james parle: 2013 sandia wind plant reliability workshop

35
Innovative Wind Maintenance Management CMMS Innovative Wind Maintenance Management CMMS James Parle Muir Data Systems James Parle Muir Data Systems

Upload: sandia-national-laboratories-energy-climate-renewables

Post on 21-Nov-2014

414 views

Category:

Technology


4 download

DESCRIPTION

Innovative Wind Maintenance Management CMMS

TRANSCRIPT

Innovative Wind Maintenance ManagementCMMS

Innovative Wind Maintenance ManagementCMMS

James ParleMuir Data SystemsJames ParleMuir Data Systems

Road MapRoad Map

CMMS overview

Wind CMMS

Preliminary survey findings

Moving forward

General CMMSGeneral CMMS

Manufacturing

Fleet

Pharmaceutical

Facilities

Utilities

Example CMMS Savings without MobileExample CMMS Savings without Mobile

Company Benefit Savings

Improve production capacity (maintenance efficiency) 5 – 15%

Increase equipment efficiency 20%

Increase in production (preventative maintenance) 40%

Reduce maintenance budget 30%

Reduce production downtime 20%

Reduce maintenance labor costs (better scheduling) 10 – 30%

Reduction in overtime 10 – 50%

Labor productivity increase 30%

Inventory cost reduction 25%

Decrease maintenance material cost 20%

Source: industry benchmarks A.T. Kearny, Grant Thornton, PWC, Gartner, ARC, Tomkins, DOE

15 – 50% O&M

Savings

Oil & Gas CMMSOil & Gas CMMS

Source: Siemens Oil & Gas

Hydro Asset Management Partnership (HydroAMP)

Hydro Asset Management Partnership (HydroAMP)

Evaluation Method

Data standard

Single database

Plant / utility reports

Open to all users

Expanding US Wind MarketExpanding US Wind Market

28% Growth $50B End of Warranty

30% Spent on Maintenance

$6B O&M 2025

0

10,000

20,000

30,000

40,000

50,000

60,000

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Win

d C

apac

ity (M

W)

Year

Current Solution Highly DatedCurrent Solution Highly Dated

Wind CMMS OverviewWind CMMS Overview

Why Wind CMMS?Why Wind CMMS?

Harsh Environmental

ConditionsRemote Locations

Lots of Moving PartsHighly Distributed

Safety Concerns

Complete Maintenance Management SolutionComplete Maintenance Management Solution

Tablet

Management Office

Cloud Server

Analytics

EnterpriseMgmt.

GridSCADA Data

Blades TowerNacelleGeneratorGearbox

API

Maintenance Management Solution DetailsMaintenance Management Solution Details

CMMS Infrastructure / Database / Analysis

DataSharing

Data Source: Tablet in the FieldData Source: Tablet in the Field

Data MovementData Movement

Data In-Take Software Modules

Data In-Take Software Modules

Large Scale Data AggregationLarge Scale Data Aggregation

Plant 1 Plant 2 Plant 1

Plant 3

Plant 2

Plant 2

Plant 4

Plant 3

Plant 1

Owner 1Owner 1Owner 2Owner 2

Owner 3Owner 3

Predictive Maintenance Anonymous Data

Aggregation System

Predictive Maintenance Anonymous Data

Aggregation System

Predictive Maintenance ValuePredictive Maintenance Value

47% O&M Cost Reduction 47% O&M Cost Reduction Source: Electric Power Research Institute

Preliminary Survey FindingsPreliminary Survey Findings

Survey OverviewSurvey Overview

Field Data Office Storage Reporting Demographics

Technology · Time · SatisfactionTechnology · Time · Satisfaction

Company TypeCompany Type

Mainly ISPs & OOsMainly ISPs & OOs

Current PositionCurrent Position

More Engineers than ExpectedMore Engineers than Expected

Company SizeCompany Size

Highly Fragmented IndustryHighly Fragmented Industry

Work Orders per YearWork Orders per Year

Average 10 Work Orders per Day Average 10 Work Orders per Day

Time in Current PositionTime in Current Position

60% Changed Job Title in Last 2 Years60% Changed Job Title in Last 2 Years

Work Order Process ChangesWork Order Process Changes

72% Change Annually or Less Often72% Change Annually or Less Often

Work Order AccuracyWork Order Accuracy

Not Good for AnalysisNot Good for Analysis

Work Order AnalysisWork Order Analysis

Limited Analysis PerformedLimited Analysis Performed

Work Order AnalysisWork Order Analysis

0

3

5

0.00

2.50

5.00

Field Office Storage Reporting

0

30

60

SatisfactionSatisfaction

TimeTime

TechnologyTechnology

Extremely

Moderately

Not at all

Analog

Digital

SomewhatDigital

0 Mins

30 Mins

60 Mins

Satisfaction vs. Employee TypeSatisfaction vs. Employee Type

0.00

2.50

5.00

Field Office Storage Reporting

Technicians

Engineers

Managers

Executives

Moderately

Not at all

Extremely

Technology vs. Company TypeTechnology vs. Company Type

0

2.5

5

Field Office Storage Reporting

ISP

OO

OEM

Digital

SomewhatDigital

Analog

CMMS Company PrioritiesCMMS Company Priorities

0

3

6

Reducedinventory costs

Customersatisfaction

Increaseduptime

Greateraccuracy

Predictiveanalysis

Scheduling

ISP

OO

OEM

Aveage

Linear (Aveage)

Least important

Somewhat important

Most important

Wind CMMS LandscapeWind CMMS Landscape

INDUSTRYSPECIFICINDUSTRYSPECIFIC

INDUSTRYAGNOSTICINDUSTRYAGNOSTIC

LOW COSTLOW COST

HIGH COSTHIGH COST

Generic Low CostGeneric Low Cost

Generic High CostGeneric High Cost In-House SolutionsIn-House Solutions

Wind Specific Low CostWind Specific Low Cost

Switching CostsSwitching Costs

Cultural Shift RequiredCultural Shift Required

Demand Better SolutionsDemand Better Solutions

CMMS reduces O&M costs

Technology is ready

Wind lagging behind other industries

Data becoming competitive advantage

Predictive maintenance is the prize

Offshore Wind CMMSOffshore Wind CMMS