june, 2013
DESCRIPTION
Sultanah II. Sultan Qaboos University Muscat, Sultanate of Oman. June, 2013. Outline Introduction - Team List Hull Steering System Propulsion System - Gearbox - Propeller - Shaft. Monitoring System Testing. The Team. Members Eyad Al Belushi Hamza Al Mahruqi - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/1.jpg)
June, 2013
Sultanah IISultan Qaboos University
Muscat, Sultanate of Oman
![Page 2: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/2.jpg)
Outline•Introduction
- Team List•Hull • Steering System• Propulsion System
- Gearbox- Propeller
- Shaft
• Monitoring System• Testing
![Page 3: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/3.jpg)
The Team
Members•Eyad Al Belushi•Hamza Al Mahruqi•Mohammed Al Mahrouqi•Nawaf Al Belushi•Rashid Al Shabibi•Said Al Jabri•Salim Al MamariSupervisors•Dr. Jamil Abdo•Dr. Nasser Al Azri
![Page 4: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/4.jpg)
NamingNamed after the first Omani ship Sultanah that visited the United States in 1840 during the reign of Sayyid Said bin Sultan.
![Page 5: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/5.jpg)
Sultana I
11 Participated in ISRProblems•Weight: 250 Ib•Steering: high friction •Shape•Gearbox: high Gear Ratio
![Page 6: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/6.jpg)
Hull
![Page 7: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/7.jpg)
Consists of three
layers:1. Fiber glass
2. Carbon fiber
3. Plastic fiber resin
Hull weight: 60 Ib
Hull
![Page 8: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/8.jpg)
Seat
![Page 9: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/9.jpg)
Design Constrains• Easily operated• Light weight• Low friction
![Page 10: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/10.jpg)
Steering System (Cont’d)Final Design• Fully mechanical steering system
• Two Push/Pull cables
• Two control joysticks
• Two levers fixed with the fins
![Page 11: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/11.jpg)
Propulsion System
![Page 12: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/12.jpg)
Propulsion System (Cont’d)Gearbox
Option IIOption I
• 1:4.5 gear ratio• Using Chain.
• 1:3 gear ratio• Direct connection
![Page 13: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/13.jpg)
Propulsion System (Cont’d)
PropellerSoftware used: Java Prop
![Page 14: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/14.jpg)
Propulsion System (Cont’d)
Propeller manufacturing• 4 axis CNC machine
![Page 15: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/15.jpg)
Shaft designAutodesk Inventor SoftwareDiameter: 25 mmApplied Torque: 30 N.mSafety Factor: 7
Propulsion System (Cont’d)
![Page 16: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/16.jpg)
Monitoring System
Mathematical Analysis
![Page 17: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/17.jpg)
Monitoring System (Cont’d)
Circuit
![Page 18: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/18.jpg)
Monitoring System (Cont’d)
Sensors positions
![Page 19: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/19.jpg)
Monitoring System (Cont’d)
Challenges•Finding waterproof sensors•Casing the circuit and its connections•Visibility of LCD screen underwater
![Page 20: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/20.jpg)
Testing•Open water diving license •Swimming pool
SQU sports hall- depth: 2 m- length: 50 m
Royal Gurd Omantechnical collage- depth: 4 m- length: 25 m
![Page 21: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/21.jpg)
![Page 22: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/22.jpg)
![Page 23: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/23.jpg)
![Page 24: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/24.jpg)
![Page 25: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/25.jpg)
QUESTIONS ?
![Page 26: June, 2013](https://reader036.vdocument.in/reader036/viewer/2022070417/568153e0550346895dc1dc0e/html5/thumbnails/26.jpg)
IntroductionTwo teams worked on Sultana II1st team (6 Students)• Hull design• General setup
2nd team (7 Students)Detailed design• Assembly• Testing• Participating on International Submarine Race, June
2013