TO: THROUGH: DATE: FROM: SUBJECT: PRESENTER: RECOMMENDATION: BUDGET IMPACT: PAST ACTION: NEXT ACTION: ATTACHMENTS: BACKGROUND: Agenda Item: A-2 Meeting Date: 03/14/17 MEMORANDUM City Commission Douglas Hutchens, Interim City March 6, 2017 ( Jorge M. Quintas, P.E., Director, ). . .k' Department of Public Works & Utilities I City Engineer a\ Patricia A venue and Beltrees Street Sanitary and Storm Sewer Emergency Repairs Russell Ferlita, Ph.D., P.E., Section Engineer I Utilities & Traffic Approve Emergency Repairs previously authorized by the Interim City Manager, per Purchasing Policy requirements. Funding for this emergency project (totaling approximately $155,000) is available in the Water & Sewer Fund (Account #441-5165-533- 461 0), and in the Stormwater Fund (Account #443-5300-541-461 0). None None 1) Memo from Russell Ferlita, Ph.D., P.E., Section Engineer I Utilities & Traffic to Douglas Hutchens, Interim City Manager;· dated February 02, 2017 requesting emergency authorization; 2) Initial and revised cost estimates from Rowland, Inc., along with Attachments ' A' & ' B', and initial Purchase Order, dated February 8, 2017. A failure in the sanitary sewer system occurred in an 18" sanitary sewer line, located at the comer of Patricia Avenue and Beltrees Street. The failure was detected as a result ofundermining of the adjacent sidewalk and surrounding ground, causing the area to begin to collapse. Due to the proximity of the adjacent roadway travel lane, this was deemed to be an emergency repair for obvious safety concerns to the public. Investigation of the failure revealed settled pipe segments and a

Upload: others

Post on 08-Nov-2021

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Manag~ - Granicus

TO:

THROUGH:

DATE:

FROM:

SUBJECT:

PRESENTER:

RECOMMENDATION:

BUDGET IMPACT:

PAST ACTION:

NEXT ACTION:

ATTACHMENTS:

BACKGROUND:

Agenda Item: A-2

Meeting Date: 03/14/17

MEMORANDUM

City Commission

Douglas Hutchens, Interim City Manag~

March 6, 2017 (

Jorge M. Quintas, P.E., Director, ). . .k' Department of Public Works & Utilities I City Engineer a\ Patricia A venue and Beltrees Street Sanitary and Storm Sewer Emergency Repairs

Russell Ferlita, Ph.D., P.E., Section Engineer I Utilities & Traffic

Approve Emergency Repairs previously authorized by the Interim City Manager, per Purchasing Policy requirements.

Funding for this emergency project (totaling approximately $155,000) is available in the Water & Sewer Fund (Account #441-5165-533-461 0), and in the Stormwater Fund (Account #443-5300-541-461 0) .

None

None

1) Memo from Russell Ferlita, Ph.D., P.E., Section Engineer I Utilities & Traffic to Douglas Hutchens, Interim City Manager;· dated February 02, 2017 requesting emergency authorization;

2) Initial and revised cost estimates from Rowland, Inc., along with Attachments 'A' & 'B', and initial Purchase Order, dated February 8, 2017.

A failure in the sanitary sewer system occurred in an 18" sanitary sewer line, located at the comer of Patricia A venue and Bel trees Street. The failure was detected as a result ofundermining of the adjacent sidewalk and surrounding ground, causing the area to begin to collapse. Due to the proximity of the adjacent roadway travel lane, this was deemed to be an emergency repair for obvious safety concerns to the public. Investigation of the failure revealed settled pipe segments and a

Page 2: Manag~ - Granicus

manhole, failing pipe lining, and loss of integrity of the line leading to Inflow and Infiltration (1&1) into the sanitary sewer system. The existing manhole and sanitary sewer pipes in this area are deep, and beyond the capabilities of City staff and equipment to safely address, Rowland Inc., was contacted in order to make the necessary repairs on an emergency basis.

Once the emergency repair work commenced and the associated maintenance of traffic (MOT) was established, City staff realized the benefit in optimizing the already in place sanitary sewer by-pass pumping and MOT in order to limit future interruptions to traffic and adjacent businesses. City staff approved the installation of a pipe liner on an unlined segment of clay sanitary sewer pipe along Beltrees, which was planned for the new future as part of the City's ongoing pipe lining plan to address I&I. Installation of this segment of liner during this emergency repair allowed the City to prevent an additional future road closure and need for by-pass pumping; thus saving time and money.

While the emergency sanitary sewer repairs were underway, it was discovered that a storm sewer culvert connecting two storm structures in the work area had failed. As the contractor was already in place to make the sanitary sewer repairs, City staff approved the removal and replacement of the failed segment of storm sewer.

These repairs of the sanitary and storm sewer pipes, totaling approximately $ 155,000, will increase the safety and reliability of these systems and help prevent future fa ilures at this locati on.

Staff respectfull y requests the Commissions concurrence of these emergency repair activities and authorizations.

Page 3: Manag~ - Granicus

DUN~DIN ENGINEERL'\'G DIVISION P.O.BOX 1348

DUNEDL'\', FLOIUDA 34697-1348 (727) 298-3174 Home of Honeymoon Island

TO:

THROUGH:

FROM:

DISTR. :

DATE:

SUBJECT:

MEMORANDUM

Douglas Hutchens, Interim City Manager

Jorge M. Quintas, P.E., Public Works & Utilities Director I City Engi

Russell Ferlita, Ph.D., P.E., Section Engineer I Utilities & Traffi0

Paul Stanek, Assistant Public Works & Utilities Director Chuck Ankney, CPPO, Purchasing Agent

February 02, 2017

Patricia Avenue and Beltrees Street Sanitary Sewer Failure

A leak in two 18" sanitary sewer main segments and failure of the corresponding manhole was detected at the comer of Patricia Ave. and Beltrees St. (Attachment A). Video imaging of the sanitary mains revealed cracking and settling of the unlined clay pipe, failure and settling of the lined clay pipe, and settling of the manhole connecting the two sanitary sewer mains. These failures have caused washing out of the surrounding soil and caving of the sidewalk immediately adjacent to the roadway, in this area. The repairs will require replacing the manhole, replacing damaged and failing sections of the 18" sanitary sewer mains, protection of the roadway section, and restoration of the area upon completion of the work. Repairs will require redirection of traffic and bypass pumping in the immediate area. The estimate of total cost for the emergency repair is $117,034, which exceeds the amount of$25,000 (see attached estimate).

According to the City's Purchasing Agent, since the cost of these repairs is in excess of $25,000, Purchasing Policy requires a memo of justification for this emergency action, and that it be approved by the City Manager.

Therefore, please review this request, and if acceptable, acknowledge your approval by signing below:

z_ a .17 rim City Manager Date:

J

Page 4: Manag~ - Granicus

Attachment A

Page 5: Manag~ - Granicus

Rowland Inc. City of Dunedin

Patricia Ave. and Beltrees Str. - Manhole Replacement Cost Estimate

Item Description Quant. u/m Unit cost I Total

D. Sewer Pipe, Force Main and Manhole Emergency Repair

Mobilization 0.00 Is 225.00 0.00

2 Traffic Control 0.00 per day 45.00 0.00

3 Labor hour Foreman regular lime 80.00 per hour 66.00 5,280.00

Foreman overtime 8.00 per hour 76.00 608.00

Operator regular time 160.00 per hour 53.00 8,480.00

Operator overtime 0.00 per hour 63.00 0.00

Truck Driver regular time 40.00 per hour 43.00 1,720.00

Truck Driver overtime 0.00 per hour 53.00 0.00

Pipe Layer regular time 160.00 per hour 46.00 7,360.00

Pipe Layer overtime 8.00 per hour 56.00 448.00

Laborer regular time 160.00 per hour 41 .00 6,560.00

Laborer overtime 0.00 per hour 51.00 0.00

4 Equipment

Foreman P/U with hand tool 88.00 per hour 28.00 2,464.00

Job truck with tools 108.00 per hour 36.00 3,888.00

Tractor & Trailer (Transport) 8.00 per hour 25.00 200.00

Track Hoe (to 100 HP) 0.00 per hour 95.00 0.00

Track Hoe (101 HP to 170HP) 0.00 per hour 130.00 0.00

Track Hoe (171 HP and up) 80.00 per hour 135.00 10,800.00

Rubber Tired Backhoe 0.00 per hour 55.00 0.00

Wheel Loader (to 150 HP) 80.00 per hour 65.00 5,200.00

Wheel Loader (151 HP and up) 0.00 per hour 70.00 0.00

Track Type Tractors (to 100 HP) 0.00 per hour 22.00 0.00

Track Type Tractors (101 HP and up) 0.00 per hour 27.00 0.00

Dump Truck {Tandem Axel) 12.00 per hour 72.00 864.00

Plate Tamp 16.00 per hour 6.00 96.00

3" Trash Pump 16.00 per hour 6.00 96.00

4" Double Diaphragm Pump 0.00 per hour 9.00 0.00

Air Compressor (125 CFM min.) 0.00 per hour 12.00 0.00

Well Point Pump 6.00 per day 100.00 600.00

Well Point 150.00 per If 26.00 3,900.00

4" Jet Pump 0.00 per day 50.00 0.00

5 Materials Asphalt - 2" overlay 0.00 per SY 15.00 0.00

3,000 psi Concrete 0.00 perCY 115.00 0.00

OffSite Selected Fill 0.00 perCY 4.00 0.00

Limerock Base Material 0.00 per Ton 25.00 0.00

#57 Washed Stone 18.00 per Ton 40.00 720.00

Bahia Sod 0.00 per SF 0.60 0.00

59,284.00

Miscellaneous Items 57,750.00

Total= $117,034.00

2/2/2017 ;2.

TOTALS 10:15 AM Page 1 of 1

Page 6: Manag~ - Granicus

Invoice# Company Description

M-13 Allowance for Contract Amendt

10% Contractors Fee

Subtotal

MWI By-Pass Pumping

MOT Plans MOT

Baker Paving Asplalt Pavement

Trench Plate Trench Box Rental

United Rental Pipe Plugs

Ferguson 18" PVC Pipe & Coupling

Oldcastle Manhole

Misc. Materials & Rentals

17-00 Cost Est Dunedin - Patricia Ave- Replace MHjJiU2017 M iscellaneous 10:15 AM

Date Utilized

20,000.00 20,000.00 0.00

10,000.00 10,000.00 0.00

8,000.00 8,000.00 0.00

2,500.00 2,500.00 0.00

1,500.00 1,500.00 0.00

3,000.00 3,000.00 0.00

2,500.00 2,500.00 0.00

5,000.00 5,000.00 0.00

0.00 0.00 0.00

Page 1 of 1

Page 7: Manag~ - Granicus
Page 8: Manag~ - Granicus

Ferlita, Russell

From: Sent : To: Cc: Subject:

Russell

Attachment B

Bill Gavitt < [email protected] >

Thursday, February 23, 2017 10:07 AM Ferlita, Russell Ken Rowland RE: Quote - Layne CIPP Liner.xlsx

Ken and I went over where we are at so far and what It will take to complete. we are going to be at approx. 155K total, that Is adding the Layne pipe lining, test plug replacement and couple days extra MOT, Bypass etc.. There has been A LOT of extra cables that were not located which has slowed us down a bit. If the pipe to the west Is

good to connect to as seen on the TV report, I do not foresee any additional costs. If we cannot connect prior to getting into the road we may have additional road work.

Thank you

Biee (itwitt General Superintendent

ROWLAND 6855 102nd Ave. N. Pinellas Park, FL 33782 Phone: {727} 545-3815 Fax: (727}546-8464

~ ~

Page 9: Manag~ - Granicus

/\11 lnvoic~s . Packing Lisrs.

<~nd Packages musl have

lhis number on 11.

Purchase Order No.

020677

02 / 08117

CITY OF DUNEDIN PURCHASING OFFICE

750 MILWAUKEE AVENUE • DUNEDIN, FL 34698 PHONE (727) 298-3000

FAX (727) 298-3078

INVOICE TO: ' '

· · I i I \\ DATE CITY OF DUNEDIN FINANCE DEPT. FAX# (727) 546 - 8464 TEL# (727) 545-3815

I ROWLAND INC.

~ fA-- 2J1(J'. -J ))

I

P.O. BOX 1348 DUNEDIN, FL 34697-1348

v 6855 102ND AVENUE NORTH s H I p

CI TY OF DUNEDIN ENGINEERING DIVIS ION 737 LOUDEN AVENUE 2ND FLOOR

E PINELLAS PARK, FL 33782 N D 0 A

L

VENDOR NO. 497

_j

T 0 DUNEDIN , FL 34 698

L

ALL PRODUCTS TO BE SHIPPED FOB DUNEDIN, INSIDE DELIVERY UNLESS OTHERWISE NOTED.

BUYER: 17815

02/28/17 REQUIRED DELIVERY DATE:NET I 3 0

REQUISITION NO: C GUMMOW I R. PERLITA REQUISITION BY: DEPT./DIVISION:

TERMS: ACCT. NO. TO BE CHARGED:5~:!~;26 6 - 53 5 . 4 6 - 1 0

ITEM NO. QUAN'TI'TY/UM DESCRIPTION

1 117034. ODI 913 081 EMERGENCY REPAIR 18" SANITARY MAIN 403 PATRICIA AV

UNIT PRICE

1 .00 00

SU -TOTAL

TO' AL

REMARKS: Pr icing per your quote dated 21212017. All work is to be coordinated with Russe or his designee. He can be reached at 72 Please reference this P.O. # on all invo the City. Contractor must provide a Certificate of listing combined General Liability o f $1 per occurrence and $2 million policy agg Worker's Compensation shall be $1 mi l lio accident, each employee and policy limit disease. Contractor must maintain these limits fo duration of the project work . Contractor shall provide a Certificat e o

*-- -- - ------* * CONTINUED * *-----------*

1 Perl ita - 298 - 3186 ces to

Ins u rance million egate.

each for

the

Ins u r -

TOTAL PRICE

117034. 0 0

117034.00

117 034. 00

_j

TERMS & CONDITIONS, AS DEPICTED ON THE REVERSE SIDE OF THIS ORDE~, ARE A FORM~L PAfiT ~F THIS.PRDE.,.",. T~)('"XE'l'l)~.l ·~.!l.$· ·~1~~-2j:S~~C!P:\

FOR CITY OF DUNEDIN

1

AUTHORIZED SIGNATURE

Page 10: Manag~ - Granicus

All I1W01l:es. Pncking Lisls, and Packages musl have I his number on 11.

Purchase Order No.

020677

02/08/17

DATE

*---- CIT-Y-OF DUNEDIN * CONTINUEDPOOCHASING OFFICE * ___ _75QMILWAU~IiE AVENUE • DUNEDIN, FL 34698

PHONE (727) 296-3000 FAX (727) 296-3076

INVOICE TO: CITY OF DUNEDIN FINANCE DEPT.

FAX# (727) 546-8464 P.O. BOX 1348 DUNEDIN, FL. 34697-1348 TEL# (727) 545 - 3815

I ROWLAND INC. v 6855 102ND AVENUE NORTH E PINELLAS PARK, FL 33782 N 0 0 R

L

VENDOR NO. 497

BUYER: 17815

_j

s H I p

T 0

L

CITY OF DUNEDIN ENGINEERING DIVISION 737 LOUDEN AVENUE 2ND FLOOR DUNEDIN, FL 34698

ALL PRODUCTS TO BE SHIPPED FOB DUNEDIN, INSIDE DELIVERY UNLESS OTHERWISE NOTED.

REOUIAEO DELIVERY DATE· U L I L t! I .L 1

NET/30 REQUISITION NO: REQUISITION BY:

C GUMMOW / R . FERLITA TEAMS: 4 4 1 - 52 6 6 - 53 5 . 4 6 - 1 0 ACCT. NO. TO BE CHAAGED:S

2 9 8 O

3 DEPT./DIVISION:

ITEM NO. QUANTITY I UM 1',., DESCRIPTION UNIT PRICE

ance naming the City as an additional in ured . The Contractor is responsible for obtain ng all permits prior to beginning the work . Contractor is responsible for all permit fees .

TOTAL PRICE

_j

' TERMS & CONDITIONS, AS DEPICTED ON THE REVERSE SIDE OF THIS ORDER, ARE A FORMAL PART C)F T~IS 9RDER. ·T~X ·E~E,PT. ;:Ss·.B!I,f 262~560C:o~4'

FOR CITY OF DUNEDIN

2