    NTPC LIMITED

    ENGINEERING DIVISION

    MANAGEMENT SYSTEM MANUAL

    LEVEL I

    ISSUE III REV 0

  • 8/3/2019 Main Body Level 1dated 05-09-11

    2/20

    Engineering Division Management System Manual Level I issue III Rev 0January 28,

    2011

    SECTION A

    2 | P a g e

    SECTION: A

    1.0: STATEMENT OF COMMITMENT

    We firmly believe in achieving Total Quality in all aspects, involving every function.

    Each function is responsible for establishing continuous improvement oriented

    management systems and procedures that comply with this Manual. Eachemployee of Engineering Division is expected to keep in focus while conforming to

    applicable requirement of the quality system. This will enable us to deliver quality

    services to our customers and will assure our sustained growth and is considered

    to be the best strategy to achieve Objectives.

    We hereby jointly declare our commitment to attain the companys vision and

    objectives through full participation in implementation of Management System

    given in the Manual.

  • 8/3/2019 Main Body Level 1dated 05-09-11

    3/20

    Engineering Division Management System Manual Level I issue III Rev 0January 28,

    2011

    SECTION A

    3 | P a g e

    Table of Contents

    SECTION: A........................................................................................................................................................ 2

    1.0: STATEMENT OF COMMITMENT............................................................................................................... 2

    3.0: DISTRIBUTION LISTOF CONTROL COPY .................................................................................................. 5

    4.0: DETAILS OF REVISION .............................................................................................................................. 6

    SECTION B:........................................................................................................................................................ 7

    1.0: GENERAL ................................................................................................................................................... 7

    2.0: MANAGEMENT SYSTEM MANUAL DOCUMENTATION STRUCTURE: ........................................................ 7

    3.0: CONTROL OF MANUALS: .......................................................................................................................... 9

    3.1: REVIEW & REVISION OF MANUALS :.................................................................................... 9

    3.2: DISTRIBUTION OF MANUALS: .............................................................................................. 10

    SECTION C:...................................................................................................................................................... 11

    1.0 : QUALITY POLICY............................................................................................................................... 11

    2.0: OBJECTIVES SETTING PROCESS...................................................................................................... 11

    2.1 : MEASUREMENT & MONITORING PROCESS FOR OBJECTIVES ................................. 12

    SECTION D: ..................................................................................................................................................... 13

    1.0 : RESPONSIBILITY & AUTHORITY: ................................................................................................... 13

    2.0 RESOURCE MANAGEMENT: ..................................................................................................................... 13

    2.1 Resource Planning............................................................................................................................... 13

    2.2 Review................................................................................................................................................. 14

    2.3Human Resources ............................................................................................................................... 14

    2.4 Competence development ................................................................................................................. 14

    2.5 Infrastructure ...................................................................................................................................... 15

    2.6 WORK ENVIRONMENT ........................................................................................................................ 15

    3.0: PRODUCTS / SERVICES OF ENGINEERING DIVISION ............................................................................... 15

  • 8/3/2019 Main Body Level 1dated 05-09-11

    4/20

    Engineering Division Management System Manual Level I issue III Rev 0January 28,

    2011

    SECTION A

    4 | P a g e

    3.1: Planning: ............................................................................................................................................ 15

    3.2: Measurement, monitoring and non conformity redressal:.............................................................. 16

    4.0 : ANALYSIS OF DATA AND IMPROVEMENT: ............................................................................................. 16

    5.0: PURCHASING OF SERVICES BY ANY DEPTT IN ENGINEERING DIVISION: ................................................ 16

    6.0: PRODUCTION AND SERVICE PROVISIONS: .............................................................................................. 16

    7.0: IDENTIFICATION & TRACEABILITY ........................................................................................................... 17

    8.0: CUSTOMER PROPERTY ............................................................................................................................ 17

    9.0: CONTROL OF MONITORING AND MEASURING DEVICES: ....................................................................... 17

    SECTION E: ...................................................................................................................................................... 18

    1.0: MANAGEMENT REVIEW ......................................................................................................................... 18

    1.1: Agenda ............................................................................................................................................... 18

    1.2: Records of Management Review Meeting........................................................................................ 19

    SECTION F: ...................................................................................................................................................... 20

    1.0: LEVEL 1 MANUAL records: ...................................................................................................................... 20

    1.1: CONTROL OF RECORDS: ..................................................................................................................... 20

    APPENDIX 1 : NTPC & Engineering division profile

    APPENDIX 2 : Engineering division organization structure, responsibility & authority

    APPENDIX 3 : Engineering division MOU

    APPENDIX 4 : Departmental products, their planning, measurement & monitoring and non conformity

    redressal philosophy

    APPENDIX 5 : Co-relation with ISO: 9001:2008

    APPENDIX 6 : Abbreviations

    APPENDIX 7 : Level I Manual Drafting Committee

    Appendix 8 : Revision record of Appendices

    Appendix 9 : Record of the review of Manual

  • 8/3/2019 Main Body Level 1dated 05-09-11

    5/20

    Engineering Division Management System Manual Level I issue III Rev 0January 28,

    2011

    SECTION A

    5 | P a g e

    3.0: DISTRIBUTION LISTOF CONTROL COPY

    Sr. No. Control copy Issued to Doc. type

    1. MASTER COPY MR Hard copy2. AUDITOR COPY MR Hard copy3. NTPC EOC INTRANET Soft copy4. RIOs ERP Soft copy

    NOTE: Old revision status and obsolete documents (electronically stamped as obsolete)

    will be maintained at a common folder on the NTPCEOC intranet for reference only.

  • 8/3/2019 Main Body Level 1dated 05-09-11

    6/20

    Engineering Division Management System Manual Level I issue III Rev 0January 28,

    2011

    SECTION A

    6 | P a g e

    4.0: DETAILS OF REVISION

    SEC.

    NO.

    REV.

    NO.

    DATE AMENDMENT DETAILS & IDENTIFICATION BY

  • 8/3/2019 Main Body Level 1dated 05-09-11

    7/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION B

    7 | P a g e

    SECTION B:

    1.0: GENERAL

    This manual describes the Management System established and maintained to

    ensure that the products / services conform to the specified requirements. The

    documented management system will help in ensuring focus to continually improve

    effectiveness in achieving the objectives.

    2.0: MANAGEMENT SYSTEM MANUAL DOCUMENTATION STRUCTURE:

    Documented management systems, procedures and instructions are established in

    accordance with business requirements of the Engineering Division of NTPC while

    meeting provisions of ISO-9001-2008.

    The Management System Documentation structure includes the

    following:

    Level I Manual: is Apex manual which includes Quality Policy, Objectives, resource

    management policy, products of Engineering division: their control philosophy,

    Management responsibilities and other system requirements.

    Level II Manual: is Divisional Level manual which includes common procedures &

    work instructions

    Level III Manuals: are Departmental Manuals which include department

    responsibilities & authority, procedures and other Quality system requirements

    Level IV Manuals: are Departmental work instructions which include Guidelines and

    Check Lists for effective functioning.

    Level I manual has eight appendices.

    Appendix 1: NTPC & Engineering division profile

  • 8/3/2019 Main Body Level 1dated 05-09-11

    8/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION B

    8 | P a g e

    Appendix 2: Engineering division organization structure, Responsibility & Authority

    Appendix 3: Engineering division MOU

    Appendix 4: Departmental products, their planning, measurement & monitoring

    and non conformity redressal philosophy

    Appendix 5: Co-relation with ISO: 9001:2008

    Appendix 6: Abbreviations

    Appendix 7: Level I Manual Drafting Committee

    Appendix 8: Revision record of Appendices

    Appendix 9: Record of the review of Manual

  • 8/3/2019 Main Body Level 1dated 05-09-11

    9/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION B

    9 | P a g e

    3.0: CONTROL OF MANUALS:

    Level I & II manual are issued by the Management Representative (MR) with the

    approval of ED (Engineering).

    MR is authorized to control and issue revisions with the approval of ED (Engg.).

    Level III & IV manuals are issued, revised & controlled by respective HODs.

    3.1: REVIEW & REVISION OF MANUALS :

    All employees of Engineering Division, may suggest changes for improvements and

    give their feedback. The suggestion should indicate the relevant clause number

    and proposed change with the reason for change.

    All the suggestions will be addressed to their respective Group Head / HOD. HOD

    will forward the suggestions to MR.

    REVIEW OF LEVEL I & II MANUALS

    The review committee appointed by MR will review the Manuals once every year to

    assess its continuity, adequacy and conformity to customer requirements. The

    review committee will also interact with suggesting departments / individuals, if

    required. The review committee will present their recommendations to apex

    committee.

    The apex committee consisting of ED (Engg.) and heads of all departments will

    review the changes suggested by review committee and if accepted the changes

    will be incorporated into the relevant manual. In case Manual is reviewed and

    adopted without any revision, then record of such review will be maintained as

    appendix 9 (i.e. Record of review of manual).

  • 8/3/2019 Main Body Level 1dated 05-09-11

    10/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION B

    10 | P a g e

    IDENTIFICATION OF CHANGES IN LEVEL I & II MANUALS.

    The revised text of Manual will be highlighted with color. In the subsequent

    revision of the manual, earlier changes will be normalized and only the latest

    changes will be highlighted with color.

    Revisions are identified numerically e.g. 0, 1 , 2 n. With revision of any section,

    the manual gets a new revision number & date. The new revision number & date is

    indicated in headerof the manual.

    When substantial changes are made in Manual the whole manual is reissued. The

    issues are identified by roman numerals e.g. I, II etc. along with date of issue.

    Each new issue supersedes all previous issues and revisions of the manual. The

    new issue of the manual will start with revision zero.

    The details of revision are given in Details of Revision section of this manual.

    Any change in the appendices will not be treated as a change or revision in the

    manual. Revision status of appendices will be identified by its date.

    Engineering division MOU (appendix 3) will be identified by the year of the MOU.

    3.2: DISTRIBUTION OF MANUALS:

    Latest version of level I, II, III & IV manual will be hosted on intranet / ERP. All

    manuals will be digitally signed documents.

    Revisions and reissues of the manual are distributed as per Distribution List.

    Old revision status and obsolete documents (electronically stamped as obsolete)

    will be maintained at a common folder on the intranet for reference only.

  • 8/3/2019 Main Body Level 1dated 05-09-11

    11/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION C

    11 | P a g e

    SECTION C:

    1.0 : QUALITY POLICY

    Striving to be worlds largest & best power producer powering Indias growth

    through safe, reliable & environmental friendly power generation at optimum cost

    and time and achieving total customer satisfaction by:

    Adoption of state of art technology on continual basis Excellence in system engineering to achieve high level of efficiency,

    safety, reliability and cost effectiveness

    Environmental engineering for meeting the national norms of pollution ofair, water and land by eco-friendly power generation

    Maintaining quality measures to ensure a high level of performance ofproducts

    Ensure effective use of information technology in engineering activitiesfor meeting targeted time schedules

    Continuous competency development of employees towards updating theirknowledge base

    2.0: OBJECTIVES SETTING PROCESS

    Engineering Division's yearly MOUs (objectives) are finalized, based on annual

    business plan of NTPC. Engineering division MOUs becomes the basis for framing

    objectives of individual departments of Engineering Division.

  • 8/3/2019 Main Body Level 1dated 05-09-11

    12/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION C

    12 | P a g e

    2.1 : MEASUREMENT & MONITORING PROCESS FOR OBJECTIVES

    ED (Engg.) with the help of P&S deptt. monitors the performance of individual

    department on quarterly basis against internal MOU targets.

    ED (Hydro Engg.) with the help of P&S deptt. (Hydro Engg.) monitors the

    performance of individual department on quarterly basis.

    The objective achievements score card is maintained by respective P&S

    departments.

  • 8/3/2019 Main Body Level 1dated 05-09-11

    13/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION D

    13 | P a g e

    SECTION D:

    1.0 : RESPONSIBILITY & AUTHORITY:

    ED (Engg) is overall in-charge for management system of Engineering Division.

    The Heads of functional groups described in the organization chart have the

    authority and overall responsibility for maintenance of management systems in

    respective areas for effective performance.

    They also have the authority to initiate action to prevent the occurrence of any

    non-conformity, identify problems related to products, initiate and record

    problems, recommend or provide solutions, verify implementation of solutions and

    control further processing of non-conforming product until the deficiency or

    unsatisfactory conditions have been corrected.

    They have freedom to re-organize the department and delegate authority to

    perform duties to subordinates but will retain the entire accountability of those

    duties.

    Organization chart of Engineering Division including Hydro Engineering, Functionsand Responsibilities of HODs is elaborated at appendix 2. The responsibilities of

    other levels are given in respective Departmental Manuals.

    As part of Engineering Division, operations of Hydro Engineering are headed by ED

    (Hydro Engg.). Hydro Engineering has got separate functional heads. Hydro

    Engineering is also being supported by PE Infra-Structure Services, Quality

    Assurance & Inspection, Environment Engineering, Engineering IT Services, Cost

    Engineering and Library & Documentation departments.

    2.0 RESOURCE MANAGEMENT:

    2.1 RESOURCE PLANNING

    Resource planning is done at the beginning of each financial year projecting the

    resource required for Engineering Division activities. The resource planning

    include:

    Manpower

  • 8/3/2019 Main Body Level 1dated 05-09-11

    14/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION D

    14 | P a g e

    Engineering assistance required from outside Skills Engineering support facilities (software, work stations, computers etc.) Logistics support facilities (reprographic equipment, communication

    facilities etc)

    Resource planning is initiated at departmental level sufficiently in advance so as to

    finalize overall Resource Plan for Engineering Division before start of financial year.

    Overall resource planning & monitoring is coordinated by respective Planning &Systems Groups of Engineering Division.

    2.2 REVIEW

    Review of augmentation and utilization of resources is taken by ED (Engineering),

    ED (Hydro Engineering) along with functional heads.

    2.3HUMAN RESOURCES

    HODs ensure that resources provided for, are effectively utilized. Control on

    resource utilization for the department is exercised by HOD. Control on resource

    utilization for consultancy assignments is exercised by the concerned Project

    Manager.

    2.4 COMPETENCE DEVELOPMENT

    A continuous up-gradation of knowledge is undertaken in order to ensure quality

    work by Engineering division. Competence development / training needs

    requirements are identified and suitable training and education is provided. The

    training needs are identified by concerned departmental heads based on functional

    requirements and forwarded to HR department for arranging training programs.

    Special emphasis is provided by HODs to identify focused areas where knowledge

  • 8/3/2019 Main Body Level 1dated 05-09-11

    15/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION D

    15 | P a g e

    base/skills enhancement is required. Training procedure is defined in Divisional

    Manual (Level II).

    2.5 INFRASTRUCTURE

    The infrastructure covers engineering support facilities like library, software,

    servers, work stations, internet, LAN, ERP-SAP and other support facilities like

    reprographic equipments, scanners, printers, communication facilities etc. These

    are identified in the Resource Plan.

    2.6 WORK ENVIRONMENT

    The work environment covers the factors related to personnel safety & security,

    lighting, HVAC, fire protection, canteen facility, sanitation and noise pollution

    control. The suitable work environment is provided to all employees by controlling

    the above factors in the engineering work area with the help of HR Department.

    3.0: PRODUCTS / SERVICES OF ENGINEERING DIVISION

    3.1: PLANNING:

    Overall planning is based on annual internal MOUs signed by Engineering division

    with Corporate Planning. Corporate Planning department finalizes the externalannual MOU with Ministry of Power (MOP).

    The new projects are identified & forwarded by Corporate Planning to New Projects

    Group of Engineering Division. R&M of existing stations is planned based on R&M

    business plan. NTPC Consultancy wing also forwards project work received from

    various customers. Engineering support to existing plants is planned based on

    specific station requirements.

  • 8/3/2019 Main Body Level 1dated 05-09-11

    16/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION D

    16 | P a g e

    The products / services of various departments of engineering division are defined

    at Appendix 4 along with planning of each product.

    3.2: MEASUREMENT, MONITORING AND NON CONFORMITY REDRESSAL:

    Measurement, Monitoring and non-conformity redressal philosophy of each of the

    products is defined, in brief, in Appendix 4.

    4.0 : ANALYSIS OF DATA AND IMPROVEMENT:

    Planning of delivery of various products help in assessing the work load of the

    individual groups / deptt. and helps in human resource planning.

    Monitoring of actual deliveries help in preparing strategies to meet new demands

    of customers.

    Non conformity data and other feedbacks received from site, suppliers, regional

    inspection offices are summarized for corrective & preventive actions, if any.

    Above data (MIS) is analyzed for future planning e.g. improvement in technical

    specification, strategies etc.

    5.0: PURCHASING OF SERVICES BY ANY DEPTT IN ENGINEERING DIVISION:

    The process of purchasing of services or hardware by any deptt of Engg. Division is

    in line with Corporate Contracts procedures. Corporate contracts procedures are

    maintained by CS Department.

    6.0: PRODUCTION AND SERVICE PROVISIONS:

    These processes are handled by EITS & ERP departments. EITS department is

    responsible for establishing and maintenance of computing systems including

    servers and LAN in EOC. ERP is responsible for maintenance of ERP-SAP system

    throughout NTPC.

  • 8/3/2019 Main Body Level 1dated 05-09-11

    17/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION D

    17 | P a g e

    7.0: IDENTIFICATION & TRACEABILITY

    All products are identified by a number as per numbering scheme. The guidelines

    of the numbering scheme is indicated at Divisional manual (Level II). The products

    are traceable through their process of approval defined by individual department.

    8.0: CUSTOMER PROPERTY

    Individual departments maintain records generated / documents received as a

    result of consulting assignment in the same manner as maintained for NTPC

    projects, as per procedure defined in Divisional Manual Level II.

    9.0: CONTROL OF MONITORING AND MEASURING DEVICES:

    Monitoring and measuring processes in Engineering Division are software driven.

    The monitoring & measuring software development or purchasing, theirimplementation and maintenance, is the responsibility of EITS department.

  • 8/3/2019 Main Body Level 1dated 05-09-11

    18/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION E

    18 | P a g e

    SECTION E:

    1.0: MANAGEMENT REVIEW

    Management reviews are undertaken to evaluate the status and adequacy of

    Management System to ensure its continued suitability, adequacy and

    effectiveness in meeting the requirements of ISO-9001-2008 and Quality Policy

    and MOUs (Objectives) of Engineering Division and Hydro Engineering

    ED (Engg.) appoints the management representative through a circular.

    1.1: AGENDA

    Management Representative (MR) initiates the Management Review taking

    following into consideration:

    Result of Audit Critical issues affecting Quality, if any Introduction of new systems, where required.

    ED (Engg.) takes Management Review Meetings in which MR, and Heads of all

    departments participate.

    The agenda for Management Review includes following:

    Trends on achievement of internal MOU objectives (furnished by P&S) Issues regarding non-conformities, corrective & preventive actions and

    customer complaints required to be discussed at HOD level (furnished by

    individual departments), if any

    Results of internal and external Quality audits (furnished by MR)Any other issue brought forward by HODs

  • 8/3/2019 Main Body Level 1dated 05-09-11

    19/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION E

    19 | P a g e

    1.2: RECORDS OF MANAGEMENT REVIEW MEETING

    MR prepares and circulates the Minutes of Management Review Meetings. Minutes

    of management review meetings are posted on the intranet (NTPCEOC) and ERP.

    Effectiveness of Management Review is ensured by ED through monitoring and

    personal observations.

  • 8/3/2019 Main Body Level 1dated 05-09-11

    20/20

    ENGINEERING DIVISION MANAGEMENT SYSTEM MANUAL LEVEL I ISSUE III REV 0January 28,

    2011

    SECTION F

    20 | P a g e

    SECTION F:

    1.0: LEVEL 1 MANUAL RECORDS:

    Circular for appointment of Management Representative by ED (ENGG.) Trends on objectives achievements (maintained by P&S dept) Internal quality audits summary ( maintained by MR) External audit records ( maintained by MR) Minutes of management review meeting ( maintained by MR)

    1.1: CONTROL OF RECORDS:

    Appointment of MR by ED (Engg.) will be as per requirement and will be identified

    by its date.

    All other records will be generated twice in a year after internal audits. All the

    above records will be identified by the Month & year. These records will be

    maintained on intranet and ERP.