8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 1 of 28 MAHARASHTRA POLLUTION CONTROL BOARD Minutes of 8 th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018 at 3.00 p.m. at MHADA Office, Grihanirman Bhavan, Kalanagar, Bandra (East), Mumbai, Maharashtra 400051. ………. The Consent Appraisal Committee meeting of the Board was held on 09.02.2018. Following members of the Consent Appraisal Committee were present: 1. Shri Milind Mhaiskar, Chairman Vice President & CEO, MHADA and Chairperson, MPCB, Mumbai. 2. Shri. P. Anbalagan Member Member Secretary, MPC Board, Mumbai 3. Shri. Padmakar Nandusekar Member Technical Advisor (Environment), MIDC, Mumbai 4. Shri. P. K. Mirashe Member Convener Assistant Secretary (Technical), MPC Board, Mumbai Additional Chief Secretary, Home (Transport) Dept., Mumbai could not attend the meeting. Leave of absence was granted to them. Following Officer of MPCB were present for the meeting: Following Officer of MPCB were present for the meeting: 1. Shri. V. M. Motghare, JD(APC), MPCB, Special Invitee 2. Shri. Y. B. Sontakke, JD(WPC), MPCB, Special Invitee 3. Shri A. R. Supate, PSO, Mumbai, Special Invitee 4. Shri. N. N. Gurav, Regional Officer (HQ), Mumbai, Special Invitee

Upload: dokhanh

Post on 16-Apr-2018

258 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 1 of 28

MAHARASHTRA POLLUTION CONTROL BOARD

Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018 at 3.00 p.m. at MHADA Office, Grihanirman Bhavan,

Kalanagar, Bandra (East), Mumbai, Maharashtra 400051.

……….

The Consent Appraisal Committee meeting of the Board was held on 09.02.2018. Following members of the Consent Appraisal Committee were

present:

1. Shri Milind Mhaiskar, Chairman

Vice President & CEO, MHADA and

Chairperson, MPCB, Mumbai.

2. Shri. P. Anbalagan Member

Member Secretary, MPC Board, Mumbai

3. Shri. Padmakar Nandusekar Member

Technical Advisor (Environment), MIDC, Mumbai

4. Shri. P. K. Mirashe Member Convener

Assistant Secretary (Technical), MPC Board, Mumbai

Additional Chief Secretary, Home (Transport) Dept., Mumbai could not attend the meeting. Leave of absence was granted to them.

Following Officer of MPCB were present for the meeting:

Following Officer of MPCB were present for the meeting:

1. Shri. V. M. Motghare, JD(APC), MPCB, Special Invitee

2. Shri. Y. B. Sontakke, JD(WPC), MPCB, Special Invitee

3. Shri A. R. Supate, PSO, Mumbai, Special Invitee

4. Shri. N. N. Gurav, Regional Officer (HQ), Mumbai, Special Invitee

Page 2: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 2 of 28

The meeting thereafter deliberated on the fresh agenda of Consent to Establish [Book-let no. 14] is placed before the committee and following

decisions were taken.

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

Booklet No 14 Consent to Establish

1 MPCB-

CONSENT-

0000016949

Mumbai International

Airport Pvt. Ltd,1st floor,

Terminal 1B, Santacruz

East Chhatrapati Shivaji

Intenational Airport,

Andheri

APPROVED

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that as per the EIA notification, there is

separate entity for Airports which falls under 7 (A)

whereas building construction project falls under 8(a) &

(b).

In view of above, it was decided to grant consent to

establish for expansion for up-gradation of Air Port on

total plot area 12,44,355 Sq. Mtrs and total BUA-

10,00,000 Sq. Mtrs. And by imposing Environmental

Clearance and standard condition.

1. PP shall not take any effective steps without obtaining

prior Environmental Clearance and submit BG of Rs

10 lakh towards compliance of the same

2 MPCB-

CONSENT-

0000019288

Indospace Industrial Park

Pune Pvt. Ltd. Plot No. D-

223/1, D-223/2, D-223/3 ,

D-223/4, Village-

Bhamboli, Chakan MIDC

Industrial Area, Phase-II

Khed

APPROVED

Consent to

Establish

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that PP has applied for proposed logistic

park on Total Plot Area 1,44,065.50 sq. mtrs and

Construction BUA 1,05,000 sq. Mtrs. Also noted that

there will not be generation of industrial effluent however,

STP based on MBBR Technology is proposed for the

treatment of sewage including OWC for wet garbage.

In view of above, it was decided to grant consent to

establish for proposed logistic park on Total Plot Area

1,44,065.50 sq. mtrs and Construction BUA 1,05,000 sq.

Mtrs. by imposing following conditions:

1. PP shall not take any effective steps without obtaining

prior Environmental Clearance and submit BG of Rs 10

lakh towards compliance of the same.

2. Logistics park shall mainly avail logistics facilitates to

Light & Heavy Engineering industries, Automobile and

Page 3: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 3 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

automobile ancillary manufacturing industries,

Electronics and Consumable durables, IT Hardware,

Fibre Glass manufacturing industries.

3. Industrial Storage, Industrial logistics industrial

assembling etc. Individual industry in the logistic park

will be responsible for obtaining their Consent to

Establish and Operate separately from MPCB.

4. Applicant shall provide and operate common pollution

control infrastructure facility such as STP, Bio-gas

plant/OWC and ensure that the individual

industries/units shall enter into MOU with Industrial

park to ensure operation and maintenance of the

common facility and other assets.

5. PP shall not allot the plot to the trade effluent

generating industry.

6. PP shall achieve the treated domestic effluent standard

for the parameter BOD- 10 mg/lit.

7. The treated domestic effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting etc.

and remaining shall be used on own land for gardening/

irrigation purpose within premises. In no case, effluent

shall find its way to any water body directly/indirectly

at any time. The firm shall affix the separate meter for

ensurance of 60% recycling of treated sewage and keep

the records of the same.

8. PP shall install online monitoring system for BOD, TSS

and flow at the outlet of STP.

9. PP shall submit BG of Rs. 25 Lakhs towards

compliance of Consent to Establish condition.

Consent shall be granted after receipt of map showing

proposed pollution control system i.e. ETP, STP, MSW

disposal arrangements etc.

Page 4: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 4 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

3 MPCB-

CONSENT-

0000026473

Resort Health and Farm,

930 -934P 935, 936, 940-

959, 961, 972 -977, 1023,

1024, 1032P, 1033, 1034P

village - Shilimb -

chawsar, [ Gut No:Cha

223, 226, 232, 234-236

243], [Sh.905-908, 910,

920, 921-928 ] Maval,

Dist. Pune

APPROVED

Consent to

Establish for

Expansion.

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that Show Cause Notice for refusal of

Consent was issued on 03.01.2018 and also noted the

reply submitted by PP on 05.01.2018 wherein, PP has

submitted desired details.

Considering the reply of the PP, it was decided to grant

Consent to Establish for Expansion for Hotel activity for

total plot area- 13,24,930 Sq. mtrs. and Construction BUA

(Expansion) of 7076.21 sq. mtrs out of 35,821.11 Sq. Mtrs

as per EC dated 09.12.2016 by imposing following

conditions;-

1. PP shall submit an affidavit in prescribed format

regarding compliance of conditions of EC and

Consent to Establish condition.

2. PP shall submit an affidavit regarding the area for

which expansion of C to E application is made is

included in Environment Clearance.

3. PP shall achieve the treated domestic effluent standard

for the parameter BOD- 10 mg/lit.

4. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting etc.

and remaining shall be utilized on land for gardening.

5. PP shall install online monitoring system for BOD,

TSS and flow at the outlet of STP.

6. PP shall submit BG of Rs. 25 Lakhs towards

compliance of EC and Consent to Establish condition.

7. PP shall re-validate the EC if project is not completed

before the expiry of the same.

8. 1st consent to operate for expansion will be considered

only after submission of NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

Consent shall be issued after receipt of additional fees, if

required.

Page 5: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 5 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

4 MPCB-

CONSENT-

0000013136

Persipina Developers Pvt.

Ltd. Bhokarpada &

Talegaon Panshil, S. No.

65/1A, 65/1B, 66/0, 67/0,

65/2, 74/6, 74/4B, 74/2,

69/0, 68/0, 62/0, 59/0,

57/1, 57/2, 57/3B, Panvel

& Khalapur, Dist. Raigad

APPROVED

Revalidation of

Consent to

Establish

(Part-I)

5 years/ validity

of EC

whichever is

earlier

It was decided to grant revalidation of consent to establish

(Phase-I) for Construction of IT SEZ and Residential

township on Total Plot area of 13,51,193.65 sq.m and

Construction BUA (FSI+Non-FSI) for Phase-I of

8,15,471sq.m. out of Total Construction BUA (FSI+Non-

FSI) of 44,82,711 sq.m. of entire project as per revalidated

EC dated 16.03.2015, by imposing following conditions:

1. PP shall submit BG of Rs. 25 lakh towards

compliance of EC and Consent to Establish condition.

2. PP shall submit an affidavit in prescribed format

regarding compliance of conditions of EC and

Consent to Establish condition.

3. PP shall achieve the treated domestic effluent standard

for the parameter BOD- 10 mg/lit.

4. The treated effluent shall be minimum 60% recycled

for secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting etc.

and remaining shall be used on land for gardening and

connected to the sewerage system provided by local

body.

5. PP shall submit Board Resolution from company

Board, towards starting of construction work without

obtaining valid consent to establish from the MPC

Board thus violated the provisions of Environmental

Laws and in future, they will not do such violations

and BG of Rs. 2 lakh towards submission of Board

resolution within one month of issue of consent.

6. PP shall amend the EC dated 16.03.2015 for name

change from M/s. Sunnyvista Realtors Pvt. Ltd to M/s.

Persipina Developers Pvt. Ltd

7. 1st consent to operate for expansion will be considered

only after submission of NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

Page 6: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 6 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

5 MPCB-

CONSENT-

0000026450

JBM MA Automotive

Private Limited, Chakan

Talegaon Road C-1/2,

MIDC Chakan, Khed,

Dist. Pune.

APPROVED

1st Consent to

Operate for

expansion and

amalgamation

with existing

consent

30.04.2018 Committee noted the reply submitted by the industry

dated 23.10.2017 in respect of SCN issued by the Board

that the industry has wrongly selected option of consent to

establish instead of 1st consent to operate.

Considering the reply of the industry, it was decided to

grant 1st consent to operate for expansion to manufacture

Sheet Metal component- 1000 MT/M (without

electroplating, pickling and painting activity) with die

washing activity and amalgamation with existing consent.

Consent shall be issued after receipt of verification report

regarding submission of Board resolution and BG as per

consent condition.

6 MPCB-

CONSENT-

0000027366

Ichalkaranji Powerloom

Mega Cluster Ltd. (Signal

Stake Holder Company -

Kallappanna Awade Co -

op. Phase II, Sector B,

Plot No. 1 to 7 Shri

Laxmi Co - oprative

Industrial Estate Ltd,

Hatkanangle, Dist.

Kolhapur

APPROVED

Consent to

Establish

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that industry has obtained consent to

establish to manufacture Sized & Warped Yarn- 23

MT/Day, Dyed Yarn-2 MT/Day and Processed Fabric-

1,00,000 Mtrs/Day vide consent dated 10.02.2017.

Now industry has applied for consent to establish for

expansion to manufacture Sized & Warped Yarn- 2

MT/Day, Dyed Yarn-2 MT/Day and Processed Fabric-

25,000 Mtrs/Day.

In view of above, it was decided to grant consent to

establish by overriding with earlier consent to establish

granted by the Board by imposing following conditions

1. Industry shall submit the BG of Rs. 10 lakh towards

compliance of consent to establish conditions.

2. Industry shall provide full-flagged ETP followed by

RO & MEE to reuse/recycle 100% treated trade

effluent in process so as to achieve zero liquid

discharge.

Page 7: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 7 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

7 MPCB-

CONSENT-

0000012122

Tata Housing

Development Company

Ltd, S.NO.-32(pt), 34(pt),

35(pt), 36/A(pt), 36/B,

36/1, 36/2, 37/1(pt), 37/B,

37/C(pt), 37/ Amantra

Project, Ecocity, Ranjoli ,

Tal- Bhivandi, Dist-

Thane

APPROVED

Re-validation

of consent to

establish

project with

expansion in

construction

BUA.

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that PP has obtained Environmental

Clearance vide letter dated 06.11.2017 for total BUA

5,35,592.40 Sq. Mtrs and consent to establish vide letter

dated 19.10.2011 for total BUA 3,64,751.24 Sq. Mtrs

which was expired on 18.10.2016.

Now, PP has applied for re-validation of consent to

establish granted by the Board dated 19.10.2011 with

increase in BUA for the total BUA- 5,35,592 Sq. Mtrs.

In view of above, it was decided to grant re-validation of

Consent to Establish with increase in BUA for

construction of Proposed Residential project on Total Plot

area of 82,263.36 sq. Mtr. and Construction BUA of

5,35,592.40 Sq Mtr. as per EC by imposing following

conditions:

1. PP shall submit BG of Rs. 25 lakh towards

compliance of EC and Consent to Establish

conditions.

2. PP shall submit an affidavit in prescribed format

regarding compliance of conditions of EC and

Consent to Establish condition.

3. PP shall achieve the treated domestic effluent standard

for the parameter BOD - 10 mg/lit.

4. The treated effluent shall be 60 % recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting etc.

and remaining shall be used on land for gardening and

connected to the sewerage system provided by local

body.

5. PP shall install online monitoring system for

parameters BOD, TSS and flow at outlet of STP.

Consent shall be issued after obtaining –

i. Revised information regarding water consumption,

domestic effluent generation treatment provided and

Page 8: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 8 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

verification of the same from SRO, Bhivandi.

ii. After verification of CRZ Clearance from competent

authority as the total BUA is increased.

iii. After receipt of year-wise C.A. Certificate /

Undertaking regarding investment done after receipt

of consent to establish dated 19.10.2011.

8 MPCB-

CONSENT-

0000030452

Sahakar Maharshi

Shivajirao Narayanrao

Nagawade SSK Ltd 51/1

Shrigonda Factory

Shrigonda, Dist.

Ahmednagar

APPROVED

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant consent to establish for expansion

of Sugar unit for 1300 TCD (from 4800 TCD to 6100

TCD) by imposing Environmental Clearance and

following conditions:

1. Industry shall not take any effective steps prior

obtaining EC and submit Bank Guarantee of Rs. 5

lakh towards compliance of consent conditions.

2. Industry shall install CPU and submit Bank Guarantee

of Rs. 3 lakh towards compliance of same.

3. 1st consent to operate for expansion will be considered

only after submission of NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

9 MPCB-

CONSENT-

0000030896

Gangamai Industries &

Constructions Ltd.,

6,222/3,223,224,225/1,22

5/2,225/3,232,233 At-

Najik Babulgaon

Shevgaon, Ahmednagar

APPROVED

Consent to

Establish

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant consent to establish for expansion

for Sugar unit- 2000 TCD (from 5500 TCD to 7500 TCD)

& Co-Gen plant 5 MW (from 32 MW to 37 MW) by

imposing Environmental Clearance and following

conditions:

1. Industry shall not take any effective steps prior to

obtaining Environment Clearance and submit Bank

Guarantee of Rs. 5 lakh towards compliance of same

and consent conditions.

2. 1st consent to operate for expansion will be considered

only after submission of NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

Page 9: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 9 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

10 MPCB-

CONSENT-

0000033035

Indiabulls Infraestate Ltd,

C.S. No. 131, 132 & 1/132

Lower Parel, Near Worli

Naka. Mumbai

APPROVED

Revalidation

of Consent to

Establish

Commissioning

of the unit or

upto

05.09.2022

whichever is

earlier

Committee noted that PP has amended the EC vide letter

dated 09.08.2017 total plot area 43,603.27 Sq. Mtrs and

total BUA 2,02,712 Sq. Mtrs. PP has obtained consent to

establish vide consent dated 06.09.2012 for total plot area

43,603.27 Sq. Mtrs and total BUA 2,14,419 Sq. Mtrs

In view of above, it was decided to grant revalidation of

Consent to Establish for construction of residential

development project for Total Plot Area of 43,603 sq.

mtrs. and total Construction BUA 2,02,712 sq. mtrs (as

per EC dated 09.08.2017) by imposing following

conditions:

1. 1.PP shall comply conditions stipulated in EC dated

09.08.2017

2. PP shall submit an affidavit in prescribed format

regarding compliance of conditions of Environment

Clearance and Consent to Establish conditions.

3. PP shall achieve the treated domestic effluent standard

for the parameter BOD - 10 mg/lit.

4. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower, make up, firefighting etc.

and remaining shall be utilized on land for gardening.

5. PP shall install online monitoring system for BOD,

TSS and flow at the outlet of Sewage Treatment Plant

(STP).

6. PP shall extend/Top up Bank Guarantee of Rs.25 Lakh

towards compliance of Environment Clearance and

Consent to Establish condition.

11 MPCB-

CONSENT-

0000033121

Transworld Furtichem

Pvt. Ltd. Plot No. 39/1 &

39/2 Dhatav, Tal. Roha,

Dist. Raigad

NOT

APPROVED

Consent to

Establish for

expansion

---- It was decided to issue Show Cause Notice for refusal of

Consent to Establish as unit is located in MIDC Dhatav

which falls under Eco Sensitive Area, Draft Notification

of Western Ghat and also CETP is not meeting outlet

norms.

Page 10: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 10 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

12 MPCB-

CONSENT-

0000031699

Pioneer Distilleries

Limited, 286/1, 2,

285/1/A, B, 285/2 286/1,

2, 285/1/A, B, 285/2, Vill.

Balapur, Tq. Dharmabad,

Dist. Nanded

APPROVED

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

In view of above, it was decided to grant consent to

establish for expansion of Ethanol plant- 70 KLPD and

Malt Spirit - 12 KLPD, by imposing Environment

Clearance and following conditions:

1. Industry shall not take any effective steps prior to

obtaining Environment Clearance for expansion

activity and submit Bank Guarantee of Rs. 5 lakh

towards compliance of the same.

2. Industry shall provide adequate facility so as to

achieve Zero Liquid Discharge of spent wash.

3. 1st consent to operate for expansion will be considered

only after submission of NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

13 MPCB-

CONSENT-

0000031945

Eurotas Infrastucture

Limited, (Cement

Grinding Unit)

Plot No. DTA 1B

Additional Sinnar

Industrial area, Village

Musalgaon, Tal. Sinnar,

Dist. Nashik

APPROVED

Re-validation

of Consent to

Establish

5 years/ upto

30.06.2019 as

per EC validity

whichever is

earlier

Committee noted that industry has obtained

Environmental Clearance vide letter dated 30.06.2012

which is valid upto 30.06.2019 (i.e. 7 years). Industry has

also obtained consent to establish to manufacture

Pozzolana Portland Cement- 4,12,500 T/M vide consent

dated 18.07.2012 which was valid upto 17.07.2017.

Now industry has applied for revalidation of consent to

establish to manufacture Pozzolana Portland Cement-

4,12,500 T/M by imposing following condition;

1. Industry shall submit Bank Guarantee of Rs. 10 Lakhs

for compliance of Consent to Establish &

Environment Clearance conditions.

2. Industry shall comply the revised standards as per new

Notification for Cement Manufacturing sector.

3. PP shall make provision of 3 CAAQMS at location as

per condition stipulated in Consent to Establish.

4. PP shall implement mechanical close type

transportation system for coal / Metal Mineral

transporting trucks.

Page 11: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 11 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

14 MPCB-

CONSENT-

0000012108

Noble Hospital,

153/A/1,2,4/1 Magarpatta

City Haveli, Dist. Pune

APPROVED

Combined

Consent &

BMW

Authorization ,

Consent to

Establish

30.06.2019 Committee noted that PP has submitted the requisite

consent fee, Bombay Nursing Home registration

certificate for 250 beds which is valid up to 31.03.2018.

In view of above, it was decided to grant combined

consent and biomedical waste authorization for 250

Bedded Hospital by imposing HCE BG regime and

standard conditions.

Consent shall be issued only after obtaining requisite bank

Guarantee Rs. 3 Lakhs.

15 MPCB-

CONSENT-

0000034084

Jindal PolyFilms Limited,

339,381, 28 Km Stone,

NH-3, Nashik Igatpuri

High Road,Village

Mundhegaon, Igatpuri,

Dist. Nasik

APPROVED

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that industry has consent to operate

which is valid upto 30.09.2020 to manufacture Polyester

Films/Polypropylene/PVDC film, Polyester Chips and

Coated films.

In view of above, it was decided to grant consent to

establish for expansion for manufacture of Pet Chips =

12,000 MT/M by imposing following conditions.

1. Industry shall provide adequate treatment facility for the

effluent generated from proposed expansion project so

as to achieve zero liquid discharge.

2. 1st consent to operate for expansion will be considered

only after submission of NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

16 MPCB-

CONSENT-

0000034171

Parag Milk Foods Ltd.,

43/1A/1 & 43/1A/2 At

Awasari Phata, Post.

Manchar. Tal. Ambegaon,

Dist. Pune

NOT

APPROVED

Consent to

Establish for

expansion

--- Committee noted that industry has consent to operate

which is valid upto 30.04.2020 to manufacture Milk

products. However, industry has not submitted any

documentary proof viz, NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

Page 12: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 12 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

In view of above, it was decided to issue SCN for consent

to establish for expansion to manufacture Milk products

due to above non-compliance.

17 MPCB-

CONSENT-

0000034517

Innovassynth

Technologies (India)

Limited, Revene survey

no -9-24 Wasarang -34-36

Chinchwali Khopoli

Khalapur, Dist. Raigad

APPROVED

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant consent to establish for expansion

with deletion of 25 existing products, reduction in

production quantity of 21 existing products and increase

in production quantity of 21 existing products and

addition of 45 new products by imposing following

conditions.

1. Industry shall not take any effective steps without

obtaining environmental clearance and shall submit

the BG of Rs. 10 lakh towards compliance of the

same.

2. Industry shall 100% reuse/recycle the treated effluent

by providing RO & MEE so as to achieve zero liquid

discharge.

18 MPCB-

CONSENT-

0000032976

Shivneri Sugars Ltd, A/p-

Ganeshtekadi, Nhavi (Bk),

Tal- Koregaon , Dist-

Satara.

APPROVED

Consent to

Establish

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that industry has purchased the existing

Sugar unit from M/s. Jijamata Sugar and Power Industries

Limited of capacity - 800 TCD, however, the said unit is

not in operation since long time.

In view of above, it was decided to grant consent to

establish for Sugar unit-4200 TCD & Co-Generation

plant- 8 MW by imposing following conditions;

1. Industry shall provide adequate capacity of effluent

treatment plant so as to achieve consented standards

along with scientific disposal arrangements for the

treated effluent.

2. Industry shall provide ESP/Bag Filters/Scrubbers to

coal/bagasse fired boiler so as to achieve the emission

standards.

3. Industry shall install CPU and submit Bank Guarantee

of Rs. 3 lakh towards compliance of same.

4. 1st consent to operate for expansion will be considered

Page 13: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 13 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

only after submission of NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

5. Industry shall submit Bank Guarantee of Rs. 5 lakh

towards compliance of consent to establish conditions.

19 MPCB-

CONSENT-

0000034871

Shri Bhogawati Sahakari

Sakhar Karkhana Ltd.

1195 to 1221 Shahunagar ,

Parite Karveer, Dist.

Kolhapur

NOT

APPROVED

Consent to

Establish for

expansion

--- Committee noted that existing Sugar unit is having

capacity- 3500 TCD and now industry applied for

expansion of Sugar unit from 3500 TCD to 4900 TCD i.e.

1400 TCD.

Committee also noted that industry has carried out excess

crushing more than consented quantity and all the JVS

results are exceeding the consented standards. Industry

has also discharged substandard effluent into the river due

to which fish kill incidence took place on 19.11.2017.

In view of above, it was decided to issue SCN for refusal

of consent to establish for expansion due to above non-

compliances by forfeiting the BG of Rs. 10 lakh as JVS

results are exceeding the consented standards.

20 MPCB-

CONSENT-

0000034578

Everest Industries

Limited, 152 & 153

Village -Lakhamapur

Dindori, Dist. Nasik

NOT

APPROVED

Consent to

Establish for

expansion

--- Committee noted that industry has consent to operate

which is valid upto 31.03.2021 to manufacture Asbestos

Cement Corrugated Sheets. However, industry has not

submitted any documentary proof viz, NOC from

CGWB/Irrigation department for consumption of ground

water/Surface water.

In view of above, it was decided to issue SCN for consent

to establish for expansion due to above non-compliance.

21 MPCB-

CONSENT-

0000035038

Finolex Industries

Limited157, 193, 95, 202,

203, 195, 196 Ranpar-

Golap, Pawas Road Dist.

Ratnagiri

NOT

APPROVED

Consent to

Establish for

--- Committee noted that industry has not submitted any

documentary proof viz, NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

Page 14: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 14 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

expansion In view of above, it was decided to issue SCN for consent

to establish for expansion due to above non-compliance.

22 MPCB-

CONSENT-

0000035299

Deepak Novochem

Technologies Ltd, Plot

No. D-27/3/1 & D-27/2,

Lote- Parshuram MIDC

Khed

APPROVED

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that industry has existing consent to

operate which is valid upto 30.10.2019 on plot no D-

27/3/1. Consent to Establish obtained for Plot No- D-27/2

dtd. 15 May 2015 for storage of Bio mass briquette.

Now, Industry has applied for consent to establish for

expansion for plot no D-27/3/1 and D-27/3/1. They have

applied for EC. Industry has proposed to provide ETP of

200 CMD and STP of 25 CMD. Industry is in MIDC Lote

and Lote CETP is non-complying. However industry has

proposed to achieve zero liquid discharge by installing RO

& MEE. They have proposed to recycle the treated

effluent in cooling towers and for gardening. However, in

zero liquid discharge, on land for gardening is not

allowed.

In the view of above, it was decided to grant consent to

establish for expansion by imposing following conditions

1. Industry shall not take any effective steps prior to

obtaining Environment Clarence from the competent

authority and submit Bank Guarantee of Rs. 5 lakh

towards compliance of same.

2. Industry shall provide adequate treatment system

followed RO & MEE so as to achieve Zero Liquid

Discharge. Industry shall not discharge treated and

untreated effluent on land for gardening

23 MPCB-

CONSENT-

0000032083

Tata Consultancy Services

Ltd, Plot C, Patlipada

Village Thane

NOT

APPROVED

Consent to

Establish and

Operate

---- Committee noted the following non-compliances viz.

1. The area mentioned in Environment Clearance,

Consent to Establish and application of Consent to

Operate do not match.

2. PP failed to re-validate Consent to Establish and

Environment Clearance.

3. The area in Occupation Certificate is different as

Page 15: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 15 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

compared with Consent to Establish and Environment

Clearance.

4. PP failed to submit the documentary proof regarding

change in name.

In view of above, it was decided to issue Show Cause

Notice for consent to establish and operate due to above

non compliances with stop work direction.

24 MPCB-

CONSENT-

0000035483

Hotel and Beach Resort

Project, Sagartirth: 2,

HISSA no. 3 B 4, HISSA

no. 1 & 3 , Tank: 16,

HISSA no. 1/1 & 1/4 27-

1/2, Temb 15 Village

Sagartirth, Tank and

Temb, Taluka Vengurla,

Dist. Sindhudrugh,

APPROVED

Revalidation of

Consent to

Establish

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that PP has obtained Environmental

Clearance vide letter dated 05.04.2017 for total plot area

2,19,084 Sq. mtrs and total BUA 61,926.22 Sq. mtrs in the

name of Hotel and Beach Resort Project. Whereas, PP has

also obtained consent to establish vide consent dated

13.02.2013 for total plot area 2,19,084 Sq. mtrs and total

BUA 61,926.22 Sq. mtrs on the name of Elite Township

Pvt. Ltd. (Beach Resort)

Now PP has applied for re-validation of consent to

establish for construction of hotel on the name of named

Hotel and Beach Resort Project on Total Plot area of

2,19,084 sq.m. and total Construction BUA of 61,926.22

sq.m. by imposing following conditions;

1. PP shall submit an affidavit in prescribed format

regarding compliance of conditions of EC and

Consent to Establish condition.

2. PP shall achieve the treated domestic effluent standard

for the parameter BOD- 10 mg/lit.

3. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting etc.

and remaining shall be utilized on land for gardening.

4. PP shall install online monitoring system for BOD,

TSS and flow at the outlet of STP.

5. PP shall submit BG of Rs. 25 lakh towards

compliance of EC and Consent to Establish condition.

Page 16: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 16 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

6. PP shall re-validate the EC if project is not completed

before the expiry of the same.

7. 1st consent to operate for expansion will be considered

only after submission of NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

Consent shall be issued after submission of documentary

proof regarding name change from M/s. Elite Township

Pvt. Ltd. (Beach Resort) to M/s. Hotel and Beach Resort

Project and after receipt of additional fees, if required.

25 MPCB-

CONSENT-

0000031725

Indoco Remedies Ltd. A-

26, A-27, A-28/1, A-28/2

Patalganaga MIDC,

Khalapur, Dist Raigad

APPROVED

Consent to

Establish for

Expansion

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that industry has existing consent to

operate which is valid upto 31.01.2021. Industry has also

obtained Environmental Clearance for expansion activity

vide letter dated 18.07.2016.

In view of above, it is decided to grant consent to establish

for expansion to manufacture 7 new products viz.

Dorzolamide Hydrochloride (0.274 Tones/M), Allopurinol

(34.17 Tones/M), Quetiapine Furmate (9.83 Tones/M),

Pregabalin (9.27 Tones/M), Febuxostat (5.083 Tones/M),

Lacosamide (0.666 Tones/M), Merabegron (1.5

Tones/M), Dapagliflozin (0.666 Tones/M), Cangliflozin

(5.0 Tones/M), Apixaban (0.583 Tones/M), Aloglitin

Benzoate (4.0 Tones/M) & Rufinamide (0.258 Tones/M),

by imposing following conditions;

1. Industry shall submit Bank Guarantee of Rs. 5 lakh

towards compliance of consent to establish and

conditions stipulated in Environment Clearance.

2. Industry shall install RO, MEE, ATFD and recycle

100 % treated effluent so as to achieve ZLD. There

shall not be any discharge on land for gardening.

3. Industry shall submit Board Resolution in prescribed

format within one month as industry took effective

steps prior to obtaining C to E and submit the BG of

Rs. 2 lakh towards compliance of the same.

4. Industry shall not to violate the conditions stipulated

in EC and consent in future and submit the BG of Rs.

25 lakh towards compliance of the same.

Page 17: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 17 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

26 MPCB-

CONSENT-

0000035827

ADM Agro Industries

Latur and Vizag Pvt. Ltd.

G 75-86 Latur, Dist. Latur

APPROVED

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that industry has existing consent in Red

category for the manufacturing of Edible Oil which is

valid upto 30.04.2018. Now, industry has applied for

consent to establish for Dal Mill & Flour Mill.

In view of above, it was decided to grant consent to

establish for Dal Mill & Flour Mill in Red category by

imposing following conditions;

1. Industry shall submit Bank Guarantee of Rs. 5 lakh

towards compliance of consent conditions.

27 MPCB-

CONSENT-

0000035293

Umicore Autocat India

Pvt Ltd, Plot 03, survey

No, 1295, 1296,

1122B,1129B,1140

Shirwal, Tal. Khandala,

Dist. Satara

APPROVED

Consent to

Establish for

installation of

additional

machinery

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant consent to establish for addition of

one no of Electric Heating Furnace by imposing following

conditions;

1. There shall be any increase in existing production

quantity as well as existing pollution load due to

addition of one no of Electric Heating Furnace.

28 MPCB-

CONSENT-

0000035904

Tata Autocomp GY

Batteries Pvt Ltd Plot No.

C-2, MIDC Ranjangaon,

Tal - Shirur, Dist - Pune

APPROVED

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant consent to establish for expansion

to manufacture Two Wheeler Lead Acid VRLA Battery-

7,50,000 No/M by imposing following conditions;

1. Industry shall upgrade the existing STP with adequate

capacity before obtaining the 1st consent to operate.

2. Industry shall 100% recycle/reuse the metal bearing

effluent into the process and non metal bearing

effluent shall be sent to CETP for further treatment

and disposal and shall not use for gardening. Industry

shall install online flow meter to ETP outlet and

recycle system to monitor the total quantity of effluent

recycled and sent to CETP within 02 months and

submit the BG of Rs. 2 lakh towards compliance of

the same.

Page 18: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 18 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

29 MPCB-

CONSENT-

0000034208

Nxtra Data Ltd. Plot No -

13/10A, 28 Hinjewadi

Mulshi, Dist. Pune

APPROVED

Consent to

establish

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant Consent to Establish for

construction of commercial project for Data Center

activity for Total Plot area 18,981 Sq. M. & Construction

BUA of 29,722.97 Sq. Mtrs. by imposing following

conditions;

1. Industry shall not take effective steps before obtaining

EC from Competent authority.

2. PP shall achieve the treated domestic effluent standard

for the parameter BOD- 10 mg/lit.

3. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting etc.

and remaining shall be used on land for gardening and

connected to the sewerage system provided by local

body.

4. PP shall install online monitoring system for parameters

BOD, TSS and flow at outlet of STP.

30 MPCB-

CONSENT-

0000034450

AAK Kamani Pvt. Ltd.,

Sr. No. 21,21,23,24,24,25

& 26, Village Honad, Post

: Sajgaon Village Honad,

Takai Adoshi Road

Khalapur, Dist. Raigad

APPROVED

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that industry has provided RO & MEE

to the existing unit.

In view of above, it was decided to grant consent to

establish for expansion to manufacture Refined Oil and

Vanaspati Oil

31 MPCB-

CONSENT-

0000036524

Indiabulls Real Estate

Company Pvt Ltd C.S No

613 & 612 Lower parel

Division, Elphinstone Mill

Mumbai

APPROVED

Revalidation of

Consent to

Establish

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that PP has obtained amended

Environmental Clearance vide letter dated 03.07.2017 for

Total Plot Area 34,383 Sq. Mtrs and Total Construction

BUA of 3,60,099 Sq. Mtrs. PP has also obtained consent

to establish vide consent dated 23.10.2012 for Total Plot

Area 34,384.93 Sq. Mtrs. and Total Construction BUA of

3,74,700 Sq. Mtrs

Now industry has applied for Re-validation of Consent to

Page 19: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 19 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

Establish with amendment for Total Plot Area 34,383

Sq.Mtrs mtrs. and Total Construction BUA of 3,60,099

Sq.Mtrs (ie for Office(wing A,B,C)-1,68,909 Sq.Mtrs,

Wing D-99,995 Sq.Mtrs, MCGM car parking-91,195

Sq.Mtrs.) as per amended EC dated 03.7.2017 by

imposing following conditions:

1. PP shall comply conditions stipulated in amended EC

granted by Board dated 3.7.2017.

2. PP shall submit an affidavit in prescribed format

regarding compliance of conditions of Environment

Clearance and Consent to Establish condition.

3. PP shall achieve the treated domestic effluent standard

for the parameter BOD - 10 mg/lit.

4. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower, make up, firefighting etc.

and remaining shall be utilized on land for gardening.

5. PP shall install online monitoring system for BOD,

TSS and flow at the outlet of STP.

6. PP shall extend/ top up the BG to form total sum of

Rs. 25 lakh towards O&M of pollution control system.

32 MPCB-

CONSENT-

0000036764

Gangamai Industries and

Constructions

Ltd.(GIACL) 224

Harinagar, Najik

Babhulgaon Post-Rakshi

Shevgaon, Dist.

Ahmednagar

APPROVED

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant consent to establish for expansion

for Ethanol production- 100 KLPD by imposing EC

conditions and following conditions;

1. Industry shall not take any effective steps prior to

obtaining Environment Clarence from the competent

authority and submit Bank Guarantee of Rs. 5 lakh

towards compliance of same.

2. Industry shall submit Bank Guarantee of Rs. 5 lakh

towards compliance of consent to establish conditions.

3. 1st consent to operate for expansion will be considered

only after submission of NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

Page 20: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 20 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

33 MPCB-

CONSENT-

0000037044

Datwyler Pharma

Packaging India Pvt Ltd

Plot No-3,4 & 5 Khandala

SEZ(Phase-I) Khandala,

Dist. Satara

APPROVED

Consent to

Establish for

Expansion

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that industry has consent to operate to

manufacture Rubber Clousers- 9000 MT/A which is valid

upto 30.09.2021.

In view of above, it was decided to grant consent to

establish for expansion to manufacture Rubber Clousers-

9000 MT/A and Omniflex Coated Rubber Clousers in

Orange category by imposing following conditions

1. Industry shall provide adequate treatment system so as

to achieve Zero Liquid Discharge (ZLD).

2. 1st consent to operate for expansion will be considered

only after submission of NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

34 MPCB-

CONSENT-

0000035310

Nagpur Metro Rail

Corporation Limited, 4/2

& other MIHAN, Dist.

Nagpur

APPROVED

Consent to

Establish

Commissioning

of the unit or 5

years

whichever is

earlier

It is observed that PP has applied for Metro Rail Depot at

MIHAN which include washing line, O&M line,

Workshop & Offices activities for Metro Rrail. for

domestic effluent propose to provide STP and for trade

effluent propose to provide ETP. Also, Built Up Area is

less than 20,000 sq. mtrs.

In view of above, it was decided to grant consent to

establish by imposing following condition –

1. PP shall submit bank guarantee of Rs. 10 Lakhs for

compliance of Consent to establish condition.

2. PP shall install online monitoring system for the

parameters BOD, TSS and flow at outlet of ETP.

3. PP shall obtain permission from Central Ground

Water Authority in case source of water is

groundwater.

4. Industry shall provide adequate treatment system

followed by RO & MEE so as to achieve Zero Liquid

Discharge.

5. 1st consent to operate will be considered only after

amendment in EC obtained by MIHAN.

Page 21: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 21 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

35 MPCB-

CONSENT-

0000037170

Elpro International

Limited C.T.S. No. - 4270

Chinchwadgaon, Haveli,

Dist. Pune

APPROVED

Revalidation of

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that PP has obtained Environmental

Clearance vide letter dated 04.09.2017 for Total Plot area

1,72,560 Sq. M. & Total Construction BUA of

1,39,482.94 Sq. M. PP has also obtained consent to

establish vide consent dated 13.11.2009 for Total Plot area

1,68,100 Sq. Mtrs. & Total Construction BUA of 231350

Sq. Mtrs.

In view of above, it was decided to grant re-validation of

Consent to Establish for construction of commercial and

residential project for Total Plot area 1,72,560 Sq. Mtrs.

and Total Construction BUA of 1,39,482.94 Sq. Mtrs. as

per Environmental Clearance granted vide letter dated

4.9.2017 by imposing following conditions;

1. PP shall submit an affidavit in prescribed format

regarding compliance of conditions of Environment

Clearance and Consent to Establish conditions.

2. PP shall achieve the treated domestic effluent standard

for the parameter BOD - 10 mg/lit.

3. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower, make up, firefighting etc

and remaining shall be utilized on land for gardening.

4. PP shall install online monitoring system for BOD,

TSS and flow at the outlet of Sewage Treatment Plant

(STP).

5. PP shall submit fresh/top up Bank Guarantee of Rs. 25

Lakh towards compliance of Environment Clearance

and Consent to Establish condition.

Page 22: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 22 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

Consent shall be issued after submission of additional

consent fee.

36 MPCB-

CONSENT-

0000036993

Endurance Technologies

Limited K-226/1, K-227

MIDC Industrial Area,

Waluj, Dist. Aurangabad

APPROVED

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant Consent to establish for expansion

to manufacture Clutch Assembly- 2,50,000 Nos./M,

Friction Plate- 10,00,000 Nos./M, CVT- 15,000 Nos./M

and Aluminum Pressure Die Casting- 700 Ton/M by

imposing following conditions;

1. Industry shall upgrade the existing ETP to the

adequate capacity prior to obtain 1st consent to

operate from the Board.

37 MPCB-

CONSENT-

0000037502

LEMON TREE

PREMIER HOTEL at

Sahar Road, CSI Airport,

Andheri Mumbai Plot No.

NS C-04, GVK Sky City,

CTS No. 145A,Village

Sahar, Sahar Road, CSI

Airport, Mumbai, SAHAR

ROAD Kurla

NOT

APPROVED

Consent to

Establish

--- Committee noted that PP has applied for consent to

establish on 12.12.2017 which is after Hon’ble High Court

order dated 26 and 29 February, 2016 in the case of Civil

Application No. 221 Of 2013 in Public Interest Litigation

No. 217 of 2009.

Hence it was decided to issue SCN for refusal of consent

to establish, as the Hon’ble High Court has restricted the

process of granting permissions for construction of new

residential and commercial buildings, including malls,

hotels and restaurants The restrictions had become

applicable from 1st March 2016.

38 MPCB-

CONSENT-

0000037896

Endurance Technologies

Limited K-228/229 MIDC

area Waluj Gangapur,

Dist. Aurangabd

APPROVED

Consent to

Establish for

expansion

Commissioning

of the unit or 5

years

whichever is

earlier

Committee noted that industry has existing consent to

operate to manufacture Aluminum Die Casting- 5000

Ton/A which is valid upto 30.04.2022.

In view of above, it was decided to grant consent to

establish for expansion to manufacture Aluminium Die

Castings- 5000 Ton/A

Page 23: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 23 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

39 MPCB-

CONSENT-

0000037798

Jubilant Life Sciences Ltd.

Gut No 25, 26, 27, 28, 32,

45 Nira Baramati, Dist.

Pune

APPROVED

Consent to

Establish for

new ETP

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant consent to establish for

construction of new Effluent Treatment Plant (ETP) of

capacity 500 CMD followed by RO system.

40 MPCB-

CONSENT-

0000038722

Harman Finochem

Limited, Plot No. A-100,

A-100/1, A-100/2, A-120

& D-1, Five star MIDC

Shendra, Aurangabad.

APPROVED

Consent to

Establish for

Expansion in

pharmaceutical

formulations

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant consent to establish for expansion

of pharmaceutical formation of Tablets - 130 Crs./Y &

Capsules - 10 Crs./Y by imposing following conditions:

1. Industry shall submit Bank Guarantee of Rs. 5 lakh

towards Compliance of consent to establish

conditions.

2. Industry shall 100% reuse/recycle the treated trade

effluent by providing RO & MEE so as to achieve

zero liquid discharge.

3. Industry shall amend Environment Clearance within

three months.

41 MPCB-

CONSENT-

0000038772

Wadhwa Construction and

Infrastructure Pvt. Ltd.,

S.No. 40 /1 and others

Village Vardoli, Panvel

Taluka Panvel, Dist.

Raigad

APPROVED

Consent to

Establish

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant Consent to Establish for

construction of residential township project for

Total Plot area 8,46,129.3 Sq. Mtrs and Total construction

BUA of 4,25,117.93 Sq. Mtrs by imposing following

conditions;

1. PP shall obtained EC from competent authority and

PP shall not take effective steps before obtaining EC

from Competent authority.

2. PP shall achieve the treated domestic effluent standard

for the parameter BOD- 10 mg/lit.

3. The treated effluent shall be 60% recycled for

Page 24: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 24 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting etc.

and remaining shall be used on land for gardening and

connected to the sewerage system provided by local

body.

4. PP shall install online monitoring system for

parameters BOD, TSS and flow at outlet of STP.

5. 1st consent to operate for expansion will be considered

only after submission of NOC from CGWB/Irrigation

department for consumption of ground water/Surface

water.

42 MPCB-

CONSENT-

0000038761

EVERSHINE

DEVELOPERS; New

survey no. 5, 5B, 5F, 5G,

5D New survey no. 5, 5B,

5F, 5G, 5D at Village

Dongare, Virar (West),

Taluka - Vasai, Dist -

Thane. Vasai

NOT

APPROVED

Revalidation of

Consent to

Establish for

Expansion

--- It was decided to defer the case and revert back to next

CAC along with clarity on EC revalidation, OC status and

provision of pollution control system.

43 MPCB-

CONSENT-

0000041397

Gondegaon Extension OC

Coal Mine Expansion

Project, Plot No 622

Gondegaon, Parseoni,

Dist. Nagpur

APPROVED

Consent to

Establish for

Expansion

from 2.5 to 3.5

MTPA

capacity

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant Consent to establish for expansion

for Coal Mining activity- 1.0 MTPA by imposing standard

Opencast Coal Mining conditions including bank

Guarantee as per BG regime.

Consent to Establish shall be issued-

i. After obtaining Environment Clearance copy from PP.

ii. After obtaining details regarding domestic effluent

quantity & treatment provided for domestic effluent.

44 MPCB-

CONSENT-

0000039698

Ajmera Developers,

S No. 69, 71, 72, 73, 74,

75, 76, 77, 78, S. No 119,

121, 122 ,124 ,125, 126,

127, 128,129 - Vasai

APPROVED

Consent to

Establish

Commissioning

of the unit or 5

years

whichever is

earlier

It was decided to grant of Consent to Establish for

proposed residential cum commercial project & Rajhans

Kshitij for Total plot area 1,37,012.20 sq. mtrs and total

construction BUA area 2,97,236.97 sq. mtrs. as per

Environment Clearance dtd. 31.07.2017 by imposing

following conditions;

1. PP shall submit an affidavit in prescribed format

Page 25: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 25 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

regarding compliance of conditions of Environment

Clearance and Consent to Establish condition.

2. PP shall achieve the treated domestic effluent standard

for the parameter BOD -10 mg/lit.

3. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower, make up, firefighting etc.

and remaining shall be utilized on land for gardening.

4. PP shall install online monitoring system for BOD,

TSS and flow at the outlet of STP.

5. PP shall submit Bank Guarantee of Rs.25 Lakhs

towards compliance of Environment Clearance and

Consent to Establish conditions.

1 Policy Guideline for Use of Pet Coke as a

fuel in Cement Kiln

It was decided to use Pet Coke as a substitute fuel in integrated cement

plants subject to the terms and conditions notified in the MoEF notification

dated 10.05.2016 & 23.11.2016.

1. They should abide by the conditions mentioned in proceeding in Writ

petition 13029/1985 in Hon’ble Supreme Court in the matter of Mr. M.

C. Mehta Vs Union of India.

2. The height of stack shall be as per the standard formula of stack height

calculation. They shall install all requisite pollution control measures as

per guidelines.

3. All the cement plants shall conduct ambient air quality monitoring on

regular interval of 15 days.

4. For pet coke storage where grinding and storage of pet coke carried out,

a barrier walls of adequate height along the periphery of premises shall

be provided.

5. Pet coke using cement industries shall submit detail of analysis of pet

coke before its use.

6. Pet coke shall be transported by providing scientific cover so as to

control fugitive emissions.

7. They shall comply with the Hazardous Waste (M & TM) 2016.

8. To comply the order issued by Hon’ble N.G.T. in the matter of

Page 26: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 26 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

471/2016 in the matter of People for Education Research Scholarship &

Outward Nutrition Vs union of India & Central Pollution Control Board.

9. Board will issue trial permission for use of pet coke initially for 6-

month period and for the compliance of same to obtain Bank Guarantee

of Rs. 10 lakhs.

10. Cement plants using pet coke shall strictly follow MoEF notification

dated 29.01.2018 regarding sale and use of pet coke in cement plants.

2 Policy Guidelines for utilization of

Pond/Bottom Ash generating from

Thermal Power Plants for backfiling in

Abandoned mines/Stone quarry

It was decided to approve only bottom ash generating from Coal based

Thermal Power Plants for backfilling in abandoned mine / stone quarries

subject to land approval from district authorities.

On the basis of compliance of fly ash notification issued by MoEFCC, GoI

we may grant NOC for utilization bottom ash for landfill to reclaim low

lying areas including back filling in abandoned mines/ stone quarry, with

following BG Regime.

Bank Guarantee Regime for utilization of Bottom ash generated form

Thermal Power Plant for back filling in abandoned mines/stone quarry.

1. Dispose available bottom ash at designated sites (earth quarry) and soil

borrow area shall be filled up with proper compaction and reclamation

and shall ensure that such reclamation and compaction to be done in

accordance with the specifications and guidelines laid down by

authorities & fly ash notifications.

2. The compaction shall be done on a scientific way so as to give strength of

natural soil strata

3. The boundary of the reclaimed site shall have fencing and entire

reclaimed site shall be bordered by scientific garland drain so as to

prevent the runoff before commencement of activity.

4. Tree plantation shall be done on the reclaimed land @ 2500 plants /

hectare and shall be maintained. The proposed program and its

implementation schedule shall be submitted within one month of

commencement of the work.

5. Declare bottom ash generation details on monthly basis prior to its

disposal. A separate register about disposal of bottom ash shall be

maintained where officials shall make entry of utilization of bottom ash

regularly and industry shall regularly submit manifests of bottom ash

Page 27: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 27 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

monthly to Board

6. There shall not be any fugitive emissions, leakage/ spillage during

transportation [Loading /Unloading] and Bottom ash transportation trucks

shall be closed from all four sides and shall be fully covered with

tarpaulins to avoid the leakage/ spillages and shall not cause any nuisance

in the surrounding during the transportation

7. The fly ash shall be utilized as per the MOEF Notification about Fly Ash

Utilization no. S.O. 763(E), dated 14/09/1999, S.O.2804 (E), dated:

03/11/2009 and S.O.254(E), dated 25.01.2016.

8. Pre monsoon & Post monsoon water quality monitoring shall carry out

every year and submit report to SPCB

9. Carrying out leachability study from reputed institute where the bottom

ash is being dumped.

10. Construction of metallic roads for transportation of ash from plant to

designated backfilling site before commencement of activity & in any

case it shall not be transported through the village.

3 Policy decision in respect of grant of

consent to Establish Expansion of

Industrial Units in the area of non-

performing CETPs

The committee noted that scheme of zero liquid discharge. Industries had

filed Writ Petitions before Hon’ble High Court Mumbai to consider their

application along with ZLD plan in a time bound manner and to grant

requisite permission.

The Hon’ble High Court Mumbai in one of the Write Petition vide order

dated 11.04.2017 directed to MPCB to process the application of the

petitioner and it is come to the conclusion that the petitioner satisfies

requirements and guideline of CPCB, then NOC may be granted to the

Petitioner.

Considering the NGT and High Court orders in the matter of non-complying

CETP’s, the issue was discussed at length and decided to consider to grant

consent to establish / expansion of industrial units with effluent treatment

plant in non-performing CETP areas, where in industry shall achieve the

zero liquid discharge (ZLD) and no pollution potential, subject to

compliance of the following directions dated 31.03.2016 issued by CPCB.

1. Not resulting in increase in pollution load such as industries generating

Nil industrial effluent, 100% industrial effluent recycling, industries

Page 28: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/consentappraisal/pdf/Web_Minutes_of_8th_CAC_Consent_to...PP shall not take any effective steps without obtaining prior Enviro nmental

8th CAC meeting of 2017-2018 (Book-let no. 14 Consent to Establish) dated 09.02.2018 Page 28 of 28

Sr

No

Application

Unique

Number

Industry Name &

Address

Decision on

grant of

consent

Consent

granted upto Remarks/Discussion

generating only concentrated stream disposed at common hazardous

waste treatment and disposal facility.

2. CETP has un-utilised hydraulic capacity and effluent of the new industry/

expansion will help in improving the performance of CETP.