lab results interface pilots wg kick-off

12
Lab Results Interface Pilots WG Kick-Off August 1, 2011

Upload: alexandra-buck

Post on 04-Jan-2016

16 views

Category:

Documents


1 download

DESCRIPTION

Lab Results Interface Pilots WG Kick-Off. August 1, 2011. Agenda. Purpose Review of Architecture Workgroup Administration Timeline Next Steps. Purpose. Provide Specifications and Project Management for the LRI Pilots - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Lab Results Interface  Pilots WG  Kick-Off

Lab Results Interface Pilots WG Kick-Off

August 1, 2011

Page 2: Lab Results Interface  Pilots WG  Kick-Off

Agenda

• Purpose• Review of Architecture• Workgroup Administration• Timeline• Next Steps

Page 3: Lab Results Interface  Pilots WG  Kick-Off

Purpose

– Provide Specifications and Project Management for the LRI Pilots

– Test whether LRI pilots can successfully incorporate the proposed use in lab reports of several standards – LOINC, OIDs, SNOMED CT, and UCUM

– To ensure that the LRI Implementation Guide (IG) is both deployment-ready and implementer-friendly prior to widespread adoption

Page 4: Lab Results Interface  Pilots WG  Kick-Off

LRI Sequence Diagram (LRI Use Case)

Page 5: Lab Results Interface  Pilots WG  Kick-Off

Workgroup Administration

• Workgroup Meeting Time• Committed Member Registration

– Workgroup Co-Chairs

• Bob Lutolf, Gensa Corporation • Rob Allen, Gensa Corporation

– Join S&I Framework Wikispaces Site– Register as committed member– Join LRI Pilots Work Group to support

• Pilot Planning• Pilot Deployments• Pilot Testing

• Consensus Process for Document Approval

Page 6: Lab Results Interface  Pilots WG  Kick-Off

Volunteer Opportunities

• Analyst• LIS Piloter• EHR Piloter• Domain SME• Pilots Tester

– Test data and test cases– Evaluation of Pilot Test results

• Feedback to LRI IG WG and LRI Vocab WG

Page 7: Lab Results Interface  Pilots WG  Kick-Off

LRI Timeline

Jul 2011

May 2011

Jun 2011

ImmediateNext 90 Days

Short Term3 to 9 months

Long Term9 to 36 monthsInitiative

LRI Pilots Workgroup

Lab Results Interface Initiative (other WGs)

Immediate Initiatives

Short Term Initiatives

Long Term Initiatives

LRI Arch WG Artifacts

Aug-Sep 2011 Oct-Nov 2010 4Q 2011 1Q 2012 2Q 2012

LRI Use Case finalized Stage 2 Meaningful Use - Final

Plan Initial Pilot Implementations

Validation Suite Code Development

Stage 2 MU -Draft

IHE Connectathon

LRI Vocab WG Artifacts

LRI Implementation Guide Drafted

LRI Pilots

Review working pilots with UCR/Harmonization (user acceptance)

Develop Test Cases for Pilot Testing

Pilot Deployments

Pilot Testing

HIMSS Interoperability Showcase

Page 8: Lab Results Interface  Pilots WG  Kick-Off

Planned Activities

• Types of Tasks– Analysis of Requirements for Successful Piloting– Design of Pilots – Best Practices

• Areas of Focus– Pilot Deployment Models– Testing Methodologies– Pilot Test Plans– Test Data Generation– Vocabulary - LOINC, SNOMED CT, UCUM, OIDs

• For each area of focus we’ll perform an analysis and design to identify specific tasks

• Some areas of focus will become sub-groups (e.g., test data)

Page 9: Lab Results Interface  Pilots WG  Kick-Off

Overview of Focus Areas

• Piloting Methodologies– LIS systems and EHRs supporting the LRI implementation guide– Approaches

• Deployment Models• How do we test vocabulary?

• Test Plans of Pilot Testing– LIS systems and EHRs supporting the LRI implementation guide– End-to-end process– Range of test cases

• Test Data– Identify common-typical use cases from in-scope lab results– Support the range of message content (e.g., multiple results in a single message)– Data must be relevant and realistic (e.g., use correct code for result)– Community to decide level that is important, breadth, and depth

Page 10: Lab Results Interface  Pilots WG  Kick-Off

Topics for Next Meeting

• Communication channels and collaboration• Review reports from New/Prospective Pilots

Workgroup committed members– Review new enrollees of pilot participants

– Discuss scope of Proposed Pilots Projects

Page 11: Lab Results Interface  Pilots WG  Kick-Off

Homework

• Sign up for Wiki and Work Group– Indicate where you can help out

• Review LRI Architecture WG Wiki• Review LRI Implementation Guide WG Wiki• Review LRI Vocabulary WG Wiki• Review

http://wiki.siframework.org/LRI+Strategy+and+Consensus+Statement

• Post feedback on Discussion tab

Page 12: Lab Results Interface  Pilots WG  Kick-Off

VIRTUAL ROUND – QUESTIONS, COMMENTS, CONCERNS?