london demand response

20
London Demand Response

Upload: thanos

Post on 22-Feb-2016

35 views

Category:

Documents


0 download

DESCRIPTION

London Demand Response. 25% capacity shutting down. Didcot Power Station closed March 2013 2000 MW. Ofgem Capacity Forecast. Demand Response Benefits. Active Network Management. UK Power Networks Low Carbon Network Fund London constrained substations - PowerPoint PPT Presentation

TRANSCRIPT

Page 2: London Demand Response
Page 3: London Demand Response
Page 4: London Demand Response
Page 5: London Demand Response
Page 6: London Demand Response
Page 7: London Demand Response

25% capacity shutting downDidcot Power Station closed March 20132000 MW

Page 8: London Demand Response

Ofgem Capacity Forecast

2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17

0% 0.8% 0.2% 1.5% 1.9% 2.0% 2.2%

Page 9: London Demand Response

Demand Response Benefits

Financial Benefits: Participation in energy demand response contracts can generate significant annual benefits

Green Performance: Provide further improvements to environmental performance

Reduce CO2: Participants immediately help make the UK electricity network less carbon intensive and greener

No Cost: There is no cost to participants or any interruption to service

Page 10: London Demand Response
Page 11: London Demand Response

Active Network Management

• UK Power Networks• Low Carbon Network

Fund• London constrained

substations• £1.8 billion network

reinforcement over 5 years

Page 12: London Demand Response
Page 13: London Demand Response

Active Network Management

• Demand Response within the M25• Chillers, pumps,

lighting, HVAC, fans• CHP• Generators

• £70,000 per MW• Get in touch with us

now to participate!

Page 14: London Demand Response
Page 15: London Demand Response

15

Page 16: London Demand Response

16

Page 17: London Demand Response

17

Page 18: London Demand Response
Page 19: London Demand Response

Selected CustomersCommercial Industrial Institutional

Page 20: London Demand Response

About KiWi Power & Next Steps

• Founded in 2009• London-based, International Focus• 25 member team• Commercialise the DR market• ISO 9001, 14001, 18001

• Immediate opportunities in London• June to August: Active Network Management• November to February: Triad Management• All year: Demand Response