotechnology) [email protected] Cauwenbergh (materials) [email protected] Lucas (ICT) [email protected]://www.iwt.be/overiwt/medewerkers/adviseur

Page 40: Informatiesessies Strategisch Basisonderzoek

Koning Albert II-laan 35, bus 16

B-1030 Brussel

Tel.: +32 (0)2 432 42 00

Fax.: +32 (0)2 432 43 99

E-mail: [email protected]

www.iwt.be

agentschap voor Innovatiedoor Wetenschap en Technologie