integrated operations sig introduction and overview david archer alan doniger posc posc regional sig...

12
Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

Upload: margaretmargaret-page

Post on 17-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

Integrated Operations SIGIntroduction and Overview

David ArcherAlan Doniger

POSC

POSC Regional SIG SeminarNew Delhi

14 January 2005

Page 2: Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

The Vision:An integrated digital EP Business with processes sufficiently automated to

enable people to achieve superior business performance.

Source: Herb Yuan (Shell)

Page 3: Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

Oil fields of the future: real-time oil and gas operations

Onshore Facilities

Decision Centers

Offshore Facilities

new capabilities – much more data; much more exposure

Source: Peter Breunig (CVX)

Page 4: Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

Smart SystemsThe basic approach of all “smart technology” is measure-model-control

– measure system properties– model actual vs desired behaviour– derive required correction parameters (adaptive control)– implement control

∆INTOPS

Acquire

Model

Analyze

Control

Source: Shell

INTOPS = Integrated Operations

Page 5: Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

Business Headquarters

Capacity Planning Design [months/years]

Operational Planning [months/years]

Scheduling [days/months]

Supervisory Control [minutes/hours]

Regulatory Control [sec/minutes]

Well & Surface facilities

- Flow, pressure and temperature in wells and separator-Fuel injection to produce heat out of a boiler

- SCADA systems for coordinating flow stations and pipelines- Gas distribution/optimization on a pipeline network- Monitoring wellheads, multiples and flow stations

- Scheduling of injection/production plan and resources-Opening and closing wells or partial completions

-Adjusting well operating parameters

- Planning of injection/production plan and resources- Planning drilling and workover resources

- Supply Chain Management & Market and customer demands

- Asset life cycle and installed based maintenance or growth- Supply Chain Management & Market and customer demands

Aut

omat

ion

leve

lTim

e-scale

Fast cycle

Slower cycle

Source: Saputelli SPE 83978

Time Scales (106 range)

INTOPS

Acquire

Model

Analyze

Control

Page 6: Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

IntOPS SIG• Area of Interest

– the definition, movement, and storage of production operation data, information, and knowledge,

• especially in support of integrated, intelligent, instrumented, etc. operations

• for near well-site and remote operations• in time scales from near real-time to months and years.

– This group is essentially a cross-vendor, cross-product line user community for production operations applications and data storage products and services.

• Players– operators, service and software providers, government

agencies, consultancies, and POSC.

Page 7: Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

IntOPS SIG

• Meeting attendees thus far include:– Oil companies: BP, ChevronTexaco, ExxonMobil, Hydro,

ONGC, Shell, Statoil– Non-profit: University of Houston, NPD, POSC Caesar– Commercial: Aspen Tech, Baker Hughes, Halliburton,

Invensys, National Oilwell, Sense Intellifield, Merrick, Schlumberger

Page 8: Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

IntOPS SIG• History

– Formed in early ‘03– Initial SIG meetings held in Houston and London– Meetings in ’04 in Houston and Stavanger– Association with and now participation in the Integrated

Information Platform (IIP) project in Norway• Statoil, Hydro, DNV, National Oilwell, POSC Caesar, FMC

– Distributed Temperature Survey Data Transfer Standard Project• Proposed by BP after initial work with BakerHughes• Validated for level of interest• Formed in Q3 and Q4• First phase due to be completed by end of 05 Q1.

Page 9: Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

IntOPS SIG• History

– Sponsored Strategic Decision Sciences’ "Roadmap to Enterprise Optimization" published in September 2004.• POSC members receive a special price for the study and the

SIG can use the results of the study. – Interaction with SPE Realtime Optimization

• We will co-chair the SPE Forum on "Automation, Measurement and Remote Control" to be held in 2005.

Page 10: Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

POSC Standards & SIGsStd/SIG DSS WITSML Int. Ops. PWLS eRegulatory Geoshare

Data Exch

- WITSML (drilling & arch.)

- WITSML (other)

Practical E&P

- Ref Vals

- Catalog

- Well Log

- Other

Data Mgt

- Epicentre

- Geoshare

App Interop

Page 11: Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

IntOPS SIG• What’s Next?

– DTS• Produce and publish initial specification in Q1 of ’05• Follow-up with pilot testing intended

– IIP• Participate in Steering Committee and working groups

– Production Data Transfer Standards Development• Exploit existing work to produce draft specifications

– Integration Operations Architecture• Identify and pursue achievable objectives guided by a selected team of

qualified member representatives

Page 12: Integrated Operations SIG Introduction and Overview David Archer Alan Doniger POSC POSC Regional SIG Seminar New Delhi 14 January 2005

David ArcherPresident and CEO

Alan DonigerPOSC Chief Technology Officer

24 Greenway PlazaSuite 1000-B

Houston, TX 77046-2401+1 713 267-5124 phone

+1 713 784-9219 [email protected]://www.posc.org