List of Cases to be submitted before 6th Consent Appraisal Committee Meeting Scheduled on 24.09.2012 at 15:00 Hrs. (Part-I) Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmitted Agenda 1 M/s. Ordanance Factory, Jawhar Nagar, Bhandara 115.21 Crs. Renewal JD(APC) 1 to 27 2 M/s. Wardha Power Co. Ltd., (Phase-I), B-2, Warora Growth Centre, MIDC, Chandrapur 1478.38 Crs. Renewal JD(APC) 28 to 47 3 M/s. Chandrapur Ferro Alloy Plant, S. No.498/2, 499,500 & 503/2, Mul Road, Chandrapur 221.42 Crs. Establish (Expansion) JD(APC) 48-69 4 M/s. ISMT Ltd., Plot No. C-1, MIDC Ahmednagar, Dist- Ahmednagar 112.3 Crs. Establish (Expansion) JD(APC) 70-84 5 M/s. Hindalco Industries Ltd., (Exp.) Sr No.95/1, 95/2, Vill- Daheli, Tal- Mouda, Dist - Nagpur 197.34 Crs. Establish (Expansion) JD(APC) 85- 109 6 M/s. Amba River Coke Ltd., (Pellet Plant), Vill- Dolvi, Tal- Pen, Dist - Raigad 723 Crs. Establish JD(APC) 110- 139 7 M/s. Amba River Coke Ltd., ( Down Stream project, CRMt), Vill- Dolvi, Wadkhal, Tal- Pen, Dist - Raigad 301.0 Crs. Establish JD(APC) 140- 173 8 M/s. Mandhana Dying Unit No.- II, C-3, MIDC Tarapur, Dist.- Thane (Review of Refusal) 157.04 Crs. 1st operate JD (WPC) 174- 197 9 Skol Breweries Ltd., MIDC Waluj, Aurangabad. (Amendment in C to O) 155.40 Crs. Amendment JD (WPC) 198- 207 10 Ruchi soya Industries, Patalganga, Raigad 223.81 Crs. Establish (Captive Power Plant) JD (WPC) 208- 218 11 M/s. Biltube Industries Ltd., Gat No. 1172 to 1178, A/p. Kodoli, Tal- Panhala, Dist - Kolhapur. 178.11 Cr Renewal JD (WPC) 219- 239 12 M/s. JSW Ispat Steel Ltd., (Coke Drying Plant) Vill- Dolvi, Tal- Pen, Dist - Raigad 1141 Crs. Establish JD(APC) 240- 253 13 M/s. JSW Ispat Steel Ltd., (Lime Calcinin Plant) Vill- Dolvi, Tal- Pen, Dist - Raigad 2772 Crs. Establish JD(APC) 254- 271 14 M/s. JSW Energy Ltd., Vill. - Nandivade, PO- Jaigad, Tal- & Dist - Ratnagiri 4698 Crs. Renewal JD(APC) 272- 311

Upload: tranphuc

Post on 18-Aug-2018

249 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

List of Cases to be submitted before 6th Consent Appraisal Committee Meeting Scheduled on 24.09.2012 at 15:00 Hrs. (Part-I)

Sr. No.

Name & Address Capital

Investment Applied For Section

Page No.

Remarks

Resubmitted Agenda

1 M/s. Ordanance Factory, Jawhar Nagar, Bhandara

115.21 Crs. Renewal JD(APC) 1 to 27

2 M/s. Wardha Power Co. Ltd., (Phase-I), B-2, Warora Growth Centre, MIDC, Chandrapur

1478.38 Crs.

Renewal JD(APC) 28 to 47

3 M/s. Chandrapur Ferro Alloy Plant, S. No.498/2, 499,500 & 503/2, Mul Road, Chandrapur

221.42 Crs. Establish (Expansion)

JD(APC)

48-69

4 M/s. ISMT Ltd., Plot No. C-1, MIDC Ahmednagar, Dist- Ahmednagar

112.3 Crs. Establish (Expansion)

JD(APC) 70-84

5 M/s. Hindalco Industries Ltd., (Exp.) Sr No.95/1, 95/2, Vill- Daheli, Tal- Mouda, Dist - Nagpur

197.34 Crs. Establish (Expansion)

JD(APC) 85-109

6 M/s. Amba River Coke Ltd., (Pellet Plant), Vill- Dolvi, Tal- Pen, Dist - Raigad

723 Crs. Establish JD(APC) 110-139

7 M/s. Amba River Coke Ltd., ( Down Stream project, CRMt), Vill- Dolvi, Wadkhal, Tal- Pen, Dist - Raigad

301.0 Crs. Establish JD(APC) 140-173

8 M/s. Mandhana Dying Unit No.- II, C-3, MIDC Tarapur, Dist.- Thane (Review of Refusal)

157.04 Crs. 1st operate JD (WPC) 174-

197

9 Skol Breweries Ltd., MIDC Waluj, Aurangabad. (Amendment in C to O)

155.40 Crs. Amendment JD (WPC)

198-207

10 Ruchi soya Industries, Patalganga, Raigad

223.81 Crs. Establish (Captive Power

Plant)

JD (WPC) 208-

218

11 M/s. Biltube Industries Ltd., Gat No. 1172 to 1178, A/p. Kodoli, Tal- Panhala, Dist - Kolhapur.

178.11 Cr Renewal

JD (WPC) 219-

239

12 M/s. JSW Ispat Steel Ltd., (Coke Drying Plant) Vill- Dolvi, Tal- Pen, Dist - Raigad

1141 Crs. Establish JD(APC) 240-253

13 M/s. JSW Ispat Steel Ltd., (Lime Calcinin Plant) Vill- Dolvi, Tal- Pen, Dist - Raigad

2772 Crs. Establish JD(APC) 254-271

14 M/s. JSW Energy Ltd., Vill. - Nandivade, PO- Jaigad, Tal- & Dist - Ratnagiri

4698 Crs. Renewal JD(APC) 272-311

Page 2: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

15 M/s. Maharashtra State Power Generation Co. Ltd., TPS, Parli (VII), Tal - Parli, Dist - Beed

1416.30 Crs.

Renewal JD(APC) 312-327

16 M/s. Hindalco Industries Ltd.,( Expansion), Sr. No. 95/1, 95/2, Vill- Daheli, Tal- Mouda, Dist - Nagpur

164.6 Crs. 1st Operate (Expansion)

JD(APC) 328-359

17 M/s. Maharashtra State Power Generation o. Ltd., Bhsawal TPS, MAHAGENCO (2 x210 MW) Unit 2 & 3, At- deepnagar, Tal- Bhusawal, Dist - Jalgaon

366.59 Crs. Renewal JD(APC)

360-388

18 M/s. Maharashtra State Power Generation o. Ltd., Bhsawal TPS, MAHAGENCO Unit 5 At- deepnagar, Tal- Bhusawal, Dist - Jalgaon

4616 Crs. 1st operate JD(APC)

389-419

19 M/s. WCL Durgapur OCM, Durgapur Sub Area, Chandrapur

196.35 Crs. 1st Operate (Expansion)

JD(APC) 420-433

20

M/s. EMCO Energy Ltd., (Phase-I), (1X300 MW Phase-I Coal Based Thermal Power Plant), MIDC Warora, Dist. - Chandrapur

1627.74 Crs. 1st operate JD(APC)

434-447

21

M/s. Finolex Industries Ltd., Vill. - Golap, Dist. - Ratanagari

1468.54 Crs.

Renewal PAMS 448-464

22

M/s. Deepak Fertilizers, Plot No. - K1 to K5, MIDC Taloja 1533.0 Crs.

1st operate PAMS

465-476

23

M/s. Deepak Fertilizers, Plot No. - K1 to K5, MIDC Taloja

1668.6 Crs. Establish

(Expansion) PAMS

477-489

24 M/s. Mazgaon Dock Ltd , Dock Yard Road, Mazgaon Mumbai.

169.18 Crs. Renewal (Expansion)

RO(HQ) 490-498

25 M/s IRB Sindhudurg Air Port Pvt. Ltd., Village Parule and ChiChippiwadi, Tal. Vengurla,

307.29 Crs. Establish (Phase-I)

RO(HQ) 499-515

26 M/s. Exide Industries Ltd.,D-II Block, MIDC Chinchwad, Pune

166.85 Crs. Operate (Expansion)

RO(HQ) 516-537

Fresh Agenda

1 M/s. Tal Mfg. Solutions Ltd., Sect-3, No.215 Part to 225 Part and 227 part and 229, Vill- Kalkari, MIHAN SEZ, Nagpur

185.91 Crs. Renewal JD(APC) 538-544

2 M/s. Rajuri Steels & Alloys Pvt. Ltd., B-6,7,8, MIDC Mul, Chandrapur

157.75 Crs. 1st operate JD(APC) 545-553

3 M/s. Ashok Leyland Pvt. Lt., MIDC Gaegaon, Tal- Sakoli, Dist - Bhandara

467.83 Crs. Renewal JD(APC) 554-563

Page 3: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

4 M/s. Kinetic Engineering Ltd/. Nagar Daund Road, Ahmednagar

142.1 Crs. Renewal (Amalgamation)

JD(APC) 564-576

5 M/s. JSW Ispat Steel Ltd., Blast Furnace Plant, Vill- Dolvi, Tal- Pen, Dist - Raigad

1141 Crs. Renewal (Additional product)

JD(APC) 577-592

6 M/s. Hindalco Industries Ltd., Plot No. 2, MID Indl. Area, Taloja, Navi Mumbai

282.36 Crs. Amendment JD(APC) 593-600

7 M/s. Avantha Power and Infrastructure Ltd., Unit- Bhigwan, 105, Pune Solapur Highway, Tal- Indpaur, Dist - Pune

275.14 Crs. Renewal JD(APC) 601-611

8 M/s. Enkel Wheel (India) Lt., Gat No. 142, Vill- Shikrapur, Tal- Shirur, Dist - Pune

173.70 Crs. Renewal JD(APC) 612-618

9 M/s. Keihin Fie Pvt. Ltd., B-3, MIDC Chakan Mahalunge, Tal- Khed, Dist - Pune

138.41 Crs. Renewal JD(APC) 619-629

10 M/s. Sanjana Power, C/o- Asahi India Glass Ltd., T-7, MIDC Taloja, Raigad

442 Crs. Establish JD(APC) 630-638

11 M/s. Mercedes-Benz India Pvt. Ltd., E-3, MIUDC Chakan, Phase-III, Kururli and Nighjoe, Tal- Khed, Dist - Pune

677.31 Crs. Establish (Expansion)

JD(APC) 639-647

12 M/s. John Deere India Pvt. Ltd., G No.166,167 & 271 to 291, Pune Nagar Road, Tal- Shirur, Dist - Pune

637.66 Crs. Establish (Expansion)

JD(APC) 648-655

13 M/s. Tata Cummins Ltd., A-1/2/1, MIDC Phaltan, Vill- Survadi, Tal- Phaltan, Dist - Satara

682 Crs. Establish JD(APC) 656-669

14 M/s. Innoventive Industries Ltd., G No.56/3,4,5, Shikrapur Chakan Road, Pimpale Jagtap, Tal- Shirur, Dist - Pune

217.78 Crs. Establish (Expansion)

JD(APC) 670-677

15 M/s. Rexam HTW Beverage Can ( India ) Ltd., Plot No. C-7, MIDC, Taloja, Tal- Panvel, Dist - Raigad

220.0 Crs. 1st operate JD(APC) 678-686

16 M/s.Navi Mumbai Waste Processing Co. Pvt. Ltd.Survey No.376,379, MSW Dumping Ground Behind Lubrizol, TTC MIDC Turbhe,Navi Mumbai

35 Crs. MSW

Authorization (Navi Mumbai

Municipal Corporation)

RO(HQ)

687-697

17 M/s.Oil and Natural Gas Corporation Ltd., (Uran Trombay Gas Pipeline) Dronagiri Bhavan,

439.57 Crs. Renewal RO(HQ) 698-709

Page 4: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

Tal-Uran,Dist:Raigad

18 M/s.Vidrabha Irrigation Development Corporation Ltd.,Irrigation Project,G.NO.36.3768.69,92,93,108,135,139,140,141, Rohma,Mutizapur,Akola

237.23 Cr Establish RO(HQ)

710-715

19 M/s.Aegies Logistics(P)Ltd.,Plot No.72,Mahul Village,Mumbai-400 074

37.17 Crs. 1st Operate RO(HQ) 716-733

List of Cases to be submitted before 6th Consent Appraisal Committee Meeting Scheduled on 24.09.2012 at 15:00 Hrs. (Part-II)

Sr. No.

Name & Address Capital

Investment Applied For Section

Page No.

Remarks

1 M/s. Infosys Technologies Ltd., Plot No. 24, Rajiv Gandhi Info. Tech Parl, Phace-2, Vill.- Man, Tal.- Mulshi, Pune

936.12 Crs. 1st Operate RO(HQ)

1 to 7

2 M/s. Vamona Developers Pvt. Ltd., S. No. 33,2A/ 2, 33/ 2B of Wadgaon Sheri, Vimannagar, Opp Giga Space, Pune

549.76 Crs. 1st Operate RO(HQ)

8 to 17

3 M/s. Indiabulls Properties Pvt. Ltd., Plont No. 612. 613, Lower Parel Division, Elphinstone Mills, Senapati Bapat Marg, Mumbai

564.2941 Crs.

Establish (Amendment)

RO(HQ)

18-26

4 M/s. Indiabulls Properties Pvt. Ltd., C.S. No. 841 of Lower Parel Division (G-South Ward) Senapati Bapat Marg, Mumbai

1143.04 Crs.

Establish (Amendment)

RO(HQ)

27-35

5 M/s. Jawaharlal Nehru Port Trust, Administrative Building, Sheva, Tal. - Uran, Dist.- Raigad

390.42 Renewal (Expansion)

RO(HQ) 36-54

6 M/s. Gharda Chemicals Ltd., B 27/29, MIDC Dombivli, Kalyan

140.34 Crs. Establish (Expansion)

PAMS 55-66

7 M/s. Vinati Organic Ltd., A-20, MIDC Lote, Tal- Khed, Dist- Ratanagiri.

107.95 Crs. Establish (Expansion)

PAMS 67-74

Page 5: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

8 M/s. Lupin Ltd., (Research Park), Plot no. 46A, 47A, Vill.- Nande, Dist.- Pune

211.07 Crs. Renewal PAMS 75-84

9 M/s. V. V. F, Plot No. - V41, MIDC Taloja, Dist. - Raigad

362.0 Crs. 1st operate PAMS 85-93

10 M/s. Croda Chemicals, Plot No. - 1/1 Part, MIDC TTC, Navi Mumbai

151.14 Crs. Establish (Expansion)

PAMS 94-

102

11 M/s Perkins India Pvt. Ltd., Plot NO. G-1, Additional Shendra, Aurangabad

712.96 Crs. Establish JD(APC) 103-

110

12 M/s.Tata Autocomp System Ltd., Interior & Plastic Division, S. No. 235 & 245, Vill- Hinjewadi, Tal- Mulshi, Dist - Pune

125 Crs. Renewal JD(APC) 111-

122

13 M/s. Reliance Infrastructure Ltd., DTPS, Vill- Agwan, Tal- Dahanu, Dist - Thane

1803.42 Crs.

1st operate (Amalgamation)

JD(APC) 123-

129

14 M/s. Maharashtra State Power Generation Co. Ltd., TPS, Old Unit- III to V, Tal- Parli, Dist - Beed

747.48 Crs. Renewal JD(APC) 130-

140

15 M/s. POSCO Electrical Steel Pvt. Ltd., Plot No. C-1/1, Vill- Bhagad, MIDC, Tal- Mangaon, Dist - Raigad

414 Crs. Establish JD(APC) 141-

150

16 M/s. Bridgestone India Pvt. Ltd., A-43, MIDC Chakan, Phase-II, Tal- Khed, Dist - Pune

875.30 Crs. 1st operate (Phase-I)

JD(APC) 151-

158

17 M/s. Alicon Castalloy Ltd., G No.1426, Shikrapur, Tal- Shirur, Dist - Pune

116 Crs. Renewal JD(APC) 159-

167

18 M/s. Viraj Profiles Ltd., Unit-II, G-2, 1/2, 1/3 MIDC Tarapur, Palghar, Thane

320.31 Crs. Establish (Expansion)

JD(APC) 168-

182

19 M/s. Neosym Industry Ltd., (The Indian Smelting & Refininf Ltd., ) G No. 201, Sanswadi, Tal- Shirur, Dist - Pune

108.98 Crs. Renewal JD(APC) 183-

189

20 M/s. Murli Industries Ltd., (Mining), Tal- Korpana, Dist - Chandrapur

335 Crs. 1st operate JD(APC) 190-

206

21 M/s. Chaman Metallics Ltd., Kosara Dongargaon Underground Coal Mine project, At- Kosara, Tal- Wani, Dist - Yavatmal

138 Crs. Establish JD(APC) 207-

217

22 M/s. Suryalaxmi Cotton Mills Ltd., (25 MW Power Generation), 9 km, Ramtek Rd., Vill- Nagardhan, Tal- Ramtek, Dist - Nagpur

113.62 Crs. 1st operate JD(APC) 218-

224

Page 6: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

23 M/s. Integrated Baranj OCM, Karnataka Emta, 84, Vill- Kiloni, Tal- Bhadrawati, Dist - Chandrapur

524.67 Crs. Renewal JD(APC) 225-

246

24 M/s. Urjankur Shree Datta Power Co. Ltd., Gat No. 251, M/s. Shree Datta Sahakari S.S.K. Ltd, Dattanagar, Shirol, Dist - Kolhapur

207.21 Crs. Renewal

JD (WPC)

247-

254

25 M/s. Bombay Rayon Fashion Ltd., C/o. Islampur Integrated Textile Park Pvt. Ltd. Vill- Peth Naka, Islampur, Tq- Walwa, Dist - Sangli

171.53 Crs.

1st operate JD (WPC) 255-

262

26 M/s Shri Saikrupa Sugar & Allied Industries Ltd., (Distillery Division), At – Hiradgaon, Tal – Shrigonda, Dist – Ahemednagar

207.45 Crs. 1st operate JD (WPC)

263-

269

27 M/s Mula S.S.K. Ltd.,(Distillery Division), At Post- Sonai, Tal – Newasa, Dist – Ahemednagar.

138.969 Crs.

Renewal JD (WPC)

270-

276

28 M/s Municipal Corporation of Greater Mumbai, Water Treatment Plant, Bhandup Complex, Kjindipada Road, Bhandup (West), Mumbai.

321 Crs. Establish (Water

Treatment Plant)

JD (WPC)

277-

283

29 M/s Tilaknagar Industries Ltd., (Grain Based Distillery), At Post Tilaknagar, Tal. Shrirampur, Ahmednagar.

196.4518 Crs.

1st operate JD (WPC)

284-

290

30 M/s. Pioneer Distilleries Pvt. Ltd., Balapur, tal.- Dharmabad, Dist.- Nanded. (C to 1st O for Expansion)

207.81 Crs. 1st operate JD (WPC)

291-

303

31 M/s. Pioneer Distilleries Pvt. Ltd., Balapur, tal.- Dharmabad, Dist.- Nanded. (C to 1st O for Bottling Plant)

207.81 Crs. 1st operate JD (WPC)

304-

312

32 M/s. Sanstar Ltd., Sr. No. 267, 268, Vill.- karvand, Tal.- Shirpur, Dist.- Dhule.

156 Crs. Establish JD (WPC)

313-

326

33 M/s. Carlsberge Ltd., H-17/1/1, MIDC, Waluj, Aurangabad. (Amendment in Consent)

142.24 Crs. Amedment JD (WPC)

327-

336

34 M/s. Bhiravnath Sugar Works Ltd., Vill.- Sonari, Tal.- Paranda, Dist.- Osmanabad.

119.8 Crs. Establish (Expansion)

JD (WPC)

337-

348

Page 7: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

35 M/s. Shri Someshwar SSK Ltd., (Sugar Unit) someshwar Nagar, tal.- baramati, Dist.- Pune. (Consent to renewal)

193.56 Crs. Renewal JD (WPC)

349-

357

36 M/s. Shri Someshwar SSK Ltd., (Co-Generation Unit) someshwar Nagar, tal.- baramati, Dist.- Pune.

193.56 Crs. Renewal (Amalgamation)

JD (WPC)

358-

365

37 M/s. Brintons Carpet Asia Pvt. Ltd., Gat No.-414/415/416, Vill.- Urawade, tal.- Mulshi, Dist.- Pune.

110.84 Crs. 1st Operate (Expansion +

Amalgamation)

JD (WPC)

366-

374

38 M/s. Schereiber Dynamix Dairies Ltd., Unit-II Plot No. E-250, MIDC Baramati, Tal.- Baramati, Dist.- Pune.

220 Crs. Establish JD (WPC)

375-

382

39 M/s. Baramati Agro Ltd., Vill- Shetfal Gade, Tal - Indapur, Dist. - Pune

116.25 Crs. Renewal JD (WPC)

383-

389

40 M/s. Cadbury India Ltd., Gut No. 532 & 533, Talegaon Dabhade, Dist. - Pune

270.10 Crs. 1st Operate (Expansion +

Amalgamation)

JD (WPC)

390-

398

41 M/s. Kukadi Sah. Sakhar Karkhana Ltd., (Molasse based distillery), At- Pimpalgaon Pisa, Tal. - Shrigonda, Dist. - Ahmednagar.

117.86 Crs. Renewal JD (WPC)

399-

405

42 M/s. Sayaji Hotel Ltd., Sr. No. 135/136, Mumbai- Bangalor bypass highway, Waked, Pune

128.58 Crs. Renewal AST 406-

418

43 M/s. Kanakia Hospitality Pvt. Ltd., (Unit of Courtyard by Marrot Mumbai International Airport), CTS No. 25B, Vill.- Chakala & 2/5 A, Vill- Mulgon on Sub Plot A at M.V. Road, Andheri (E), Mumbai

253.57 Crs. Renewal ( Expansion)

AST 419-

430

44 M/s. Duet India (Pune) Pvt. Ltd., 197/3, A/p- Lohegaon, Tal - Haveli, Dist. - Pune

171.25 Crs. Renewal AST 431-

437

45 M/s.Jupiter Lifeline Hospitals Ltd., S. No. 73/1, 73/3, 73/4, 5, 73/6, 74/1, 77/1, 78/29, 48/1, 48/2, Vill. - Panchpakhadi, Dist. Thane

105 Crs. Renewal AST 438-

445

Page 8: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

Review Items

1 M/s. Mahindra & Mahindra (Automotive Division), Akurli Road, Kandivali (E), Mumbai

Compliance status of BG

JD(APC) 446-

449

2 M/s. Bilt Graphics Paper Products Ltd., PO- Ballapur, Dist - Chandrapur

Proposal of Bank

Guarantee

JD(APC) 450-

475

3 M/s. Tata Cummins Ltd., A-1, A-1/2, MIDC Survadi, Phaltan, Lonand Rd., Satara

Exempt the condition in

consent (Installing the

condition of air pollution control system for paint

booth)

JD(APC) 476-

507

4 M/s. Kalyani Thermal Systems Ltd., Plot No. E-84, MIDC Ranjangaon, Pune

Compliance status of BG

JD(APC) 508-

519

5 M/s.City Corporation Ltd.,Amnora Park Town Project,Phase-I,Survey No.173,177,182,184,187 to 200, 242 to 245,Manjari,Pune

802.43 Crs. Renewal RO(HQ) 520-

536

6 Non Compliance of Authorization under MSW(M&h)Rules,2000 in respect of M/s.Kalyan Dombivali Municipal Corporation

RO(HQ) 537-

545

7 M/s. Thermax Babcock & Wilcox Energy Solutions Pvt. Ltd., (TBWESPL) Plot No. A-2, A-3, Khandal Indl. Area, Ph-1 MIDC

Request for waive the consent

conditions JD

(APC)

546-

558

8 To regulate the source and purchase of non added urea used as a raw material while granting consent to operate to the industry

AST 559-

560

Page 9: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

Resubmitted Agenda ( Part-I)

CAC Item No.01 Name of the Industry: M/s. Ordnance Factory,

Jawahar Nagar, Bhandara.

HOD Remarks:

1. Applied for renewal of consent for the production of Recrystallised Hexamine, Acids, Single base

Propellant , Ballistite Propellant, Nitrocellulose, RDX & RDX Compounds, Double Base Rocket

Propellants – Quantity as per production target decided Ministry of Defence.

2. Earlier consent for the manufacturing of Hexamine-60 MT/M, Ether-20 MT/M, Weak Nitric Acid-

200 MT/M, Sulphuric Acid (Conc.94-96%) -200 MT/M, Nitric Acid (Conc. 99%)-500 MT/M &

Nitrocellulose-120 MT/M was valid up to 31.07.2012.

3. Capital investment of the industry is Rs.115.21 Crores. Consent Fee 6,91,260/- paid for the

period up to 31.7.2015.

4. DE-3200 CMD. Sewage Treatment plant provided. Disposal on land in the premises. I.E.-5200

CMD. Primary, Secondary and Tertiary Treatment provided. Treated effluent disposed into nalla

outside the premises.

5. R.O. Nagpur vide letter dated 2.11.2010 has issued the directions U/s. 33A of Water (P & CP)

Act, 1974 and U/s.31A of the Air (P & CP) Act, 1981, the copy of directions is enclosed herewith.

6. SRO, Bhandara reported that industry has not complied with the following directions.

i) Treated effluent is not recycled/re-used and it discharge into local nalla outside factory

premises.

ii) Industry submitted proposal for laying of treated effluent distribution pipeline network for

disposal of treated effluent on land in the premises which had to be start in June 2012

and will be completed by June, 2014. However, the work is not yet started.

iii) Treated effluent collections sump of adequate capacity not constructed.

7. SRO further reported that

i) Huge quantum of chemical sludge is found dumped near .S.D.B.

ii) Storage facility for dried chemical sludge is not adequate.

iii) One of the wall of SDB was found broken and hazardous waste found spilled out of this

unit.

iv) Industry has installed new RDX plant and have added RDX product in this application but

investment is not mentioned. Also additional fees not paid and from when they have

commissioned this plant is not disclosed.

v) There is increase in the Industrial effluent by 1200 M3/day but details of capacity of

existing ETP is not mentioned.

vi) SRO Office has issued a letter dated 22.6.2012 to the industry & reply is awaited.

The case was discussed in C.A.C. Meeting held on 25.07.2012 and it was decided to issue SCN for refusal of consent for non-compliance of consent conditions, directions issued by the Board and

Page 10: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

installed new RDX plant without prior permission of the Board. Accordingly Board has issued SCN vide letter dated 31.7.2012. Industry has submitted the reply of SCN vide letter dated 13.08.2012. In view of above we may grant consent with additional products such as RDX with the following conditions. 1) Reuse the treated effluent and execute the scheme before December, 2013 with Bank Guarantee

of Rs.5/- Lakhs. 2) For storage of sludge in scientific manner the adequate arrangement shall be carried out before

March, 2013 with B.G. of Rs.2/- Lakhs. 3) Operational Bank Guarantee of Rs.2/- Lakhs. 4) To obtain the Membership of Hazardous Waste within next 2 months with B.G. of Rs.1/- Lakh. 5) All the remaining hazardous which is lying shall be disposed to CHWTSDF within next 45 days

with operational B.G. of Rs.2/- Lakhs. 6) For carrying out any expansion in future Consent to Establish shall be taken.

Page 11: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.02

Name of the Industry: M/s. Wardha Power Company Ltd (Phase-I), Plot No.B-2, Warora Growth Center, Warora MIDC, Dist: Chandrapur. H.O.D. Remarks:

1. Applied for renewal of consent to operate for one year with no change in consented electricity generation i.e 2 x 135 MW.

2. Earlier consent was valid up to 31.05.2012. 3. Earlier estimated gross capital investment was Rs 1581.12 Crores whereas industry has now shown

Gross capital investment as Rs 1478.38 Crores. The industry has submitted this is actual investment including infrastructure development, clean technology, pollution control systems, and better production management. Consent fees of Rs.29,56,760/- paid for the period up to 31..05.2013.

4. Industrial Effluent – 5358 CMD. ETP provided. Domestic Effluent- 384 CMD, STP provided. Treated effluent recycled to maximum extent and remaining disposed on land for gardening.

5. ESP followed by Bag house provided to boiler. Bag house provided to coal crusher and transfer point. 6. Analysis results of ambient air quality monitoring carried out between 22.10.2011 to

08.02.2012 shows the parameter RSPM are exceeding the standards. 7. Stack monitoring results are exceeding the standards most of the times. 8. Cess payment made up to 31/08/2011 & Environmental statement was submitted. 9. As per earlier consent directions industry has deposited bank Guarantee of Rs 5.0 Lacs which is valid

up to 13 March 2013. Discussed in CAC held on 3.7.2012 & it was decided to issue show cause notice for refusal of consent for non-compliance of consent condition. Show cause notice was issued on 13.7.2012 and industry submitted the reply of show cause notice on dated 16.7.2012. Necessary pollution control system is provided by the unit. Already Bank Guarantee of Rs.20/- Lakh is available against Phase –II renewal. We may grant renewal of consent for phase-I Unit up to 31.5.2013.

Page 12: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.03 Name of the Industry : M/s. Chandrapur Ferro Alloy Plant, Survey No.498/2, 499 & 500 & 503/2, Mul Road, Chandrapur.

HOD Remarks:

1) Applied for consent to establish for expansion project by installing one submerged Electric

Arc Furnace of capacity of 45 MWA for production of high carbon ferro-manganese, silico-mangnese and electricity plant of capacity of 4.0 MW based on co-gas generated from manufacturing process.

2) Existing unit consent for manufacturing of Ferro Manganese Plant, Sinter Plant and Power Plant was valid up to 31.12.2011 and Capital Investment of existing unit is Rs.86.70 Crores. Applied for renewal of consent for existing unit. Show cause notice issued to the existing unit vide letter dated 23.04.2012 due to non-compliance of consent conditions and interim directions issued by the Board and due to discharge of substandard into river Zarpat.

3) Capital Investment of the expansion project is Rs. 221.42 Crores. Industry has paid Consent fee of Rs.4,42,480/-, as per new GR

5) Domestic Effluent is 24 CMD. and Industrial Effluent is 500 CMD, Septic Tank and Soak pit provided.

6) This office has issued interim directions vide letter dated 19/12/2011 to carry out Environmental Works in time bound manner.

The case was discussed in CAC meeting held on 3.7.2012 and it was decided to issue show cause notice for refusal of consent as the existing unit has not complied with the consent conditions. Accordingly the show cause notice was issued to the industry on 12.7.2012. R.O. Chandrapur vide letter dated 17.7.2012 submitted the reply of SCN. The unit is not complying to the time period issued by the Board for completion of pollution control system and industry requested for extension of time period. The B.G. of the existing unit of Rs.12/- Lakhs is forfeited by the Board as per the decision taken in the Consent Committee. In view of above, we may grant consent to establish for expansion only after the completion of pollution control works of the existing unit.

Page 13: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.04

Name of the Industry: M/s. ISMT Ltd, Plot No. C-1, MIDC Ahmednagar, Dist: Ahmednagar. HOD Remarks:

1. Industry has applied for expansion in the production of Seamless Tubes of different

diameters – 2000 MT/Month. 2. Capital Investment of the proposed expansion is Rs.17.4 Crores. Capital Investment of

existing unit is Rs.94.90 Crores. Total Capital Investment of the industry is Rs.112.3 Crores, hence in the purview of CAC. Consent to Establish fee of Rs.50,000/- is paid by the industry.

3. Existing unit consent for manufacturing of Seamless Metal Tubes of different diameters – 4000 MT/Month is valid up to 31.03.2014.

4. Proposed expansion is in existing unit which is located in MIDC Ahmednagar & about 2.8 km from Sina river, A-II Class.

5. Domestic Effluent-43 CMD, Septic Tank and Soak pit provided. Treated effluent is disposed on land for gardening. Industrial Effleunt-24.0 CMD, Primary treatment provided. Treated effluent disposed on land for gardening.

6. SRO Ahmednagar reported that; i) Industry already completed work of expansion unit last year without obtaining

consent from the Board.

ii) ETP Sludge found lying on the ground. iii) Industry has not provided fume extraction system facility & adequate air pollution control

equipment to pickling, phosphating Section and Surface treatment plant as per the previous consent granted by the Board.

iv) Industry has not provided sampling facility to furnace chimney. v) Industry is disposing treated effluent on the back side of the ETP towards MIDC

road. vi) Industry has dumped ETP sludge on open land near sludge filter press. vii) Hazardous waste storage was not as per Hazardous Waste Rule. viii) Adequate height of chimney was not provided to fired tagging section.

7. Environment Statement for the period 2010-2011 submitted. 8. Latest analysis result of treated effluent, ambient air quality monitoring & stack monitoring

are not furnished. 9. Cess payment details are not furnished. Discussed in CAC dated 3.7.2012 and it was decided to issue Show cause notice for refusal of consent for not obtaining necessary permission from the Board before starting the expansion activity and existing unit is not complying with the consent conditions. Accordingly SCN was issued on 12.7.2012. Industry replied the to the show cause notice on 26.7.2012 stating that they have already done expansion and production trial is already taken. We may grant consent Establish (Expansion) with condition that industry should submit Company Board Resolution as the unit has taken production without consent.

Page 14: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.05 Name of the Industry: M/s Hindalco Industries Limited, (Expansion Project), Sr. No. 95/1, 95/2, Village Daheli, Tq. Mouda, Dist. Nagpur

HOD Remarks:

1. Existing RED/LSI unit of manufacturing of Aluminium strips & sheets – 3250 MT/Month having valid consent for the period up to 31.12.2012.

2. Now applied consent to establish for expansion for manufacturing of additional products of Aluminium Strips, Sheets, Foils and Aluminium Laminated and Printed Products -2250 Mt/month.

3. Capital investment of the proposed expansion is Rs.197.34 crore. Capital Investment of the existing unit is Rs.198.8/-crore. ( Total C.I. is Rs. 396.14/-crore)

4. Industry has paid consent to Establish fee of Rs. 3,94,780/- as per New Consent Feee GR dated 25.8.2011.

5. Industry does not satisfy RRZ policy as Kanhan River is about 350 meter from plant, hence industry required to submit the pollution load certificate for existing and expansion activity.

The case was discussed in CAC meeting held on 16.04.2012 & it was decided to issue SCN for refusal of consent for not complying with RRZ policy, 2009. Accordingly, SCN dated 24.04.2012 was issued to the industry. Industry vide e-mail dated 25.05.2012 submitted the reply to the SCN.

In view of non-compliance of R.R.Z. Policy we may refuse the application of the industry for expansion project. Discussed in CAC Meeting held on 3.7.2012 and it was decided that SLO shall review the industry reply dated 25.5.2012 regarding coverage of Kanhan river policy 2009 and resubmit the case in next CAC. SLO recommended that the file may be referred to RRZ policy Committee for review and opinion. The industry vide letter dated 14.09.2012 has submitted the revised proposal for the expansion project for further consideration. Industry stated that there will not be any increase in production level. Only they are proposed to add some machineries like rolling mill/separator/roll grinder/annealing furnace etc. so that from the same machine micro level alluminium sheets can be made keeping the same production level and there will be reduction in water quality to 60 me3/day and no increase in effluent quantity discharge. The additional machine cost 197.34 Crores to install the same. The unit has given original and modified proposal. In view of above, we may put up the modified proposal before CAC for further consideration on the ground that there will not be any change in production quantity as per earlier granted one and decrease in water consumption.

Page 15: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.06 Name of the Industry: M/s. Amba River Coke Ltd,

(Pellet Plant) Village: Dolvi, Wadkhal, Tal: Pen, Dist –Raigad.

. HOD Remarks:

1. Applied for grant of consent to Establish. 2. Application for grant of consent to establish received to HQ on 19.03.2012. 3. Query letter send to industry on 02.04.2012. 4. This case was discussed in the CAC meeting held on 16.04.2012 and it was

decided to refer the file to Sr. L. O. for status of PIL, High Court decision. 5. Hon’ble Chairman instructed to obtain clarification from SRO about his comment

regarding PIL and Court case etc. in consent processing report. 6. SRO Raigad-II has submitted on 26.06.2012 that grievances in PIL is not related

with the industrial premise of the applicant company and proposed area of project is neither disputed nor related to destruction of mangroves.

7. Industry has applied for EC for expansion of integrated steel plant from 3 MTPA to 5 MTPA.

8. This case was discussed in CAC meeting held on 3/07/2012 and it was decided to keep the case in abeyance and Sr. L.O.’s comment was called in respect of S.R.O.(Raigad-II)/R.O.(Raigad) submission regarding FIR/PIL.

9. Sr.L.O. in his report stated that Survey Nos. of the plot on which existing and proposed projects are projected is not included in the FIR and Affidavit.

10. Industry has paid consent fees Rs.14,46,000/-as per revised G.R.25.08.2011. 11. Consent to establish may be granted subject to condition that industry shall not

take any effective Steps till EC is obtained.

Page 16: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.07 Name of the Industry: M/s. Amba River Coke Ltd,

(Down Stream Project, CRM) Village: Dolvi, Wadkhal, Tal: Pen, Dist –Raigad.

. HOD Remarks:

1. Applied for grant of consent to Establish. 2. Application for grant of consent to establish received to HQ on 19.03.2012. 3. Query letter send to industry on 02.04.2012. 4. This case was discussed in the CAC meeting held on 16.04.2012 and it was

decided to refer the file to Sr. L. O. for status of PIL, High Court decision. 5. Hon’ble Chairman instructed to obtain clarification from SRO about his comment

regarding PIL and Court case etc. in consent processing report. 6. SRO Raigad-II has submitted on 26.06.2012 that grievances in PIL is not related

with the industrial premise of the applicant company and proposed area of project is neither disputed nor related to destruction of mangroves.

7. Industry has applied for EC for expansion of integrated steel plant from 3 MTPA to 5 MTPA.

8. This case was discussed in CAC meeting held on 3/07/2012 and it was decided to keep the case in abeyance and Sr. L.O.’s comment was called in respect of S.R.O.(Raigad-II)/R.O.(Raigad) submission regarding FIR/PIL.

9. Sr.L.O. in his report stated that Survey Nos. of the plot on which existing and proposed projects are projected is not included in the FIR and Affidavit.

10. Industry has paid consent fees Rs.6, 02,000/-as per revised G.R.25.08.2011. 11. Consent to establish may be granted subject to condition that industry shall not

take any effective Steps till EC is obtained.

Page 17: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.08 Name of industry :- M/s. Mandana Dyeing Unit-II,

(Division of Mandhana Industries Ltd.) C-3, MIDC Tarapur, Boisar, Dist - Thane

HOD Remarks :

Case was disused in CAC meeting held on 31.01.2012 and was decided to refuse the consent as the industry had not completed commissioning of RO Plant & ETP plant system to chive zero discharge.

Consent was refused on 06.02.2012.

Industry submitted vide letter dated 23.08.2012 requesting withdraw of the refusal and also requested to allow them to discharge 30% (400 CMD) to MIDC drainage network which further leads to CETP.

The TEPS CETP, Tarapurhas issued NOC dt. 20.08.2012 for discharging treated effluent to outlet of CETP at point suggested by MIDC /MPCB.

Hon’ble high court, Mumbai in PIL filed by Nicholas Almedia V/s State of Maharashtra & Ors to oversee the compliance of the CETP’s in state of Maharashtra.

Sub-Regional Officer, Tarapur has reported that CETP has already receiving 25 MLD effluent and no further effluent could be accommodated in CETP, Tarapur.

Sr. Law Officer has stated that decision may be taken on basis of the order passed by Hon’ble High Court, Mumbai

The order includes monitoring the performance of non-compiling CETP, particularly highly polluting category which includes Tarapur.

We may grant permission to industry for disposal of 30% @ 400 CMD to outlet of CETP. The separate pipeline up to outlet of CETP shall be lay down by industry with prior permission from MIDC including confirmation of joining point to outlet pipeline of CETP.

Submitted in CAC.

Page 18: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.09 Name of industry :- M/s. Skol Breweries Ltd., L-5, MIDC Waluj,

Aurangabad.

HOD Remarks: 1. Applied for Consent to operate i.e. installation of biomass Briquette fired Boiler 12 TPH. 2. Application received at SRO Aurangabad-I on Dt.27/03/2012 and at HQ 04/05/2012. 3. Manufacturing of Beer. Existing consent is valid till 31/03/2015. 4. Ind has installed Bag house as an air pollution control equipment. 5. Existing boiler is furnace oil Fired Boiler. 6. JVS results are fluctuating in respect of BOD & COD. 7. Treated effluent sent to CETP 8. The application was discussed in CAC dtd 03.07.2012 & It was decided to obtain details

of all directions issued to the industry by the Board on record and revert back to CAC. The report was called from RO Aurangabad. RO Aurangabad vide E mail dtd 29.08.2012 submitted the compliance.

9. We may grant C to O for installation of Briquette fired Boiler & also amalgamate in existing consent..

Page 19: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.10 Name of industry :- M/s. Ruchi Soya Industries Ltd.,

(For additional activity) Patalganga, At Isambe, Savroli-Kharpada Road, Tal- Khalapur, Dist- Raigad.

HOD Remarks :

Case was disused in CAC meeting held on 03.07.2012 and was Not approved. It was decided to verify case for RRZ Policy, 2009 and information regarding previous consent.

The distance certificate of irrigation department submitted by industry, it shows 2.10 KM distance from river Patalganga.

Previous consent was issued on 28th June 2012 vide no. MPCB/JD(WPC)/EIC-RD-2274.12/O/CAC-484.

Recommended for Consent to Establish for 4.42 MW Captive Power Plant with condition of ESP.

Page 20: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.11 M/s. Biltube Industries Ltd. Gat No. 1172 – 1178, A/P - Kodoli, Taluka - Panhala, Dist - Kolhapur.

Industry has Fresh re-applied for renewal of Consent to Operate due to earlier consent refusal by the Board dt. 07.08.2012 for not achieving the consented standard and not achieving zero discharge. It is RED/LSI unit.

Total capital investment is 171.53 Cr. as per CA certificate submitted by industry.

Industry engaged in manufacturing of Core Board - 4000 MT/M, Cone Board - 1500 MT/M and captive power plant of 4 MW

Total Industrial Effluent generation is 1209 m3/day, out of which 1044 m3/day reused and net dischargeable effluent is 165 m3/day

Industry has provided ETP comprising Fine Screen, Jash Automatic Screen, Equalization Tank, Flash Mixer, Primary Clarifier, Aeration Tank, Secondary Clarifier, Final Treated Tank, Decanter, Sludge Drying Bed. Industry has proposed for Sand Filter and Activated Carbon Filter.

Treated effluent is disposed by spring on coal and ash handling section and own land for Gardening and Plantation.

Industry generates domestic 2.5 m3/day effluent which is treated in septic tank

Industry has provided ESP to coal fired boiler and water sprinkling arrangement for the coal and ash handling section.

Industry submitted reply against refusal of consent

Fresh fees paid by industry Rs. 7,12,560/- for consent validity upto 31.12.2013

RO Kolhapur has recommended renewal of consent subject to provide separate energy meter to ETP, Flow meter to outlet of ETP, ETP up-gradation plan with time bound manner and obtaining of Bank Guarantee.

Board has issued refusal and now industry has applied fresh application stating complying such as Activity zero discharge ETP up-gradation plant with BG

Recommended to grant renewal of consent to operate.

Page 21: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.12

Name of the Industry: M/s. JSW Ispat Steel Limited., (Coke Drying plant)

Village: Dolvi, Tal: Pen, Dist –Raigad..

HOD Remarks:

1. Applied for grant of consent to Establish. 2. Application for grant of consent to establish received to HQ on 9.04.2012. 3. Query letter send to industry on 23.04.2012. 2. Reply submitted by the industry on 23.04.2012. 3. This case was referred to Sr. L. O. for status of PIL, High Court decision. 4. Hon’ble Chairman instructed to obtain clarification from SRO about not

mentioning his comment regarding PIL and Court case etc. in consent processing report.

5. SRO Raigad-II has submitted on 26.06.2012 that grievances in PIL is not related with the industrial premise of the applicant company and proposed area of project is neither disputed nor related to destruction of mangroves.

6. This case was discussed in CAC meeting held on 3/07/2012 and it was decided to keep the case in abeyance and Sr. L.O.’s comment was called in respect of S.R.O.(Raigad-II)/R.O.(Raigad) submission regarding FIR/PIL.

7. Sr.L.O. in his report stated that Survey Nos. of the plot on which existing and proposed projects are projected is not included in the FIR and Affidavit.

8. Industry has paid consent fees Rs.15,100/-as per revised G.R.25.08.2011. 9. Consent to establish may be granted.

Page 22: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.13

Name of the Industry: M/s. JSW Ispat Steel Limited., (Lime Calcining plant)

Village: Dolvi, Tal: Pen, Dist –Raigad.

HOD Remarks:

1. Applied for grant of consent to Establish. 2. Application for grant of consent to establish received to HQ on 19.03.2012. 3. Query letter send to industry on 02.04.2012. 4. Reply submitted by the industry on 23.04.2012. 5. This case was referred to Sr. L. O. for status of PIL, High Court decision. 6. Hon’ble Chairman instructed to obtain clarification from SRO about his comment

regarding PIL and Court case etc. in consent processing report. 7. SRO Raigad-II has submitted on 26.06.2012 that grievances in PIL is not related

with the industrial premise of the applicant company and proposed area of project is neither disputed nor related to destruction of mangroves.

8. Industry has applied for EC for expansion of integrated steel plant from 3 MTPA to 5 MTPA.

9. This case was discussed in CAC meeting held on 3/07/2012 and it was decided to keep the case in abeyance and Sr. L.O.’s comment was called in respect of S.R.O.(Raigad-II)/R.O.(Raigad) submission regarding FIR/PIL.

10. Sr.L.O. in his report stated that Survey Nos. of the plot on which existing and proposed projects are projected is not included in the FIR and Affidavit.

11. Industry has paid consent fees Rs.1, 00,000/-as per revised G.R.25.08.2011. 12. Consent to establish may be granted subject to condition that industry shall not

take any effective Steps till EC is obtained.

Page 23: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.14 Name of the industry: M/s. JSW Energy Ltd.,

A/p- Jaigad, Tal- & Dist – Ratnagiri H.O.D. Remarks:-

1. Case discussed in CAC meeting held on 03/07/2012, it was decided to issue SCN for refusal of consent to industry, as have not provided FGD as conditions of EC/Consent.

2. SCN was issued to the industry vide this office letter dt. 10/07/2012 and accordingly reply received from the industry vide their letter dt. 13/07/201.

3. Due to fire incidence on 19/06/2012, could not commission FGD as per EC conditions.

4. Submitted revised schedule to MoEF Govt of India and MoEF Govt of India have accepted the revised schedule.

5. Hon’ble High Court, Bombay have granted Ad-Interim stay on forfeiture of BG. 6. We my extend the time period of completion of FGD’s as per revised schedule and

renew the consent upto 30/06/2013 with condition of BG extension as directed by MoEF.

7. We may place the consent application before CAC for further consideration.

Page 24: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.15 Name of the industry: M/s. Maharashtra State Power Generation Co. Ltd.,

Thermal Power Station Parli (VII), Tal- Parli, Dist – Beed,

H.O.D. Remarks:-

1. Case discussed in CAC meeting held on 25/07/2012, it was decided to revisit the points of Joint meeting of MAHAGENCO & MPCB and time bound programme submitted by industry and revert back to CAC.

2. Accordingly, the points of Joint Meeting of MAHAGENCO & MPCB and time bound programme submitted by the industry are revisited and the separate sheet of action point statement is submitted before CAC.

3. In view of above we may grant renewal of consent upto 31/05/2014 with BG of Rs.34/- Lakhs for compliance of recommendations on action plan.

4. We may place the consent application before CAC for further consideration.

Page 25: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.16 Name of the Industry : M/s. Hindalco Industries Limited, Sr. No.95/1, 95/2, Village Daheli, Tal: Mouda, Dist: Nagpur. HOD Remarks:

1. Existing unit. RED/LSI. 2. Applied for consent to operate for expansion i.e. for installation of new machineries;

Rolling Mill – 2 Nos., Twin Chamber Remelt Furnace-1 No., Roll Grinder – 1, Aluminium Furnace-1 No.

3. Board has granted Consent to Establish for installing additional facilities as mentioned above without increase in quantity of products.

4. Consent of existing unit valid for the period up to 31.12.2012 for manufacturing of Aluminium Strips and Sheets – 3250 MT/Month.

5. This application is only for operation for additional facilities for further processing of the products i.e. Aluminium Strips and Sheets of lesser thickness for which additional investment of Rs.164.6 Crore as envisaged.

6. Board has refused the consent vide letter dated 3.2.2012 due to non-completion of installation of machineries and pollution control equipments and non-compliance of consent to establish conditions as per the decision taken in CAC meeting dated 23.01.2012.

7. Industry vide letter dated 11.2.2012 received on 17.2.2012 has requested to consider permission for Rolling Mill No.1 and Laminator for which the work is already completed.

8. SRO, Nagpur-II has also verified the fact and certified that the work of Rolling Mill No.1 and Laminator is completed.

Board has granted Consent to Operate for Rolling Mill No.1 and Laminator for the period up to 28.02.2013 as per the decision taken in CAC meeting held on 02.03.2012. Industry vide letter dated 14.09.2012 has submitted that they have completed all the installation of the machine and are ready for operation.

We may grant consent to operate amalgamating of existing consent for rolling mill no.2, twin chamber remelt furnace, roll grander and aluminium furnace.

Page 26: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.17 Name of the Industry : M/s. Maharashtra State Power Generation Co. Ltd., Bhusawal Thermal Power Station, Unit No. 2 & 3 At: Deepnagar, Tal: Bhusawal, Dist: Jalgaon. HOD Remarks:

1. Applied for renewal of consent for 2 x 210 MW coal based thermal power plant. 2. Earlier consent for electricity generation 482.5 MW (2 x 210 & 1 x 62.5 MW) was valid up

to 31.12.2011. 3. Capital investment of the existing power plant Unit no.2 & 3 is Rs.366.59 Crores. Industry

has paid Consent fee of Rs.7,33,180/- as per new GR dated 25.08.2011 for the period up to 31.12.2012.

4. Domestic Effluent – 1800 CMD. STP provided. Industrial Effluent – 7000 CMD. ETP provided.

5. JVS analysis results of effluent are within limit. 6. ESP provided to unit no.2 & 3. 7. Stack monitoring results are exceeding the standards limit. 8. Fly ash is disposed to cement manufacturers. Earlier the case was discussed in CAC dated 29.05.2012 and it was decided to issue Show Cause Notice for refusal of consent for non-compliance of consent conditions. Accordingly, Board has issued SCN vide letter dated 20.6.2012. Industry has submitted their reply vide letter dated 30.6.2012. Action plan submitted by Power Station as per joint action plan meeting. The power station authorities has given the programme for retrofication / revamping / pollution control system upgradation as per joint action plan. The recommendation of MPCB along with time period are shown in separate chart which is attached herewith.

In view of above we may grant renewal up to 31.12.2012 with total B.G. of Rs.79/- lakhs as per the programme / recommendation of MPCB against each compliance shown in column no.’N’.

Page 27: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.18 Name of the Industry : M/s. Maharashtra State Power Generation Co. Ltd., Bhusawal Thermal Power Station, Unit No. 5 At: Deepnagar, Tal: Bhusawal, Dist: Jalgaon. HOD Remarks:

1. Applied for 1st Consent to Operate for Unit No.5 of 500 MW. 2. Consent to Establish is obtained from the Board, vide letter dated 8.8.2006 for 500 MW.. 3. Board has already granted Consent to Operate for Unit No.4 of 500 MW which is valid up to

30.11.2012. 4. Capital investment of the unit is Rs.4616 Crores. Industry has already paid Consent fee of

Rs.92,32,000/- as per new GR dated 25.08.2011. 5. Domestic Effluent – 1440 CMD. STP provided. Industrial Effluent – 6290 CMD. ETP

provided. 6. Coal consumption is 13151 MT/day. 7. ESP provided with design of SPM standard of 50 mg/Nm3. 8. Dry ash silo provided. 9. Regional Officer, Nashik vide letter dated 2.5.2012 received on 10.05.2012 reported the

non-compliance of MAHAGENCO Power plant related to Unit No.5 and also mentioned that MAHAGENCO authority has not taken any effective steps regarding disposal of ash slurry effluent. Regional Officer, Nashik recommended refusal of consent to operate of Unit No.5 of 500 MW.

The case was discussed in CAC meeting held on 29.05.2012. It was decided to revert back to CAC after receipt of completion report from R.O. regarding the pollution control system. R.O. Nashik vide letter dated 10.8.2012 received on 21.08.2012, has submitted the compliance report of M/s. Bhusawal TPS Unit-5. Industry has submitted joint action plan for unit no.4 & 5. We may grant 1st Consent to Operate for Unit No.5 for one year period subject to following conditions. i) To achieve the consent standards regularly for which operational B.G. of Rs.10 Lakhs

shall be obtained. ii) To provide STP within one year period for which operational B.G. of Rs.5 Lakhs shall be

taken. iii) To provide ash water recycling arrangement within one year period for which B.G. of

Rs.5 Lakhs shall be obtained.

Page 28: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.19 Name of the industry: M/s. WCL Durgapur Opencast Mine, WCL Durgapur Opencast Sub Area, PO-Durgapur, Tal & Dist: Chandrapur. H.O.D. Remarks.

1. Applied for consent to operate for expansion of coal production from 2.3 million ton per year to 3.0 million ton per year.

2. Mine authority has obtained consent to establish for expansion quantity of 3.0 million

ton per year vide letter dated 18/06/2010.

3. Mine authority has obtained Environmental Clearance for expansion quantity for 3.0 million ton per year from MoEF, vide letter dated 16th march 2012.

4. The Board vide letter no.MPC/CRO/137/352/2011 dated 18/02/2011, had issued interim directions to said mine. As per directions, mine authority has completed following works. a)Concrete pavement to 100 meter at weigh bridge. b) Sprinkler arrangement near Weigh Bridge.

5. Mine authority has taken following measures to control pollution i) Water sprinklers at CHP area, with side cladding to conveyor belts. ii) Tarring of coal transportation roads. iii) Sprinklers along haul road. iv) Mobile water tankers for water spraying. v) Sprinklers at weigh bridge. vi) Rain gun at Coal stock yard no V vii) Road cleaning & booming.

6. Water Pollution i) Work shop ETP. ii) Sedimentation Tanks for mine water treatment. iii) DETP for treatment of colony sewage.

7. Analysis results of ambient air quality monitoring shows the RSPM level are exceeding the standards.

Discussed in CAC held on 3.7.2012 and it was decided to keep the case in abeyance till the completion of installation of Pollution control system as per Environment Clearance/Consent condition for existing and proposed unit. Report from SRO Chandrapur received on 14.09.2012. all the pollution related works are now completed as per SRO report. Except work of A.P.C. at C.H.P. and roads. Regular complaints from nearby residents. In view of above, we may grant consent for 3.0 million ton per annum capacity with condition that mine shall complete remaining works within 2 months with a Bank Guarantee of Rs.10/- Lakhs.

Page 29: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.20

Name of the industry : M/s. EMCO Energy Ltd (Phase-I),

(1x300 MW Phase-I Coal Based Thermal Power Plant),

MIDC Warora, Dist: Chandrapur.

H.O.D. Remarks:

1. Applied for grant of consent to operate for phase -1 for power generation of 1x 300 MW.

2. The industry has obtained consent to establish for phase -1 for 1 x 300 MW from the Board

vide letter dated 23/06/2010.

3. The Industry has obtained Environmental clearance from the MoEF, GOI, vide letter dated

19th May 2008 (2x135mw) & amendment vide letter dated 4th June 2009 for 1 x330 MW

project.

4. Gross capital investment of the industry is Rs 1627.74 Crores. Industry has paid consent fee

of Rs 32,55,480/- for one year, as per new GR.

5. Domestic Effluent is 384 CMD. Industrial Effluent is 6218 CMD. STP & ETP provided.

Treated Effluent will be recycled in the process.

Page 30: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.21 Name of Industry: - M/s. Finolex Industries Ltd. Vill. Ranpar Golap, Tal. & Dist. Ratnagiri

HOD Remarks-

1. Application for Plain renewal of Consent. 2. Product- of PVC resins, pipes & CPP. 3. Application received at SRO on 18/07/2012 and at HQ on 04/08/2012. 4. Additional information was called from RO Kolhapur vide letter dtd. 13/08/2012.

Accordingly RO Kolhapur vide E-mail dtd. 21/08/2012 submitted additional information.

5. The case was placed before CAC meeting dtd. 21/08/2012 and it was decided that report by E-mail from RO was received by today (on 21.08.2012), hence it was decided to resubmit the case in next meeting after examining the report of RO.

6. RO Kolhapur has submitted additional information as industry has paid additional consent fees of Rs. 75,000/- towards C to E for increased CI, Env. Statement Report submitted, Latest JVS results etc.

7. I.E. generation is 4020 m3/day from which 2160 m3 is recycled and reused back. Also the daily quantity of desalination water reject back to sea is 4000 m3.

8. Considering this, the renewal may be granted up to 31.07.2014

Page 31: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.22

Name of the Industry: M/s Deepak Fertilisers & Petrochemicals Corporation Ltd. Plot No K-1 to K -5 MIDC Taloja, Dist- Raigad.

HOD Remark:-

Applications recd at RO Navi Mumbai on 17/02/2012.

Application recd at HQ on 06/06/2012.

Mfg of Basic Fertilizer activity. Existing unit holding consent valid upto 31.08.2016.

Earlier C to E was granted for mfg of Liquid CO2, weak & Concentrated Nitric Acid on 29.4.2008.

Industry has obtained C to O for all the products except conc. Nitric Acid.

Now applied for 1st consent to operate for mfg of Concentrate Nitric Acid CNA III- 3850 MT/M.

Existing full fledged common two ETPs provided. The total I.E. –3878.28 CMD and D.E. 577 CMD. Proposed IE & DE – NIL

Industry location 50 mtrs from Kasardi river. Attracts RRZ policy 2009 but C to E already granted in 2008, prior to RRZ policy 2009.

Proposed direction was issued on 7/12/11 due to ammonia gas leak incidence on 1.12.2011 & fish kill incidence in Kasardi river on 03.12.2011. industry submitted the reply at RO NM.

RO Navi Mumbai has recommended for grant of consent to 1st operate with BG condition for checking P.D. compliance or to ensure no such incidence takes place in future.

Earlier case was discussed in CAC meeting held on 25/7/2012 and it was decided to refer the case to RRZ Committee and revert back to CAC. Accordingly letter sent to RRZ committee on 28/8/2012. mean time industry has made representation to Hon’ble Chairman of the Board stating that, they are obtained C to E on 29/4/2008, prior to RRZ notification 2009 and there is no increase in pollution load in earlier combined consent granted by Board and requested for grant of consent to operate and not to refer the case to RRZ Committee as the plant is already erected and commissioned. As Kasardi river was not notified before 2009.

In this regard CAC may take suitable decision about industry request. If the industry request is consider then, We may consider case for 1st C to O for Concentrated Nitric Acid with amalgamation by imposing following conditions-.

1. Provision of emergency waste storage tank of sufficient capacity in case of any accidental discharge / contaminated storm water.

2. Proponent shall submit the adequacy report about APC of concentrated Nitric Acid plant

3. Operational B G of Rs 5.00 lacs.

Page 32: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.23 Name of Industry: M/s Deepak Fertilizers & Petrochemicals Corporation Ltd Plot No K-1 to K-5, MIDC Taloja, Raigad.

Application recd at RO NM on 04.04.2012

Application recd at HQ on 29.05.2012

Existing unit. Mfg of Basic Fertilizers.

Applied for consent to establish of Expansion for mfg of liquid CO2.

Existing I.E. – 3878.28 CMD , Proposed IE quantity 15.6 CMD. Industry has proposal of installing RO plant of 24.0 CMD capacity and achieving no additional discharge to CETP.

Industry location 50 mtrs from Kasardi river, attracts RRZ policy 2009.

RO NM has recommended to grant consent after receipt of “No increase in pollution load certificate”.

Case was discussed in CAC meeting held on 03/07/2012 and it was decided to issue SCN for refusal. Accordingly SCN was issued and reply from industry is received.

Industry has submitted “No increase in pollution load certificate” from IIT Bombay. Industry has proposal of installing RO plant of 24.0 CMD capacity and achieving no additional discharge to CETP.

The proponent has planned to recover the CO2 gas which is going to atmosphere, there by reducing GHG emissions.

Considering IIT Bombay report we may grant consent to establish with no increase in pollution load.

Page 33: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.24 Name of industry: - M/s. Mazgaon Dock Ltd , Dock Yard Road, Mazgaon Mumbai. HOD Remarks:

Resubmission case was placed before CAC of 29/05/2012.

Applied for renewal of Consent to operate with expansion.

Application received at SRO on 27/02/2012 and at HQ on 07/05/2012

Capital investment of the industry is 169.18 Crs.

Industry has provided ETP consisting of primary treatment followed by tertiary treatment, which is inadequate considering physical segregation of high COD & metal bearing system, which requires up gradation of existing of ETP.

Industry has provided Air Pollution Control System in form of suction hood.

JVS analysis results dated 28/06/2011, & 22/09/2011 are exceeding consent limit.

RO Mumbai, recommended renewal of consent to operate with Bank Guarantee for up gradation of ETP, STP & Air Pollution Control System.

ETP is not operated regularly.

Dry & wet Dock construction started without CRZ clearance & C to E from MPC Board.

More than 10% increase in investment made without permission i.e C.I. Increased from 143.27 Crs to 169.18 Crs

SCN for refusal of consent issued on 27/6/2012.

In reply dated 26/7/2012mentioned that the activity is exempted for CRZ Clearance ,whereas it is permitted activity.

Firm has not submitted EC/CRZ Clearnce.

SRO Reported Non Compliance of STP & ETP.

Recommended for refusal of consent for Non Compliance of ETP & STP AND Non submission of EC & CRZ Clearance.

Page 34: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.25 Name of Industry M/s IRB Sindhudurg Air Port Pvt. Ltd., Village Parule and ChiChippiwadi, Tal. Vengurla, Dist Sindhudurg. HOD Remarks:

1. Applications for Consent to Establish. 2. Application Received at SRO on 15/03/2012 and at HQ on 07/05/2012. 3. Sewage generation is 15 M3/day Industry has proposed STP of 15 M3/day 4. The firm has proposed vermicomposting for Biodegradable.

5. The firm has obtained EC of MoEF, vide F.No.10-27/2010-IA.III dt. 21/12/2011. 6. The location of the site falls in the Sindhudurg Distrcit which is declared as a Tourism District. 7. The Moratorium for consideration of the projects in Sindhudurg District was upto 30/06/2012. 8. Consent may be granted with the condition that no effective steps to be taken on site prior to confirmation of applicability of the moratorium to the said project & review by MOEF and obtaining BG of Rs. 10 lacs for providing STP and MSW processing plant

Page 35: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.26 Name of Industry: M/s Exide Industries Ltd., D – II Block, MIDC Chinchwad, Pune – 19. HOD Remarks:

1. The Industry has obtained C to O vide No. BO/MPCB/RO(HQ)/ HSMD/Battery/ CAC/ 48 dt. 16.05.2011 is valid up to 31.12.2013 for manufacturing of Lead acid Storage Batteries are as follows:

Existing

1. SLI (Automotive) - 1,30,000.0 Units/M 2. MX (Motorcycle) - 2,25,000.0 Units/M

2. The Industry has obtained C to E vide No. BO/MPCB/RO(HQ)/ HSMD/Battery/ CAC/

102 dt. 31.10.2011 is valid up to commissioning of the unit or five years, which ever earlier for manufacturing of Lead acid Storage Batteries are as follows:

After Expansion

1. SLI (Automotive) - 2,50,000.0 Units/M 2. MX (Motorcycle) - 3,75,000.0 Units/M

3 Now applied for C to O as per the C to E consent order dated 31.10.2011. 4 Application received at SRO on 22/02/2012 and at HQ on 30/06/2012. 5 Water consumption - 629 M.3 /day, Industrial Effluent: 248 M.3 /day & Sewage

Effluent - 128 M.3 /day. 6 As per the reply of Industry,

STP is provided, commissioned & ready to work.

Trade effluent & domestic effluent is about 248 CMD & 128 CMD respectively. For treatment of trade effluent of 248 CMD, Industry has provided ETP, completed with tertiary treatment & recycling is as follows:

Treated effluent = 248 CMD

Treated effluent recycled for toilet flushing = 30 - 35 CMD

Treated effluent recycled for process for battery cooling = 130-135 CMD

Treated effluent recycled for shop floor washing = 4 - 5 CMD

Treated effluent recycled for gardening = 75 - 80 CMD [ Land available for gardening / irrigation is 16170 sq.mt. is adequate]

Battery dealers applications are not submitted with relevant information, necessary documents by the Industry for obtaining registrations from Board.

7 Board has issued SCN for non compliance, but Industry has submitted partly

satisfactory reply on non compliances as observed in the application. 8 Consent may be granted for C to O for expansion with B G of Rs. 5.0 lakhs for O & M

of ETP & STP to achieve standards.

Page 36: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

Fresh Agenda ( Part-I)

CAC Item No.01

Name of the Industry: M/s. TAL Manufacturing Solutions Ltd., Sector-3, Sr. No.215 (part) to 225(part) and 227 (part) to 229 (part), Vill: Kalkuhi, MIHAN SEZ, Nagpur (Rural), Dist: Nagpur.

H.O.D. Remarks.

1. Existing Unit RED/LSI, The unit is located in MIHAN SEZ, Nagpur. Applied for renewal of

consent. 2. Existing unit consent for manufacturing of Aerospace Assemblies – 500 Nos. / Months

and Aerospace Components - 50,000 Nos/Month was valid up to 31.08.2012. 3. Capital investment of the industry is increased from Rs.180 Crores to 185.91 Crores.

Consent fee of Rs. 7,43,640/- is paid by the industry for the period up to 31.08.2014. However, consent to Establish fee of Rs. 25,000/- for increase in capital investment of Rs.5.91 Crores required to be submitted by the industry.

4. Domestic Effluent – 25.6 CMD. Septic Tank provided and disposed to MADC Sewage Treatment Plant. Industrial Effluent – 152 CMD ETP comprising of Primary, Secondary and tertiary treatment provided. Treated effluent partly recycled and remaining disposed on land for gardening.

5. Industry has provided wet scrubber as air pollution control systems to the surface treatment section & paint booth also provided. Bag filter provided to shot peening Section and abrasive blasting machine. We may grant conditional renewal for one year with condition that unit shall inform to the Board when they are going to start actual production.

Page 37: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.02 Name of the industry: M/s. Rajuri Steels & Alloys Pvt. Ltd., B-6, 7 & 8, MIDC Mul, Dist: Chandrapur.

1. M/s Rajuri Steels & Alloys Pvt Ltd, Plot no, B-6,7 & 8, MIDC Mul,Dist Chandrapur, has

applied for 1st consent to operate for Sponge Iron Plant of 100 TPD only.

2. Said unit had obtained consent to Establish Vide letter no BO/RO-Chandrapur/RO (P & P)/EIC –CH-440-10/E/Cc-67 dated 19/03/2011, for following production. 1) Sponge Iron 180 TPD. 2) Power Plant 10 MW. 3) M.S.Billets 525 TPD. 4) Re-Rolling 500 TPD.

3. Industry has obtained Environmental Clearance from the Government of Maharashtra, vide SEAC-2011/CR-683/TC2 dated 4th July 2012, for Sponge iron 180 TPD, Power Plant 30 MW,Billet Plant 525 TPD and Re-Rolling mill 500 TPD.

4. Industry has intended to operate for Sponge Iron unit of 180 TPD in first stage & other units like power plant, Billets unit & Rolling Mills are proposed in second Phase.

5. Now applied only for Sponge Iron production. Cost of Sponge Iron unit shown as Rs 39.7 Crores and deposited consent fee of Rs 75,000/- for one year.

6. Total capital investment of the industry (Power Plant 30 MW, Sponge Iron Unit 180 TPD, Billet Plant 525 TPD & Re-rolling Mill 500 TPD) is Rs.157.75 Crores.

7. SRO Chandrapur reported that; a) Industry has erected only one sponge iron kiln having capacity of 100

TPD and ready for operation. b) Electrostatic Precipitator having three fields is provided with stack having

height of 60 meters. c) Bag Filters are provided at cooler discharge, Product house & raw

material section & separation building. d) Conveyor Belts with side claddings are provided. e) Bag filters are provided at coal crusher with chimney of height 30 meter. f) Electric connection of all the de dusting is expected to complete within

seven days. The Unit has not yet completed the necessary pollution control system and consent to operate for phase-I may be given only after compliance of Consent to Establish and Environment Clearance conditions

Page 38: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.03

Name of the industry: M/s. Ashok Leyland Pvt. Ltd., MIDC Gaegaon, Tal: Sakoli, Dist: Bhadara H.O.D. Remarks

1. Applied for renewal of Consent. 2. Earlier consent for manufacturing of commercial vehicle assembly 750 Nos./Month,

Crown wheel and pinion – 80 MT/Month, Gear Boxes Assembly – 10500 Nos./Month and components machining – 1050 MT/Month valid up to 30.09.2012.

3. Total Capital investment of the Industry is 467.83 Crores. Consent fee of Rs.18,71,420/- paid for the period up to 30.09.2014.

4. Domestic Effluent- 108 CMD, STP provided. Industrial Effluent- 14.0 CMD. ETP provided. Treated effluent disposed on land for gardening.

5. Analysis results of effluent sample collected from ETP outlet are within limit. 6. Scrubber provided to phosphating plant and paint booth. Bag filter provided to shot

blasting machine. Analysis results of stack monitoring are within limit. 7. Hazardous waste generated from the industry is disposed to CHWTSDF, Butibori. Form

– 4 of hazardous waste is submitted. 8. Environment statement for the year 2010-11 submitted. 9. Cess return filed up to 30.06.2012 and Cess paid up to September, 2010.

We may grant renewal of consent up to 30.09.2014.

Page 39: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.04 Name of the Industry: M/s. Kinetic Engineering Ltd., Nagar Daund Road, Ahmednagar. H.O.D. Remarks:

1. Industry has applied for renewal of consent of existing unit with amalgamation with first consent to operate for expansion and with additional production of gears and shafts set 8000 nos/month and wheel rim 85000 Nos/month.

2. Existing consent is valid up to 30/09/2011 & also having consent to establish which was issued on 24/12/2010.

3. Capital Investment of the industry is Rs.142.10 Crores. Consent fee of Rs.2,84,200/- is paid by the industry.

4. Domestic Effluent-26 CMD, Septic Tank and Soak pit provided. Industrial Effleunt-3.3 CMD, Primary treatment provided. Disposal on land for gardening.

5. Acoustic enclose not provided to the DG set. LPG is used as a fuel in furnace and diesel used in thermopack and DG sets.

6. Latest Analysis results of treated effluent, stack monitoring, ambient air quality and noise monitoring are not submitted.

7. Cess payment details not furnished. 8. SRO Ahmednagar reported that;

i) The Industry has not mentioned commissioning date of expanded unit in the application. ii) The Industry has not provided continues AAQM station as per consent to establish

granted vide no. NK-4116-09/E/CC/282 Dated 14.12.2010. iii) The Industry has not submitted total gross capital investment for the year

2008,2009,2010 & 2011. And also not submitted the month wise production quantity after obtaining Consent To Establish for the expansion.

9. RO, Nashik has reported that distance of the industry mentioned by SRO is 1 km from Sina river which is notified river A-II class hence industry falls under RRZ Policy, decision may be taken accordingly.

As reported by RO/SRO that the distance of industry from notified river is 1.0 k.m. which attracts R.R.Z. also industry is carrying additional products of gears and shaft set 8000 Nos./Month and wheel 85000 nos./month which also attracts RRZ Policy. Industry has not complied to Consent compliance i.e. installation of CAAQMS In view of above, as unit is not complying we may issue show cause notice for refusal of consent.

Page 40: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.05

Name of the Industry: M/s JSW Ispat Steel Limited.,

(Blast Furnace plant), Village: Dolvi, Tal: Pen, Dist: Raigad. HOD Remarks:

1. Applied for grant of renewal of consent to operate. 2. Application for grant of renewal consent to operate received to HQ on 02.08.2012. 3. Query letter send to industry on 16.08.2012. 4. Industry has submitted reply on 01.09.2012. 5. SRO Raigad –II has submitted reply on 01.09.2012 and on 06.09.2012. 6. SRO-Raigad-II has reported that Industry has already installed Top Gas Heat

Recovery System for 5.6 MW electricity generation in year 2000 towards compliance of CREP Guidelines and hence EC is not applicable .Also Industry has complied with the conditions of the interim Directions issued on 15.11.2011.

7. Industry has paid consent fees Rs.1, 14, 14,500/- as per revised G.R.25.08.2011. 8. RO- Raigad has recommended case for grant of renewal of consent to operate

with incorporation of product 5.6 MW Electric power from Top Gas Recovery Turbine.

9. Renewal of Consent to operate may be granted upto 31.12.2017 with the condition of submission of operational B.G. of Rs.10/- Lakhs.

Page 41: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.06 Name of the Industry:-

M/s Hindalco Industries Ltd. Plot No. 2, MIDC Industrial Area Taloja A.V.,Navi Mumbai, Dist Raigad 410 208

HOD Remarks:-

Industry has applied for amendment of consent to operate only change in fuel pattern

Application received at SRO- Navi Mumbai on dtd 16/07/2012 and at HQ on 21/08/2012.

consent is valid up to 30/6/20114

Currently industry are using LSHS (13,000 Lit/D) and Furnace oil (12,000 Lit/D) as fuel now the they are wanted to use Piped Natural Gas (PNG) (20,000 SCM/D) as fuel along with LSHS and Furnace Oil for furnaces

Industry has submitted environmental statement report.

HW send to CHWTSDF Taloja.

Regional officer Navi Mumbai has recommended for the amendment of consent to operate

We may grant amendment for change in fuel

We may place the consent application before CAC for further consideration.

Page 42: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.07

Name of the industry :- M/s. Avantha Power and Infrastructure Ltd. Unit Bhigwan, 105, Milstone, Pune Solapur Highway, Bhadalwadi-Paundhwadi, Tal. Indapur, Dist. Pune

HOD Remarks:-

Applied for renewal of consent

Application received at SRO- Pune on dtd 02/05/2012 and at HQ on 21/06/2012

Previous consent was valid up to 30/06/2012

Industrial Effluent Generation is 1008 CMD. The trade effluent is being treated in ETP of M/s. Bilt Graphics Paper Products Ltd. (sister concern unit Bhigwan) which is adjacent to this unit.

Treated effluent is utilized for plantation in factory premises. Remaining effluent is discharged into Bori Nalla

Total area covered under plantation 6.9 hectors

Domestic effluent is 62 CMD. Its mixed in trade effluent & treated in ETP

Industry has provided electrostatic preceptors followed by common stack of 120 mtr height to the CFBC boiler 1 and 2 also provided bag filters followed bu common stack of 75 mtr height to the Oil boiler and FBC boiler.

Coal handling section the concreting/pitched road is not provided. Water sprinkling arrangement needs improvement.

As per previous consent condition industry not installed Continuous monitoring facility for stack emission analysis and 3 CAAQMS and micrometeorological station for So2, Nox and PM.

RO Pune has recommended the case for grant of renewal of consent

We may issue SCN for refusal of consent for non above compliance

We may place the consent application before CAC for further consideration.

Page 43: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.08 Name of the industry :- M/s. Enkel Wheel (India ) Ltd.

Gat No. 142, Village Shikrapur, Tal. Shirur, Dist Pune 412 208

HOD Remarks:-

Applied for renewal of consent

Application received at SRO- Pune on dtd 13/04/2012 and at HQ on 21/06/2012

Previous consent was valid up to 30/04/2012

Industrial effluent is NIL

Domestic Effluent Generation 80 CMD for which provided sewage treatment plant.

Treated effluent is used for gardening

Industry has provided fume extraction system to furnace & dust collector system to shot blasting section

RO Pune has recommended for grant of renewal of consent

We may grant the consent for period up to 30/04/2014 with extension of earlier B.G. period up to consent validity period.

We may place the consent application before CAC for further consideration.

Page 44: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.09 Name of the industry :- M/s. Keihin Fie Pvt. Ltd.

B-3, MIDC Chakan, Mahalunge, Tal. Khed, Dist. Pune 410 501

HOD Remarks:-

Applied for renewal of consent

Application received at SRO- Pune on dtd 24/05/2012 and at HQ on 28/08/2012

Previous consent was valid up to 30/06/2012

Industry generating 75 M3/d of effluent for which Industry has provided primary, secondary and tertiary treatment to treat industrial effluent.

Industry is generating 82 CMD of domestic effluent for which is industry has provided full fledged STP.

JVS analysis result on 12/04/2012,10/02/2012,23/12/2012& 1/11/2011 are under prescribed limit

Industry has provided ventury type water scrubber for surface treatment plant, & Dust collector provided to shot blasting unit

JVS result of air/Noise of Pvt Lab on 30/04/2012 is under prescribed limit.

Adequate height of chimney provided to DG set

RO Pune has recommended for grant of renewal of consent

We may grant consent up to 30/06/2015 with operational B.G. of Rs. 5/- Lakhs

We may place the consent application before CAC for further consideration.

Page 45: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.10

Name of the Industry:- M/s. Sanjana Power, C/o. Asahi India GlassLimited, Plot T-7, MIDC Taloja, Raigad 410 208

HOD Remarks:-

Applied for consent to establish

Application received at SRO-Taloja on dtd 25/04/2012 and at HQ on 01/08/2012

Industry proposed to install on Plot No. T-7, MIDC, Taloja.

Board has granted the consent to M/s Asahi India Glass Limited on same Plot which is valid upto 30/11/2012 with C.I.442 Crs.

M/s Asahi India Glass Limited is a float glass mfg unit. In the process of float glass furnace generates flue gas at a temp of 520 Deg. C. This gas is currently being let out into the atmosphere so M/s Sanjana Power Glass Ltd would like to utilize this flue glass heat to generate Captive Power.

Copy of agreement between M/s Asahi India Glass Limited & M/s. Sanjana Power & NOC submitted the industry

Industrial effluent & Hazardous waste will be NIL

RO Navi Mumbai has recommended the case for grant of consent to establish for Captive power plant from waste heat recovery system.

We may grant the consent to establish

We may place the consent application before CAC for further consideration.

Page 46: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.11

Name of the industry :- M/s. Mercedes-Benz India Private Limited,

Plot No. E-3, MIDC Chakan, Phase-III, Kuruli and Nighoje, Tal. Khed, Dist. Pune 410 501

HOD Remarks:-

Applied for consent to establish for expansion

Application received at SRO- Pune on dtd 29/05/2012 and at HQ on 01/08/2012

Existing plant consent is valid up to 28/02/2015

Industry located @ 3.0 KM away from AII Class River Indrayani. Satisfy the distance criteria.

Industrial effluent generation is 10 CMD (Proposed 10 CMD) which is due to washing of activity. Which will be primary treated by oil skimming and further treated into existing STP

Domestic effluents generation is 100 CMD (Proposed 4 CMD) which is treated in Sewage treatment plant by upgrading the same.

RO Pune has recommended the case for grant of consent to establish for expansion.

We may grant consent to establish for expansion

We may place the consent application before CAC for further consideration.

Page 47: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.12 Name of the Industry:- M/s. John Deere India Pvt. Ltd.

Gat No. 166,167 & 271 to 291, Pune Nagar Road, Sanaswadi, Tal. Shirur, Dist. Pune

HOD Remarks:-

Applied for consent to establish for expansion

Application received at SRO-Pune on dtd 25/05/2012 and at HQ on 01/08/2012.

Existing plant consent is valid up to 31/12/2012

Fees paid as per revised fees structure G.R.

Industry is generating 312.40 CMD (Proposed 35 CMD)of effluent for which Industry has provided two ETP of capacity 350 CMD

Industry is generating 228 CMD (Proposed 50 CMD) of domestic effluent for which two no. STP of capacity 420 CMD provided

JVS analysis result on 06/08/2011 submitted. which is under prescribed limit

RO Pune has recommended the case for grant of consent to establish for expansion

We may grant the consent to establish for expansion

We may place the consent application before CAC for further consideration.

Page 48: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.13 Name of the industry: - M/s. Tata Cummins Ltd.

Plot No. A 1/2/1, MIDC Phaltan, Village- Suravadi, Tal. Phaltan, Dist. Satara 415 523

HOD Remarks:-

Applied for consent to establish

Application received at SRO-Satara on dtd 12/06/2012 and at HQ on 21/08/2012.

Generation of Industrial effluent will be 16 CMD for which proposed to provide ETP of capacity 25 CMD (Proposal enclosed)

Domestic effluent will be 52 CMD for which proposed provide STP of capacity 55 CMD (Proposal enclosed)

Air pollution control system will be provided to DG set & test cell

Hazardous waste will be send to CHWTSDF Ranjangaon. Membership obtained

RO Pune has recommended for grant of consent to establish

We may grant the consent to establish

We may place the consent application before CAC for further consideration.

Page 49: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.14 Name of the industry :- M/s. Innoventive Industries Ltd.

Gat No. 56/3,4,5, Shikrapur Chakan Road, Pimpale Jagtap, Tal. Shirur, Dist Pune 412 208

HOD Remarks:-

Applied for consent to establish for expansion

Application received at SRO- Pune on dtd 09/04/2012 and at HQ on 19/07/2012

Earlier industrial effluent is NIL. Now industry will be generate I.E 160 CMD for which industry has proposed to provide ETP. In which 108 CMD process effluent will be recycle after treatment

Domestic effluent generation is 24 CMD (Proposed 1.2 CMD) for which septic tank & soak pit provided.

JVS analysis result on 30/01/2012 is under prescribed limit

Industry proposed to provide Scrubber to pickling section

HW will be send to CHWTSDF Ranjangaon

RO Pune has recommended the case for grant of consent to establish for expansion

We may grant consent to establish for expansion

We may place the consent application before CAC for further consideration.

Page 50: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.15 Name of the industry :- M/s. Rexam HTW Beverage Can (India) Ltd.

Plot No. C-7, MIDC Indl Area, Taloja, Tal Panvel, Dist, Raigad Maharashtra

HOD Remarks:-

Applied for consent to operate

Application received at SRO- Taloja on dtd 10/07/2012 and at HQ on 03/09/2012.

Industrial effluent generation is 198 CMD. Industry has completed the up gradation work of ETP with capacity of 210 CMD. (Photograph enclosed)

Industry has a member of CETP Navi Mumbai

Domestic effluent Generation is 9 CMD. Industry has provided septic tank & soak pit.

Industry provided stack with filtration system to heating furnace.

Regional officer Navi Mumbai is recommended for grant of consent to operate with condition of overriding effect on earlier valid consent

We may grant the consent to operate for period up to 31/07/2014 over ridding effect on earlier consent with operational B.G. of Rs. 5/- Lakhs

We may place the consent application before CAC for further consideration.

Page 51: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.16 Name of Industry M/s.Navi Mumbai Waste Processing Co. Pvt. Ltd Survey No.376,379, MSW Dumping Ground Behind Lubrizol, TTC MIDC ,Turbhe,NaviMumbai HOD Remarks:

1. Applications for MSW Authorization in respect of NMMC 2. Application Received at SRO on 19/07/2012 and at HQ on 17/08/2012. 3. Previous Authorization Valid upto 10/06/2009. 4. Applied for Authorization of waste processing facility for Organic Manure-80 Mt/Day,

Refuse derived fuel-20 T/Day and the project operated by M/s.Navi Mumbai Waste Processing Co. Pvt. Ltd

5. Board has granted Authorization under MSW(M &H)2000 on 25/2/2009 which was

valid upto 31/12/2009, it was based on without prejudice to order of PIL No.98/2005.

6. Board has again granted Authorization on 10/6/2009 on the name of M/s. Hydro air Tectonics(PCD)Ltd.,on Behalf of NMMC for processing of refuse derived fuel-5625 MT/M,Compost-4500 Mt/M,Eco-Bricks-1575 MT/M, Recyclable material like plastic, metals, glass-1125 MT/M.

7. NMMC had given contract to M/s.Navi Mumbai Waste Processing Co. Pvt. Ltd vide

letter dated 11/8/2011.

8. RO Navi Mumbai has recommended that MSW Authorization to said applicant with condition of order of PIL No.98/2005, and if applicable, may be by canceling of earlier permission granted to M/s. Hydro air Tectonics(PCD)Ltd.

9. C.I. of proposed project is Rs. 35 Crore.

10. Authorization may be granted with the condition of obtaining BG of Rs. 5 lakh for

compliance of Authorization conditions

Page 52: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.17 Name of Industry M/s.Oil and Natural Gas Corporation Ltd., (Uran Trombay Gas Pipeline)

Dronagiri Bhavan, Tal-Uran,Dist:Raigad.

HOD Remarks: 1. Application for Renewal of Consent for operation of pipeline(having 36 inch dia) to

transport oil (from uran to Jawahar deep trombay).

2. Application Received at SRO on 11/07/2012 and at HQ on 13/08/2012.

3. The C.I. of the project is 439.57 Cr. Fees Paid is Rs.43,95,800/- + 75000/-

4. Previous C.I. was Rs.414 Cr. The firm has increased the C.I. to Rs. 439.57 Crores. The firm has paid additional fees.

5. There is no Industrial effluent generation and Hazardous Waste generation

6. SRO Taloja has issued reminder letter to industry dated 11/7/2012 for following Information, a. C.I. Certificate. b. Reason for increased in C.I. from Rs. 414 Cr to Rs.439.57Cr.

7. SRO Taloja has recommended the case for grant of C to R.

8. The case is recommended for renewal of consent upto 31/08/2017

Page 53: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.18

Name of Industry: M/s Vidrabha Irrigation Development Corporation Ltd., Irrigation Project, G.No. 36, 37, 68, 69, 92, 93, 108, 135 139, 140,141, Village Rohna, Tq.Murtizapur Dist. Akola. HOD Remarks:

1. Application Consent to Establish for Construcion of Barrage across Uma River Total Storage Capacity of Barrage - 20.79 M M3

1. Application Received at SRO on 26/07/2012 and at HQ on 13/08/2012 2. Water requirement -60.M.3/day

Sewage generation -4.0 M3 /day Septic Tank and Soak Pit proposed.

3. The Solid Waste generation - Nil

4. The project proponent has not obtained EC.

5. SRO Akola –I has recommended the case for grant of C to E.

6. C to E may be granted subject to condition of obtaining BG of Rs. 10 lacs and condition of obtaining EC prior to initiation of work

.

Page 54: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.19 Name of Industry: M/s Aegies Logistics (P)Ltd. Plot No.72, Mahul Village, Mumbai-400 074 HOD Remarks:

1. Application for 1st Consent to Operate for 12 Nos. of Non CRZ Tanks for total quantity of 36100 KL

1. Application Received at SRO Mumbai-III on 03/03/2012 and at HQ on 19/03/2012

2. Industrial Effluent generation is NilP

3. Sewage generation is 6.0 M3/day

4. Solid waste generation is Nil

5. Consent to 1st Operate may be granted for 12 Nos. of Non CRZ Tanks for storage and

Handling of Non Hazardous Chemicals.

6. Legal Action for Violation of CRZ shall be dealt separately by calling report from RO Mumbai.

7. RO Mumbai has recommended the case for 1st consent to operate.

8. Consent to Operate may be granted with the condition of obtaining BG of Rs. 10 lacs

for compliances of consent conditions

Page 55: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

Fresh Agenda (Part-II)

CAC Item No.01 Name of Industry M/s.Infosys Technologies Ltd., Plot No.24, Rajiv Gandhi Info Tech Park, Phase-2,Village:Man,Tal:Mulshi, Dist: Pune. HOD Remarks:

1. Application for Consent to 1st Operate for IT &ITES Project for construction of Building SDB 1 to 9, Food Court 1 to 3, Power Block 1& 2, IBPO 1&2,ECC & Training centre for Phase-II (in Part) for Built Up Area 4,04,897.0O M2. in total BUA of 6,22,619 M2

2. Application Received at SRO on 18/08/2012 and at HQ on 7/09/2012. 3. Board has issued C to E dated10/5/2011 for,

i. Total Plot area - 4,61,264.00 M2 ii. BUA - 6,22,619.00 M2

4. Sewage generation is 1386 M3/day and project proponent has provided STP of capacity 2000 M3/day.

5. The project proponent has obtained EC vide No. SEAC 2010/CR.707/TC.2 dt.9/6/2011, a. Total Plot area - 4,61,264.00 M2

i. BUA - 6,22,619.00 M2

6. RO has recommended the case for Grant of Consent to 1st Operate for period upto 31/8/2014.

7. The C.I. of the firm may be considered Rs. 936.12 crores as against Rs. 18,72,247 .

8. The case is recommended for grant of consent to 1st operate with the condition of obtaining BG of Rs. 10 lacs for maintenance and operation of STP and MSW processing plant.

installed new RDX plant without prior permission of the Board. Accordingly Board has issued SCN vide letter dated 31.7.2012. Industry has submitted the reply of SCN vide letter dated 13.08.2012. In view of above we may grant consent with additional products such as RDX with the following conditions.

7) Reuse the treated effluent and execute the scheme before December, 2013 with Bank Guarantee of Rs.5/- Lakhs.

8) For storage of sludge in scientific manner the adequate arrangement shall be carried out before March, 2013 with B.G. of Rs.2/- Lakhs.

9) Operational Bank Guarantee of Rs.2/- Lakhs. 10) To obtain the Membership of Hazardous Waste within next 2 months with B.G. of Rs.1/-

Lakh. 11) All the remaining hazardous which is lying shall be disposed to CHWTSDF within next

45 days with operational B.G. of Rs.2/- Lakhs. 12) For carrying out any expansion in future Consent to Establish shall be taken.

Page 56: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.02

Name of Industry M/s. Vamona Developers Pvt. Ltd., S.No.33,2A/2,33/2B of Wadgaon Sheri, Vimannagasr,Opp Giga Space,Pune. HOD Remarks:

1. Application for Consent to 1st Operate (in part) for construction activity of Office Building and Bazaar Mall for,

Total plot area : 79,881.00M2.

Total Built Up area : 66,726.76 M2.

Total Built Up Area for Office Building: 50,742.17 M2

Total Built Up Area for Bazaar Mall :15,984.59 M2

2. Application Received at SRO Pune-I on 4/07/2012 and at HQ on 04/09/2012.

3. Board has issued C to E dated 7/8/2009 for construction of commercial Building, Mall,

Four Star Hotel, Service Apartments &Office Building project and services for Total plot area : 79,881 M2.

Total Built Up area : 2,01,619.1 M2.

4. The project proponent has obtained EC vide No. SEAC 2010/CR.62/TC.2 dated .30/6/2010 for construction of

a. 1st Building : Mall + Four Star Hotel+ Service Apartments +Office Area + Parking b. 2nd Building: Office Building + Bazzar. c. 3rd Building: Parking Building.

Total plot area : 79,881 M2.

Total Built Up area : 66,789.04 M2

5. The project proponent has consumed the total Built up Area For two activities ie. Office Building & Bazzar Mall instead of third activity ie. For Parking Building has not mentioned.

6. Sewage generation is 270 .0 M3 /day and project proponent provided STP having

capacity 830 M3 /day

7. SRO Pune-I Reported that project proponent has consume the total Built up area in two activities which was allotted in Environmental Clearance for 3 Nos. of activities .

8. RO-Pune has recommended that necessary amendment is required in EC, Prior to grant

C to Operate.

9. C.I of firm may be considered Rs. 549.76 Crore as against Rs.10,99,620/-

10. The case is recommended for grant of consent to 1st operate with the condition of obtaining BG of Rs. 10 lacs for maintenance and operation of STP and MSW processing plant.

Page 57: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.03

Name of Industry: M/s Indiabulls Properties Pvt. Ltd.., Plot No. 612, 613 Lower Parel Division, Elphinstone Mills, Senapati Bapat Marg, Mumbai- 400 013.

HOD Remarks:

1. Application for Amendment in Consent to Establish 7. Application Received at SRO on 28/06/2012 and at HQ on 18/07/2012

3. Water consumption - 568.00 M3 /day Sewage generation - 550.0 M3 /day

STP Proposed - 650 M3 /day

4. The Solid Waste generation - Biodegradable waste – 1.082 T/day On site Bio-Composting proposed

Dry Garbage- 1.736 T/day

Disposed to authorized recyclers

5. The project proponent has obtained EC vide No. SEAC 2010/CR- 180/TC2 dt.23/01/2012. 6. RO Mumbai has recommended for amendment in C to E

7. Consent may be granted with the condition of obtaining BG of Rs. 10 lacs for providing STP and MSW processing plant, for 5 years or upto commissioning, whichever is earlier..

Page 58: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.04

Name of Industry: M/s Indiabulls Properties Pvt. Ltd.., C.S. No. 841 of Lower Parel Division(G-South Ward), Senapati Bapat Marg, Eilphinstone (W), Mumbai-400 013 HOD Remarks

1. Application for Amendment in Consent to Establish 8. Application Received at SRO on 21/04/2011 and at HQ on 18/07/2012

3. Water consumption - 680.00 M3 /day Sewage generation - 613.0 M3 /day

STP Proposed - 650 M3 /day

4. The Solid Waste generation - Biodegradable waste – 1.26T/day On site Bio-Composting proposed

Dry Garbage- 2.136 T/day Disposed to authorized recyclers

5. The project proponent has obtained EC vide No. SEAC 2010/CR-284/TC2 dt.23/01/2012.

6. RO Mumbai has recommended for amendment in C to E Consent may be granted with the condition of obtaining BG of Rs. 10 lacs for providing STP and MSW processing plant, for 5 years or upto commissioning, whichever is earlier..

Page 59: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.05

Name Of Industry M/s Jawaharlal Nehru Port Trust,

Administrative Building, Sheva, Tal- Uran, Dist Raigad-400 707

HOD Remarks

1. Application for renewal of consent with expansion in existing activity of Handling Containers, Dry bulk Cargos from 56 MT/A to 60.76 MT/A.

2. Application Received at SRO on 13/06/2012 and at HQ on 27/07/2012 3. The previous consent was valid upto 30/06/2012. 4. The Industrial Effluent is Nil. 5. The sewage generation is increased from 2500 M3 to 3900 M3 .

a. STP is provided for sewage treatment having capacity 3900 M3. 6. The garbage generated is Disposed by way of Biocomposting. 7. Hazardous waste generated is Disposed to CHWTSDF/authorized reprocessor. 8. Project Proponent has EC vide No.J-11013/21/88-IA dated 16th Suptember 1988. 9. Project Proponent has CRZ Clearance vide No. J-17011/18/96-IA/III Dated 22nd July

2005. 10. Industry has submitted additional consent fee of Rs.6,40,148/- towards

a. Increase in C.I. from 358.413 Cr to Rs.390.420 Cr. b. (Fees Paid: Rs.78,08,413/- + Rs.6,40,148/-)

11. The case is recommended for C to R with expansion for period upto 30/6/2013.

Page 60: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.06

Name of Industry: - M/s. Gharda Chemicals Ltd. Plot No. B-27/29, MIDC Phase-I Dombivli, Dist. Thane.

HOD Remarks-

1. Application for Consent to Establish for Change in Fuel.

2. Products- Pesticides (Technical & Formulation).

3. Application received at RO on 16/06/2012 and at HQ on 11/07/2012.

4. IE generation as per existing consent is – 525 m3/d Industry has provided Primary, Secondary & Tertiary treatment for effluent. Treated effluent is discharged to CETP Dombivli. Due to proposed change in product mix there will be no generation of additional industrial effluent.

5. Presently industry have installed two numbers of Furnace oil fired Boilers with one is in operation and other is standby. Industry proposes to replace one of these boilers with solid fuel fired boiler and use it as main boiler & keep furnace oil fired boiler standby so that incase of non availability of solid fuel FO boiler will be used. Industry has submitted Assessment/Computation of Pollution Load.

6. Capital Investment of existing unit is Rs. 131.84 Crore. Capital investment for proposed change in fuel is Rs. 8.50 Crore.

7. Directions entry taken in CMS direction module.

8. Industry is already covered in CAC list at sr. no. 133.

9. Considering this, Consent to Establish for installation of Coal/Briquette fired Boiler may be granted up to Commissioning of the unit.

Page 61: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.07

Name of Industry: - M/s. Vinati Organics Ltd., Plot No. A-20, MIDC Lote, Tal. Khed, Dist. Ratnagiri.

HOD Remarks-

1. Application for Consent to Establish for Waste heat based 5 MW power plant

without using auxiliary fuel. 2. Product- Electricity 3. Application received at SRO on 26/06/2012 and at HQ on 23/07/2012. 4. Water consumption for cooling & Boiler will be 874 m3/d. Industrial Effluent

generation will be 468 m3/d. Industry proposes to provide ETP of capacity 470 m3/d. Treated water from RO permeate is reused to cooling tower make up water and gardening. RO reject is reused in process as mixed polymer.

5. Industry proposes to provide Electro Static Precipitator (ESP) with 50 mtr. Height chimney.

6. Considering this, Consent to establish may be granted for waste heat based power generation of 5MW.

Page 62: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.08

Name of the Industry: M/s Lupin Ltd (Research Park)

46/A, 47/A, Vill-Nande, Tal-Mulshi, Dist-Pune. HOD Remark:-

Application recd at RO Pune on 31/07/2012.

Application recd at HQ on 31/08/2012.

R & D activity of pharmaceuticals products.

Industry applied for renewal of consent with increased CI.

I.E. - 111 CMD, D.E. - 75 CMD. Primary, secondary and tertiary treatment is provided. Disposal – On land for gardening. 8 acre land is available. One JVS report of dated 24.05.2012 & it is within consented limits.

C.I increased due to addition of new lab equipments and plant.

In earlier consent due to inadequate land, a condition is incorporated as BG of Rs 5 lakhs towards compliance of land acquisition for disposal of treated effluent or reduce the total effluent quantity upto 160 CMD.

Industry has submitted BG Rs 5 lacs. Also industry has claimed that, they are reduced the effluent quantity upto 112 CMD and submitted daily log book for last 3 months of effluent generation.

But Industry requested not to reduce the consented effluent quantity.

RO Pune has recommended for renewal of consent with increased CI.

Considering the compliance report, we may be consider the case for renewal with increase CI and restricted of total effluent quantity upto 160 CMD.

Page 63: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.09 Name of the Industry: M/s V.V.F Ltd

Plot No V-41, MIDC Taloja, Tal-Panvel, Dist- Raigad

HOD Remark:-

Application recd at RO Navi Mumbai on 14/06/2011

Application recd at HQ on 16.12.2011

Existing Chemical Industry is holding consent valid upto 31.07.2014.

Now applied for consent to 1st Operate for generation of gas based 7 MW power plants.

Existing I.E. 200 CMD, Proposed I..E 2.01 CMD, Existing D.E. 60.0 CMD. Proposed 0.5 CMD.

Existing ETP of Capacity 798 CMD comprising primary, secondary and tertiary treatment. Disposal – Into CETP.

JVS results are within limits.

Board has issued show cause notice to industry for not obtaining EC and completed the installation of plant & machineries. Now Industry has submitted EC for the same.

Industry has paid consent fee upto 31.07.2014, which is upto existing consent validity.

RO Navi Mumbai has recommended for grant of consent to 1st Operate after submission of EC.

Earlier SCN was issued to industry for not obtaining EC and completed the

installation of plant & machineries. Now industry has submitted EC copy along with JVS reports. Hence, we may consider for grant of 1st Consent to Operate for generation of gas based 7 MW power plants with amalgamation of existing consent.

Page 64: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.10 Name of Industry: M/s. Croda Chemicals (India) Pvt Ltd

Plot No. 1/1, MIDC TTC, Navi Mumbai JDPAMS:-

Application recd at RO Pune on 14.05.2012

Application recd at HQ on 13.07.2012.

Industry is engaged in Mfg of Chemicals.

Applied for C to E for expansion of existing products.

Existing I.E. 90 CMD. Proposed I.E.-27 CMD. Existing D.E. 18 CMD, Proposed- 2 CMD. ETP comprising primary, secondary & tertiary.

Disposal- Into CETP. JVS reports are within the limit. (Except %sodium)

Products attracts EC.

Propose to upgrade the existing pollution control system with respect to air and water.

HW- Disposal CHWTSDF. Form IV not submitted.

Page 65: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.11

Name of the industry: - M/s. Perkins India Pvt. Ltd.,

Plot NO. G-1, Additional Shendra, Aurangabad 431 007

HOD Remarks:-

Applied for consent to establish

Application received at SRO-Aurangabad dtd 01/09/2012 and at HQ on 19/09/2012.

Generation of Industrial effluent will be 10 CMD for which proposed to provide ETP (Primary, Secondary. Tertiary) (Proposal enclosed)

Domestic effluent will be 57 CMD for which proposed provide STP (Proposal enclosed)

Total Land available for used of effluent @ 12350 sq m

Adequate height of chimney will be provided to (1500 KVA X 2) DG set & test Cell

Hazardous waste will be send to CHWTSDF & auth. Reprocessor.

RO Aurangabad has recommended for grant of consent to establish.

We may consider the case for consent to establish by imposing conditions towards provision of VOC control system.

We may place the consent application before CAC for further consideration.

Page 66: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.12 Name of the industry :- M/s. Tata Autocomp System Ltd.

(Interior & plastic Division) S. No. 235 & 245, Village Hinjewadi,

Tal. Mulshi, Dist Pune 411057

HOD Remarks:-

Applied for renewal of consent

Application received at SRO- Pune on dtd 05/10/2010 and at HQ on 21/06/2012

Previous consent was valid up to 30/09/2010

Earlier Industrial Effluent Generation 30 CMD. Now it is 54 CMD (Increased 14 CMD) for which industry has provided full fledged effluent treatment plant

Earlier domestic Effluent Generation 52 CMD. Now it is 45 CMD (decreased 7 CMD) for which provided sewage treatment plant.

Total open land available for greenbelt is 13442 sqm

industry has provided air pollution control system to paint booth, oven & D.G. set.

RO Pune has recommended the case for grant of renewal of consent.

We may grant the consent for period up to 30/09/2013 with operational BG of Rs. 5/- Lakhs

We may place the consent application before CAC for further consideration.

Page 67: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.13

Name of the industry: M/s. Reliance Infrastructure Ltd., DTPS, Vill- Agwan Tal- Dahanu, Dist – Thane

H.O.D. Remarks:-

1. Applied for consent to operate for grinding of coarse ash into fine ash. 2. Obtained the consent to establish from the Board for the same. 3. Obtained the permission from MoEF Govt of India & Dahanu Taluka Envt.

Protection Authority. 4. Existing unit is coal based Thermal Power Plant having valid consent upto

31/03/2015 for electricity generation of 500 MW. 5. Provided dust collector & reverse pulse jetting filter are provided to grinding unit. 6. No additional requirement of water for the grinding unit as the water required only

for domestic purpose will be used from existing plant. 7. JVS analysis reports of trade effluent of existing unit are within consented limits. 8. Provided ESP & FGD to the Boiler. 9. JVS analysis reports of stack air monitoring are within limits. 10. Provided online continuous online stack monitoring system. 11. Provided 3 nos of CAAQMS system 12. Fly ash utilization is complied by industry. 13. We may grant consent to operate to the ash grinding unit with amalgamation to

the existing power plant upto 31/03/2015. 14. We may place the consent application before CAC for further consideration.

Page 68: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.14 Name of the industry: M/s. Maharashtra State Power Generation Co. Ltd., Thermal Power Station Parli, Old Un it – III to V, Tal- Parli (V), Dist – Beed,

H.O.D. Remarks:-

1. Applied for renewal of consent. 2. Electricity generation – 3 X 210 MW (12-15 million units per day) 3. ESP is provided to each unit with individual stacks of unit III – 902 mtrs Unit- IV

140 mtrs & unit V-220 mtrs. 4. Ammonia dosing is provided to unit V. 5. Industrial effluent is generated from cooling - 9489 CMD & from ash handling is

7380 CMD. Provided ETP I of 300 M3/Hr ETP-II 400 M3/Hr 70 M3/Hr capacities. 6. Total effluent is used for ash disposal. 7. Dom Effluent is 2000 CMD for DE provided Sewage treatment plant. 8. JVS results are within the limit. 9. Stack air monitoring results of the year 2011-12 for parameter TPS are

exceeding the consented loimtis, the annual average results are 302 mg/NM3 10. Ambient air quality monitoring results are within the limits. 11. Boiler Ash 3000 MT /D is generated. 12. Dry fly ash is collected in Silo & disposed to various agencies. 13. Wet bottom ash is disposed to ash pond. 14. For CAAQMS the work is awarded to M/s. Envirotech Instruments Pvt. LTd., New

Delhi by TPS authorities. 15. Action plan is submitted by TPS for pollution control equipments revamping. The

recommendation of MPCB are attached with application. 16. RO & SRO recommended the grant of consent renewal for the period upto

30/06/2012. 17. In view of above we may grant renewal of consent upto 30/06/2012 with BG of

Rs.75 Lakhs for compliance of recommendations on action plan. 18. We may place the consent application before CAC for further consideration.

Page 69: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.15 Name of the Industry: M/s POSCO Electrical Steel Private Ltd., Plot no.C-1/1, Vile Bhagad MIDC Area, Tal: Mangaon, Dist: Raigad. HOD Remarks:

1. Applied for grant of consent to establish. 2. Application for grant of consent to establish received to HQ on 01.08.2012. 3. Query letter send to industry on 16.08.2012. 4. Industry has submitted reply on 01.09.2012. 5. Industry has proposed to treat industrial effluent and domestic effluent into ETP (

MBR,EDR and MEE) / STP of C.R. coil plant. 6. Industry has proposed to recycle /reuse 85 % of the treated effluent for cooling,

boiler and flushing etc. Remaining 15% will go to concentrate evaporation treatment.

7. Industry has paid consent fees Rs.8, 28,100/-as per revised G.R.25.08.2011. 8. RO- Raigad has recommended case for grant of consent to establish with condition

for installation of air pollution control system for all exhaust attached to the furnaces and for zero discharge.

9. Consent to establish may be granted up to commissioning of the unit

Page 70: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.16

Name of the industry :- M/s. Bridgestone India Private Limited (Phase-I), Plot No. A-43, MIDC Chakan, Phase-II, Tal. Khed, Dist. Pune 410 501

HOD Remarks:-

Applied for 1st consent to operate for phase-I

Application received at SRO- Pune-II on dtd 23/07/2012 and at HQ on 04/09/2012.

Industry has obtained consent to establish for phase I & II on dated 08/06/2012

Generation of industrial effluent is 320 CMD for which effluent treatment plant provided with capacity 400 CMD.

Domestic effluent generation is 160 CMD for which sewage treatment plant of 250 CMD capacity provided

Treated effluent will be used on land for gardening within premises.

Dust collector with low flow low volume scrubber is provided to carbon handling/charging section.

RO Pune has recommended the case for grant of 1st consent to operate for 1st phase for period upto 31/08/2013.

As per consent to establish condition industry shall install 3 CAAMS station. But industry not install the same yet

We may grant the consent to operate after complete the compliance of consent conditions.

We may place the consent application before CAC for further consideration.

Page 71: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.17 Name of the industry :- M/s. Alicon Castalloy Ltd.,

Gat No. 1426, Shikrapur, Tal. Shirur, Dist. Pune 412 208

HOD Remarks:-

Applied for renewal of consent

Application received at SRO- Pune on dtd 21/01/2011 and at HQ on 26/06/2012

Previous consent was valid up to 31/12/2010

Industrial effluent is 40 CMD for which ETP provided

Domestic Effluent Generation 140 CMD for which provided sewage treatment plant.

JVS result on 17/08/2011; 01/10/2011 & 12/12/2011 are submitted. Limit of PH (2.35, 10.16), BOD (164 PPM), COD (164,368 PPM) are higher to prescribed limit.

SRO reported that Scrubber provided to 14 nos Furnaces.

As per earlier consent condition no. 10 Industry shall submit the B.G. of Rs.1/- Lakh towards operation & maintenance. Not submitted the same

RO Pune has recommended for grant of renewal of consent

We may issue SCN for refusal of consent

We may place the consent application before CAC for further consideration.

Page 72: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.18 Name of the industry :- M/s. Viraj Profiles Ltd. Unit-II, Plot No. G-2, 1/2, 1/3, MIDC Tarapur, Boisar, Tarapur, Tal. Palghar,

Dist. Thane

HOD Remarks:-

Applied for f consent to establish for expansion

Application received at SRO-Tarapur on dtd 10/04/2012 and at HQ on 21/08/2012.

Industrial Effluent Generation will be NIL (Existing Plant I.E. is 61 CMD) for which industry has provided effluent treatment plant.

Domestic effluent generation will be Nil (existing Plant D.E. is 9 CMD)

Industry will be used 1004 CMD water for Cooling purpose

Industry has proposed to replace old 3 Nos of induction furnace & 1 No. of New AOD with the latest auto operated ABP-German technology

We may grant consent to establish for expansion subject to environmental clearance

We may place the consent application before CAC for further consideration

Page 73: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No.19 Name of the industry: - M/s. Neosym Industry Limited

(The Indian Smelting & Refining Company Ltd.) Gat No. 201, Sanswadi, Taluka Shirur,

Dist. Pune 412 208

HOD Remarks:-

Applied for renewal of consent

Application received at SRO-Pune on dtd 04/05/2012and at HQ on 19/07/2012.

Previous plant consent is valid up to 30/04/2012

Industry requested for change of name from M/s The Indian Smelting & Refining Company Ltd. to M/s. Neosym Industry Limited. Industry submitted the Certificate of incorporation from the registrar of companies Maharashtra

Industrial effluent is NIL.

Industry has provided septic tank & soak for 30 CMD for Domestic effluent.

SRO Pune issued letter for Submit STP proposal along with time bound program. Accordingly industry submitted the proposal of STP.

Generation of hazardous waste is NIL

Fume extraction system followed by common stack provided to melting furnace. Fume extraction system with bag type dust collector provided to sand moulding plant. Shot blasting unit provided with in built dust collector with stack and felting section provided with bag type dust collector.

Industry not submitted environment statement report.

Regional officer Pune recommended for grant of renewal of consent with change of Name.

We may grant the consent to operate for 30/04/2017 with condition. 1)To construct STP within 6 Months & B.G. of Rs. 5/- Lakhs 2)To Submit Environmental statement report within 1 month period with B.G. of Rs. 2/- Lakhs

We may place the consent application before CAC for further consideration

Page 74: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 20 Name of the Industry: M/s. Murli Industries Ltd. (Mining), Tal: Korpna, Dist: Chandrapur. H.O.D. Remarks

1. Existing cement plant, lime stone mine and power plant. 2. Now, Applied for first consent to operate for lime stone mining of 0.6 MTPA over Zutting 42.16

Hect (0.2 MTPA), Zutting 18.06 Hect (0.2 MTPA) Zutting 25.28 Hect (0.1 MTPA) & Pimri 30.33 Hect (0.1 MTPA).

3. The Board earlier vide letter no BO/RO (P & P)/E/CC-156 dated 21/09/2007, had granted consent to establish for lime stone mining for the quantity of 2,50,000 Mt /Month, i.e 3.0 Million Ton per year, for mine lease area of Naranda (40.79 Hect) Naranda (71.01 Hect),Zutting (58.52 Hect), Zutting (42.16 Hect), Zutting (18.06 Hect), Zutting (25.28 Hect),Pimri (30.33 Hect).

4. The Mine authority has obtained Environmental clearance from the Government of Maharashtra vide letter dated 8th July 2010 for lime stone mining as following. A. Zutting 18.06 Hect 30,00,00 Ton/Year (0.3 MTPA)

B.Zutting 25.28 Hect 0.6 MTPA C.Pimri 30.33 Hect 6,00,000 Ton/Year(0.6 MTPA) D.Zutting 42.16 Hect 6,00,00 Ton/Year (0.06 MTPA) -------------------------------------------------------------------------------- Total 115.83 Hect 1.56 MTPA.

5. The Board had granted consent to operate for lime stone mining of 2.4 Million Ton/Year vide letter no.BO/PCI-II/RONG/O/EIC No.NG-1485-08/CC-135 dated 2/04/2009, valid up to 30/09/2013( for mining lease 71.01 Hect).Also Obtained EC from MoEf, GoI,New Delhi, for Naranda mine lease of 71.01 Hect and production of 2.4 Million ton per year, vide letter dated 12 December 2008.

6. Total capital investment of the project is Rs.335/- Crores. Gross capital investment of 0.6 MTPA Lime Stone Mine shown as Rs 1.94 Crores & deposited consent fee of Rs 15,000/- for one year & Rs 2,80,000/- as per Rs 0.4 per ton per year.

7. Nearest mine lease boundary of Pimpari is about 225 meters from the notified River Penganga & thus not satisfying RRZ policy.

8. Regional Office vide letter dated 22/11/2011 has issued interim directions to the existing unit with directions to provide fixed water sprinklers along mine haul roads. The unit has not yet complied to the interim directions issued by R.O. Chandrapur. Consent to operate is required for 0.6 Million Ton/Annum for lime Stone Mining for which consent to establish is already obtained. Air Pollution control system needs to be strengthened. Environment Clearance compliance needs to be done. CAAQMS not yet installed. In view of above we may issue show cause notice for refusal of consent.

Page 75: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 21 Name of the Industry: M/s. Chaman Metallics Ltd, Kosara Dongargaon Underground Coal Mine Project, At: Kosara & Dongargaon, Tal: Wani, Dist: Yavatmal. H.O.D. Remarks:

1. Industry has applied for grant of consent to Establish for underground coal mine at village Kosara, & Dongargaon for coal production of 0.3 Million Ton per year.

2. Obtained NOC from Gram Panchayat Kosara (Dongargaon). 3. Industry has obtained Environmental Clearance from The MoEF for coal production of 0.3

Million Ton per year, vide letter dated 11th July 2011. 4. Project cost of mine is Rs 138 Crores, and deposited Total consent fee of Rs 3,96,000/-

including mining charges at the rate of Rs 0.4 per ton per year. 5. DE-120 CMD. STP proposed. IE-3358 CMD. ETP proposed for workshop. 6. Fix water sprinklers will be provided at coal stock yard and CHP premises. 7. Internal roads will be tarred. 8. R.O. Chandrapur recommended grant of consent to establish subject to following.

a) Submission of river distance certificate from the Irrigation Department. b) As per EC project cost is Rs 200 Crores, whereas industry has submitted undertaking for Rs

138 Crores. Industry should submit correct project cost & deposit consent fee accordingly. c) Mine authority shall carry Avenue Tree plantation along coal Transportation roads. d) Mine authority shall develop Green Belt along CHP & Mine surface area before actual

commissioning of mine. e) Mine authority shall regularly maintain coal transportation road to avoid fugitive dust emissions

due to truck movements. f) To maintain buffer zone along working area, coal storage area. g) Ambient Air Monitoring Facility

SRO, Chandrapur vide email dated 15.09.2012 reported that notified river Penganga A-II Class is about 10.12 K.M. from surface land boundary, hence satisfy RRZ policy, 2009. We may grant consent to Establish for underground mine.

Page 76: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 22 Name of the Industry: M/s Suryalaxmi Cotton Mills Ltd.

(25 MW Power Generation), 9 km, Ramtek Mouda Road, Vill: Nagardhan, Tal: Ramtek, Dist: Nagpur.

H.O.D. Remarks

2. Applied for 1st Consent to Operate for 25 MW (2 x12.5 MW) Coal based captive power plant. 3. Consent to Establish is granted by the Board vide letter dated 08.04.2009. 4. Environment Department, GoM has granted Environment clearance to the said project vide

letter dated 20.07.2010 and amended on 24.01.2012. 5. Capital investment of the Power Plant is Rs.113.62 Crores. Consent fee of Rs.4,72,600/- is paid

by the industry for the period up to 31.07.2014. 6. DE- 9.6 CMD. STP provided. Treated Effluent will be disposed on land for gardening. IE-233

CMD. 7. SRO, Nagpur-I reported that;

i) Unit has completed installation work of APC i.e. ESP to Boiler, Bag Filter to Coal handling & coal crushing activity. Only final connections are remaining,

ii) Civil work of Silo for storage of Fly Ash is completed. iii) Construction work of neutralization pit for treatment of industrial effluent is in process.

As per the status report the work of pollution control system to the power plant is not yet

completed and hence, we may grant consent only after the completion of pollution control related works.

Page 77: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 23 Name of the industry: M/s. Integrated Baranj Open Cast Mines Karnataka Emta, Plot No.84, Vill: Kiloni, Tal: Bhadrawati,

Dist: Chandrapur.

H.O.D. Remarks

1) Mine authority has applied for renewal of consent to operate for two years 2) Earlier Consent for coal mine 2.5 Million TPA is valid up to 30.06.2012. 3) Capital Investment of the industry is Rs. 554.67 Crores & deposited consent fee of Rs

40,98,680/- accordingly. 4) IE-10,185 CMD including mine water. DE-130 CMD, for mine water treatment authority

has provided & commissioned Water Treatment Plant & treated mine water used for plantation, Water spraying & balanced discharges into Nearby Konda nala. For workshop effluent treatment, mine authority has provided ETP and treated effluent is recycled.

5) For air pollution control, mine authority has deployed mobile water tankers, fixed water sprinklers along light weight movement road, but existing facility is totally inadequate to control, air pollution.

6) AAQM results are mostly exceeding to the consented standards.

7) R.O. Chandrapur reported that, this mine is complaint & LAQ oriented and thus observing non-compliance of consent conditions & directions issued by the Board. As per Board’s directions Existing BG of Rs 10.0 Lacs for Railway siding & Rs 2.0 lacs for mine has been forfeited and new BG of same amount has been obtained which are valid up to 10th April 2013. Condition of internal road needs improvement.

8) R.O. Chandrapur recommended renewal of consent with following directions with time bound program.

I. To provide high efficiency air pollution control system based on latest available technology. II. To provide at least three Continuous Ambient Air Quality Monitoring Stations.

III. To maintain coal transportation road along with automatic dust collection & road wetting machine.

IV. Tarring of internal road shall be carried out. V. Mine authority shall undertake water harvesting program in mine area, railway siding & in the

vicinity villages. The unit is still not yet complied. R.O. Chandrapur has submitted the report which is not complied. Complaint from local MLA regarding discharge of effluent into nalla. CAAQMS and adequate air pollution control system are not installed. In view of above, we may issue show cause notice for refusal of consent.

Page 78: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 24

Name of the industry: M/s. Urjankur Shree Datta Power Co. Ltd.

Gat No. 251, M/s. Shree Datta Sahakari S.S.K. Ltd, Dattanagar, Shirol Dist - Kolhapur.

H.O.D. Remarks:

Industry has applied for Renewal of Consent to Operate. It is RED/LSI unit.

Industry is engaged in production of Electricity using Bagasse and Coal as fuel.

Total capital investment is ` 207.21 Cr. as per CA certificate submitted by industry which was 232 Cr. against pervious consent granted by the Board.

Industry has paid fees of ` 8,28,877/-

The Industry site is located at Gut. No. 251, M/s. Shree Datta Shetkari SSK Ltd. Dattanagar, Shirol, Kolhapur - 416 120. Site location is 7 km away from A-II Class Krishna River, hence satisfy RRZ criteria.

Previous consent is valid up to 30.09.2012

Industry is generating 4 m3/day domestic effluent which will be treated in septic tank followed by soak pit.

Industry is generating 578 m3/day Industrial Effluent from Bleed of Cogeneration, Boiler Blow Down and Soot Blowing De-aerator which is treated in ETP. This ETP comprised with following units Equalization tank, Neutralisation Tank, Clarifier, Treated Water Sump, Sludge drying bed.

Treated effluent is used for gardening on own land of 5.60 hectors.

Industry has provided to Baggase/Coal fired High Pressure Boiler which having stalk height of 100 m attached with ESP for air pollution control.

RO Kolhapur has recommended application for renewal of consent to operate up to 30.09.2014

Recommended to renewal the case after obtaining clarification change in CI from 232 Cr to 207.21 Cr.

Obtaining fees of consent form Rs. 100/-

Page 79: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 25

Name of the industry: M/s. Bombay Rayon Fashion Ltd.

C/o. Islampur Integrated Textile Park Pvt. Ltd. Vill- Peth Naka, Islampur, Tq- Walwa, Dist- Sangli. H.O.D. Remarks:

Industry has applied for 1st Consent to Operate. It is RED/LSI unit.

Total capital investment is 171.53 Cr. as per CA certificate submitted by industry.

The proposed site is located in M/s. Islampur Integrated Textile Park (IITP), Gut. No. 905/A4, 905/A5, 924, 926, 944/2, 946/2, 949/2. A/p. Peth, Tq- Walwa, Dist- Sangli – 415407.

M/s. Islampur Integrated Textile Park has obtained consent to establish for infrastructure project.

Industry has proposed to manufacture of Gray Fabric - 300 T/M, Yarn waste (By Product) - 12.5 T/M.

The industry has started trail run of the weaving machinery since December 2011 for training of workers.

As per C to E granted by board, total consented effluent were 166 CMD (Industrial -106 CMD + Domestic 60 CMD), however now industry has curtailed generation of total effluent to (Industrial 22 CMD + 42 CMD = 64 CMD)

Industry will be generating of 42 CMD domestic effluent at full capacity utilization which will be treated by CSTP provided by M/s. IITP which will comprise units as Equalization tank, pH Correction tank, Bar Screen, O & G Trap, Flocculation, Settling Clarifier, UASB Reactor.

Presently IITP has provided 20 CMD packaged STP and further full-fledged CSTP of 370 CMD capacity will be provided which is under construction and will be completed by 30.09.2012

Industry is generating 22 CMD Industrial Effluent from sizing, Boiler Blow Down and Humidification Activity which will be treated by CETP provided by M/s. IITP. This CETP comprising the unit as Equalization tank, Bar screen, O&G Trap, pH Correction tank, Ozone contact tank, Flocculation, Settling Clarifier, however upgradation of CETP is under process and will be completed by 30.09.2012

M/s. Islampur Integrated Textile Park will be recycled & reused treated effluent for development of green belt & horticulture in over area of 60,000 m2 which will be completed by 30.09.2012.

Industry has provided mechanical type Dust Collector to Boiler having stalk height of 30

Industry has paid requisite consent fees Rs 3,43,060/-

SRO Sangali has recommended for consent to operate, after getting concrete proposal for completion of STP and ETP with treated effluent disposal system.

Recommend to first consent to operate with condition to treat entire effluent in their individual ETP and dispose to CETP.

Till commission of CETP effluent generating activities shall not commission.

The CETP will be commissioned by 30.09.2012

No effluent generating production may be start prior to CETP commission.

Page 80: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 26 Name of industry :- M/s Shri Saikrupa Sugar & Allied Industries Ltd., (Distillery Division), At – Hiradgaon, Tal – Shrigonda,

Dist – Ahemednagar

HOD Remarks :

Industry has applied for First consent to operate of Distillery Unit.

Total Capital Investment is Rs. 207.45 Cr. Sugar – 164 Cr. & Distillery- 43.45 Cr.

Consent for Sugar + Cogeneration unit was issued on 16/03/2012 which is valid up to 31/11/2012.

Capacity of distillery is 50 KLPD with continuous fermentation process.

CREP: - Industry has provided 30 days capacity storage tank with HDPE sheet lining and concreting at the bottom.

Unit has provided Bio-methnation plant followed by multiple effect evaporators.

CREP complied industry.

Industry has obtained environmental clearance from MOEF.

We may grant consent to first operate up to 30.06.2013

Page 81: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 27

Name of industry :- M/s Mula S.S.K. Ltd.,(Distillery Division),

At Post- Sonai, Tal – Newasa, Dist – Ahemednagar

HOD Remarks :

Industry has applied for renewal of consent for Distillery Unit.

Total Capital Investment is Rs. 138.969 Cr. Sugar + Co-generation Unit – 138.089 Cr. & Distillery- 13.88 Cr.

The Capital investment is increased from 12.10 Cr. to 13.88 Cr. thus, industry has submitted consent fees against increased in investment.

Consent for Sugar + Cogeneration unit was valid up to 30/06/2012. Unit applied for Auto Renewal on 14th Feb 2012. But there was increase in C.I. by 10 %. Industry was informed by letter dated 29/02/2012 to apply for grant of renewal at SRO, Ahmednagar office.

Rs.5 Lacs bank guarantee is submitted by industry for CREAP compliance.

Wet scrubber to boiler not provided

CREP partially complied.

RO, Nashik Has issed SCN, industry has not replied.

BG of 2 lakh encash & obtain additional B.G. of 2 lakh for CREP compliance in next 4 month.

We may grant renewal.

Page 82: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 28 Name of industry :- M/s Municipal Corporation of Greater Mumbai,

Water Treatment Plant, Bhandup Complex, Kjindipada Road, Bhandup (West), Mumbai.

HOD Remarks :

This is a application for drinking water treatment plant (WTP), for C to E of Bhandup plant.

Total investment of the STP is 321 Cr.

Existing WTP is of 1910 MLD. MCGM has proposed expansion of 900 MLD. Total capacity after expansion would be 2810 MLD.

Board has not received proposals of other WTP

There is no categorization for WTP.

We may grant consent in “RED” category.

Page 83: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 29 Name of industry :- M/s Tilaknagar Industries Ltd., (Grain Based Distillery),

At Post Tilaknagar, Tal. Shrirampur, Ahmednagar

HOD Remarks :

Industry has applied for Renewal of Consent. Industry category is RED/ LSI.

Total Capital Investment is Rs. 196.4518 Cr. (Grain based Distillery is 100.9889 and Molasses based distillery is 95.4629 Cr.)

Previous consent was granted in Orange category as it is Grain based distillery.

Effluent is treated in Multiple Plate Evaporator, residue is used as a cattle feed.

No effluent discharge,

ESP provided to boiler.

We may grant renewal of consent up to 30.04.2014

Page 84: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 30 Name of Industry: - M/s Pioneer Distilleries Ltd, Expansion of 40 KLPD A/P Balapur, Tq. Dharmabad, Dist. Nanded. HOD Remark:-

1. Applied for first consent to Operate for expansion of Distillery.

2. Obtained consent to establish for expansion. Obtained Environmental Clerance. 3. C.I 76.08 Crores for expansion , 15 crores for IMFL Plant & existing 116.63 Crores.

Hence Total Capital investment 207.81 Crores. 4. Existing consent was amalgamated which is valid till 31.08.2015. 5. Industrial effluent generation 551CMD including cooling tower effluent.. 6. Application received at SRO nanded 02.06.2012 & at HQ. 03.08.2012. 7. Provided Primary aerobic digester 3 nos, secondary five multi effect evaporation system

for spent wash generated from molasses based distillery. The effluent generated from grain based distillery is recycled in process. Concentrate left after MEEP is mixed with solid fuel & fired into boiler.

8. The work of installation of MEE is not yet completed. Civil work of dryer was completed & material was found at site.

9. Provided Multi cyclone dust collector followed by Venturi scrubber as an APC. 10. H2s scrubber to biometahnisation plant & Co2 recovery Plant. 11. The condition of scrapping of lagoons within six months period was prescribed in the

consent to establish dtd 03.01.2012, granted for expansion. 12. RO Aurangabad visited the industry on 27.06.2012 & observed that work of scrapping of

lagoons was in progress. 13. 4 lagoons out of 9 lagoons are not yet scrapped & spent wash was stored in lagoons. 14. In lieu of Bank guarantee of Rs 1.25 Lakhs industry has submitted Demand draft of Rs

1.25 Lakhs at Regional office Aurangabad.. 15. Consent to operate (Expansion) will not be granted till the compliance of conditions

stipulated in earlier as well as the Current consent to establish was prescribed in the consent to establish dtd 03.01.2012.

16. RO Aurangabad recommended for grant of consent to Operate for expansion with forfeiture of Bank Guarantee of Rs 1.25 lakhs since industry has not complied the condition of scrapping of lagoons within 6 months and not submitted time frame for scrapping of lagoons.

17. Industry has also not complied the condition of achieving of zero discharge as per the existing consent issued by Board which ind was supposed to complete by Mid of Feb 2012.

18. We may grant Consent to operate for expansion.

Page 85: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 31 Name of Industry: - M/s Pioneer Distilleries Ltd,(Bottling Plant) A/P Balapur, Tq. Dharmabad, Dist. Nanded. HOD Remark:-

1. Applied for Consent to Operate for bottling plant. 2. Application received at SRO Nanded on 22/05/2011 and at HQ 04/08/2012. 3. Bottling of IMEPL 3600 KL/M. 4. Provided neutralization and settling tank. 5. Treated effluent will be used on land for gardening. 6. SRO/Ro recommended for grant of Consent to operate 7. We may grant Consent to operate up to 31.05.2013.

Page 86: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 32

Name of Industry: - M/s Sanstar Ltd. Sr No 267, 268, Vill Karvand, Tq. Shirpur, Dist. Dhule. . HOD Remark:-

1. Applied for Consent to Establish. Manu facturing of Starch. 2. Application received at SRO Dhule on 05/06/2012 and at HQ 16/07/2012. 3. Proposed industry is @13.93 KM from Tapi River satisfies RRZ Policy. 4. IE generation 2103 CMD .Proposed Primary treatment foll Proposed industry is @13.93 KM

from Tapi River satisfies RRZ Policy. 5. IE generation 2103 CMD .Proposed Primary treatment followed by Anaerobic treatment.

Treated effluent will be used on land for gardening 6. Land available for disposal of effluent 66 Hectres. Seems to be adequate. 7. Coal fired Boiler proposed ESP as an APC. 8. SRO Reported that seasonal river Arunawati is @ 0.67 Km from industry which meets to river

Tapi.(Notified) 9. SRO Recommended for grant of consent to establish by Stipulating Stringent consented

parameters for disposal of Effluent. 10. ed by Aneribic treatment. Treated effluent will be used on land for gardeining 11. Land available for disposal of effluent 66 Hectres. Seems to be adequate. 12. Coal fired Boiler proposed ESP as an APC. 13. SRO Reported that seasonal river Arunawati is @ 0.67 Km from industry which meets to river

Tapi.(Notified) 14. SRO Recommended for grant of consent to establish by Stipulating Stringent consented

parameters for disposal of Effluent. 15. We may grant Consent to Establish.

Page 87: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 33 Name of industry :- M/s. Carlsberg India Pvt. ltd, H-17/1/1 MIDC Waluj, Dist. Aurangabad

HOD Remarks:

Industry has applied for amendment in Consent in respect of Capital investment. Manufacturing of Beer.

The consent of said industry is valid till 31.05.2013.

The capital investment of industry is increased to the tune of 32.24 Crores in comparison with earlier investment.

The total capital investment is 142.24 Crores.

Application received at SRO Aurangabad-I on Dt.13/07/2012 and at HQ 03/08/2012.

The increase in capital investment is due to addition of Beer process tanks, Warehouses, up gradation of ETP, Flavored beer .

SRO & RO reported that the production level, water consumption as well as effluent quantity is not going to increase due to addition of investment.

Provided secondary treatment . The treated effluent is sent to CETP for further treatment & Disposal .

JVS result are fluctuating within range of 8.4 mg/l to 93.5 mg/l as compared to Consented Standards of 30 mg/l.

RO Reported that O & M of ETP is not proper as traces of Oil observed in equalization tank, sludge was flowing in buffer tank, No scrapper mechanism was found in operation of Secondary clarifier,.

Industry has not provided Air Pollution control equipment to coal crushing section.

Ind has submitted Envt. Statement. Cess returns submitted upto March 2012 & cess paid upto March 2010.

As per CMS Module no directions are issued to industry.

Ro recommended to forfeit the Bank Guarantee of Rs 1.0 lakhs, which was valid earlier upto 13.05.2010 after getting renewed from them and to obtain fresh bank guarantee of Rs one lakh.

JVS results are not meeting the consented standards, we may issue SCN for refusal of Consent for expansion in C.I

Page 88: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 34

Name of industry :- M/s Bhairavnath Sugar Works Ltd., Tal Paranda, Dist. Osmanabad

HOD Remarks:

Applied for Consent to establish for expansion of Sugar industry from 2500 TCD to 3500 TCD .

Capital Investment of existing sugar is 45 Cr & proposed sugar expansion 20.80 Crs, proposed Cogen 32 Crores, Distillery 22 Crores . Total capital investment 119.8 crores including Co-gen & Distillery.

Proposed Site is @ 3 Km from Sina river notified river satisfy RRZ Policy.

Does not attract Environmental Clerance.

Application received at SRO Latur on Dt.22/06/2012 and at HQ 24/08/2012.

Existing renewal of Consent of sugar industry is valid till 31.12.2012 & for Co-gen Consent to Establish is issued on 30.07.2012.

Consent of sugar industry is issued with condition of bank guarantee of rs 5.0 lakhs for operation & maintenance of Pollution control devices & Rs 2.0 lakhs for avoiding ingress of bagasse & other materials in effluent carrying pipeline network. Submitted Bank Guarantees on 08.08.2012

Earlier the industry was in purview of Consent Committee as C.I was less than 100 Crores.

Existing industrial effluent generation 275 CMD including cooling tower blow down &

Proposed 94 CMD due to expansion.

Provided Primary , Secondary & tert. treatment system. Ind has carried out upgradation of ETP for 500 CMD.

Treated effluent is used on land for gardening . 100 Acres land available.

JVS results dtd 31.01.2011 ,20.2.2011 & 27.02.2012 are exceeding the standards in respect of BOD & COD.

Cess returns submitted upto Aug 2012 . Submitted Environmental statement for year 2010-11.

Wet Scrubber proposed to Boiler for control of air Pollution.

SRO & RO recommended for forfeiture of existing Bank guarantee of Rs 25,000/- as JVS results are alarmingly high.

The application is to be placed in CAC as total C.I of industry 119.8 crores including expansion.

We may grant Expansion.

Page 89: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 35

Name of industry :- M/s. Shree Someshwar SSK Ltd., (Sugar Unit)

A/p.- Someshwarnagar, Tal.- Baramati, Dist.- Pune.

HOD Remarks:

Applied for renewal of the consent for Sugar unit.

Previous consent was valid upto 31.08.2010.

Application received at SRO on dt.21.05.2012 and HQ on dt.11.07.2012.

C.I is increased by Rs.46.91 Cr due to internal road construction and modernization of mill, as per industries letter dt.15.06.2012.

Industrial effluent generation is 400 CMD and D.E is 120 CMD.

ETP is provided with secondary treatment.

JVS analysis results dt.22.02.2012, 18.01.2012 & 19.12.2011 are submitted which are exceeding in respect to BOD, COD.

The land available for the disposal of the treated effluent with industry is about 214 Acres. Which seems to be adequate.

ESP is provided as an APC system.

Environmental Statement is submitted for period 2010-11.

Cess returns are submitted upto April-2012.

Submitted the BG of Rs. 2.0 lakhs

Industry vide letter dt.09.08.2012, has requested for the renewal of the consent for the previous consented quantities and expressed their apology for the mistake in the quantities mentioned in the application.

Recommended for renewal of consent with encashment of exiting BG of Rs. 2.0 lakhs and imposing fresh BG of Rs. 5.0 lakhs and with amalgamation to exiting co-generation unit.

Page 90: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 36 Name of industry :- Shri Someshwar SSK Ltd.,

Someshwar nagar, Ta.- Baramati, Dist.- Pune.

HOD Remarks:

Applied for the Renewal of Consent for the 18 MW Co-Generation Unit.

Application received at SRO on dt.21.05.2012 and at HQ on dt.11.07.2012.

Previous consent was valid upto 31.01.2011.

Total C.I of the Industry is Rs.193.56 Crs (Sugar + Co-gen+ Distillery)

Industry submitted that C.I is increased due to internal road constructions.

Industrial effluent generation is 700 CMD and D.E is 4.5 CMD.

ETP is provided with secondary treatment. Common ETP for Sugar & Co-gen unit.

JVS analysis results dt.22.02.2012, 18.01.2012 & 19.12.2011 are submitted which are exceeding in respect to BOD, COD.

The land available for the disposal of the treated effluent with industry is about 214 Acres.

ESP is provided as an APC system.

Environmental Statement is submitted for period 2010-11.

Cess returns are submitted upto April-2012.

Industry has submitted BG of Rs. 2.0 Lakhs against the Consent condition of Sugar unit.

Recommended for grant of Renewal and amalgamation with sugar unit consent.

Page 91: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 37 Name of industry :- M/s. Brintons Carpet Asia Pvt. Ltd.,

Vill.- Urawade, Tal.- Mulshi, Dist.- Pune

HOD Remarks:

Applied for the C to 1st Operate for Expansion along with amalgamation with exiting consent. Yarn and textile processing involving scouring, bleaching, dying unit.

Obtained C to E for the Expansion on dt.07.06.2012 and exiting unit consent to operate is valid upto 31.12.2013.

Application was received at SRO on dt.15.06.2012 and at HQ on dt.11.07.2012.

Total C.I of the Industry is Rs. 110.84 Crore.

Industrial effluent is to the tune of 152 CMD and D.E is 54 CMD.

ETP provided with tertiary treatment.

Three packaged STP’s provided of capacity 20 CMD each.

JVS analysis results are well within the limits.

Land available for the disposal is about 12 Acres for the treated effluent.

Dust collector is provided to shearing machine.

Obtained membership of CHWTSDF M/s. MEPL Ranjangaon, for the disposal of the HW.

Cess returns are submitted upto March, 2012 and cess paid upto Sep, 2011.

Environmental Statement is submitted for period 2010-2011.

Industry has submitted BG of Rs. 5.0 Lakhs towards giving explanation for increased C.I and also submitted the Company’s Board of Resolution as per the consent condition.

Recommended for grant of the C to 1st operate with amalagamation.

Page 92: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 38 Name of industry :- Schereiber Dynamix Dairies Ltd., Unit –II

E-250, MIDC baramati, Tal.- Baramati, Dist.- Pune.

HOD Remarks:

Applied for consent to establish for manufacturing of Milk powder, Baby food, ghee and butter. Red/LSI. Unit-II is proposed at plot No. E-250, Baramati MIDC.

Application received at SRO on dt.14.06.2012 and at HQ on dt.13.08.2012.

Industry has valid consent for the mfg. Dairy products, which is situated at different plot No. E-94, MIDC Baramati.

Industry informed that Unit –II is a separate entity and its ETP will also be separate.

Located at about 5.00 Km from river Karha (A-2 class).

Industry will generates domestic effluent to the tune of 150CMD and Industrial Effluent to the tune of 1350CMD.

Propose to provide separate Effluent Treatment Plant at Gat No. 88 & 89 of Rui village for treatment of trade and domestic effluent with capacity 1500CMD.

Industry propose to dispose the treated effluent for gardening / irrigation on the land of M/s. Sahyadri Agro Ltd., Katfal, Tal.- baramati through pipeline.

The Sahyadri agro Ltd., have issued NOC for acceptance of disposal of the treated effluent on at about 118 Hectors land.

Industry has proposed to provide stack to spray Dryer with height 37mtr. and D.G set of capacity 1500KVA with stack height 8mtr (above roof).

RO Pune has recommended for grant of the consent the condition of recycling of the treated effluent to the maximum extent.

Recommended for grant of Consent to Establish.

Page 93: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 39 M/s. Baramati Agro Ltd., (Distillery Unit) Vill.- Shetfal Gade, Tal.- Indapur, Dist.- Pune HOD Remarks:

Applied for the renewal of consent for the 60 KLPD distillery unit.

Previous consent was valid upto 31.05.2012.

Application is received at SRO on dt.12.04.2012 and at HQ on dt.25.06.2012.

Industrial effluent is to the tune 420 CMD and D.E -12 CMD.

For the treatment of the Industrial effluent Biodigestor is provided as primary followed by bio-composting.

Industry has provided 11 Acres of compost yard.

Industry has submitted vide letter dt.18.05.2012 that Industry has provided 30 days storage tank and 5 days RCC tank as per CREP norms. Provided Bio-methanization followed by bio –composting, provided compost yard as per CREP norms along with fencing and test wells.

Industry has provided Dust collector with bag filters followed by stack of height 40 mtrs as an APC system.

Industry has paid water cess upto 31.10.2011 and submitted the environmental statement for a period 2010-11.

As per the CMS module no directions issued to distillery unit.

Recommended for grant of the renewal of the consent.

Page 94: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 40 M/s. Cadbury India Ltd, Gat No.-532 & 533, Induri, Talegaon Dabhade, Dist.- Pune HOD Remarks:

Applied for the Consent to First operate for expansion.

Application received at SRO on dt.04.07.2012 and at HQ on dt.10.09.2012.

C.I of the Industry is Rs.270.10 Crs and C.I of the expansion of 717 MT/M is Rs.4.14 Cr.

This is existing industry; consent is valid upto 31.03.2013, for the capital investment Rs. 102.5 Crs and production of Milk crumb, chocolate & confectionary 1820 MT/Month.

Thereafter Board has granted one consolidate consent for two expansion production qty of 2880 MT/Month (717 + 2163) vide dated 13.06.2012 for the capital investment Rs. 128.30 Crs.

Now industry has applied for consent to operate for expansion for the production of 717 MT/M amongst the total 2880MT/M granted as per C to E.

Effluent generation from the expansion of 717 MT/M is Nil, in addition to the exiting 500 CMD.

There is no increase in water budget than existing consent.

Industry has provided combine ETP of the capacity 660 CMD comprising of primary, secondary & tertiary treatment.

JVS analysis results dt.29.03.2012, 15.02.2012 and 03.12.2011 are submitted, which are well within the consented limits.

Treated combine effluent used on land for gardening within premises.

10 hector land provided for gardening / irrigation purpose.

Industry has submitted no change in pollution load due to expansion from U.D.C.T. Mumbai.

Existing two boilers provided with common 44 mtrs. stack with mechanical dust collector to briquette fired boiler.

Obtained membership of CHWTSDF for the disposal of the H.W.

Cess paid upto march 2010; returns are submitted upto may 2012.

Recommended for grant of C to O for 717 MT/M out of C to E quantity 2880 MT/M, with amalgamation to exiting consent valid upto 31.03.2013.

Page 95: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 41 Name of industry :- M/s Kukadi Sah. Sakhar Karkhana Ltd.,

(Molasses Based Distillery Unit) At – Pimpalgaon Pisa, Tal – Shrigonda, Dist – Ahmednagar.

HOD Remarks :

Industry has applied for Consent to Establish.

Capital Investment of Distillery unit is 36.90 Cr. Sugar unit capital investment is Rs. 80.96

Cr. Total C.I. of unit is Rs. 117.86 Cr.

Sugar unit consent was issued on 02 Aug. 2012 which is valid up to 31/12/2012.

Capacity of unit is: Rectified Spirit – 30 KL/Day, Electric Power – 1 MW, Bio compost – 70 MT/Day and Bio gas – 16000 M3/day.

Total water consumption is 833 CMD, in which Industrial effluent generated 312 CMD.

Unit is located 40 KM from Goda river and 4.5 KM from Ahmednagar- Daund Highway.

We may grant Consent to Establish, New application.

Page 96: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 42 Name of Industry: M/s. Sayaji Hotels Ltd. Survey No.135/136.Mumbai-Banglore Bypass Highway, Wakad, Tal-Mulshi, Dist. Pune.

HOD HOD Remarks:-

1. Application for grant of grant of renewal of Consent to Operate received at RO, Pune on 31/03/2011.

2. R.O. (Pune) forwarded application at HQ on 31.5.2012. 3. Environment clearance not required as the total BUA is 10,711 sq. mtrs. 4. Query Letters issued on 8.06.2012, 16.07.2012 & 14.08.2012 for submission of details

regarding increase in C.I., details of swimming pool, and payment of addl. Consent fee, etc. 5. Applicant has replied that their hotel is having three star rating and they do not have any

swimming pool and laundry activity in-house. Also, reported that C.I. is increased from Rs. 87.05 Crs. To Rs. 128.58 Crs. due to taking into consideration value of furniture, fixtures and immovable assets.

6. Total water consumption is @ 154.00M3/day and domestic effluent generated is 124.00M3/day. STP is provided consisting of primary, Secondary, & tertiary treatment for the treatment of sewage effluent.

7. Earlier Hotel was granted Consent under Orange category as it was not having Swimming pool & laundry activities. As per CPCB’s direction dtd. 4/06/2012 regarding classification, Hotels having Nos. of rooms above 100, comes under Red Category. Also, C.I. is above Rs. 100 Crs., hence granting authority is CAC.

8. R.O Pune has recommended the case for renewal of consent for lodging & boarding activity without Swimming pool & Laundry activity.

9. Renewal of Consent to Operate may be granted for Hotel activity (254rooms) for period upto 31/01/2014 after receipt of additional Consent fee as Env. Dept.’s revised Consent fee G.R. dtd. 25/08/2011.

Page 97: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 43 Name of Industry: Kanakia Hospitality pvt. Ltd. CTS no. 25B,Village Chakal & 215 A, Vill Mulgaon On Sub plot A, M.V. Road , Andheri (E), Mumbai-400059.

HOD Remarks:-

- Application received at SRO on 28.6.2012 for grant of renewal of consent to operate of existing

Hotel activity (299 Rooms) with enhanced capacity (additional 43 Nos. of rooms) - R.O. (Mumbai) forwarded application to H.Q. on 30.7.2012.

- Earlier Hotels application for grant of consent to establish for additional 43 rooms submitted in

SRO, Mumbai-II on 19.3.2012. Was returned back by R.O. (Mumbai) vide letter dtd. 9.4.2012 due to non-submission of information regarding feasibility report of STP for additional sewage of 25 CMD.

- Environment clearance is not applicable as the total UA after expansion is 17036.71 Sq Mtrs. - - SRO reported that existing STP is adequate for treatment of additional sewage generated, and

the treated domestic eff. is being used for flushing & gardening. The excess effluent is discharged in to MCGM sewer. Hotel authority has provided ozonization for swimming pool of water.

- SRO has recommended grant of renewal of consent to operate with enhanced capacity. - SCN may be issued for violation of the consent conditions as-

1) The industry has carried out expansion of hotel without obtaining prior Permission from the Board.

2) Pollution load is increased after capacity enhancement. Capacity of the Existing STP is 270 CMD whereas sewage generation quantity after Enhancement is 290 CMD.

Page 98: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 44 Name of the Industry: M/s Duet India (Pune) Pvt. Ltd., 197/3, At Post Lohegaon, Tal.-Haveli, Dist. Pune. HOD Remarks:

1. Applied for grant of renewal of Consent to Operate on 31/12/2011 at Regional Office, Pune. 2. RO, Pune forwarded the application to A.S. (T) Section on 3/09/2012 and recommended to

grant renewal of Consent to Operate upto 31/12/2013. 3. Query letter was issued to Hotel authority and to RO, Pune on 6/09/2012 for submission of

details compliance of the Water CESS Act, submission of Env. Statement etc. 4. Hotel authority has submitted via letter dtd. 13/09/2012 that -

(i) they use filtered water for swimming pool and chlorination is not done, (ii) that due to oversight the Estimated Total Project Cost considered earlier was 99.28 Crs and the Actual Project Cost after capitalization of the Hotel is Rs. 171.25 Crs, (iii) that they are regularly filing the Water CESS Returns and copy of the Env. Statement will be submitted in due course of tim

5. Hotel authority has provided primary treatment for trade effluent from laundry and then connected to STP. 6. RO, Pune has recommended to grant renewal of Consent to Operate upto 31/12/2013. 7. Renewal of Consent to Operate may be granted upto 15/12/2013. Firm has paid total Consent fee of Rs. 8,12,563/- including difference & delay payment charges.

Page 99: List of Cases to be submitted before 6th Consent …mpcb.gov.in/consentappraisal/pdf/6th CAC meeting web agenda.pdf · List of Cases to be submitted before 6th Consent Appraisal Committee

CAC Item No. 45 Name of the Industry: M/s Jupiter Lifeline Hospitals Ltd., S. No. 73/1(pt), 73/3(pt), 73/4(pt), 5, 73/6(pt), 74/1(pt), 77/1(pt), 78/29(pt), 48/1, 48/2(pt), Village- Panchpakhadi, Dist. Thane. HOD Remarks:

1. Applied for grant of renewal of Consent to Operate on 20/09/2011 at Regional Office, Thane. 2. SRO, Thane-I forwarded the application to A.S. (T) Section on 5/03/2012 and recommended to

grant renewal of Consent to Operate. 3. Query letter was issued to Hospital authority and to SRO, Thane-I on 13/03/2012 for submission

of details compliance of the Water CESS Act, submission of JVS results, submission of C.A. Certificate, Copy of BMW Auth. and details of the Hotel activities etc.

4. Hospital authorities have not replied properly to this office query letters dtd. 13/03/2012 & 23/04/2012.

5. Earlier Hospitals were granted Consent under “Orange” category. But, as per CPCB’s directions dtd. 4/06/2012 regarding classification Health Care Establishments comes under Red category. Hence, Consent granting authority in this case is CAC.

6. Hotel authority has provided STP for the treatment of sewage effluent. JVS result dtd. 26/12/2011 shows that concentrations of all the parameters are within limits.

7. SRO, Thane-I has recommended to grant renewal of Consent to Operate. 8. Renewal of Consent to Operate may be granted under “Red” category after receipt of additional

Consent fee as per Env. Dept.’s revised Consent fee G.R. dtd. 25/08/2011 and subject to condition of submission of suitable Bank Guarantee for submission of Water CESS Returns & Environmental Statement regularly.