May 23, 2014 | NEPOOL Markets Committee. ISO New England Staff. System & market Operations, Market Development, Market Monitoring . Discussion of proposed changes focused on Dual Fuel Capability, Unused Oil Inventory, Demand Response and potentially LNG. Winter Reliability Program. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: May 23, 2014 | NEPOOL Markets Committee

M A Y 2 3 , 2 0 1 4 | N E P O O L M A R K E T S C O M M I T T E E

ISO New England StaffS Y S T E M & M A R K E T O P E R A T I O N S , M A R K E T D E V E L O P M E N T ,

M A R K E T M O N I T O R I N G

Discussion of proposed changes focused on Dual Fuel Capability, Unused Oil Inventory, Demand Response and potentially LNG

Winter Reliability Program

Page 2: May 23, 2014 | NEPOOL Markets Committee

2

Proposal Summary

• The ISO is proposing changes focused on dual fuel resource participation in the markets:– Additional compensation will be provided to offset commissioning costs– Additional compensation will be provided for unused oil inventory– ISO is also proposing permanent rule changes through separate initiatives

• Requirement to burn higher cost fuel when offered/cleared will no longer be required under competitive market conditions

• ISO-initiated audit rules will be extended to apply to, and compensate for, dual fuel resource annual tests

• The ISO is proposing to provide additional compensation for:– Unused oil inventory of non-dual fuel resources– Unused LNG contract volume of pipeline gas resources– Demand response (similar to Winter 2013/14)

Page 3: May 23, 2014 | NEPOOL Markets Committee

UNUSED CONTRACTED LNG PROGRAMDiscussion of proposed mechanics for LNG program

Page 4: May 23, 2014 | NEPOOL Markets Committee

4

Offset risk of unused contracted LNG at the end of the winter period

• Program design is intended to offset risk of having unused contracted LNG volumes at the end of the winter period providing compensation for resources that acquired firmer fuel which they did not use– This program’s focus is on providing a peaking service that would

augment the availability of pipeline gas

• Resources that are eligible and elect to participate in the program will be compensated for any unused contracted LNG volumes up to the maximum program level based upon a fixed rate– Resources that are fully unavailable for any hours during the winter

period will have their payments reduced

Page 5: May 23, 2014 | NEPOOL Markets Committee

5

Contracts that are submitted to participate in the program must meet specific criteria

• Contract duration would be from December 1 through at least February 28– All contracted volumes must be available to be called in this period– Must follow a “take-or-pay” construct

• Must be resource (delivery point/gas meter) specific and certify that firm transportation arrangements are in place to deliver the gas during peak winter load conditions (e.g., not recallable)– Only dispatchable resources that use natural gas as its primary fuel

(including dual fuel resources) may participate in the program– Contracts are expected to be used for the generation of electricity at the

specified resource during the winter period

• Maximum contract volume eligible for compensation is set at 2 days at full load based upon the winter SCC– There is no minimum contract volume to participate in the program

Page 6: May 23, 2014 | NEPOOL Markets Committee

6

Contracts that do not meet the program obligations are not eligible to participate in the program

• Participants must submit proposed contracts to the ISO by October 1 for review– These proposal must include the LNG provider, certification of deliverability

and proposed contract volumes (including any limitation on the volumes that can be taken hourly, daily, monthly or over the period)

– The ISO will review and accept proposals on a first come/first served basis up to the daily capability of the LNG providers and will provide notice back to participants by October 15

• Participants must submit the contracts with the LNG providers based upon their accepted proposals to the ISO on or before December 1– ISO will review contracts against the problem obligations

• Any contracts that are submitted after December 1 or do not meet the program obligations will not be eligible for compensation in the program

Page 7: May 23, 2014 | NEPOOL Markets Committee

7

Participants will be compensated based upon unused contract volumes on eligible contracts

• The Program Payment is calculated as:

Eligible Quantity x Program Rate

Where:the Eligible Quantity will be the lesser of:

• Maximum eligible contracted volume – 2 days at full load based upon winter SCC

• Contracted volume on December 1 or• Unused contracted volume at the end of the day on February 28

• Program payments are allocated to RTLO (excluding DARD pumps) for the winter period (December 1 through February 28)

Page 8: May 23, 2014 | NEPOOL Markets Committee

8

Resources that are unavailable during the winter will have their payments reduced

• The Availability Charge is calculated as:

Program Payment x (100% - Availability Metric)

Where: the Availability Metric is calculated as:

(Hours resource was available for operation in period) / (Period hours from December 1 through February 28)

• Availability Charges are allocated back to RTLO (excluding DARD pumps) for the winter period (December 1 through February 28)

Page 9: May 23, 2014 | NEPOOL Markets Committee

DUAL FUEL COMMISSIONING PROGRAMSummary of changes made to the program rules or additional details about the program rules since the Markets Committee meeting on May 6-7

Page 10: May 23, 2014 | NEPOOL Markets Committee

10

Offset testing costs associated with restoring or commissioning dual fuel capability

• Program design is intended to offset testing costs associated with restoring or commissioning dual fuel capability

• Resources that are eligible and elect to participate in the program will be compensated through real-time NCPC for any testing related costs– Resources that do not maintain their dual fuel capability per the

obligations of the program will be charged back a portion of the compensation

Page 11: May 23, 2014 | NEPOOL Markets Committee

11

Resources that have not recently operated on their secondary fuel are eligible to participate

• Any resource that burns natural gas as its primary fuel, has not demonstrated their ability to operate on its secondary fuel since December 1, 2011, is able to switch fuels within eight hours and has a minimum tank size is eligible to participate in this program– Minimum tank size is based upon the fuel required to start the

resource from a cold state plus to support EcoMin operation of the resource for the greater of four hours or their Minimum Run Time

• Participants with resources that would like to participate need to submit a formal request to the ISO prior to December 1, 2014– The ISO will work with a participant to establish a plan to commission

(or restore) their resource’s dual fuel capability

Page 12: May 23, 2014 | NEPOOL Markets Committee

12

Resources that do not maintain their capability will be charged back a portion of their payments

• Resources that do not maintain their dual fuel capability for the obligation period (through May 31, 2018) as demonstrated each year through performance and achieving the minimum inventory requirement are charged for the compensation associated with the remaining period for which they are obligated– If the resource was unable to demonstrate their capability because of an unplanned

outage or annual maintenance, no compensation would be charged back; however, the resource would be expected to demonstrate within 30 days of becoming available

– If the resource is not able to demonstrate prior to May 31, 2018, the participant would be charged for the period since the resource had last met these requirements

• Resources that successfully demonstrate through a dual fuel resource audit and achieve the minimum inventory requirement would be able to “recover” funds for the remainder of the period for which they are obligated

Page 13: May 23, 2014 | NEPOOL Markets Committee

13

To remain eligible for compensation, resources must also maintain a minimum fuel inventory

• In addition to having to demonstrate their dual fuel capability each year, resources will also be required to have a minimum level of fuel inventory on-site– Fuel inventory on December 1 must be at a level to be able to start the

resource from a cold state plus to support EcoMin operation of the resource for the greater of four hours or their Minimum Run Time

• Any fuel oil burned since November 15 will be considered as in inventory • Any fuel oil burned for testing since November 15 would need to be replenished

by January 1

• Resources that are commissioned after November 15, 2014 and prior to February 1, 2015 have 15 days after their commissioning date to meet the minimum fuel inventory requirement– Resources commissioned after February 1, 2015 must meet the minimum

inventory requirement by December 1, 2015

Page 14: May 23, 2014 | NEPOOL Markets Committee

UNUSED OIL INVENTORY PROGRAMSummary of changes made to the program rules or additional details about the program rules since the Markets Committee meeting on May 6-7

Page 15: May 23, 2014 | NEPOOL Markets Committee

15

Offset risk of unused fuel oil inventory at the end of the winter period

• Program design is intended to offset risk of having unused fuel oil inventory at the end of the winter period

• Resources that are eligible and elect to participate in the program will be compensated for any unused fuel oil up to the lesser of the maximum compensation level and the initial inventory level based upon a fixed rate– Resources that are fully unavailable for any hours during the winter

period will have their payments reduced

Page 16: May 23, 2014 | NEPOOL Markets Committee

16

Eligible resources that elect to participate in the program must meet minimum inventory requirements

• Participant must submit request by October 1 to the ISO for each resource they would like to have participate in the program – This request would include the target inventory level

Resources are obligated to hold a minimum usable inventory as of December 1 at least equal to the lesser of:– 11 days’ supply at full load operation based upon the winter SCC or – 90% of usable fuel storage capacity on-site or dedicated tank at adjacent location

• Any fuel oil burned since November 15 will be considered as in inventory when evaluating if a resource met the minimum inventory obligation

• All units at a station with a shared fuel supply are required to participate if one unit elects to participate unless a unit is expected to be unavailable for the winter period

• Regardless of whether the resource has a Capacity Supply Obligation, participants must submit Supply Offers for resources participating in the program into the Day-Ahead Energy Market and Real-Time Energy Market at the resource’s maximum physical capability for each hour of the day

Page 17: May 23, 2014 | NEPOOL Markets Committee

17

Resources that have late season fuel deliveries scheduled will need to notify the ISO by February 1

• Resources that plan to schedule fuel for delivery after February 15 must notify the ISO prior to February 1 of the expected delivery to have these quantities remain eligible for compensation– Any deliveries which the ISO receives notice that are delivered prior to

the end of February 28 will be eligible for compensation as a Late Season Replenishment

• Any fuel that is delivered after February 1 must be maintained by the facility for use in the production of electricity through the end of November– Any fuel that is not used for the production of electricity will be charged

back to the participant at the fixed rate associated with the program

Page 18: May 23, 2014 | NEPOOL Markets Committee

18

Resources will be compensated based upon unused oil inventory

• The Program Payment is calculated as:

Eligibility Quantity x Program RateWhere:

the Eligibility Quantity will be the lesser of:• Maximum eligible inventory level

– determined as the lesser of:» 15 days’ supply at full load operation based upon winter SCC or » 95% of usable fuel storage capacity on-site or dedicated tank at adjacent

location• Inventory (adjusted for recent burn) on December 1 or• Inventory at the end of the day on February 15 plus Late Season

Replenishment• Inventory at the end of the day on February 28

• Program payments are allocated to RTLO (excluding DARD pumps) for the winter period (December 1 through February 28)

Page 19: May 23, 2014 | NEPOOL Markets Committee

UNUSED FUEL PROGRAMS SETTLEMENT AND BILLING

Discussion of mechanics of how the Unused Oil Inventory Program and the Unused Contracted LNG Program will be settled and billed

Page 20: May 23, 2014 | NEPOOL Markets Committee

20

ISO will bill load based upon estimated unused fuel on a monthly basis

• ISO will estimate what the remaining quantities at the end of the season for both unused fuel programs and will determine an estimated Total Estimated Unused Fuel Charge

• The monthly Estimated Program Charges for December, January and February will be calculated as:

Total Estimated Unused Fuel Charge x (Days in Month/Days in Period)

• The Estimated Program Charges will be include on the non-hourly services bill following each month and will be allocated to RTLO excluding DARD pumps

Page 21: May 23, 2014 | NEPOOL Markets Committee

21

ISO will bill actual unused fuel inventory costs on a monthly basis• Actual Program Payments, net Availability Charges would be

allocated to each month in the same manner as the Total Estimated Unused Fuel Charge

• On the April non-hourly services bill, the actual Program Payments net Availability Charges will be billed to load for December, January and February– If the estimated quantities were greater than the actual quantities available at

the end of the season (net availability changes), this would be a refund to load– If the estimated quantities were less than the actual quantities available at the

end of the season (net availability changes) this would be an incremental charge to load

• All payments associated with the unused fuel programs will be included on the May non-hourly services bill

Page 22: May 23, 2014 | NEPOOL Markets Committee

22

Resettlements will be handled in the same manner as other market and services

• Since Program Payments net Availability Charges have been allocated to each month and the Program Payments net Availability Charges will not change after the initial settlement, each month will be resettled following the same process as other charges included in non-hourly services bill– This resettlement re-allocates charges based upon changes to RTLO

• Any Meter Request for Billing Adjustments (RBA) would also be handled following the same approach

Page 23: May 23, 2014 | NEPOOL Markets Committee

DEMAND RESPONSE PROGRAMSummary of changes made to the program rules or additional details about the program rules since the Markets Committee meeting on May 6-7

Page 24: May 23, 2014 | NEPOOL Markets Committee

24

ISO is modifying the participation and dispatch commitment and flexibility rules for this program

• Requests to participate in the program must be received by October 1

• Total participation will be limited to 100 assets and 100MW

• Proposed changes to the dispatch commitment and flexibility will be made based both operational needs and participant feedback – 6 hour maximum dispatch– Up to 30 dispatches per season– 4 hour minimum time between dispatches

Page 25: May 23, 2014 | NEPOOL Markets Committee

PROPOSAL SUMMARY & SCHEDULE

Page 26: May 23, 2014 | NEPOOL Markets Committee

26

Proposal Summary

• The ISO is proposing changes focused on dual fuel resource participation in the markets:– Additional compensation will be provided to offset commissioning costs– Additional compensation will be provided for unused oil inventory

• The ISO is proposing to provide additional compensation for:– Unused oil inventory of non-dual fuel resources– Unused LNG contract volume of pipeline gas resources– Demand response (similar to Winter 2013/14)

Committee Date Focus

MC May 6-7 • Present proposal

MC May 23 • Present modifications to proposal and draft tariff language• Discuss rates and costs

MC June 3 • Present final tariff language

MC June 10-11 • Request vote on proposal

Page 27: May 23, 2014 | NEPOOL Markets Committee

APPENDIX: FULL PROGRAM PROPOSALThe material includes the topics that were presented at the Markets Committee on May 6. • Changes to the slides are identified as “modified” in the upper right

corner with modified text highlighted in red• New slides are identified as “new” in the upper right corner

27

Page 28: May 23, 2014 | NEPOOL Markets Committee

DUAL FUEL COMMISSIONING PROGRAM

Page 29: May 23, 2014 | NEPOOL Markets Committee

29

Offset testing costs associated with restoring or commissioning dual fuel capability

• Program design is intended to offset testing costs associated with restoring or commissioning dual fuel capability

• Resources that are eligible and elect to participate in the program will be compensated through real-time NCPC for any testing related costs– Resources that do not maintain their dual fuel capability per the

obligations of the program will be charged back a portion of the compensation

Page 30: May 23, 2014 | NEPOOL Markets Committee

30

Resources that have not recently operated on their secondary fuel are eligible to participate

• Any resource that burns natural gas as its primary fuel, has not demonstrated their ability to operate on its secondary fuel since December 1, 2011, is able to switch fuels within eight hours and has a minimum tank size is eligible to participate in this program– Minimum tank size is based upon the fuel required to start the resource

from a cold state plus to support EcoMin operation of the resource for the greater of the for four hours or their Minimum Run Time

• Participants with resources that would like to participate need to submit a formal request to the ISO prior to December 1, 2014– The ISO will work with a participant to establish a plan to commission (or

restore) their resource’s dual fuel capability

Modified Slide

Page 31: May 23, 2014 | NEPOOL Markets Committee

31

Resources will be compensated for testing costs required to commission the dual fuel capability• Resources will be compensated for any testing costs that they incur

through the real-time NCPC settlement pursuant to Market Rule 1, Appendix F– For the period prior the Energy Market Offer Flexibility changes being implemented,

the NCPC adjustment proposed under the permanent dual fuel resource auditing rules will apply as appropriate

• The amount of testing costs are capped for each resource assuming 20 hours of testing at full load (based upon winter SCC) adjusted for energy revenues and assuming three starts being incurred in supporting of testing– Once the resource has exceeded the cost recovery limit, all testing associated with

commissioning or restoring the dual fuel capability will be ineligible for any additional real-time NCPC

• NCPC costs related to this program are allocated to daily RTLO excluding DARD pumps

Modified Slide

Page 32: May 23, 2014 | NEPOOL Markets Committee

32

Eligible resources that elect to participate in the program must maintain their dual fuel capability

• Resources that request this compensation are expected to maintain the dual fuel capability through May 31, 2018

• After a resource has established its dual fuel capability, the resource will be required to demonstrate its capability each year by:– Performing a dual fuel resource audit prior to December 1

• The ISO will schedule this audit and compensate performance consistent with the dual fuel resource audit rules

– Having a minimum fuel inventory on December 1 to be able to start the resource from a cold state plus to support EcoMin operation of the resource for the greater of four hours or their Minimum Run Time

• Any fuel oil burned since November 15 will be considered as in inventory • Any fuel oil burned for testing since November 15 would need to be

replenished by January 1

Modified Slide

Page 33: May 23, 2014 | NEPOOL Markets Committee

33

Resources that do not initially demonstrate their capability will not be compensated

• Resources that do not successfully establish duel fuel capability after their commissioning testing is complete through a dual fuel resource audit by December 1, 2015 will not be compensated for their commissioning testing costs– Any prior compensation would be refunded back to monthly RTLO

(excluding DARD pumps) in the month in which the resource failed to demonstrate (e.g., November-2015)

• Resources that are commissioned after November 15, 2014 and prior to February 1, 2015 have 15 days after their commissioning date to meet the minimum fuel inventory requirement– Resources commissioned after February 1, 2015 must meet the minimum

inventory requirement by December 1, 2015

Modified Slide

Page 34: May 23, 2014 | NEPOOL Markets Committee

34

Resources that do not maintain their capability will be charged back a portion of their payments

• Resources that do not maintain their dual fuel capability for the obligation period (through May 31, 2018) as demonstrated each year through performance and achieving the minimum inventory requirement are charged for the compensation associated with the remaining period for which they are obligated– If the resource was unable to demonstrate their capability because of an unplanned

outage or annual maintenance no compensation would be charged back; however, the resource would be expected to demonstrate within 30 days of becoming available

– If the resource is not able to demonstrate prior to May 31, 2018, the participant would be charged for the period since the resource had last met these requirements

• Resources that successfully demonstrates through a dual fuel resource audit and achieve the minimum inventory requirement would be able to “recover” funds for the remainder of the period for which they are obligated

Modified Slide

Page 35: May 23, 2014 | NEPOOL Markets Committee

35

Example: Resource fails to demonstrate capability after successfully restoring dual fuel capability

• Resource A established their dual fuel capability on December 1, 2015 incurring total testing costs paid through real-time NCPC of $300K– This resource has an obligation to maintain their capability until May

31, 2018 (or 30 months)

• The equivalent monthly rate of the $300K payment is $10K – ($300K payment / 30 months)

• If Resource A is unable to demonstrate their capability for December 1, 2017, the participant would be charged back $60K for the 6 months remaining in the period– 6 months x $10K equivalent monthly rate

New Slide

Page 36: May 23, 2014 | NEPOOL Markets Committee

36

Example: Resource demonstrates its capability after being unable to prior to December 1

• Building upon the prior example, Resource A is able to successfully demonstrate their capability on January 20, 2018– Payments are restored starting on the first of the next month– There are 4 months remaining in the period from February 2018

through May 2018

• The participant would be paid $40K for restoring their dual fuel capability– 4 months x $10K equivalent monthly rate

New Slide

Page 37: May 23, 2014 | NEPOOL Markets Committee

UNUSED OIL INVENTORY PROGRAM

Page 38: May 23, 2014 | NEPOOL Markets Committee

38

Offset risk of unused fuel oil inventory at the end of the winter period

• Program design is intended to offset risk of having unused fuel oil inventory at the end of the winter period

• Resources that are eligible and elect to participate in the program will be compensated for any unused fuel oil up to the lesser of the maximum compensation level and the initial inventory level based upon a fixed rate– Resources that are fully unavailable for any hours during the winter

period will have their payments reduced

Modified Slide

Page 39: May 23, 2014 | NEPOOL Markets Committee

39

Resources that are able to operate on oil must meet specific criteria to participate in the program

• A resource must be dispatchable and use oil as its primary fuel

OR

• A resource must be dispatchable, use natural gas as its primary fuel and oil as its secondary fuel that:– has successfully demonstrated their dual fuel capability through a dual

fuel resource audit prior to December 1; OR

– has their dual fuel capability commissioned prior to January 1 (pursuant to the Dual Fuel Commissioning Program)

Page 40: May 23, 2014 | NEPOOL Markets Committee

40

Eligible resources that elect to participate in the program must meet minimum inventory requirements

• Participant must submit request by October 1 to the ISO for each resource they would like to have participate in the program – This request would include the target inventory level

Resources are obligated to hold a minimum usable inventory as of December 1 at least equal to the lesser of:– 11 days’ supply at full load operation based upon the winter SCC or – 90% of usable fuel storage capacity on-site or dedicated tank at adjacent location

• Any fuel oil burned since November 15 will be considered as in inventory when evaluating if a resource met the minimum inventory obligation

• All units at a station with a shared fuel supply are required to participate if one unit elects to participate unless a unit is expected to be unavailable for the winter period

• Regardless of whether the resource has a Capacity Supply Obligation, participants must submit Supply Offers for resources participating in the program into the Day-Ahead Energy Market and Real-Time Energy Market at the resource’s maximum physical capability for each hour of the day

Modified Slide

Page 41: May 23, 2014 | NEPOOL Markets Committee

41

Resources that do not meet the minimum criteria have until January 1 to meet the program obligations

• Resources that do not meet the minimum inventory requirement to participate in the program on December 1 have until January 1 to meet these requirements – Any fuel oil burned since November 15 will be considered as in

inventory

• Any fuel oil used in testing (or commissioning) on or after November 15 must be replenished by the later of January 1 or 15 days after the commissioning date of the dual fuel resource

• Resources that do not meet these criteria will not be eligible to participate in the program

Page 42: May 23, 2014 | NEPOOL Markets Committee

42

Participants will need to notify the ISO of late season fuel deliveries to be eligible for compensation

• Resources that plan to schedule fuel for delivery after February 15 must notify the ISO prior to February 1 of the expected delivery to have these quantities remain eligible for compensation– Any deliveries which the ISO receives notice that are delivered prior to

the end of February 28 will be eligible for compensation as a Late Season Replenishment

• Any fuel that is delivered after February 1 must be maintained by the facility for use in the production of electricity through the end of November– Any fuel that is not used for the production of electricity will be charged

back to the participant at the fixed rate associated with the program

New Slide

Page 43: May 23, 2014 | NEPOOL Markets Committee

43

Resources will be compensated based upon unused oil inventory

• The Program Payment is calculated as:

Eligibility Quantity x Program RateWhere:

the Eligibility Quantity will be the lesser of:• Maximum eligible inventory level

– determined as the lesser of:» 15 days’ supply at full load operation based upon winter SCC or » 95% of usable fuel storage capacity on-site or dedicated tank at adjacent

location• Inventory (adjusted for recent burn) on December 1 or• Inventory at the end of the day on February 15 plus Late Season

Replenishment• Inventory at the end of the day on February 28

• Program payments are allocated to RTLO (excluding DARD pumps) for the winter period (December 1 through February 28)

Modified Slide

Page 44: May 23, 2014 | NEPOOL Markets Committee

44

Eligible resource’s compensation is based upon inventory at the start and end of the Winter Period

Maximum Capacity Maximum Capacity

Level on December 1, 2014

Level on March 1, 2015

Level on December 1, 201490% of Total Capacity

95% of Total Capacity

30% of Total Capacity

Program Payment is applied to

30% of Total Capacity

Program Payment is applied to

90% of Total Capacity

75% of Total Capacity

Level on March 1, 2015

Modified Slide

Page 45: May 23, 2014 | NEPOOL Markets Committee

45

Resources that are unavailable during the winter will have their payments reduced

• The Availability Charge is calculated as:

Program Payment x (100% - Availability Metric)

– The Availability Metric is calculated as:(Hours resource was available for operation in period) / (Period hours from December 1 through February 28)

• Availability Charges are allocated back to RTLO (excluding DARD pumps) for the winter period (December 1 through February 28)

Page 46: May 23, 2014 | NEPOOL Markets Committee

UNUSED FUEL PROGRAMS SETTLEMENT AND BILLING

Discussion of mechanics of how the Unused Oil Inventory Program and the Unused Contracted LNG Program will be settled and billed

Page 47: May 23, 2014 | NEPOOL Markets Committee

47

ISO will bill load based upon estimated unused fuel on a monthly basis

• ISO will estimate what the remaining quantities at the end of the season for both unused fuel programs and will determine an estimated Total Estimated Unused Fuel Charge

• The monthly Estimated Program Charges for December, January and February will be calculated as:

Total Estimated Unused Fuel Charge x (Days in Month/Days in Period)

• The Estimated Program Charges will be include on the non-hourly services bill following each month and will be allocated to RTLO excluding DARD pumps

New Slide

Page 48: May 23, 2014 | NEPOOL Markets Committee

48

ISO will bill actual unused fuel inventory costs on a monthly basis• Actual Program Payments, net Availability Charges would be

allocated to each month in the same manner as the Total Estimated Unused Fuel Charge

• On the April non-hourly services bill, the actual Program Payments net Availability Charges will be billed to load for December, January and February– If the estimated quantities were greater than the actual quantities available at

the end of the season (net availability changes), this would be a refund to load– If the estimated quantities were less than the actual quantities available at the

end of the season (net availability changes) this would be an incremental charge to load

• All payments associated with the unused fuel programs will be included on the May non-hourly services bill

New Slide

Page 49: May 23, 2014 | NEPOOL Markets Committee

49

Resettlements will be handled in the same manner as other market and services

• Since Program Payments net Availability Charges have been allocated to each month and the Program Payments net Availability Charges will not change after the initial settlement, each month will be resettled following the same process as other charges included in non-hourly services bill– This resettlement re-allocates charges based upon changes to RTLO

• Any Meter Request for Billing Adjustments (RBA) would also be handled following the same approach

New Slide

Page 50: May 23, 2014 | NEPOOL Markets Committee

WINTER DEMAND RESPONSE RELIABILITY PROGRAM

Page 51: May 23, 2014 | NEPOOL Markets Committee

51

Demand response component is similar to the 2013/14 Winter Reliability Program

• Designed for assets that are capable of reducing load between 0500 and 2300 on any day for up to 180 hours for winter period

• Assets may or may not be assigned to an FCM resource

• Committed MW must be incremental to any CSO if there is an FCM audit or dispatch coincident to a winter program dispatch

• Performance based compensation– Monthly program payment– Energy payments

Page 52: May 23, 2014 | NEPOOL Markets Committee

52

Additional similarities to 2013/14 Winter DR Program

• Must be a Real-Time Demand Response (RTDR) Asset

• Manual program dispatch may be at zonal or asset level if there are transmission constraints

• Monthly payment based on committed MW – No payment made if performance is below 75% of commitment

• Auditing requirement if no simultaneous FCM dispatch

• Continue to bill in the monthly following the month and issue payments on a one month lag

Modified Slide

Page 53: May 23, 2014 | NEPOOL Markets Committee

53

A number of changes are being proposed from the 2013/14 Winter DR Program• Requests to participate in the program must be received by October 1

• A fixed monthly payment rate will be set to align with other aspects of the program design

• Proposed changes to the dispatch commitment and flexibility will be made based both operational needs and participant feedback – 6 hour maximum dispatch– Up to 30 dispatches per season– 4 hour minimum time between dispatches

• Elimination of energy penalty for underperformance to align with other aspects of the program design

• Limit participation to no more than 100 assets and 100MW

Modified Slide