may 20, 2020 notice of bid shoal creek raw water pump ... · the shoal creek raw water pump station...

13
May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump Station Lanier Filter Plant Pump System Improvements BL057-20 The Gwinnett County Board of Commissioners is soliciting competitive sealed bids from qualified contractors for the Shoal Creek Raw Water Pump Station Lanier Filter Plant Pump System Improvements. Bid submittal date and location: Sealed bids will be received by the Gwinnett County Department of Financial Services - Purchasing Division-2 nd Floor, 75 Langley Drive, Lawrenceville, Georgia 30046 until 2:50 P.M. local time on July 24, 2020 and then publicly opened and read aloud at 3:00 P.M. Any bid received after 2:50 P.M. will not be accepted. Bid envelope must be marked on the outside with Bid Number, name of Bidder, date and time of opening. Contractor providing the utility work must have a current valid Utility Contractors License. Special Conditions: The Gwinnett County Department of Water Resources shall comply with O.C.G.A § 36-91- 20 as amended for mandatory pre-qualification of prospective bidders. Therefore, interested bidders should obtain a Pre-Qualification Application for this specific project from the Gwinnett County Purchasing Office, 75 Langley Drive, 2nd Floor, Lawrenceville, Georgia 30046 or download from our website www.gwinnettcounty.com. In order to download, please select “BL057-20 NOT” and the prequalification application is attached. Pre-qualification applications will be received by email to [email protected] or delivered to the Gwinnett County Purchasing Office, 75 Langley Drive, Lawrenceville, Georgia 30046 until 2:00 P.M. local time on June 19, 2020. Any pre-qualification application received after this date and time will not be accepted. Any modifications to the prequalification criteria must be addressed prior to application submittal. If you feel any of the criteria in the prequalification application is restrictive, please notify Dana Garland by email at [email protected] by June 10, 2020. If the submitted application does not meet the minimum prequalification criteria, the application will be rejected. A list of pre-qualified bidders should be available by 4:00 P.M. local time on July 06, 2020. NOTE: Bids submitted by contractors who have not been prequalified will not be considered. Project Description: The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated constant-speed vertical turbine raw water intake pumps to deliver flow to Lanier Filter Plant. Each pump is rated at 50 million gallons per day (mgd). The pumps provide raw water to the Lanier Filter Plant (LFP). This project includes replacing the existing pumps motors to improve the reliability of the pumping system and refurbishing the existing pumps. Work includes the removal of existing 2500 hp, synchronous type pump motors and installation of new 2500 hp, induction type pump motors; removal and replacement of all conductors associated with the motor and controls; replacing all flex conduit with new at the motor/pump area to extend to the new equipment; providing new reverse rotation electronic monitor for interface to the existing motor starter controls; removal of existing reduced

Upload: others

Post on 12-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

May 20, 2020 NOTICE OF BID

Shoal Creek Raw Water Pump Station Lanier Filter Plant Pump System Improvements BL057-20

The Gwinnett County Board of Commissioners is soliciting competitive sealed bids from qualified contractors for the Shoal Creek Raw Water Pump Station Lanier Filter Plant Pump System Improvements. Bid submittal date and location:

Sealed bids will be received by the Gwinnett County Department of Financial Services - Purchasing Division-2nd Floor, 75 Langley Drive, Lawrenceville, Georgia 30046 until 2:50 P.M. local time on July 24, 2020 and then publicly opened and read aloud at 3:00 P.M. Any bid received after 2:50 P.M. will not be accepted. Bid envelope must be marked on the outside with Bid Number, name of Bidder, date and time of opening. Contractor providing the utility work must have a current valid Utility Contractors License.

Special Conditions:

The Gwinnett County Department of Water Resources shall comply with O.C.G.A § 36-91- 20 as amended for mandatory pre-qualification of prospective bidders. Therefore, interested bidders should obtain a Pre-Qualification Application for this specific project from the Gwinnett County Purchasing Office, 75 Langley Drive, 2nd Floor, Lawrenceville, Georgia 30046 or download from our website www.gwinnettcounty.com. In order to download, please select “BL057-20 NOT” and the prequalification application is attached. Pre-qualification applications will be received by email to [email protected] or delivered to the Gwinnett County Purchasing Office, 75 Langley Drive, Lawrenceville, Georgia 30046 until 2:00 P.M. local time on June 19, 2020. Any pre-qualification application received after this date and time will not be accepted. Any modifications to the prequalification criteria must be addressed prior to application submittal. If you feel any of the criteria in the prequalification application is restrictive, please notify Dana Garland by email at [email protected] by June 10, 2020. If the submitted application does not meet the minimum prequalification criteria, the application will be rejected.

A list of pre-qualified bidders should be available by 4:00 P.M. local time on July 06, 2020. NOTE: Bids submitted by contractors who have not been prequalified will not be considered.

Project Description: The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated constant-speed vertical turbine raw water intake pumps to deliver flow to Lanier Filter Plant. Each pump is rated at 50 million gallons per day (mgd). The pumps provide raw water to the Lanier Filter Plant (LFP). This project includes replacing the existing pumps motors to improve the reliability of the pumping system and refurbishing the existing pumps. Work includes the removal of existing 2500 hp, synchronous type pump motors and installation of new 2500 hp, induction type pump motors; removal and replacement of all conductors associated with the motor and controls; replacing all flex conduit with new at the motor/pump area to extend to the new equipment; providing new reverse rotation electronic monitor for interface to the existing motor starter controls; removal of existing reduced

Page 2: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

NOTICE OF BID - PAGE 2 Shoal Creek Raw Water Pump Station Lanier Filter Plant Pump System Improvements BID DATE: July 24, 2020 BID NUMBER: BL057-20

voltage auto-transformer (RVAT) type motor starters with associated synchronous controls and installation of new reduced voltage solid state (RVSS) motor starters; concrete equipment pad extension for new motor starter as required; relocation of the existing control panel section forward to match the face of the RVSS; removal and proper disposal of all materials, motor, conductors, etc.; rehabilitation of four (4) pumps; improvements to the discharge valve hydraulic units including installation of second gas bottle, second piston accumulator, associated valves, tubing and fittings; other piping mechanical, electrical and instrumentation improvements; testing and start up to construct the Shoal Creek Raw Water Pump Stations (SCRWPS) Lanier Filter Plant (LFP) Pump System Improvements complete in place, ready to operate, and as shown on the Drawings and Specifications.

View Construction Drawings and Specifications at the following locations:

Gwinnett County Dept. of Financial Services Purchasing Division – 2nd Floor

75 Langley Drive Lawrenceville, GA. 30046

Obtain Construction Drawings and Specifications Specifications must be purchased from Brown and Caldwell at the below address for a non-refundable fee of $50.00 for cd. Only complete sets will be issued. Brown and Caldwell Vici Hood 990 Hammond Drive Suite 400 Atlanta, GA 30328 770 673-3626 [email protected]

Obtain the Plan-Holders List

The plan-holders list is available from Brown and Caldwell. Pre-bid Date and Location:

A pre-bid conference is scheduled for 10:00 A.M. on July 09, 2020 at the Gwinnett County Shoal Creek Raw Water Pump Station, 1620 Buford Dam Rd, Buford, GA 30518. All bidders are strongly urged to attend.

Facility Access

Gwinnett County does not discriminate on the basis of disability in the admission or access to its programs or activities. Any requests for reasonable accommodations required by individuals to fully participate in any open meeting, program or activity of Gwinnett County Government should be directed to Susan Canon, Gwinnett County Justice and Administration Center, 770-822-8165.

Safety Protocol/BYOPPE During the on-site pre-bid conference, Personal Protection Equipment (PPE) shall be worn. PPE includes but is not limited to ANSI Class 2 or 3 safety vests, Class E hard hats, ANSI approved eye protection, safety toe boots and hearing protection where required. Bring your own PPE. (NOTE: PPE is not required inside the administrative building)

Instructions on Submitting Questions Questions regarding bids should be submitted to Dana Garland, Purchasing Associate III at fax 770-822-8728, or email [email protected] no later than 3:00 p.m. local time, July 13, 2020. Bids are legal and binding upon the bidder when submitted.

Page 3: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

NOTICE OF BID - PAGE 3 Shoal Creek Raw Water Pump Station Lanier Filter Plant Pump System Improvements BID DATE: July 24, 2020 BID NUMBER: BL057-20

Bonding and Insurance: All Bidders are required to submit a Bid Bond or a certified check made payable to the Gwinnett County Board of Commissioners in the amount of five percent (5%) of the total amount bid. The Bid Bond or certified check must be enclosed in the envelope with the sealed bid. The successful bidder will be required to furnish a contract Performance Bond and Payment Bond, each in the sum of 100% of the total amount bid and provide insurance coverage as required by the contract documents.

Bonding Company should be licensed to do business in Georgia, licensed to do business by the Georgia Secretary of State, authorized to do business in Georgia by the Georgia Insurance Department, listed in the Department of the Treasury's Publication of Companies Holding Certificates of Authority as Acceptable Surety on Federal Bonds and as Acceptable Reinsuring Companies and must have an A.M. Best rating of A-10 or higher.

All bonds should be submitted on forms provided by Gwinnett County and agencies providing bonds and insurance should provide proof that they meet the criteria outlined in the bid and contract documents.

Bid Withdrawal:

No Bidder may withdraw his Bid within sixty (60) days after the actual date of the opening thereof. Liquidated Damages:

Bidder agrees to complete the Contract awarded within the "allowable calendar days for completion" from the date of the "Notice to Proceed" and he further agrees that the Owner may retain from the monies which may become due the amount of $1,500.00 / $500.00 for each and every day that the completion of the work may be delayed.

Bids in the case of Corporations not chartered in Georgia, must be accompanied by proper certification stating that said Corporation is authorized to do business in the State of Georgia. The County will award the Contract to the lowest "qualified" bidder, subject with the Owner's right to reject any or all bids, to waive technicalities, and to make an award deemed in its best interests. With limited response, Gwinnett County reserves the right to extend the solicitation opening date as appropriate in order to assure a competitive procurement process.

CONSECUTIVE CALENDAR DAYS FOR COMPLETION: 670 (substantial) / 700 (final)

GWINNETT COUNTY BOARD OF COMMISSIONERS

Page 4: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

COMPANY NAME:

APPLICATION FOR QUALIFICATION TO BID SHOAL CREEK RAW WATER PUMP STATION LANIER FILTER PLANT

PUMP SYSTEM IMPROVEMENTS (BL057-20) PAGE: 1 OF 10

APPLICATION FOR QUALIFICATION TO BID

Shoal Creek Raw Water Pump Station Lanier Filter Plant Pump System Improvements

(BL057-20)

Project Name: Shoal Creek Raw Water Pump Station Lanier Filter Plant Pump System Improvements

Type of Project: Pump Station Capital Improvements

Description: The project scope includes the rehabilitation of the existing four vertical turbine pumps and replacement of 2500 HP motors (Tencarva Muncipal) and associated mechanical and electrical work. Tencarva Municipal will furnish materials, equipment, tools and labor to remove, rehabilitate, install, test, and certify the existing four vertical turbine pumps complete with new 2500 hp induction type motors as described in the Tencarva Municipal scope of work dated April 20, 2020.

Owner Name: Gwinnett County

Applicant Name:

Note: Gwinnett County reserves the right to approve of all personnel provided by the Contractor including but not limited to Project Managers, Project Superintendents and subcontractors for any portion of work resulting from this qualification process.

Page 5: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

COMPANY NAME:

APPLICATION FOR QUALIFICATION TO BID SHOAL CREEK RAW WATER PUMP STATION LANIER FILTER PLANT PUMP

SYSTEM IMPROVEMENTS (BL057-20) PAGE: 2 OF 10

I. INSTRUCTIONS

A. Applicant SHALL NOT attach information in lieu of completion of the application documentation. All information requested by the County SHALL be provided within the application document; however, additional pages may be attached if more space is required (or if additional projects are necessary to demonstrate ability), or as otherwise instructed within the application document. All additional pages shall be clearly labeled with the applicant’s name, pre-qualification application title, project number and page number.

B. Reference projects must be complete prior to submittal of pre-qualification application.

C. Applicant’s qualification WILL be determined based upon the information presented. All questions must be answered in full, without exception. Failure to do so may result in the applicant being deemed non-responsive and therefore may not be considered for qualification.

D. Only complete and accurate information shall be provided by the Applicant. The Applicant hereby

warrants that, to the best of its knowledge and belief, the responses contained herein are true, accurate, and complete. The Applicant should complete the Applicant Certification included in this packet. The Applicant also acknowledges that the Owner is relying on the truth and accuracy of the responses contained herein. If it is later discovered that any material information provided by the Applicant given in response to a question, knowing it was false, shall constitute grounds for immediate disqualification and termination or rescission by the Owner of any subsequent agreement between the Owner and the Applicant. The Owner shall also have and retain any other remedies provided by law.

E. If there are any questions concerning the completion of this form(s), the Applicant is encouraged to

contact the Owner’s representative: Dana Garland, CPPB, Purchasing Associate III, Gwinnett County Purchasing Division, via email at [email protected] or telephone at 770-822-8723. Any modifications to the prequalification criteria must be addressed prior to application submittal. If you feel any of the criteria in the prequalification application is restrictive, please notify Dana Garland by June 10, 2020. If the submitted application does not meet the minimum prequalification criteria, the application will be rejected.

F. Corporations (including principal/corporate officers), Partners, and/or Individuals interested in being considered for pre-qualification to bid on the Shoal Creek Raw Water Pump Station Lanier Filter Plant Pump System Improvements (BL057-20) with Gwinnett County SHALL NOT be currently under indictment for criminal misconduct involving any local, state or federal government entity.

G. Applicant must be staffed and equipped to complete at least 35-percent of their work described in the

contract documents with personnel directly employed by the Applicant. Subcontractors do not qualify.

H. The form must be completed and submitted by email to [email protected] or delivered to the Gwinnett County Purchasing Office no later than the Pre-Qualification Due Date Specified on the Notice to Bid or any Addenda issued by the County which alters said date.

.

Page 6: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

COMPANY NAME:

APPLICATION FOR QUALIFICATION TO BID SHOAL CREEK RAW WATER PUMP STATION LANIER FILTER PLANT PUMP

SYSTEM IMPROVEMENTS (BL057-20) PAGE: 3 OF 10

II. GENERAL BACKGROUND (PRIME CONTRACTOR) A. Current name and address of Applicant:

1. Applicant Name:

Mailing Address:

City: State and Zip: Business Address:

City: State and Zip: Contact Person:

Telephone and Fax: E-mail:

2. Applicant is: Licensed to conduct utility business in the State of Georgia?

Yes

No

If Yes, Provide Applicants State of Georgia Utility License Number:

B. Principals/Officers/Individuals authorized to sign contracts:

Name and Title:

Name and Title: Name and Title:

C. Is applicant currently under indictment for criminal misconduct involving any local, state or federal government entity?

If yes, provide details:

Has applicant ever been indicted involving any local, state or federal government entity?

If yes, provide details:

Has Applicant been involved in litigation or filing claims against Owners, construction contract administration firms, or design firms?

If yes, provide details for each:

Has applicant ever been on an ineligibility list to submit bids to a local, state or federal government entity; deemed ineligible, unqualified, or incapable of performing work for a private firm or government entity?

If yes, provide details:

D. What percentage of the work will the Applicant perform with its own employees? %

E. Does Applicant have a written Safety Program?

F. Does applicant have any upheld OSHA citations in the past five years?

If yes, provide details for each:

Page 7: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

COMPANY NAME:

APPLICATION FOR QUALIFICATION TO BID SHOAL CREEK RAW WATER PUMP STATION LANIER FILTER PLANT PUMP

SYSTEM IMPROVEMENTS (BL057-20) PAGE: 4 OF 10

III. MINIMUM QUALIFICATION CRITERIA CONTRACTORS CAN SUBMIT AND BE QUALIFIED ON PROJECTS WHICH DIRECTLY RELATE TO THEIR FIRM’S EXPERIENCE ONLY. EXPERIENCE CLAIMED FOR CURRENT PERSONNEL, WHILE THEY WERE EMPLOYED BY ANOTHER FIRM, WILL NOT BE ACCEPTED.

The satisfactory completion of the following within the past fifteen (15) years with a final contract value of at least $3,000,000.00 (unless stated otherwise in requirement section of the table):

Requirement Met? Requirement

Yes No Three (3) projects that must have been performed (as the Prime Contractor) directly for a utility or other government entity.

Yes No Three (3) water/wastewater pump station rehabilitation projects (Minimum capacity of 25 mgd per pump) and motors (Minimum of 1500 hp per motor) as the Prime Contractor.

Yes No Three (3) projects that must have involved installation of medium voltage cables (1500hp or greater).

Yes No Three (3) water/wastewater pump station projects that must have involved modifications to the electrical distribution system and control system, including installation of reduced voltage solid state (RVSS) motor starters.

Yes No Three (3) projects that must have involved coordination and work in conjunction with other contractor(s) performing work at the same site.

Yes No Three (3) projects that must have included instrumentation upgrades.

Page 8: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

COMPANY NAME:

APPLICATION FOR QUALIFICATION TO BID SHOAL CREEK RAW WATER PUMP STATION LANIER

FILTER PLANT PUMP SYSTEM IMPROVEMENTS (BL057-20) PAGE: 5 OF 10

IV. COMPANY (Applicant) EXPERIENCE – SIMILAR PROJECTS COMPLETED

Using the forms provided in this Section, list previously completed or current projects which are similar in scope and complexity to this project which were completed ONLY by the Applicant.

Provide in this Section, information for key project personnel: Project Manager, Construction Manager, Construction Superintendent and Site Safety Officer.

A. Project No. 1 Project Name:

Location:

Project Description:

Bid Amount:

Number of Change Orders/ Total:

Change order amount:

Final Contract Amount:

Liquidated Damages Assessed against your firm (Y/N)

Utility Owner:

Address:

Contact Person:

Contact Person Telephone:

Contact Person E-mail Address:

Project Manager:

Construction Manager:

Construction Superintendent:

Site Safety Officer:

Owner’s Representative: Name and phone number:

Contract Dates: Date of Notice to Proceed: Date of Final Completion:

Was your company the prime contractor for this project?

Yes No

Was this project performed directly for a utility or other government entity?

Yes No

Did this project include a water/wastewater pump station rehabilitation projects (Minimum capacity of 25 mgd per pump) and motors (Minimum of 1500 hp per motor)?

Yes No

mgd per pump _________ hp per motor _______

Did this project involve installation of medium voltage cables (1500hp or greater).

Yes No

hp per cable __________

Was this a water/wastewater pump station project that involved modifications to the electrical distribution system and control system, including installation of reduced voltage solid state (RVSS) motor starters?

Yes No

Did this contract require the contractor to coordinate and work in conjunction with other contractor(s) performing work at the same site?

Yes No

Did this project include instrumentation upgrades? Yes No

Comments/Describe projects in terms of degree of difficulty, problems encountered, etc., or any pertinent information that might be useful in the evaluation of your request for pre-qualification:

Page 9: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

COMPANY NAME:

APPLICATION FOR QUALIFICATION TO BID SHOAL CREEK RAW WATER PUMP STATION LANIER

FILTER PLANT PUMP SYSTEM IMPROVEMENTS (BL057-20) PAGE: 6 OF 10

B. Project No. 2 Project Name:

Location:

Project Description:

Bid Amount:

Number of Change Orders/ Total:

Change order amount:

Final Contract Amount:

Liquidated Damages Assessed against your firm (Y/N)

Utility Owner:

Address:

Contact Person:

Contact Person Telephone:

Contact Person E-mail Address:

Project Manager:

Construction Manager:

Construction Superintendent:

Site Safety Officer:

Owner’s Representative: Name and phone number:

Contract Dates: Date of Notice to Proceed: Date of Final Completion:

Was your company the prime contractor for this project?

Yes No

Was this project performed directly for a utility or other government entity?

Yes No

Did this project include a water/wastewater pump station rehabilitation projects (Minimum capacity of 25 mgd per pump) and motors (Minimum of 1500 hp per motor)?

Yes No

mgd per pump _________ hp per motor _______

Did this project involve installation of medium voltage cables (1500hp or greater).

Yes No

hp per cable __________

Was this a water/wastewater pump station project that involved modifications to the electrical distribution system and control system, including installation of reduced voltage solid state (RVSS) motor starters?

Yes No

Did this contract require the contractor to coordinate and work in conjunction with other contractor(s) performing work at the same site?

Yes No

Did this project include instrumentation upgrades? Yes No

Comments/Describe projects in terms of degree of difficulty, problems encountered, etc., or any pertinent information that might be useful in the evaluation of your request for pre-qualification:

Page 10: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

COMPANY NAME:

APPLICATION FOR QUALIFICATION TO BID SHOAL CREEK RAW WATER PUMP STATION LANIER

FILTER PLANT PUMP SYSTEM IMPROVEMENTS (BL057-20) PAGE: 7 OF 10

C. Project No. 3 Project Name:

Location:

Project Description:

Bid Amount:

Number of Change Orders/ Total:

Change order amount:

Final Contract Amount:

Liquidated Damages Assessed against your firm (Y/N)

Utility Owner:

Address:

Contact Person:

Contact Person Telephone:

Contact Person E-mail Address:

Project Manager:

Construction Manager:

Construction Superintendent:

Site Safety Officer:

Owner’s Representative: Name and phone number:

Contract Dates: Date of Notice to Proceed: Date of Final Completion:

Was your company the prime contractor for this project?

Yes No

Was this project performed directly for a utility or other government entity?

Yes No

Did this project include a water/wastewater pump station rehabilitation projects (Minimum capacity of 25 mgd per pump) and motors (Minimum of 1500 hp per motor)?

Yes No

mgd per pump _________ hp per motor _______

Did this project involve installation of medium voltage cables (1500hp or greater).

Yes No

hp per cable __________

Was this a water/wastewater pump station project that involved modifications to the electrical distribution system and control system, including installation of reduced voltage solid state (RVSS) motor starters?

Yes No

Did this contract require the contractor to coordinate and work in conjunction with other contractor(s) performing work at the same site?

Yes No

Did this project include instrumentation upgrades? Yes No

Comments/Describe projects in terms of degree of difficulty, problems encountered, etc., or any pertinent information that might be useful in the evaluation of your request for pre-qualification:

Page 11: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

COMPANY NAME:

APPLICATION FOR QUALIFICATION TO BID SHOAL CREEK RAW WATER PUMP STATION LANIER

FILTER PLANT PUMP SYSTEM IMPROVEMENTS (BL057-20) PAGE: 8 OF 10

D. Project No. 4 Project Name:

Location:

Project Description:

Bid Amount:

Number of Change Orders/ Total:

Change order amount:

Final Contract Amount:

Liquidated Damages Assessed against your firm (Y/N)

Utility Owner:

Address:

Contact Person:

Contact Person Telephone:

Contact Person E-mail Address:

Project Manager:

Construction Manager:

Construction Superintendent:

Site Safety Officer:

Owner’s Representative: Name and phone number:

Contract Dates: Date of Notice to Proceed: Date of Final Completion:

Was your company the prime contractor for this project?

Yes No

Was this project performed directly for a utility or other government entity?

Yes No

Did this project include a water/wastewater pump station rehabilitation projects (Minimum capacity of 25 mgd per pump) and motors (Minimum of 1500 hp per motor)?

Yes No

mgd per pump _________ hp per motor _______

Did this project involve installation of medium voltage cables (1500hp or greater).

Yes No

hp per cable __________

Was this a water/wastewater pump station project that involved modifications to the electrical distribution system and control system, including installation of reduced voltage solid state (RVSS) motor starters?

Yes No

Did this contract require the contractor to coordinate and work in conjunction with other contractor(s) performing work at the same site?

Yes No

Did this project include instrumentation upgrades? Yes No

Comments/Describe projects in terms of degree of difficulty, problems encountered, etc., or any pertinent information that might be useful in the evaluation of your request for pre-qualification:

Page 12: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

COMPANY NAME:

APPLICATION FOR QUALIFICATION TO BID SHOAL CREEK RAW WATER PUMP STATION LANIER

FILTER PLANT PUMP SYSTEM IMPROVEMENTS (BL057-20) PAGE: 9 OF 10

E. Project No. 5 Project Name:

Location:

Project Description:

Bid Amount:

Number of Change Orders/ Total:

Change order amount:

Final Contract Amount:

Liquidated Damages Assessed against your firm (Y/N)

Utility Owner:

Address:

Contact Person:

Contact Person Telephone:

Contact Person E-mail Address:

Project Manager:

Construction Manager:

Construction Superintendent:

Site Safety Officer:

Owner’s Representative: Name and phone number:

Contract Dates: Date of Notice to Proceed: Date of Final Completion:

Was your company the prime contractor for this project?

Yes No

Was this project performed directly for a utility or other government entity?

Yes No

Did this project include a water/wastewater pump station rehabilitation projects (Minimum capacity of 25 mgd per pump) and motors (Minimum of 1500 hp per motor)?

Yes No

mgd per pump _________ hp per motor _______

Did this project involve installation of medium voltage cables (1500hp or greater).

Yes No

hp per cable __________

Was this a water/wastewater pump station project that involved modifications to the electrical distribution system and control system, including installation of reduced voltage solid state (RVSS) motor starters?

Yes No

Did this contract require the contractor to coordinate and work in conjunction with other contractor(s) performing work at the same site?

Yes No

Did this project include instrumentation upgrades? Yes No

Comments/Describe projects in terms of degree of difficulty, problems encountered, etc., or any pertinent information that might be useful in the evaluation of your request for pre-qualification:

Page 13: May 20, 2020 NOTICE OF BID Shoal Creek Raw Water Pump ... · The Shoal Creek Raw Water Pump Station is located at 1620 Buford Dam Road, Buford, Georgia and is equipped with four dedicated

COMPANY NAME:

APPLICATION FOR QUALIFICATION TO BID SHOAL CREEK RAW WATER PUMP STATION LANIER

FILTER PLANT PUMP SYSTEM IMPROVEMENTS (BL057-20) PAGE: 10 OF 10

APPLICANT CERTIFICATION

I certify to the Owner that the information and responses provided on this Application for

Pre-Qualification are true, accurate and complete. The Owner, or its designated

representative, may contact any entity or reference listed in this Application. Each

entity or reference may make any information concerning the Applicant available to

the Owner or its designated representative.

Sworn to before me this

day of

20 .

APPLICANT:

By:

Title:

Sworn to and subscribed before me this day of

20 .

Notary Public

My Commission Expires:

Seal

End of Application