List of Cases to be submitted before 2nd sitting of 8th Consent Appraisal Committee Meeting Scheduled on 27.12.2012 at 3.30 P.M. Sr. No. Name & Address Capital Investment Applied For Section Page No. Rem arks Resubmitted Agenda 1 M/s. Chandrapur Ferro Alloy Plant, S No. 498/2, 499, 500 & 503/3, Mul Road, Chandrapur 221.42 Crs Establish for expansion JD(APC) 1 to 26 2 M/s. Dighi Port Ltd., Stone Crusher and RMC Plant, G No. 71, A/p- Dighi, Tal-p Shrivardhan, Dist - Raigad 1053 Crs Renewal JD(APC) 27 to 40 3 M/s. Avantha Power and Infrastructure Ltd., Unit- Bhigwan, 105, Pune Solapur Highway, Tal- Indpaur, Dist - Pune 275.14 crs Renewal JD(APC) 41-59 4 Manadhana Dyeing ( Unit-II), ( Division of Mandhana Industries Ltd), C-3, MIDC Tarapur, Boisar, Dist- Thane. 157.04 Crs. 1st Operate JD(WPC) 60-87 Fresh Agenda Part-I 1 M/s. Maharashtra State Power Generation Co. Ltd., Nashik Thermal Power Station, Ekhlare, Tal & Dist - Nashik 4390 Crs Establish for expansion JD(APC) 88-96 2 M/s. Bajaj Auto Ltd., Plot No. A- 1, MIDC Chakan, Mahalunge, Tal- Khed, Dist - Pune 447.71 Crs Consent to operate with amalgamation JD(APC) 97-108 3 M/s. Tetra Pak India Pvt. Ltd., B- 53, MIDC Chakan, Phase-2, Vill- Vasuli, Tal- Khed, Dist - Pune 600.25 Crs 1st operate JD(APC) 109-122 4 M/s. Kalyani Thermal System Ltd., E-84, MIDC Ranjangaon, Tal- Shirur, Dist - Pune 133.61 Crs 1st operate for expansion with amalgamation JD(APC) 223-132 5 M/s. Ideal Energy Project Ltd., Borgaon, Lambat Nr Bela, Khusapar, Kinala, Tal- Umred, Dist - Nagpur 1432.93 Crs 1st operate for 270 MW JD(APC) 133-139 6 M/s. Grace Industries Ltd., A-23, MIDC Indl. Area, Tadali Growth Centre, Chandrapur 259.83 Crs Consent to operate for Kiln III & IV JD(APC) 140-146 7 M/s. Clarient Chemicals (I) Ltd, Plot No.113/114, MIDC Dhatav, Tq- Roha, Dist- Raigad. 191.44 Crs. Amendment in change in product Mix JD(PAMS) 147-150 8 M/s. Century Rayon, P.B. No. 22 , Murbad Road, Shahad, Ulhasnagar, Dist- Thane 118.40 Crs. Amendment in consent JD(PAMS) 151-159 9 M/s. Majalgaon SSK Ltd. ( Distillery Div)Sundarnagar, Talegaon, Tq- Majalgaon, Dist- Beed. 200.08 CRs. Renewal JD(WPC) 160-166 10 M/s. Solapur Municipal Corporation, Indrabhuvan, Punyashlok Appasaheb Ward Path, Solapur. Renewal of Authorisation RO(HQ) 167-172

Upload: buique

Post on 26-Mar-2018

235 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

List of Cases to be submitted before 2nd sitting of 8th Consent Appraisal Committee Meeting Scheduled on 27.12.2012 at 3.30 P.M.

Sr. No. Name & Address Capital

Investment Applied For

Section Page No.

Remarks

Resubmitted Agenda 1 M/s. Chandrapur Ferro Alloy

Plant, S No. 498/2, 499, 500 & 503/3, Mul Road, Chandrapur

221.42 Crs Establish for expansion JD(APC) 1 to 26

2 M/s. Dighi Port Ltd., Stone Crusher and RMC Plant, G No. 71, A/p- Dighi, Tal-p Shrivardhan, Dist - Raigad

1053 Crs Renewal JD(APC) 27 to 40

3 M/s. Avantha Power and Infrastructure Ltd., Unit- Bhigwan, 105, Pune Solapur Highway, Tal- Indpaur, Dist - Pune

275.14 crs Renewal JD(APC) 41-59

4 Manadhana Dyeing ( Unit-II), ( Division of Mandhana Industries Ltd), C-3, MIDC Tarapur, Boisar, Dist- Thane.

157.04 Crs. 1st Operate JD(WPC) 60-87

Fresh Agenda Part-I

1 M/s. Maharashtra State Power Generation Co. Ltd., Nashik Thermal Power Station, Ekhlare, Tal & Dist - Nashik

4390 Crs Establish for expansion JD(APC) 88-96

2 M/s. Bajaj Auto Ltd., Plot No. A-1, MIDC Chakan, Mahalunge, Tal- Khed, Dist - Pune

447.71 Crs Consent to

operate with amalgamation

JD(APC) 97-108

3 M/s. Tetra Pak India Pvt. Ltd., B-53, MIDC Chakan, Phase-2, Vill- Vasuli, Tal- Khed, Dist - Pune

600.25 Crs 1st operate JD(APC) 109-122

4 M/s. Kalyani Thermal System Ltd., E-84, MIDC Ranjangaon, Tal- Shirur, Dist - Pune 133.61 Crs

1st operate for expansion

with amalgamation

JD(APC) 223-132

5 M/s. Ideal Energy Project Ltd., Borgaon, Lambat Nr Bela, Khusapar, Kinala, Tal- Umred, Dist - Nagpur

1432.93 Crs 1st operate for 270 MW JD(APC) 133-139

6 M/s. Grace Industries Ltd., A-23, MIDC Indl. Area, Tadali Growth Centre, Chandrapur

259.83 Crs Consent to operate for Kiln III & IV

JD(APC) 140-146

7 M/s. Clarient Chemicals (I) Ltd, Plot No.113/114, MIDC Dhatav, Tq- Roha, Dist- Raigad.

191.44 Crs. Amendment in change in product Mix

JD(PAMS) 147-150

8 M/s. Century Rayon, P.B. No. 22 , Murbad Road, Shahad, Ulhasnagar, Dist- Thane

118.40 Crs. Amendment in consent JD(PAMS) 151-159

9 M/s. Majalgaon SSK Ltd. ( Distillery Div)Sundarnagar, Talegaon, Tq- Majalgaon, Dist- Beed.

200.08 CRs. Renewal JD(WPC) 160-166

10 M/s. Solapur Municipal Corporation, Indrabhuvan, Punyashlok Appasaheb Ward Path, Solapur.

Renewal of Authorisation RO(HQ) 167-172

Page 2: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

11 M/s. Vasai Virar Minicipal Coporation, S. No. 30 A-31 and 32 , Vill- Gokhiware, Dist- Thane.

Renewal of Authorisation RO(HQ) 173-176

12 M/s. Skoda Auto India Pvt. Ltd., A-1/1, MIDC, Shendra, Aurangabad

433.01 Crs Renewal and 1st operate

for expansion JD(APC) 177-191

13 M/s. Mahindra Vehicle Mfg. Ltd., A-1, Chakan Indl. Area, Phase- IV, Tal- Khed, Dist - Pune

3510.92 Crs Renewal with expansion JD(APC) 192-203

14 M/s. Ordinance Factory, Varangaon, Tal- Bhusawal, Dist - Jalgaon

118 Crs Amendment in consent to

operate JD(APC) 204-210

15 M/s. Croda Chemicals (I) Pvt. Ltd. Plot No. 1/1 (part), TTC MIDC, Kopar Khairane, Navi Mumbai

141.51 Crs. Renewal JD(PAMS) 211-221

16 M/s. Goodyear South Asia Tyres Pvt. Ltd. H-18, MIDC Waluj, Aurangabad.

779.06 Crs. Renewal JD(PAMS) 222-229

17 M/s. Samsonite South Asia Pvt. Ltd, Gut. No. 159-163, At-Gonde Dumala, Tal- Igatpuri, Dist- Nashik

108.26 CRs. Renewal JD(PAMS) 230-245

18 M/s. Polygenta Technologies Ltd, Gat No. 265,266, Vill- Avankhed, Tal- Dindori, Dist-Nashik.

204.45 Crs. Renewal JD(PAMS) 246-256

19 M/s. Cummins India Ltd., S no.3 to 7,31(1), 32,33,37,38,41,42 & 43, Kothrud, Pune

801.75 Crs Renewal JD(APC) 257-266

20 M/s. Zamil Steel Building (I) Pvt. Ltd., B-32/2, MIDC Ranjangaon, Pune

103.39 Crs Renewal JD(APC) 267-275

21 M/s. Tata Motors Ltd., Chinchwad Works, Pune 336.32 Crs Renewal JD(APC) 276-284

22 M/s. Ratnagiri Gas & Power Pvt. Ltd., LNG Terminal, G No. 1036,1037,1039,1040, A/p- Anjanvel, Guhagar, Tal- Guhagar, Dist - Ratnagiri

369.20 Crs Renewal JD(APC) 285-291

23 M/s. Sona Alloys Pvt. Ltd., C-1, MIDC Lonand, Tal- Khandala, Dist - Satara

445.38 Crs Renewal JD(APC) 292-305

24 M/s. Hindustan Aeronautics Ltd., Aircrat Division, Ojhar Township, Nashik

424.87 Crs Renewal JD(APC) 306-316

25 M/s. Supermax Personal Care Pvt. LTd., ( Plant-I), Wagle Indl. Est. PO LBS Marg, Thane

102.7 Crs Renewal JD(APC) 317-323

26 M/s. Jindal Saw Ltd., A-59-60, MIDC Malegaon, Sinnar, Dist - Nashik

750 Crs Renewal JD(APC) 324-333

27 M/s. Lloyd Steel Industries Ltd., Oxygen Plant, Lloydsnagar, Bhugaon Link Road, Tal & Dist - Wardha

625.6 Crs Renewal JD(APC) 334-339

28 M/s. Tata Motors Ltd., Passenger Ca Unit, Sect 15 & 15 A, PCNTDA, Chikhali, Tal- Haveli, Dist - Pune

4311.84 Crs Renewal JD(APC) 340-350

Page 3: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

29 M/s. Adani Power Maharashtra Pvt. LTd., A-1, Vill- Tiroda, Dist - Gondia

6560 Crs Renewal JD(APC) 351-359

30 M/s. Reliance Cementation Pvt. Ltd., J-2, MIDC Butibori, Nagpur 282.07 Crs

Amendment in consent to

operate JD(APC) 360-373

31 M/s. Ultratech Cement Ltd., Po- Awarapur, Tal- Korpana, Dist - Chandrapur

961.59 Crs Amendment in consent to

operate JD(APC) 374-393

32 M/s. Sharad SSK Ltd ( Suagr), Shamrao Patil ( Yadravakar ) Nagar, Narande, Tal- Hatkangale, Dist- Kolhapur.

112.25 Crs Renewal JD(WPC)

394-401

33 M/s. Asian Paint Ltd, Plot No. A-1, MIDC Khandala, Phase-I, Tal- Khandala, Dist- Satara

1045.46 Crs. 1st Operate JD(PAMS) 402-413

34 M/s. Khed Economic Infrastructry Pvt. Ltd. Khed City, Muntiproduct SEZ, Tq-Khed &Sirrur, Dist- Pune

3650 Crs. 1st Operate ( Part)

RO(HQ)

414-421

35 Udgiri Sugar and Power Ltd ( Sugar Unit), Sr. No. 586,87/88, A/p. Bamani, Tal- Khanapur, Dist- Sangali.

105.45 Crs 1st Operate JD(WPC)

Review Item 1 Issue of disposal of spent acid of

metal plating industries located in the jurisdiction of Regional Office, Nagpur.

JD(APC)

422-426

2 Submission of material balance and process flow and Water balance for Sugar, Co- Generation and Distillery.

JD(WPC)

427-431

Fresh Agenda II 1 M/s Hikal Ltd, Plot No T-21,

MIDC Taloja, Dist-Raigad 206.08 Crs Renewal with

C to E for installation of Boiler

JD(PAMS)

2 M/s Wockhardt Ltd. (Bio Tech Park)Plot No. H-14/2, MIDC Waluj, Dist. Aurangabad

432.66 Crs Consent to Establish for installation of Briquette fired Boiler

JD(PAMS)

3 M/s. Bayer CropScience Ltd, Kolshet Road, Thane.

161.58 Crs. Cancellation of consent

JD(PAMS)

4 M/s Essel Infraprojects Ltd. (Resort), Plot bearing CTS No. 1917, 1923, 1925 & 1940 of village Gorai, Borivali (West), Mumbai.

116.76 Crs Amendment in Consent to Establish

AS(T)

5 M/s Reliance Corporate IT Park Ltd., village Gotahivli & Talavali, Navi-Mumbai

684.25 Crs. C to E AS(T)

Page 4: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

6 M/s Indiabulls Properties Pvt. Ltd.., Plot No. 612, 613 Lower Parel Division, Elphinstone Mills, Senapati Bapat Marg, Mumbai-400 013

914.64 Crs. 1ST Operate (In part for IT park)

RO(HQ)

7 M/s Indiabulls Properties Pvt. Ltd.., C.S. No. 841 of Lower Parel Division(G-South Ward), Senapati Bapat Marg, Eilphinstone (W), Mumbai-400 013

607.89 Crs. 1ST Operate (In part for IT park)

RO(HQ)

8 M/s Nirlon Ltd. CTS No. 257/1, 257/B, 257/C, 257/D, 257/E, 257/F, 557, 558, 559, 571, 586/3, part of 257E Village Goregaon (E) and Pahadi Taluka Borivali, Mumbai

581.48 Crs. 1ST Operate in part

RO(HQ)

9 M/s. Shree Chatrapati Shahu SSK Ltd.Tal – Kagal, Dist – Kolhapur

204.06 Crs Amendment in Consent to Establish

JD(WPC)

10 M/s. Malegaon SSK Ltd. (Sugar+ CoGen amalgamation)A/P Shivnagar, Tal _ Baramati, Dist - Pune

136.74 Crs Renewal of consent with amalgamation

JD(WPC)

11 M/s. Malegaon SSK Ltd. (Distillery Unit) A/P Shivnagar, Tal _ Baramati, Dist - Pune

136.74 Crs Renewal JD(WPC)

12 M/s. Baramati Agro Ltd. (Co-Gen Unit), Vilage Shetfal Gade, Tal – Indapur, Dist – Pune

186.30 Crs Renewal JD(WPC)

13 M/s. Lokmangal Agro Distillery Gat No. 573-575 Subhash Nagar, AP - Bibidarphal, Tal – North Solapur, Dist – Solapur

149.36 CRs Renewal JD(WPC)

14 M/s. Mumbai Municiapl Corportion of Grater Mumbai ( STP)(MCGM) Mahapalika Marg, Fort, Mumbai – 400001

Renewal JD(WPC)

15 M/s. Nashik Municipal Corporation ( STP) Rajiv Gandhi Bhavan, Sharanpur Road, Nashik

Renewal JD(WPC)

Review Item – Part-II 1 The review of CAC cases as per

CAC calendar ( Dec- 2012 ) those not applied for renewal of consent.

AS(T)

2 Vitthal Corporation Ltd., (Textile Division), Vitthalnagar, Mhaisgaon-Tadwale (M), Tal -

203.07 Crs Establish JD(WPC)

Page 5: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

Madha, Dist - Solapur

3 Vitthalrao Shinde SSK Ltd., (Expansion), A/p - Gangamainagar, Tal - Madha, Dist- Solapur

168.73 Establish

(Expansion) JD(WPC)

4 The Saswad Mali Sugar Factory Ltd., (Co-generation) Malinagar, Tal - Malshiras, Dist - Solapur

177.26 Cr. Establish JD(WPC)

Page 6: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

Resubmitted Agenda CAC Item No.01 HOD Remarks Name of the Industry : M/s. Chandrapur Ferro Alloy Plant, Survey No.498/2, 499 & 500 & 503/2, Mul Road, Chandrapur. HOD Remarks: 1) Applied for consent to establish for expansion project by installing one submerged

Electric Arc Furnace of capacity of 45 MWA for production of high carbon ferro-manganese, silico-mangnese and electricity plant of capacity of 4.0 MW based on co-gas generated from manufacturing process.

2) Existing unit consent for manufacturing of Ferro Manganese Plant, Sinter Plant and Power Plant was valid up to 31.12.2011 and Capital Investment of existing unit is Rs.86.70 Crores. Applied for renewal of consent for existing unit. Show cause notice issued to the existing unit vide letter dated 23.04.2012 due to non-compliance of consent conditions and interim directions issued by the Board and due to discharge of substandard into river Zarpat.

3) Capital Investment of the expansion project is Rs. 221.42 Crores. Industry has paid Consent fee of Rs.4,42,480/-, as per new GR

5) Domestic Effluent is 24 CMD. and Industrial Effluent is 500 CMD, Septic Tank and Soak pit provided.

6) This office has issued interim directions vide letter dated 19/12/2011 to carry out Environmental Works in time bound manner.

The case was discussed in CAC meeting held on 3.7.2012 and it was decided to issue show cause notice for refusal of consent as the existing unit has not complied with the consent conditions. Accordingly the show cause notice was issued to the industry on 12.7.2012. R.O. Chandrapur vide letter dated 17.7.2012 submitted the reply of SCN. The unit is not complying with the time period issued by the Board for completion of pollution control system and industry requested for extension of time period. The B.G. of the existing unit of Rs.12/- Lakhs is forfeited by the Board as per the decision taken in the Consent Committee. The case was discussed in CAC meeting held on 24.09.2012 and it was decided to keep the case in abeyance till the completion of pollution control system for existing unit. RO Chandrapur vide letter dated 14.12.2012 has submitted the compliance report and seen that unit has mostly complied with the directions but unit has not yet submitted the Bank Guarantee of Rs.24 Lakhs for existing unit as per the decision taken in CC. In view of above, we may grant consent to establish for expansion only after submission of B.G. of Rs.24/- Lakhs.

Joint Director (APC)

Page 7: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.02 HOD Remarks Name of the Industry: M/s. Dighi Port Ltd.

(Stone crusher and ready mix plant) Gut no.71,A/p : Dighi,

Tal: Shrivardhan, Dist –Raigad.

1. Applied on 03.04.2012 for grant of renewal of consent to operate for RMC plant. 2. Application for grant of renewal of consent to operate received to HQ on

28.09.2012. 3. SRO-Mahad has reported in his processing report that industry has not

provided adequate air pollution control system. 4. Regional officer –Raigad has recommended case for grant of renewal of

consent to operate under orange category up to 31.03.2014. 5. As per CPCB’s direction dated 04.06.2012 regarding classification of the

industry, RMC plant falls under Green category [Green industries list- sr.no.72]. 6. Industry has paid consent fees Rs.15,000/-as per revised G.R.25.08.2011. 7. This RMC unit is located inside the premises of Dighi port and said activity is

carried out for development of Dighi port. The total capital investment of the port is Rs. 1,053/- Crores.

8. This case was discussed in the CAC meeting held on 26.11.2012 and it was decided to issue SCN for non provision of APCS.SCN was issued to industry on 04.12.2012.

9. Industry has submitted their reply on 06.12.2012 stating that, they have provided roads within premises are regularly cleaning and wetting ground within premises, planted trees at the site and frequently sprinkling water all around the site and area.

10. Field Officer -Mahad has visited site on 10.12.2012 reported that industry has not provided adequate air pollution control system and not in operation since June-2012.

11. Industry has not provided adequate air pollution control system Hence Refuse grant of renewal of consent to operate.

Joint Director (Air Pollution Control)

Page 8: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.03 HOD Remarks:- Name of the industry :- M/s. Avantha Power and Infrastructure Ltd.

Unit Bhigwan, 105, Milstone, Pune Solapur Highway, Bhadalwadi-Paundhwadi, Tal. Indapur, Dist. Pune

• Applied for renewal of consent • Application received at SRO- Pune on dtd 02/05/2012 and at HQ on 21/06/2012 • Previous consent was valid up to 30/06/2012 • Industrial Effluent Generation is 1008 CMD. The trade effluent is being treated in

ETP of M/s. Bilt Graphics Paper Products Ltd. (sister concern unit Bhigwan) which is adjacent to this unit.

• Treated effluent is utilized for plantation in factory premises. Remaining effluent is discharged into Bori Nalla

• Total area covered under plantation 6.9 hectors • Domestic effluent is 62 CMD. Its mixed in trade effluent & treated in ETP • Industry has provided electrostatic preceptors followed by common stack of 120 mtr

height to the CFBC boiler 1 and 2 also provided bag filters followed bu common stack of 75 mtr height to the Oil boiler and FBC boiler.

• Coal handling section the concreting/pitched road is not provided. Water sprinkling arrangement needs improvement.

• As per previous consent condition industry not installed Continuous monitoring facility for stack emission analysis and 3 CAAQMS and micrometeorological station for So2, Nox and PM.

• RO Pune has recommended the case for grant of renewal of consent • The case has been discussed in the Consent Appraisal Committee meeting held on

24/09/2012 and the Consent Appraisal Committee has decided to issue SCN for refusal of consent for discharging effluent in to Nalla, CAAQMS not installed and inadequate land for disposal of effluent.

• We may grant renewal of consent for one year period with condition that 1 industry shall stop discharge effluent from power plant into Bori Nall within 3 month with BG of 5/- Lakhs 2. To install opacity & CAAQMS before June 2013 with BG of 5/- Lakhs 3. To provide adequate land to disposal of effluent within next 6 month with Bg 5/- Lakhs 4. For operation & pollution control system as continuous basis BG of Rs. 5/- Lakhs • We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 9: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.04 HOD Remarks

Name & address on Industry :- M/s Mandhana Industries Ltd, C-3, MIDC Tarapur, Boisar, Dist. Thane 1. Applied for 01st consent to Operate. 2. Application received at SRO Tarapur on 12/11/2010 and at HQ 13/12/2010. 3. Textile processing industry. 4. Consent toEstablish was granted by Board vide dtd B-85, 30/08/2010 upto

commissioning of Unit. 5. The condition of 100% recycle/reuse of treated effluent in the plant & to achieve Zero

discharge, was prescribed to industry. SRO Tarapur vide letter dtd 03/11/2011 reported that, A) Industry has provided 3 MLD effluent treatment plant comprising of Bar screen, Oil

& grease trap, Reaction tank, equalization tank, Aeration tank, Secondary Clarifier, Decanter.

B) The erection of 1 MLD capacity RO plant has been completed comprises of Pre treatment plant (Silica removal, tertiary reactivator clarification, chlorination,& multimedia filtration, ultra filtration & reverse osmosis Plant (Single stage 70% recovery), Chlorine treatment for RO reject.

C) The culture development (MLSS) in aeration tank is under progress.

6. Industry vide letter dtd 03/11/2011 requested for amendment in consent to Establish i.e permission of discharge of RO reject 30% i.e @400 CMD to out let of CETP instead of zero discharge .

7. Application was discussed in CAC 22.11.2011 and it was decided to issue SCN to industry.

8. SCN was issued & case was re discussed in CAC dtd 31.1.2012 & refused the consent. 9. Ind requested for withdrawl of refusal and Application was discussed in CAC meeting

dtd 24.09.12, It was decided to seek clarification from MIDC regarding the capacity of effluent carrying pipeline from CETP to final disposal point.

10. Letter was sent to MIDC on 30.10.2012 by Legal department.

11. MIDC vide letter dtd 10.12.2012 communicated that

A)The existing disposal line upto navapur creek is 1000mm dia psc which can safely carry effluent of 75 MLD.

B)Tarapur CETP can accommodate 400CMD treated effluernt received from M/s Mandhana Industries Ltd at CETO out Let as per TEPS letter dtd 20.08.2012.

c)The commection point for treated effluent of said industry after CETP out l;et will have to be finalized by MIDC & MPCB so as to monitor their treated effluent.

12. MIDC has no Objection to allow said industry to connect treated effluent to CETP 0utlet subject to certain conditions .

13. we may place application in CAC.. JD(WPC)

Page 10: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

Fresh Agenda Part-I

CAC Item No.01 HOD Remarks Name of the Industry: M/s. Maharashtra State Power Generation Company Ltd., Nashik Thermal Power Station, Eklahare, Tal & Dist: Nashik. 1. Applied for consent to establish for expansion project of coal based thermal

power plant of 660 MW.

2. Said project is about 0.5 km from notified river Godawari, hence not satisfied

RRZ policy.

3. Environment clearance is required for proposed project.

4. SRO Nashik reported that Local Body namely Grampanchayat namely Eklahare

has not given NOC to proposed expansion project.

5. Capital Investment of the proposed expansion project is Rs.4390/- crores.

Consent fee details are not furnished by the SRO, Nashik.

6. ESP is proposed to coal fired boiler.

7. Compliance of existing unit for consent conditions along with monitoring results

are not furnished.

In view of non-confirming to R.R.Z. Policy, we may refuse the Consent to

Establish for expansion.

Joint Director (APC) 

 

 

 

Page 11: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.02 HOD Remarks

Name of the industry :- M/s. Bajaj Auto Ltd. Plot No. A-1, MIDC Chakan, Mahalugegaon, Tal. Khed. Dist. Pune

• Applied for 1st consent to operate for expansion with amalgamation of existing

consent • Application received at SRO- Pune on dtd 29/09/2012 and at HQ on 29/10/2012. • Existing consent is valid upto 31/03/2015 having a capital investment RS 431.16cr. &

industry has obtained consent to establish for expansion on 10/03/2011 & 23/12/2011

• Industrial effluent by combining all consent is 491.0 CMD and domestic effluent is 530.0CMD. ETP provided consisting primary, secondary & tertiary treatment having capacity 790 CMD (ETP-I & II with capacity 550 & 240 CMD respectively). STP consisting primary & secondary having capacity 600 CMD & for tertiary treatment it is connected to ETP-I clarifier. Treated water is used for Gardening on area of 54 Acre of land within premises

• Incinerator is provided with double chamber & scrubbing facility. • DG Set of capacity 3187 KVA x 2 nos is provided with HSD as fuel. • Paint shop boiler & Incinerator of 100 kg/hr capacity provided with LPG as fuel. • APCs are provided to Furnace, shot blasting unit & Incinerator. • RO Pune has recommended for amalgamation of three consents, after the receipt of

compliance. • We may Grant 1st consent to operate for expansion with amalgamation of existing

consent for period up to 31/03/2015 with forfeiting existing BG of Rs. 5/- Lakhs & obtaining fresh BG of Rs. 10/- Lakhs

• We may place the consent application before CAC for further consideration. Joint Director (APC)

Page 12: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.03 HOD Remarks Name of the industry :- M/s. Tetra Pak India Pvt. Ltd.,

Plot. No. B-53, MIDC, Chakan, Phase - 2, Village - Vasuli,

Tal – Khed, Dist. Pune 410501

• Applied for 1st consent to operate

• Application received at SRO- Pune-II on dtd 21/11/2012 and at HQ on 20/12/2012.

• Industry has obtained consent to establish 03/01/2011

• Generation of industrial effluent is 104 CMD for which effluent treatment plant provided

• Domestic effluent generation is 40 CMD for which sewage treatment plant of provided

• Treated effluent will be used on land for gardening within premises. Land open land available @ 30,000 m2

• Adequate height of chimney provided to DG Set and APC to Boiler

• Industry obtained membership of CHWTSDF Ranjangaon. HW will be sent to CHWTSDF & auth. Reprocessor

• RO Pune has recommended the case for grant of 1st consent to operate for period upto 31.12.2013

• We may grant the consent to operate 31/12/2013 with condition that they shall install online stack monitoring measurement Nox with exemption of CAAQMS & operational BG of Rs. 5/- Lakhs

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 13: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.04 HOD Remarks Name of the industry :- M/s. Kalyani Thermal System Limited.

Plot No. E-84,MIDC, Ranjangaon, Tal. Shirur, Dist. Pune 412 209

• Applied for 1st consent to operate

• Application received at SRO- Pune on dtd 07/09/2012 and at HQ on 29/10/2012.

• Existing plant consent is valid up to 31/12/2012 & also obtained C to E for expansion on 22/02/2012

• Generation of industrial effluent is Nil (existing 5 CMD) for which effluent treatment plant provided.

• JVS analysis result on 28/06/2012 and 18/06/2012 submitted .Parameter of BOD (480, 316 PPM), COD (1240, 872 PPM) and SS (280,110 PPM) not meeting the prescribed standard.

• Domestic effluent generation is (existing 57 CMD + Proposed 38 CMD)

• RO Pune has recommended the case for grant of 1st consent to operate for expansion

• We may grant consent to operate for expansion only after the receipt of application for existing one & amalgamation to 1st C to O with forfeiting of BG of Rs. 5/- Lakhs against exceeding the result & obtaining Fresh BG of Rs. 10/- Lakhs

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 14: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.05 HOD Remarks

Name of the Industry: M/s. Ideal Energy Project Ltd.,

Borgaon Lambat near Bela, Khursapar, Kinala,

Tal: Umred, Dist: Nagpur.

HOD Remarks:

1. Applied for First Consent to Operate for 270 MW Coal based Thermal Power Plant.

2. The unit has obtained Environment Clearance vide letter dated 15.05.2009 by

Environment Department, Govt. of Maharashtra.

The Work of Pollution Control system yet not completed. Also additional fees is required. Consent to Establish/E.C. compliance not yet done. Hence we may issue SCN for refusal of consent.

Joint Director (APC)

Page 15: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.06 HOD Remarks

Name of the Industry: M/s. Grace Industries Ltd.,

A-23, MIDC Tadali, Chandrapur

1. Applied for First Consent to Operate for Kiln III & IV for sponge iron production- 6000

MT/Month.

2. As per consent condition of existing unit of Sponge Iron Kiln-I & II Nothing mentioned about Bank Guarantee of Rs.2/- Lakhs. Compliance of Environment Clearance Conditions and Consent to Establish conditions are not submitted.

In view of above, we may ask for details.

Joint Director (APC)

 

 

Page 16: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.07 HOD Remarks

Name of Industry: - Clariant Chemicals (I) Ltd,

Plot No-113/114 MIDC Dhatav,

Tq-Roha , Dist-Raigad.

1. Application for Amendment with change in product mix. 2. Manufacturing of Synthetic organic dyestuff, pigment dyestuff, synthetic resins in

binders, textile and leather chemicals, and intermediates for pigments, dyes, agro chemicals, pharmaceuticals, optical brightening agent.

3. Application received at SRO on 02/08/2012 and at HQ on 16/08/2012. 4. The Consent of industry is valid upto-31/12/2014.Now they have applied for increase

in water consumption and C.I with change in product quantity without changing the total consented quantity.

5. The proposed change in product mix attracts EIA notification 2006 as there is increase in effluent quantity thereby pollution load including air pollution.

6. The No increase in pollution load certificate submitted by industry is not supported with basis of calculation /rate of emission.

7. The clarification submitted by the industry w.r.t. No increase in pollution load is not satisfactory. Hence we may not consider the proposal for change in product mix. We may issue SCN for refusal for proposed product mix.

JD(APC)

Page 17: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.08 HOD Remarks

Name of Industry: - M/s. Century Rayon

P.B. No. Murbad Road, Shahad.

Ulhasnagar, Dist. Thane.

1. Application for Amendment in Consent for increase in production of sulphuric acid. 2. Products- Chemical 3. Application received at SRO on 16/11/2012 and at HQ on 05/12/2012. 4. IE generation as per existing consent is – 13000 m3/d Industry has provided Primary

& Secondary treatment for effluent. Treated effluent is discharged to waldhuni nalla. Analysis results are within consented standards. Due to proposed increase in production there will be no generation of additional industrial effluent.

5. Due to optimization in sulphuric acid manufacturing process, the conversion efficiency of SO2 to SO3 has been increased. This will result in increase in production of sulphuric acid and reduction in SO2 emissions form 4 kg/t to 3.5 kg/t.

6. Industry had paid consent fees for consent to establish and operate for period up to 31/12/2014

Considering the above, we may consider the case for amendment n increase in sulphuric acid production from 71000 Mt/Yr. to 76000 MT/Yr., Subject to obtaining of locational clearance from industry department as per MMR policy.

JD(APC)

Page 18: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.09 HOD Remarks Name of Industry :- M/s Majalgaon Sahkar Karkhana Ltd., (Distilery Division)Sunder nagar, Tal – MajalgaonDist. Beed

• Industry has applied for Renewal of Consent. Distillery of 45 KLPD. • Capital investment 79.69 Crores, Distillery 28.39 Crores & proposed Co-gen

with Investment 92 crores, obtained C to E for cogen from Board . • The Total Capital investment of industry is 200.79 Crores. • Industrial effluent generated 450 CMD. • Provided Bio methanisation with composting on @ 17 acres as per CREP norms. • Achieved Zero discharge. • Industry has provided one day (2 nos.) & 45 days (1 no.) storage tank for spent

wash. • Steel tanks provided for storage of molasses. • Submitted Environmental statement for Year 2011-12. • Cess returns submitted up to Aug 2012, assessment order is not received. • As per previous consent condition industry has submitted B.G.of Rs. 2.0 Lakhs with

validity 26.04.2013. • SRO, Aurangabad-II recommended for renewal of Consent. • We may renew consent with extension of B.G with Consent period.

JD(WPC)

Page 19: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.10 Name of Industry/Local Body: Solapur Municipal Corporation ‘Indrabhuvan’ Punyashlok Appasaheb Warad Path, Railway Lines, Solapur-4313001

HOD Remarks:

1. Applied for renewal of Authorization under MSW Rules-2000. 2. Application Received at SRO on 27/08/2012 and at HQ on 12/12/2012 3. Waste generation- 450 MT/day 4. Treatment method- Anaerobic digestion followed by energy generation of 3

MW/day 5. RO has recommended the case subject to condition of capping of existing dump

site and provision of SLF within 6 months period, with suitable Bank Guarantee 6. Authorization may be granted subject to condition of

i)Existing BG to be forfeited

ii)Authorization may be granted with BG of Rs. 10 lacs for capping of existing landfill site and provision of SLF within one years period

RO(HQ)

Page 20: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.11 HOD Remarks

Name of Industry/Local Body:Vasai Virar Municipal Coproation at S. No. 30A-31 and 32 Village Gokhiware Dist Thane

1. Applied for renewal of Authorization under MSW Rules-2000. 2. Application Received at SRO on 30/08/2012 and at HQ on 26/11/2012 3. Previous authorization granted vide No.BO/MSWT/B-2754 dt. 16/05/2011 valid

upto 30/04/2012, for 200 MT/day. 4. Now applied for 300 MT/day for composting and allied products i.e. Fuel Bricks,

Plastic items, Paving blocks, Scrap material for recycling by adopting Integrated processing Technology, Project on Boot Basis by M/s Hanjar Biotech Vasai Pvt. Ltd.

5. RO has recommended the case for renewal of authorization 6. Authorization may be granted with BG of Rs. 5 lacs for authorization conditions

RO(HQ)

Page 21: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.12 HOD Remarks

Name of the industry:- M/s. Skoda Auto India Pvt. Ltd. A-1/1, MIDC Shendra, Aurangabad.

1. This office is in receipt of two separate applications from industry for grant of Renewal of consent & 1st consent to operate. We may club these two applications together and the details after clubbing these two application is as below:-

2. Existing consent is valid upto 31/12/2012 and valid for Assembly of motors cars 90 cars/Day and obtained consent to establish for Assembly of motor cars 20cars/Day, now we may consider the application as for Assembly of motors 110 car/Day.

3. The total CI after clubbing two applications is Rs 433.01 crores i.e. Rs.292.71 crores existing and Rs.140.3 crores expansion. The CI shown by industry during C to E was Rs. 231.65 crores. Industry vide their letter dated 27/11/2012, reported that the proposed project was for Audi Q-7 & Q-3 car assembling, but now only project of Audi Q-7 is approved and accordingly capital investment was approved by industry Board and submitted the CA certificate of CI as Rs. 140.33 crores.

4. The existing ETP & STP will be used by industry for treatment of indl. & domestic effluent generated. The capacity of ETP is 25 CMD and total effluent generated is 24 CMD from existing & expansion. The capacity of STP is 50 CMD and total effluent generated is 45 CMD from existing & expansion.

5. JVS results are within limit. 6. Submitted the Environment statement for the year of 2011-2012. Cess returns are

filed upto October- 2012 and have not received the assessment order. 7. RO & SRO have recommended the grant of consent Renewal & 1st operate. 8. The fees paid for renewal are Rs 1756287/- for three years period, this is considering

CI as Rs.292.71 crores and paid fees for 1st operate are Rs.280674/- for one year considering CI as Rs.140.3 crores. If we grant consent for three years considering CI as Rs.433.01 crores the fees will be Rs.2598600/-. So the difference fees of Rs. 561639/- is to be recovered from industry.

9. We may consider grant of consent renewal and 1st operate for period of three years after receipt of additional fees.

We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 22: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.13

HOD Remarks

Name of Industry :- M/s. Mahindra Vehicle Manufacturers Ltd.

Plot No. A-1, Chakan Industrial Area,

Phase IV, Tal. Khed, Dist. Pune 410 507

• Applied renewal of consent to operate with expansion

• Application received at SRO- Pune on dtd 12/11/2012 and at HQ on 06/12/2012.

• Board had granted consent to establish for whole project with capital investment of 4000.0 Cr on dated 03/08/2009

• Industry obtained consent to operate for part of project valid up to 30.11.2012

• The industrial effluent is generation is 629.0 CMD, 18.0 CMD from cooling towers & 50.0 CMD from DM/softener back wash totaling to 697 CMD for which they have provided ETP of 1500 CMD followed by constructed wetland beds of 750 CMD as tertiary treatment & 450 CMD RO + 60 CMD MEE as standby arrangement. Treated waste water from ETP is recycled in the process and the remaining is sent to HRTS for zero discharges

• Domestic effluent is 263.0 CMD for which STP of 275 CMD is provided. Treated sewage from STP is used for gardening within the premises

• APCS are provided to DG Sets, paint booth, oven & wax booth

• RO Pune has recommended for grant of renewal of consent to operate with expansion for period upto 30.11.2013

• We may renewal of renewal of consent to operate with expansion for period up to 30/11/2013 with operation BG of Rs. 5/- Lakhs

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 23: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.14 HOD Remarks Name of the Industry: M/s Ordinance Factory,

Varangaon, Tal: Bhusalgaon, Dist: Jalgaon.

1. Applied for grant of amendment in consent to operate at RO Nashik on

07.11.2012.

2. Application for grant of consent to operate received to HQ on 17.12.2012.

3. Application for amendment of consent to operate for discharge of treated

trade and sewage effluent in to irrigation canal of Bhogawati River.

4. RO-Nashik had issued SCN on 17.05.2012 for violation of consent conditions.

Villagers has requested to allow ordinance factory to discharge trade /sewage

effluent into irrigation canal so that it will be available for irrigation of their

/farms.

5. SRO Jalgaon has requested that ordinance factory is discharging treated

trade/sewage effluent in to irrigation canal since inception.

6. Industry has paid water cess up to 30.09.2011.

7. SRO- Jalgaon has recommended grant of amendment in consent to operate.

8. We may not allow ordinance factory to discharge treated effluent in to

Bhogawati river as the unit is not operating their ETP /STP on regular basis

and discharging untreated effluent. Hence we may restrict the present

consent condition only. i.e. The treated effluent shall be reused/recycled to

the maximum extent and remaining shall be disposed on land for gardening

only. There shall not be any discharge outside the factory premises.

Joint Director (Air Pollution Control)

Page 24: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.15 HOD Remarks

Name of Industry:- M/s Croda Chemicals (India) Pvt. Ltd.

Plot no. 1/1 (part), TTC MIDC,

Kopar Khairane, Navi Mumbai.

• Application recd at RONM on 01/11/2012. • Application recd at HQ on 17/12/2012. • Industry is engaged in mfg of Chemicals. • Applied for renewal with increase in C.I. from Rs. 101.14 Cr to Rs. 141.51 Cr. • I.E. 90 CMD, D.E. 18 CMD, ETP provided comprising primary, secondary & Tertiary

system. Disposal- Into CETP. • JVS reports are within limit, except pH & % sodium. • RONM has recommended for grant of renewal of consent with change in Capital

Investment.

We may consider the case for renewal of consent by forfeiting existing BG of Rs. 2 lakhs and imposing fresh BG of Rs. 4 lakhs towards O & M of ETP.

JD(PAMS)

Page 25: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.16

HOD Remarks

Name of Industry: - M/s. Goodyear South Asia Tyres Pvt Ltd H-18 MIDC Waluj Aurangabad

1) Application for renewal with decrease in C.I.

2) This is Tyre Manufacturing industry.

3) Application received at RO on 26/11/2012 and at HQ on 13/12/2012.

4) Industrial effluent generation will be 220.0 CMD after expansion.

5) Industry has applied for renewal of consent with reduction in C.I.

6) Industry has submitted clarification that last C.I as per CA certificate was 805.97 Cr

which was based on the proposed expansion estimated cost but they have not

utilized Rs.25.0 Cr therefore total C.I is Rs.779.0638 Cr.

7) JVS results are within limit.

8) We may consider the case for renewal of consent up to 31/12/2013 with decrease in

C.I.

JD(PAMS)

Page 26: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.17 HOD Remarks

Name of Industry: M/s. Samsonite South Asia Pvt. Ltd, Gut No. 159-163, At Gonde Dumala, Tal. Igatpuri, Dist. Nashik

- Applied for renewal of consent with increase in CI.

- Application received at SRO ON 05.04.2011 and at HQ it received on 30.07.2012.

- The industrial effluent generation is about 2 CMD & domestic 28 CMD. Industry has provided septic tank and soak pit only.

- Industry has submitted cess returns up to May 010 & paid up to May.010 - Environment statement submitted for the year 2010-2011 - we may consider the case for renewal for consent subject to additional

consent fees/restricting the validity period and by imposing condition towards provision of STP within 6 months with BG of Rs. 5 Lacs towards its timely completion.

JD(PAMS)

Page 27: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.18 Cancelled.

Page 28: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.19 HOD Remarks

Name of Industry :- M/s. Cummins India Ltd.,

S. No.3 to 7,31(1),32,33,37,38,41,42 & 43, Kothrud, Pune 411 038

• Applied for renewal of consent • Application received at SRO- Pune on dtd 21/08/2012 and at HQ on 06/12/2012.

• Previous consent was valid up to 30/09/2012 • Industrial effluent is 30.2 CMD (earlier 5 CMD)for which ETP provided

• Domestic effluent generation is 450 CMD (earlier 150 CMD)for which sewage treatment plant

• Scrubber provided to paint booth • RO Pune has recommended the case for grant of consent for period up to

30/09/2014 subject to submission of additional consent fees

• Industry not submitted justification for increase in C.I. by 263.47 Crs & increase in effluent quantity and additional consent fees We may consider the case after receipt of information

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 29: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.20 HOD Remarks

Name of the Industry:- M/s. Zamil Steel Building (I) Pvt. Ltd. Plot No. B-32/2, MIDC, Ranjangaon, Pune 412 209

• Applied for Renewal of consent

• Application received at SRO-Pune on dtd 01/11/2012 and at HQ on 06/12/2012.

• Previous consent was valid up to 30/11/2012

• Industrial effluent is Nil.

• For domestic effluent [30 CMD], industry has provided STP of 40 CMD capacity. The treated effluent is used for gardening within premises.

• Dry scrubber is installed to paint booth with adequate stack height.

• For shot blasting unit, dust collector [bag filter type] is provided. Provided. Stack provided to baking oven

• RO Pune has recommended for grant of renewal of consent for period up to 30/11/2015

• We may grant the consent for period up to 30/11/2015 with extension of existing BG 5/- lakhs up to consent validity

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 30: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.21 HOD Remarks Name of the Industry:- M/s. Tata Motors Ltd.

Chinchwad Works, Pune-411 033

• Applied renewal of consent

• Application received at SRO- PC on dtd 25/10/2012 and at HQ on 06/12/2012.

• Previous consent was valid up to 31/12/2012

• Industrial effluent generation380 CMD for which Effluent Treatment Plant

• Domestic effluent generation is 175CMD

• Presently, sewage generated from industry is connected to PCMC sewer line. Board has stipulated condition in the earlier consent, to provide STP within 12 months. (i.e 13/03/2013)Industry has started installation work of STP. Packaged units of STP are received at site & civil work of collection tank completed.

• Wet Scrubbing arrangement provided to melting section

• RO Pune has recommended for renewal of consent up to 31.12.2013, subject to condition of installation of STP within stipulated time as per previous consent

• We may renewal of consent for period up to 31/12/2013 with condition to complete STP before 15/03/2013 as per earlier laid condition & extension of existing BG up to Consent validity

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 31: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.22 HOD Remarks

Name of the Industry :- M/s. Ratnagiri Gas and Power Pvt. Ltd. LNG Terminal (A joint venture of NTPC & GAIL),

Gut No. 1036,1037,1039,1040,Vill:- Anjanvel, Guhaghar, Dist –Ratnagiri.

1. The industry has applied for renewal of consent for Liquefied Natural Gas Storage and Transportation Terminal.

2. Previous consent is valid up to 31/12/2012. 3. At present this terminal is not in operation since the beginning (2005). 4. The industry has provided septic tank and soak pit to domestic effluent,

overflow is treated in the RGPPL residence colony STP. 5. The regular monitoring of emission volatile organic compounds and other

parameters not carried out due to non operation of plant and empty storage tank.

6. The C I is Rs.3692 Crores and existing was Rs. 2469.74, C I increased by 1222.26 Crores. The industry submitted a clarification stating that the terminal was not in operation and following amounts were added in the figure of last year investment as i) Cost of dredging the navigation channel ii) Cost on account of preparatory work done for the commissioning attempted in March/April-2012. iii) Interest paid on the debt part of the capital.

7. RO/SRO recommended renewal of consent for period up to 31/12/2013. 8. We may consider grant of renewal of consent.

We may place the case before CAC for further discussions.

Joint Director (APC)

Page 32: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.23 HOD Remarks Name of the Industry:- M/s. Sona Alloys Pvt. Ltd.

Plot No. C-1, MIDC Lonand, Tal. Khandala, Dist. Satara 415 521

• Applied renewal of consent

• Application received at SRO- Pune on dtd 09/11/2012 and at HQ on 06/12/2012.

• Previous consent was valid up to 30/11/2012

• Industrial effluent generation 37 CMD

• Domestic effluent generation is 21CMD

• Industry has provided STP and ETP for treatment of domestic and industrial effluent respectively (details enclosed). Earlier effluent generated from power plant unit was used in slag cooling pond and now, the same is taken to ETP and after treatment it is used in slag cooling pound.

• JVS result of dated16/08/2012, 26/09/2012 and 03/10/2012 submitted which is under prescribed limit.

• JVS ambient air monitoring result on dated 17/08/2012,31/07/2012 and 29/04/2012 submitted. Parameters of SPM (572,809 and 335 ug/m3) and RSPM (193,262 ug/m3) not meeting the prescribed standards

• We may grant renewal of consent up to 30/11/2013 with condition that unit shall extend BG of Rs. 50/- lakhs up to consent validity period & forfeit of BG of Rs. 10/- Lakhs against exceeding result/fugitive emission & non tarring of road

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 33: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.24 HOD Remarks Name of the Industry: M/s Hindustan Aeronautics Ltd, Aircraft Division, Ojhar Township, Dist: Nashik.

1. Applied for grant of renewal of consent to operate at RO Nashik on

12.07.2012.

2. Application for grant of consent to operate received to HQ on 29.10.2012.

3. RO-Nashik had issued SCN on 29.08.2012 for violation of consent

conditions i.e. not operating and maintaining STP satisfactorily, treated

effluent of STP not reused, Environment statement and water cess details

not submitted.

4. Industry has not submitted reply to SCN.

5. SRO Nashik has submitted information on 18.12.2012 about ETP, Water

consumption, Details of APCS and information about CHWTSDF.

6. We may obtain the additional consent fees towards difference in capital

investment from the industry.

7. Recommended for grant of renewal of consent to operate up to

30.06.2017 with the condition that industry shall submit copy of

Environment statement and water cess details within one month time

period and obtain the B.G.of Rs.2+2 lakhs towards compliance of the

same.

Joint Director (Air Pollution Control)

Page 34: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.25 HOD Remarks Name of the Industry: M/s Supermax Personal Care Pvt. Ltd. (Plant-I) Wagle Industrial Estate P.O., L.B.S. Marg, Thane 400604.

1. Industry has applied for plain renewal of Consent to Operate. 2. Application received at SRO-Thane-I on dtd. 22/10/2012 and at HQ on dtd

26/11/.2012. 3. Previous consent was valid upto 31/08/2012.

4. Industrial effluent is nil.

5. Domestic effluent generation is 48 CMD. Industry has provided Septic tank and soak pit.

6. Dust collector system is provided to grinding section.

7. RO/SRO recommended the case for period upto 31/08/2014.

8. We may grant renewal upto 31/8/2014.

9. We may place the application before CAC for further consideration.

Joint Director (Air Pollution Control)

Page 35: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.26 Name of the Industry: Jindal Saw Limited.

Plot no.A-59-60, MIDC Malegaon,

Tal: Sinner, Dist: Nashik.

HOD Remarks:

1. Applied for grant of renewal of consent to operate at RO Nashik on 16.10.2012.

2. Application for grant of consent to operate received to HQ on 06.12.2012.

3. Industry has submitted B.G.of Rs.10 lakhs in the Board towards installation of

ARP which was valid up to 25.05.2012. Industry has been instructed to renew

B.G. by SRO Nashik.

4. Industry vide their letter dated 30.05.2011 communicated that during pilot plant

trial it was observed that product quality is altered by use of recovered acid.

Hence, they have not installed ARP.

5. SRO-Nashik has reported that industry has not installed acid recovery plant due

to product quality issue while reusing the recovered acid. The spent acid

generated from pickling activity is treated in ETP and treated water is reused /

recycled 100% in process. H.W. generated in the form of sludge is disposed off

at CHWTSDF.

6. Industry has provided ETP and APCS. Analysis results are observed within

limits.

7. Industry has paid water cess up to March-2011.

8. Industry has submitted Environment statement for year 2011-12.

9. Industry has paid consent fees of Rs.45, 53,306/- + Rs.250/- as per revised

G.R.25.08.2011.

10. RO- Nashik has recommended case for grant of renewal of consent to operate

up to 30.10.2015.

11. Industry has submitted representation regarding pilot study ensure that same

will be implemented within six months, but company not yet installed ARP.

12. Recommended to issue SCN for refusal of consent to operate and

subsequently forfeit the B.G.of the unit.

Joint Director (Air Pollution Control)

Page 36: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.27 Name of the Industry: M/s. Lloyds Steel Industries Ltd. (Oxygen Plant),

Lloyd Nagar, Wardha.

HOD Remarks:

1. Applied for renewal of consent for oxygen plant.

2. We may amalgamate with the existing plant and amalgamating all the consents for the

period up to 30.04.2015.

Joint Director (APC)

Page 37: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.28

HOD Remarks Name of the Industry:-

M/s.Tata Motors Ltd. Passenger Car Unit,

Sector No. 15 & 15A, PCNTDA, Chikhali, Taluka – Haveli, Dist.: Pune: 410 501

• Applied renewal of consent.

• Application received at SRO- Pune on dtd 20/10/2012 and at HQ on 06/12/2012.

• Previous consent was valid up to 31/12/2012

• Industrial effluent generation3120 CMD

• Domestic effluent generation is 1040CMD. Industry has provided STP (Photograph enclosed)

• JVS result of ETP dated 23/02/2012, 26/03/2012 and 18/07/2012submitted which is under prescribed limit.

• Paint booths are closed type & provided with water screen. For VOC control regenerative thermal oxidizer unit is provided. Bag filtration system provided to shot blasting section.

• JVS ambient quality result dated 24/07/2012,25/07/2012 and 25/07/2012 submitted . RSPM LEVEL not meeting the prescribed standards (112,225,254 ug/Nm3)

• RO Pune has recommended the case for grant of renewal of consent after receipt of consent fees & compliance of condition

• Industry submitted additional consent fees of Rs. 57,056/- on dated 04/12/2012 and also they have provided STP

• We may renewal of consent up to 31/12/2013 with condition forfeit part BG of Rs. 10/- Lakhs against, JVS not meeting standards & take operational BG of Rs.. 20/- Lakhs

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 38: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.29

HOD Remarks Name of the Industry: M/s. Adani Power Maharashtra Private Ltd.,

Plot No.A-01, Vill: Tiroda, Dist: Gondia.

1. Applied for renewal of consent of power plant 1320 MW.

2. SRO Bhandara has submitted the compliance report and reported the compliance but monitoring results are not submitted.

We may renew the consent of the unit for the period up to 30.11.2013 with extension of B.G. of Rs. 10/- Lakhs up to consent validity period.

Joint Director (APC)

 

Page 39: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.30

HOD Remarks Name of the Industry: M/s. Reliance Cement Company Pvt. Ltd.,

(Formerly known as M/s. Reliance Cementation Pvt. Ltd.),

Plot No.J-2, MIDC Butibori,

Dist: Nagpur.

 

1) Board has granted consent to Operate vide letter dated 28.08.2012 for the production

of cement 2.0 Million Ton/A which is valid up to 31.05.2013 as per the decision taken

in CAC dated 21.08.2012..

2) Now they have applied for now they have application amendment in consent.

consent to Operate for the consent condition No. 3(i), 3(ii) & 5 (ii). Also, requested for

only one CAAQM instead of 3 CAAQMS.

3) We may amend the consent conditions as follows:

3 (i) Trade effluent – 2.5 CMD

3 (ii) Domestic Effluent – 8.0 CMD

- Unit does not have any DG Sets, Hence Consent Conditions 5(1) (iii) 1 to 8 is to be deleted

5 (iii) Auxiliary Stack – 38 meters instead of 30.5 Meters.

Also we may allow the unit to install only one CAAQM as per the location fixed by MPCB team.

Joint Director (APC) 

  

 

 

 

 

Page 40: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.31

HOD Remarks Name of the Industry: M/s. Ultratech Cement Ltd.,

Po-Awarpur, Tal: Korpana,

Dist: Chandrapur.

1. Industry requested to amend the consent for TPP Unit-III Capacity from 23 MW to 25

MW.

2. The unit has got amended Environment Clearance vide letter dated 27.2.2012 by MoEF

for substituting 3 x23 MW by 2 x 23 MW and 1 x 25 MW.

3. The unit vide letter dated 08.11.2012 has requested for amendment in consent due to

design margin and optimum utilization of inbuilt capacity.

In view of above we may grant amendment in consent by substituting the 3 x 23 MW

by 2 x23 MW & 1 x25 MW as per E.C. conditions.

Joint Director (APC)

 

Page 41: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.32

HOD Remarks Name of the Industry:- M/s. Sharad SSK

Shamrao Patil (Yadravakar) Nagar, Narande, Tal – Hatkangale, Dist – Kolhapur

• Industry has applied for consent to renewal for sugar factory and consent to first operate for CoGen with amalgamation. It is RED/LSI unit.

• Previous consent is valid up to 31.10.2012 and Co-Gen C to E • CI of the sugar industry is Rs. 63.55 Cr. and CI of Co-Gen is Rs. 48.70 Cr. Total CI

of the industry is Rs. 112.25 Cr. • As per SRO report CI of sugar has increased by 5.41 Cr. from 58.14 Cr. to 63.55

Cr. due to modification and modernization. • Capacity of the unit 2500 TCD which manufacture Sugar- 9000 MT/M, Bagasse -

21000 MT/M, Molasses – 3000 MT/M & Press Mud - 2625 MT/M. and Co-Generation Plant of 11 MW.

• Total water intake is 1300 CMD and IE is 625 CMD for treatment of which industry has provided ETP comprising of Primary, Secondary treatment with anaerobic digester.

• Domestic Effluent generation of 75 CMD which is treated in shared ETP. • As per SRO Report CERP compliances are as follows, - Waste water generation is more than 100 lit/ton of cane crushed. - Industry has provided 15 days storage tank. - Multi-cyclone dust collector is attached to boiler having stack of height 60 m as an

APC. • Land available for disposal of treated effluent is 82 acre which is sufficient. • JVs results dt. 31.12.2011 was exceeding and results dt. 31.01.2012 is within

consented limit. • Industry has submitted Environmental Statement for year 2011-2012. • Cess paid up to Jan 2012 and submitted returns up to Nov 2012. • Industry has paid consent fees Rs. 2,10,000/- • Industry has submitted BG of Rs. 5 + 2 lakhs as per consent condition and BG of 2

Lakhs returned on Dec 2012 after compliance. • SRO Kolhapur recommend to renew consent up to 31.10.2015 • We may restrict IE for sugar unit to 250 CMD and Co-Gen for 75 CMD. • C to O first for co-gen (11 MW) and plain renewal of sugar (500 TCD) i.e. 9000

MT/M white sugar. • CI increased by 5.41 Cr. in modernization (C to E cogen CI 48.70 Cr. + Sugar

renewal CI 58.14 Cr.) • Recommend to grant the consent.

Page 42: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.33 HOD Remarks

Name of Industry : M/s.Asian Paints Ltd;

Plot No.A-1, MIDC Khandala, Phase – I,

Tal.Khandala, Dist.Satara

HOD Remarks –

1. Application for 1st Consent to Operate 2. Product-Solvent & water based paints, Resin/Polymers. Consent to Establish is

valid upto COU. 3. Application received at SRO on 7.9.12 and at HQ on 3.12.12. 4. As per consent to establish CI is Rs.885 crore. CI is increased from Rs.885 crore

to Rs.1045.46 crore, without change in production. Industry has paid additional consent fees for increased CI.

5. IE generation is 118 m3/d. Industry has provided Primary, secondary and tertiary treatment followed by RO system and Multiple Effect Evaporator. Treated effluent will discharge on land for gardening.

6. Industry has obtained environmental clearance vide letter dtd.8.9.10. 7. For treatment and disposal of HW, captive incinerator has been provided as per

CPCB guidelines. The captive incinerator is equipped with Ventury and Packed Bed Caustic Scrubber.

In view of above. we may consider the case for 1st C to O for Phase-I by imposing conditions of VOC, TOC and for incinerator as per CPCB guidelines.

Page 43: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.34 HOD Remarks Name of Industry M/s. Khed Economic Infrastructure Pvt. Ltd. (Khed City),Multi Product Sez, At S.No.135(part),277(part),303(part),304(part) 305,306,309(part),310,311(part),330,332(part), Tal & Shirur,Dist:Pune.

• Application for Application received for Grant of C to 1ST Operate (Phase-I,210 Ha)for development of Multi Product SEZ at Khed, District -Pune.

• Application Received at RO Pune on 18/10/2012 and at HQ on 08/11/2012. • Said Project is joint venture Compony established by MIDC &Kalyani Group for Multi

Product Special Economic Zon(SEZ) which is approved & notified by the Ministry of Commerce & Industry(MoCL),GOI.

• MPCB has granted C to E Dated 17/8/2011 Total Plot Area : 1,70,56,200.00 Sq.mtrs.

Built Up Area : 2,04,64,000.00 Sq.mtrs • Project proponent obtained Environmental Clearance from MoEF,GOI vide No.21-

944/2007-IA-III dated 20th May,2010 for Total Plot Area 4500Hectare • Water consumption -1.8 CMD.

Sewage Generation - 1.0CMD. Industrial Effluent Generation-0.8 CMD.

• SRO Reported that, a. Applicant has not provided common STP.

Every Individual Plot holder will be providing their own septic tank arrangement b. Road Access provided. c. One substation at Nimbgaon is constructed to supply water. d. About 45000 sapling has been planted. e. On site 9 earthen nalla bunds & 2 cement nalla bund are constructed for rain water harvesting.

• Quantity of Non-Hazardous waste generate is not mentioned. • There is no clarity from SRO Report and Application Details submitted by Project

Proponent that for what purpose project proponent has applied for C to 1st Operate and As per Environment Clearance., i.e. Industries likely to be setup within the SEZ are: Heavy Industries, Light Industries, Electronics and Electrical Products, Automobiles, Biotechnology, Pharmaceutical. IT/ITES/Food Processing, Textiles and apparel, gems, jeweler, Plastics. Aviation & Logistics.

• As per condition No. 15.,mentioned in Previous consent that individual industry/projects shall obtain C to E from the Board.

• RO Pune Recommended for C to 1st Operate for phase-I for Period upto 31/08/2014. • We may grant C to 1st Operate subject to condition that the industry shall provide

STP and no sewage shall be discharge to any water body. RO(HQ)

Page 44: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.35 HOD Remarks Name of Industry M/s. Udgiri Sugar and Power Ltd. (Sugar Unit) Sr. No. 586, 87/88, A/p Bamani,

Tal –Khanapur, Dist – Sangali

• Industry has applied for consent to First Operate for Sugar and Co-Gen Plant. It is RED/LSI unit.

• Previous consent to establish issued dt. 22.12.2011 valid for 5 years/commissioning of the unit.

• Capacity of unit is 2500 TCD, Sugar Production 5221 MT/M and Co-Gen - 14 MW. • Industry has C.I. of Sugar unit Rs. 105.45 Cr. as per CA certificate submitted by

industry. • Domestic effluent is generating 18 m3/day which is treated in Septic Tank & followed

by anaerobic filter. • Industrial Effluent is generating 260 m3/day and has provided ETP and has provided

100 acre of land for disposal of treated effluent which is sufficient. • Industry has provided ESP to 75 ton Boiler of having 75 m stack. • CERP compliances are as follows as per SRO report,

- Industry has started ETP one month before starting cane crushing. - Waste water generation is 100 lit/ton of cane crushed. - Industry has provided 15 days storage tank. - Industry has provided ESP as APC.

• Industry has paid fees of Rs. 2,11,000/- for consent to operate. • SRO Kolhapur has recommended for renewal of consent to operate up to 30.10.2013 • CREP Complied unit. • Recommend to grant C to O

JD(WPC)

Page 45: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

Fresh Agenda II

CAC Item No.01 HOD Remarks

Name of the Industry: M/s Hikal LTD,  

Plot No T‐21, MIDC Taloja. Dist ‐ Raigad 

HOD Remark:‐  

• Application for Renewal with increase in CI from Rs. 191.69 Crore to Rs. 206.08 Crore & C to E for installation of Briquette fired Boiler with CI Rs. 4.61 Crore.

• Application received RO NM on 07/11/2012. • Application received at HQ on 14/12/2012. • I.E. 788.95 CMD. D.E. 30 CMD. Primary and secondary treatment, ETP provided.

Disposal into CETP Taloja.  • Some JVS parameters are exceeding the consented limit, However RONM has

remarked for relaxation of parameters and difficulties for analysis of some parameters in Boards laboratory. 

• RO NM has issued ID on 16/06/2011 for reuse of treated effluent to the best possible. Compliance report submitted. 

• As per ID compliance industry has started recycling of 80 CMD treated effluent. • Earlier industry has paid consent fees for 5 years but Board has granted consent for

2 years. Industry has requested to consider the balance fee.  

In view of above, recommended for grant of renewal of consent with Consent to Establish for installation of Briquette fired Boiler by considering previous balance consent fees paid and imposing revised standards of pesticides manufacturing industry.

JD(PAMS)

Page 46: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.02 HOD Remarks  

Name of the Industry:    M/s. Wockhardt Ltd. (Bio Tech Park) Plot No. H-14/2, MIDC Waluj, Dist. Aurangabad. • Application recd to SRO Aurangabad 31/10/2012. • Application recd at HQ on 13/12/2012. • Existing unit Mfg of Bulk Drugs. • Existing Consent valid up to up to 31/12/2016. Applied for Consent to Establish for

installation of Briquette fired Boiler by replacing one FO fired Boiler. • Ash generated will be disposed by land filling or sale to Brick manufacturers. • No additional effluent generation. • Proposed CI for installation of Boiler is Rs. 1.7377 Crore. • The proposed change of fuel for boiler is clean fuel as compare to furnace oil.

However it is desirable to have comparison of pollution from industry based on characteristic of fuel use.  

In view of above, we may consider for grant Consent to Establish for installation of Briquette fired Boiler after getting no increase in pollution load confirmation from industry / reputed institute. 

                    JD(PAMS) 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 47: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

 

CAC Item No.03 HOD Remarks  

Name of Industry: M/s. Bayer CropScience Ltd, Kolshet Road, Thane.

• The consent is valid for quality assurance/ quality control laboratory for analysis of the product manufactured at different locations of Byer Group of companies & Remediation of site with respect to contaminated soil, ground water. Treatment facility was provided for generation of trade effluent 2.5 CMD and sewage waste water 240 CMD. JVS results are within the limits.

• Industry has stopped all its manufacturing activities in phased manner in the year 2008. Industry has dismantled and shifted all their machineries, they have also stopped their laboratory work. Industry has disposed off contaminated soil from their premises- 214469 MT to CHWTSDF.

• Though the proponent had carried out remediation work , which has been verified by the RO, Thane by collecting and analyzing ground water and soil samples , being pesticide mfg. industry, this needs to certify by the reputed third party viz. IIT, NEERI, UDCT etc.

• We may consider the request of the industry about cancellation of consent by imposing following conditions.

The project proponent is responsible for carrying out any remedial measures, if required in future at their own cost. the consent fees paid up to 31.12.2014 shall not be refunded. The proponent shall settle any dues viz. cess payment, JVS analysis charges, if any. The project proponent shall submit a copy of report of third party about safe closer of the site to the Board and responsible for implementations of suggestions, if any there of. The proponent shall submit a BG. Of Rs. 10/- Lacs towards above compliances.

• Recommended for cancellation of the consent granted to the industry which is valid up to 31.12.2014 subject to above conditions.

 

 

 

 

 

 

 

 

 

Page 48: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.4 HOD Remarks  

Name of Industry: M/s Essel Infraprojects Ltd. (Resort), Plot bearing CTS No. 1917, 1923, 1925 & 1940 of village Gorai,

Borivali (West), Mumbai. HOD Remarks: 1. Application for grant of amendment of Consent to Establish for expansion of the

proposed Resort (from 25,000 sq. mtrs. to 37,833.37 sq. mtrs.) received at R.O. (Mumbai) on 21/11/2012.

2. Firm has obtained Consent to Establish for construction of Resort building having BUA 25,000 sq. mtrs. vide Consent No. BO/RO(P&P)/EIC-MU-1536-10/E/CC-16 dtd. 15/01/11.

3. Firm has obtained CRZ Clearance for the proposed Resort from MCZMA, GoM vide

letter No. MCZMA 2009/CR 16/MCZMA dtd. 11/02/2010. 4. Firm has obtained amendment of Environmental Clearance from the SEIAA, GoM vide

letter No. EC SEAC 2011/CR.54/TC.2 dtd. 27/05/2011 for expanded built-up area 37,833.37 sq. mtrs.

5. Firm has proposed to provide STP comprising of collection tank, manual bar screen and

grit chamber, aeration tank and tube deck settlers, filtration system followed by disinfection system for treatment of sewage generating from Resort. After treatment, the treated sewage will be utilized for flushing, firefighting, cooling tower and for gardening purposes.

6. Solid wastes (Biodegradable) / Wet garbage -130 Kg/day will be used as manure

after Vermi-composting, Solid wastes (Non-Biodegradable) – 170 Kg/day will be disposed off by sale to scrap merchant, and STP Sludge- 30 Kg/day will be used as manure after drying.

7. SRO(Mumbai-IV) / RO(Mumbai) have recommended that grant of amendment of Consent to Establish.

8. Amendment of Consent to Establish may be granted for expanded built-up area 37,833.37 sq. mtrs. to proposed Resort after receipt of additional Consent fee of Rs. 1,58,420/- towards difference of Capital Investment as per Env. Dept.’s revised Consent Fee G.R. dtd. 25/08/2011.

Asst. Secretary (Tech.)

   

 

 

 

 

Page 49: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.5 HOD Remarks

Name of Industry: M/s Reliance Corporate IT Park Ltd.,

S.No.17/1/P/B,22/7to8,29/1to7,30/1,2,32/1to3,33/1to3,34/1to7,35/2,45/1, 48,98/1,2,99/1/A,99/2to3,99/8,99/4+10,99/5A,99/6,99/7, 99/1B+10D+11+

12B,99/12A+13A, 99/13B, 99/10B+5B,99/9+10C,100/1B,100/2 of Village Gothivli & Talavali, Navi-Mumbai, Dist. Thane. HOD Remarks:

• Application for grant of Consent to Establish for construction of proposed Hotel, Service & Residential Apts having built-up area 1,76,904.0 sq. mtrs. on plot area 87,323.0 sq. mtrs.

• received at R.O. (Navi-Mumbai) on 25/10/2012.

• Site located at 50 mtrs. from Thane Creek falls under CRZ area. Firm has applied for obtaining CRZ Clearance for the proposed construction from MCZMA, GoM on 9/05/2012.

• Firm has applied for obtaining Env. Clearance for the proposed construction

from SEIAA, GoM on 9/10/2012.

• Firm has proposed to provide STP comprising of collection tank, manual bar screen and grit chamber, aeration tank and tube deck settlers, filtration system followed by disinfection system for treatment of sewage. After treatment, the treated sewage will be utilized for flushing, firefighting, cooling tower and for gardening purposes.

• Solid wastes (Biodegradable) / Wet garbage – 1,000 Kg/day will be used as

manure • after composting, Solid wastes (Non-Biodegradable) – 596 Kg/day will be

disposed off by • sale to scrap merchant, and STP Sludge- Kg/day will be used as manure

after drying.

• SRO(Navi-Mumbai-II) / RO(Navi-Mumbai) have recommended that grant of Consent to Establish.

• Consent to Establish may be granted for construction of proposed Hotel,

Service & Residential Apts having built-up area 1,76,904.0 sq. mtrs. on plot area 87,323.0 sq. mtrs. subject to condition that applicant shall not take effective steps towards implementation of the project until CRZ from MCZMA; EC from SEIAA; permission for constructions from the Local Body i.e. NMMC are obtained and submission of B.G. of Rs. 10 Lakhs towards compliance of the same.

Asst. Secretary (Tech.)  

 

 

 

 

Page 50: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

 

CAC Item No.06 HOD Remarks Name of Industry: M/s Indiabulls Properties Pvt. Ltd.., Plot No. 612, 613 Lower Parel Division, Elphinstone Mills, Senapati Bapat Marg, Mumbai-400 013

1. Application for 1st consent to Operate in part

2. Application Received at SRO on 27/09/2012 and at HQ on 07/12//2012

3.Water Consumption (Domestic) - 391.0 M3/day Sewage generation - 357.0 M3/day STP provided - 510.0 M3/day 4. Solid waste generation;

Biodegradable- 180.0 kgs/day- Composting provided Non Biodegradable- 800.0 Kgs/day- Sale to authorized party

5.The project proponent has obtained EC vide No. SEAC 2010/CR- 180/TC2 dt.23/01/2012.

. 6. RO has recommended the case for 1st Consent to Operate in part 7. Consent may be granted with the condition of obtaining BG of Rs. 10 lacs for oeration and maintenance of STP and MSW processing plant

RO(HQ)

Page 51: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.07 HOD Remarks Name of Industry: M/s Indiabulls Properties Pvt. Ltd.., C.S. No. 841 of Lower Parel Division(G-South Ward), Senapati Bapat Marg, Eilphinstone (W), Mumbai-400 013

1. Application for 1st consent to operate in part

3. Application Received at SRO on 27/08/2012 and at HQ on 07/12/2012

3. Water Consumption (Domestic) - 499.0 M3/day Sewage generation - 455.0 M3/day STP provided – 613.0 M3/day

4. Solid waste generation; Biodegradable- 250 kgs/day- Composting provided Non Biodegradable- 2160 Kgs/day- Sale to authorized party

5. The project proponent has obtained EC vide No. SEAC 2010/CR-284/TC2 dt.23/01/2012. 6. RO Mumbai has recommended the case for 1st C to O in part for IT park 7. Consent may be granted with the condition of obtaining BG of Rs. 10 lacs for operation and maintenance of STP and MSW processing plant, upto 31/12/2014

RO(HQ)

Page 52: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.08 HOD Remarks Name of Industry: M/s Nirlon Ltd. CTS No. 257/1, 257/B, 257/C, 257/D, 257/E, 257/F, 557, 558, 559, 571, 586/3, part of 257E Village Goregaon (E) and Pahadi Taluka Borivali, Mumbai

1. Application for 1st consent to Operate in part 2. Application Received at SRO on 27/08/2012 and at HQ on 07/12/2012

3.C to E granted vide No.BO/RO(P&P)/B- 2376 dt. 11/09/2006 for Total Area of - 10,39,27.70 M2

4. Water Consumption- 230.0 M3/day Sewage generation- 190.0 M3/day

STP provided – 525.0 M3/day 5. Solid waste generation processing details not furnished

6. The firm has obtained EC of MoEF vide No. 21- 777/2006-IA.III dt.28/09/2007.

Plot area - 1,03,928 M2 Built up Area-1,52,796.20M2

7. RO Mumbai has recommended the case for 1st C to O in part

8.Consent may be granted with the condition of obtaining BG of Rs. 10 lacs for operation and maintenance of STP and MSW processing plant, upto 31/12/2014

RO(HQ)

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 53: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.09 HOD Remarks

Name of Industry

M/s. Shree Chatrapati Shahu SSK Ltd.

Tal – Kagal, Dist – Kolhapur

• Industry has applied for consent amendment in existing Consent to Establish. It is RED/LSI unit.

• Previous consent was issued dt. 04.02.2012 vide letter no. BO/JD (WPC) EIC No. KP-7744-11/E/CC-CAC-246 valid up to commissioning of unit or 5 yr. whichever earlier.

• Industry proposes production of Sugar 5850 MT & M and Co-Gen 9 MW. • Total Capital Investment of Industry - Rs. 204.06 Cr.

o Capital investment of Sugar unit – Rs. 66.76 Cr. o Capital investment of Co-gen unit – Rs. 53.63 Cr. o Capital investment of Distillery unit – Rs. 16.70 Cr.

• Industry is generating 16 m3/day Domestic Effluent which will be treated in septic tank followed by soak pit.

• Industry will be consume 400 m3/day water and will generate 130 m3/day Industrial Effluent and 16 m3/day Domestic Effluent.

• Treated effluent will be disposed on own land of 98.8 acre which is sufficient. • JVS analysis result dt. 23.11.2011 are exceeding while result dt. 03.01.2012,

30.03.2012 is within limit. • Industry has provided ESP as APC attached to Baggase/Coal Fired Boiler having

stack height of 70 m. • Industry has already paid fees for consent to Establish. • Production of Co-Gen 9 MW was not reflected in earlier consent application as well in

product category of IMIS module. • Industry had submitted Bank Guarantee of Rs. 2 Lakh towards to cover the effluent

collection system and to avoid the ingress of Bagasse. This BG of 2 Lakhs has been returned against the compliance. JVS results were within limit so BG of 5 lakhs was not imposed while issuing renewal of consent dt.04.02.2012.

• SRO Kolhapur has recommended application for amendment in consent to establish. • We may grand amendment by Co-Gen 9 MW in addition to C to E issued on

04.02.2012 • Earlier consent was issued without Co-Gen, as it was not mentioned in application

and IMIS process, but industry has applied but was not included in last processing by RO/SRO.

• Now we may consider as processed application received for inclusion of Co-Gen, it requires EC

• C to E was obtained and provided ESP • We may grant C to E with amalgamation to existing consent of C to E dt. 04.02.2012

JD(WPC)

Page 54: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.10 HOD Remarks

Name of Industry

M/s. Malegaon SSK Ltd. (Sugar+ CoGen amalgamation)

A/P Shivnagar, Tal _ Baramati, Dist - Pune

• Applied for renewal of consent with amalgamation for Sugar and Co-generation unit. • Previous consent is validity – Sugar – 31.12.2012 & Co-generation – 31.10.2012. • Previous consented quantity for the Co-generation unit was 24 MW and now industry

has applied for 21 MW. • Total CI of Industry is Rs. 136.74 Cr.

− Sugar - Rs.53.64 Cr. − Co Gen - Rs.64.32 Cr. − Distillery - Rs. 18.78 Cr.

• Total water consumption is 3672 CMD. I.E generation is 752 CMD and D.E. is 55 CMD.

• ETP provided with secondary treatment. • JVS analysis results dt.18.01.2012 & 20.02.2012 provided which are exceeding the

consented limits in respect of BOD, COD, SS & TDS. • Land available for the disposal is @ 22 Hectors which seems to be adequate. • CREP Compliance – Partially complied.

- ESP is provided as an APC system. - Work of provision of 15 days storage tank is in progress as reported by.

• Cess Paid Upto – Jan 2012, Returns submitted upto Sept. 2012. • Environmental Statement is submitted for period 2011-12. • Submitted BG of Rs. 2.0 Lakhs valid upto 23.01.2013against the Consent condition

for Sugar Unit for Non- compliance of Consent conditions and CREP guidelines. • Submitted BG of Rs. 5.0 Lakhs valid upto 08.12.2012 against the Consent condition

for Cogeneration Unit for up gradation of ETP to achieve prescribed standards. • We may grant renewal by reducing Co-Gen from 24 MW to 21 MW. • BG of Rs. 5+2 may be obtained (earlier BG of Rs. 5 lakhs may be returned or

extended if fresh BG not obtained) • CREP complied provided ESP and zero discharge.

JD(WPC)

Page 55: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.11 HOD Remarks

Name of Industry

M/s. Malegaon SSK Ltd. (Distillery Unit)

A/P Shivnagar, Tal _ Baramati, Dist - Pune

• Applied for renewal of consent for distillery unit. • Previous consent is valid upto 31.12.2012. • Total CI of Industry is Rs. 136.74 Cr. • CREP Compliance – Partially complied.

− Provided 5 days and 30 days impervious tank. − Provided 11 acre of compost yard out of which 4 acres concreting completed

and remaining is in process. − Provided Bio-methanation plant and reboiler system for reduction of spent

wash. • Total Water consumption is 630 CMD, I.E. – 408 CMD an D.E. – 50 CMD. • Steam is taken from Boiler of the Sugar Unit, ESP is provided as an APC system. • Cess Paid Upto – Jan 2012, Returns submitted upto Sept. 2012. • Environmental Statement is submitted for period 2011-12. • Industry has submitted BG of Rs. 1.0 Lakh valid upto 31.12.2012 against the

previous consent condition. • We may grant renewal with BG Rs. 5 Lakhs as per consistence approach (48KLPD)

for providing 11 acre compost pucca yard. JD(WPC)

Page 56: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.12 HOD Remarks

Name of Industry

M/s. Baramati Agro Ltd. (Co-Gen Unit)

Vilage Shetfal Gade, Tal – Indapur, Dist – Pune

• Applied for renewal of consent for Co-Gen unit for the capacity of 22 MW. Red LSI.

• The total capital investment of existing sugar, co-gen and distillery unit is 186.30 Cr (Sugar: 117.43 Cr + Cogen-49.93 Cr + Distillery :18.94 Cr)

• Previous consent was for co-generation unit is valid upto 30.10.2012 for the capacity of 20 MW.

• The consent for the Sugar unit is valid for as period upto 31.12.2012. • Environmental clearance is obtained for the capacity 20 MW. • Total Water consumption is 250 CMD, I.E is 30 CMD and D.E is 8 CMD. • ETP provided with primary and secondary treatment common for the Sugar

and Co-generation unit, with primary and secondary treatment. • JVS analysis results 23.11.2011and 19.01.2012 are provided which are

exceeding in respect of BOD and COD. • ESP is provided to the Bagasse fired boiler as an APC system. • Water cess paid up to April 2012 and returns are submitted upto Oct, 2012. • Industry has submitted Environmental Statement for 2011-2012. • We may renew consent. • Sugar consent not yet received to HQ

JD(WPC)

Page 57: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.13 HOD Remarks

Name of Industry

M/s. Lokmangal Agro Distillery Gat No. 573-575 Subhash Nagar, AP - Bibidarphal, Tal – North Solapur, Dist – Solapur

• Industry has applied for renewal of consent 80 KLPD distillery unit. It is RED/LSI Unit.

• Previous consent is valid up to 31.12.2012 • CI of the unit is 95.08 Cr. Against the previous CI Rs. 79.03 Cr. CI increased by

16.05 Cr. (Total Investment of Industry is Sugar 54.28 Cr. +Distillery 95.08 Cr. = Total 149.36 Cr.)

• CREP complied – • Provided 30 days impervious storage tank. • Provided 7 stage MEE • Provided 7 acre compost yard with fencing arrangement. • Provided 1 no of test tube well for ground water monitoring. • Water consumption – 1333 CMD I.E – 961 CMD and D.E - 8 CMD. • ESP is provided as an APC system. • SRO Reported that spent wash found send for one time for land application through

tankers without prior permission of the Board. • Industry has submitted BG of Rs. 5 Lakhs valid up to 26.03.2013, towards

compliance of CREP norms as per previous consent condition. • Environmental statement details are not provided. • Cess assessment done up to august 2012 • Industry has paid consent fee Rs. 1,25,000/- for renewal of consent. However

industry has not submitted fee of Rs. 50,000/- towards increased in CI 16.05 Cr. • RO Pune has recommended for consent • We may renew consent • BG of Rs. 5 Lakh obtained for CREP compliance against old consent dt. 09.02.2012

valid up to 31.12.2012 may be returned and obtained fresh BG as per consistence approach Rs. 2 Lakhs for securing compliance.

• Rs. 2 Lakhs BG may be obtained for Environmental Statement in one month.

JD(WPC)

Page 58: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.14 HOD Remarks Name of Industry M/s. Mumbai Municiapl Corportion of Grater Mumbai (MCGM) Mahapalika Marg, Fort, Mumbai – 400001

HOD Remarks:

• Applied for the renewal of Consent to operate. • Previous conditional consent was granted on dt.03.02.2012 valid upto 31.03.2012. • Application received at SRO on dt.03.09.2012 and at HQ on dt.07.11.2012. • MCGM has installed 7 Nos. of STP at locations – Colaba, Love Grove, Bandra,

Versova, Malad, Bhandup, Ghatkopar. • At present sewerage is treated in primary treatment followed by aerated lagoons and

with disposal into the creak /sea. The present capacity of this sewage treatment plant is inadequate and needs up gradation to cope up with additional load and to achieve the standards of BOD and SS.

• Operational and Maintanace of STP’s need improvement and all aerators of aerated lagoons must be kept in operation for effective treatment of Waste water.

• Parameters like BOD are exceeding the consented standards as per the analysis reports.

• As per the previous consent condition MCGM yet not submitted the report of implementation of “ Bombay Sewage Disposal Project” (BSDP).

• We may renew the consent as per the earlier consent granted.

JD(WPC)

Page 59: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

CAC Item No.15 HOD Remarks Name of the industry :- M/s. Nashik Municipal Corporation Rajiv Gandhi Bhavan, Sharanpur Road, Nashil 02

• Applied for the renewal of Consent.

• Application received at SRO on dt.03/07/2010 and at HQ on dt.21/12/2012. • Sewage treatment plant provided for 200.5 MLD capacity out of 280 MLD • Bank Guarantee of Rs. 50/- Lakhs Submitted which is valid up to 31/12/2013 • We may renew the consent

JD(WPC)

Page 60: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

Review Item. (Part-II) No. 1 AS(T)  Section                  

The review of CAC cases of renewal as per calendar for the month of Dec- 2012 was taken. It was observed that following industries has not applied for renewal of consent till today.

Sr. No.

Name of the industry Validity

1 Nath Pulp And Paper Mills Ltd Nathnagar , Wahegaon , Tq Paithan, Dist- Pune

31.12.2012

2 Naval Dockyard, Liongate,Shahid Bhagat Singh Road Fort, Mumbai

31.12.2012

3 J W Marriot Hotel of Juhu Beach Resort Ltd, Juhu- Tara Road, Mumbai-49.

31.12.2012

4 Offbit Developers Pvt. Ltd. Phoenix Market City, Village Kirol,LBS Road,Kurla(W),Mumbai

31.12.2012

5 Terna SSSK Ltd (Sugar - Division), Village Dhoki Tq. and Dist. Osmanabad

31.12.2012

6 Sonhira Sahakari Sakhar Karkhana Ltd (Sugar), A/p-Wangi, Mohanrao Kadamnagar, Kolhapur

31.12.2012

In view of above we may issue SCN to revoke consent.

Page 61: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

Review Item. (Part-II) No. 2

Name of industry: Vitthal Corporation Ltd., (Textile Division), Vitthalnagar, Mhaisgaaon-Tadwale (M), Tal – Madha, Dist – Solapur.

HOD Remarks :

• Industry has applied for Establish of Textile unit.

• Total CI of Textile 108.62 Cr.

• Proposed unit is located 6.3 Km from Seena river.

• Treated effluent will be used for gardening, 2.5 hector land available.

• This is separate orange category unit, not connected with sugar factory.

• By mistake processed in CAC Confirmed with SRO

• Authority is MS

• Recommended for withdrawing from CAC

 

Page 62: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

Review Item. (Part-II) No. 3 Name of industry :- M/s Vitthalrao Shinde SSK Ltd., A/p- Gangamainagar,

Tal - Madha, Dist – Solapur HOD Remarks :

• Industry has applied for expansion of sugar from 3500 to 8500 TCD and Co-generation unit from 30.50 to 38 MW.

• Industry has applied for Environmental Clearance for expansion of Sugar and Co-

generation unit.

• JVS are exceeding prescribed consented standard. 

• SRO, Solapur and RO, Pune has recommended Consent to Establish (Expansion)

• We may grant C to E as existing unit is complying to directions.

• We may grant C to E as per consistence approach.

• BG of Rs. 5 Lakhs towards compliance and provision of pollution control devices.

• Recommend to grant C to E.

Page 63: Scheduled on 27.12.2012 at 3.30 P.M. Sr. Name & …mpcb.gov.in/consentappraisal/pdf/8thCACpartII28122012.pdfList of Cases to be submitted before 2nd sitting of 8th Consent Appraisal

Review Item. (Part-II) No. 4 Name of industry :- The Saswad Mali Sugar Factory Ltd.,

(Co-generation Unit), Malinagar, Tal – Malshiras, Dist – Solapur

HOD Remarks :

• Industry has applied for Establish of 14.80 MW co-generation plant.

• Total C.I. 177.26 Cr. in which Co-generation C.I. is 93 Cr.

• JVS are exceeding existing unit. But JVS are of last season.

• Board has granted consent on 31.10.2012. with B.G of Rs. 5 + 2 and 2 lakh for wet

scrubber.

• Industry has not submitted B.G. In process of submission.

• JVS results dt. 26/4/2012,10/05/2012, 30/10/2012 are exceeding

• As per Consistence approach, BG submitted by industry for for existing unit hence

we may treat this as compliance.

• BG of Rs. 5 Lakhs shall be obtained in C to E for provision of pollution control

devices

• We may grant Consent to Establish.