ministry of local government and rural development … · 8/5/2016 · asiwa two meetings...
TRANSCRIPT
1
MINISTRY OF LOCAL GOVERNMENT AND RURAL DEVELOPMENT
BOSOME FREHO DISTRICT ASSEMBLY
ANNUAL PPROGRESS REPORT
2015
Compiled by:
District Planning & Coordination Unit
February 2016
2
TABLE OF CONTENTS
Contents Page
1.1 Introduction ..................... ...................................... ....................... 1
1.1.2 District Profile........................................................... ............................. 1
1.1.3 District Governance..................... ...................................... ........... 1
1.1.4 District Assembly and its Objectives..................... ............................. 2
1.1.5 Purpose of the 2015 Annual Progress Report (APR) ................................. 2
1.2 The key M&E Objectives for the Year............................. ....................... 3
1.3 Processes Involved and Difficulties Encountered............ ....................... 4
2.1 Status of Implementation of DMTDP................................... ....................... 5
2.2 M&E Activities Report............... ...................................... ....................... 9
2.2.1 Programme and Projects Status as at 31st December 2015....................... 9
2.3 Update of Disbursement from Funding Sources............... ....................... 19
2.3.1 The Sources of External Inflow...................................... ....................... 19
2.3.2 Comments on the Releases of Funds.............................. ....................... 22
2.3.3 Efforts to Generate More Revenue................................. ....................... 22
2.3.4 Challenges with Regard to Disbursement....................... ....................... 22
3.1 Updates on Indicators and Targets............................... ....................... 23
3.1.1 Agriculture..................................... ................................... ....................... 23
3.1.2 Education ..................................... ................................... ....................... 25
3.1.3 Health ................................................. ................................... ....................... 28
3.2 Updates on Critical Development and Poverty Issues. ....................... 36
3.2.1 The School Feeding Programme..................................... ....................... 36
3.2.2 Incentives for Business Development ......................... ....................... 38
3.2.4 The Sustainable Management of Lake Bosomtwe Project ................. 40
3.2.5 Social Welfare.......................... ......................... ....................... 41
3.2.6 Poverty Status of the District.. ........................... ......................... 42
4.1 The Way Forward..................... ............................ ........................ 43
4.2 Conclusion..................................... ............................ ........................ 44
3
List of Tables
Table 1: Programmes Activities and Achievements for 2015......................... 05
Table 2a: District’s Development Fund (DDF) Projects................................. 09
Table 2b: District Assemblies Common Fund (DACF) Project...................... 12
Table 2c: GETFund Projects........................................................................... 14
Table 2d: GOG and Other Projects ................................................................... 16
Table 3: Revenue Mobilisation Performance as at 31st December 2015........ 33
Table 4: District Indicators and Parameters Agriculture................................. 36
Table 5: Registered Farmers in Bosome Freho.............................................. 38
Table 6: Staffing Situation in Public Schools ................................................ 26
Table 7: District Indicators and Parameters (Education).............................. 27
Table 8: BECE Pass Rate 2010-2015............................................................. 28
Table 9: District Indicators and Parameters (Health)................................... 29
Table 10: Situation of Core Health Staff ......................................................... 30
Table 11: District Indicators and Parameters (HIV)....................................... 32
Table 12: District Indicators and Parameters (Transp. & and Account Gov.) 32
Table13: No. of Births Registered for 2015.................................................... 33
Table 14: Beneficiaries under the School Feeding Programme....................... 34
Table 15: Beneficiaries of Rural Enterprises Project....................................... 36
Table 16: Trained and Start Up Beneficiaries (2015)........................................ 37
Table 18: Update on Indicators and Targets (GYEEDA).................................. 38
Table 19: Access to Safe Water and Sanitation .............................................. 39
Table 20: Categories of Disabled Persons Registered....................................... 40
Table 21: Family Welfare Cases Handled From 2007 to 2015...................... 40
4
1.1 Introduction
In compliance with statutory requirements for monitoring and evaluation, mechanisms are put
in place to measure progress of planned programmes and projects undertaken by the district,
the Bosome Freho District Assembly on an annual basis prepare a District Annual Progress
Report.
The Annual Progress Report 2015 was prepared within the context of programmes and projects,
which are in line with the seven thematic areas of the Medium Term Development Plan
(MTDP) as follows:
Ensuring and sustaining macroeconomic stability
Enhanced competitiveness of Ghana’s Private Sector
Accelerated agricultural modernization and natural resource management
Oil and Gas
Infrastructure and Human settlement Development
Human development, employment and productivity
Transparent and accountable governance.
In addition to programmes and projects initiated at the local level, the Assembly also monitor
and report on direct national and development partner interventions ongoing at the local level
and report on their status of implementation. Beside these, the Assemblies report on core
indicators which give indication to the level of welfare of the people and therefore serve as
tools of evaluation for the various poverty reduction interventions put in place by central
government and development partners at the grassroots level.
1.1.2 District Profile
The Bosome Freho District Assembly is among the 30 political and Administrative Districts in
the Ashanti Region, established under the Legislative Instrument (L.I.).
1.1.3 District Governance
The District has 4 Area Councils made up of the following (Bosome, Bosomtwe East, Sunso
Freho and Nsuta). By the creation of more electoral areas, the District now has 21 electoral
areas. The Assembly has 21 elected members and 9 government appointees making the sum
total of 30. They constitute the District Assembly and perform legislative functions of the
5
Assembly. The District Chief Executive and the Member of Parliament for the Constituency
are also ex-officio members of the Assembly
Traditionally, the District is mostly ruled by ‘Adikrofo’, most of the land belong to the Kokofu
Paramountcy and Dadease Traditional Council which is an oberempon stool.
1.1.4 District Assembly and its Objectives
The Assembly is the highest political and administrative body in the District and therefore
exercises deliberative, legislative and executive functions. It has the mission and responsibility
to improve the quality of life of the people through sustainable development. To achieve this
mission, the District has set itself certain objectives namely:
To facilitate the effective functioning of the local government administration in the
District.
To ensure efficiency and effectiveness in the use of resources of the District and the
decentralized departments.
To monitor, co-ordinate and harmonize the implementation of development plans and
activities in district.
To facilitate the provision of basic social and economic infrastructure and services in
the district.
To facilitate community based and private sector development in the district.
1.1.5 Purpose of the 2015 Annual Progress Report (APR)
The purpose of the 2015 Annual progress Report is to assess and evaluate the performance of
the Assembly, review and provide information on the impacts and achievements of the district
based on the objectives set –out in the Medium Term Development Plan (2014-2017) in
relation to the programmes and projects targeted for the year 2015.
This report therefore indicates the level of progress of development programmes and projects
initiated both by the District and the Government. Also the core indicator levels were examined
to access their performance. The report also accessed the medium term development plan 2014-
2017 in its first year of operation. As part of the exercise, funding sources of revenue for project
implementation were also reviewed to indicate the volume that was made available during the
period and timeliness. Critical poverty interventions being implemented in the District were
also reviewed to see their progress.
6
1.2 The key M&E objectives for the year
The report is to assess and evaluate the performance of the District Assembly, review and
provide information on the impacts and achievements of the District based on the objectives
for the year 2015. This was achieved by assessing and collating achievement by various
departments within the District based on the objectives set by them and the implementation of
major projects and programmes that the Assembly planned to undertake. Among the primary
objectives of the Assembly for the year were among the following;
A. Ensuring and Sustaining Macroeconomic Stability
i. Increase Internally Generated Fund by 40% by December 2015
B. Enhancing Competitiveness in Ghana’s Private Sector
To improve upon 220 private businesses access to finance by December 2015
To improve upon the knowledge and skills of 210 small scale business
entrepreneurs by December 2015
C. Accelerated Agricultural Modernisation and Agro-based Industrial
Development
To promote the adoption of modern technology among 50% of farmers within the
District by 2017.
D. Infrastructure and Human Settlements Development
To improve access to energy supply for both domestic and commercial purposes by
23% by 2017
To improve upon 5Key Road Networks in the District by December 2017
To draw a comprehensive settlement scheme for ten (10) communities by Dec.
2017
To Improve upon coverage of potable water from 35% to 45% by December 2017
Electricity Coverage Increased by 20% in the District by 2017
E. Human Development, Productivity and Employment
Open a register of businesses/entrepreneurs for Local firms
Organise business development training programmes for 200 small and medium
Scale Entrepreneurs by December 2017
Reduce diseases of public health importance by 10%
To halt and reverse the further spread of HIV/AIDS
7
Give financial support to 30 men and 10 disabled women to support their education
F. Transparent and Accountable Governance
To strengthen the capacity of 4 Area councils by Dec. 2017
To strengthen the capacity of the Assembly in efficient and effective service
delivery by 2017.
To improve women’s participation in local governance from in 2009 to 45% by
2017.
1.3 Processes Involved and Difficulties Encountered.
Beside the review of major programmes and projects of the District Assembly the
Decentralised Departments also reported on their performance against set targets. Among the
key departments which reported on their performance to the Assembly were Education, Health
and Agriculture, Department of Community Development, Department of Social Welfare and
the Business Advisory Centre.
Major challenges encountered during the process of compiling the report were as follows;
Limited funding for the implementation of programmes and projects outlined in the
District annual action plan. The District relied mostly on the District Assemblies
Common Fund and there was a huge deficit. The Internally Generated Fund (IGF) of
the Assembly has been very low over the years of the Assembly’s operation.
Excessive delay in the release of the District Assemblies Common Fund
Inadequate logistical support for monitoring and evaluation of the Assembly activities
Excessive delay in the release of the District Development Facility (DDF)
Delay in the preparation and submission of reports by Departments of the District.
8
2.1 Status of Implementation of the MMTDP in 2015
The Bosome Freho District Assembly is in the third year of implementing the 2014-2017 District’s Medium Term Development Plan.
In this regard the 2014, budget of the Assembly and other expenditure were prioritized in favour of policies programmes, projects and interventions
within the seven thematic areas of the MTDP. The performance of the Assembly in terms of programmes and projects were deduced from the 2015
Annual Action Plan and Budget.
Table 1: Programmes Activities and Achievements for 2015
S/N Activities Location Achievement Absolute Achievement Result (%)
001 Organise 4no. General Assembly
meetings
Asiwa Two meetings organised 50%
002 Organise 4 Executive committee
meetings
Asiwa 1meeting organised 25%
003 Organise 28 subcommittee meetings Asiwa 6meetings organised 21.4%
004 Organise 4 DPCU meetings Asiwa 4meetings organised 100%
005 Contract a mechanic to maintain
District Assembly vehicles
Asiwa D/A vehicles maintained 100%
006 Procure library and publication
supplies
Asiwa Library and publication supplies
procured
100%
007 Procure cleaning materials Cleaning materials procured 100%
9
008 Maintain street lights on quarterly
basis
Districtwide Street lights maintained 100%
009 Support to area council activities Districtwide Activities of area councils supported 100%
010 Support to the activities of presiding
member
Asiwa Presiding members activities
supported
100%
011 Provide maintenance to office
machines
Asiwa Office machines maintained 100%
012 Embark on quarterly auditing of all
revenue heads at their stations
Districtwide Revenue heads audited 70%
013 Support MP's project annually Districtwide MPs project supported 100%
014 Support activities of the district
business advisory centre
District Business Advisory Centre
supported
100%
015 Organise training workshop for 40
WATSAN committee members
Districtwide WATSAN Committees trained 100%
016 Organise half yearly workshop for area
council members
Asiwa, , Nsuta
Morontuo and
Abosamso
8 workshops orgainsed 100%
017 Provide capacity building for staff Staff capacity building organised 100%
018 Embark on minor maintenance on
Assembly Buildings
Districtwide Assembly buildings maintained 80%
019 Support 2 national celebrations Asiwa 6th March and Independence Days
Celebrated
100%
020 Provide maintenance for grader on
quarterly basis
Assembly Grader Maintained 100%
10
021 Branding/marketing of Bosome Freho
District annually
Assembly’s website with Macks
Publication operational
100%
022 Organise periodic public fora Districtwide Public Fora organise 100%
023 Support culture and security related
issues
Districtwide Culture and Security activities
supported
100%
024 Support DPCU activities annually Asiwa DPCU activities supported 100%
025 Organised half yearly pay your levy
campaign
Two pay your levy campaigns
organised
100%
026 Embark on planning scheme for four
communities annually
Asiwa, Bobiam,
Anyinase and
Anyanso
-
027 Provide assistance to decentralised
departments
Districtwide Decentralised departments supported 100%
028 Support to NALAG activities Nalag Activities Supported 100%
029 Procure and supply 200 low tension
poles to support rural electrification
Districtwide Low tension poles 100%
030 Construct 2no. area council blocks at
Nsuta and Morontuo
Nsuta and Morontuo 1area council block constructed
50%
031 Completion of 1No. 44 office
Administration Block
Asiwa Central Administration Block
Completed
100%
032 Completion of construction of 12
Room Nurses Junior Staff Quarters
Asiwa Junior Staff Quarters Completed 70%
033 Completion of construction of 1No.
Semi-Detached Staff bungalow (No.3)
Asiwa Construction of Staff Bungalow
Completed
100%
11
034 Support to Community Self Help
Project
Districtwide Community Innitiated Project
supported
100%
035 Procure office equipments Asiwa -
036 Improve capacity of the registry staff,
secretaries, and DPCU members
Asiwa Trainning programmes orgsnied for
registry staff, secretaries and DPCU
members
100%
037 Strengthen the capacity of district
gender desk officer
Gender Desk officer trained 100%
038 Maintenance of Educational Facilities Districtwide District Education Facilities
maintained
60%
039 Create a District Education Fund Districtwide -
040 Construction of 1No. 3Unit Classroom
Block
Supom 1No.3Unit Classroom Block under
construction
100%
041 Construction of 1No.3-unit classroom
block with office and store
Kwame-Ntowkrom 1No.3-unit classroom block with
office and store under construction
100%
042 Construction of 1No. 12-seater Aqua
Privy Toilet
Anyanso Construction of 1No. 12-seater Aqua
Privy Toilet ongoing
100%
043 Cladding of 1No. 6-unit pavilion block Beposo Cladding of 1No. 6-unit pavilion
block ongoing
100%
044 Construction of D/A Model School Asiwa D/A Model School under
construction
100%
045 Procure Poly-tank for Schools Selected Schools -
046 Support to School Feeding programme 27 selected schools School Feeding programme
supported
100%
12
047 Support to Sport Development Districtwide District sporting activities supported 100%
048 Support to District Immunisation
Campaign
Disstrictwide District Immunisation Campaign
supported
100%
049 Support to Malaria Control
Programmes
Districtwide Malaria Control Programmes
supported
100%
050 Organise Educational Campaign on
HIV/AIDS
Districtwide HIV/ AIDS educational campaign
organised
100%
051 Organise behavioural Change
communication Campaign in mining
communities
Districtwide Behavioural change communication
campaign organised
100%
052 Organise programmes to improve upon
maternal health
Districtwide Maternal health activities suported 100%
053 Support District Sanitation
programmes
Districtwide Disrictwide sanitation programmes
supported
100%
054 Collect data on water and sanitation
facilities
Districtwide Data on water and sanitation
collected
100%
055 Embark on Districtwide Cocoa
Spraying Exercise
Districtwide Cocoa spraying exercise conducted 100%
056 Maintain Office facilities Asiwa Office facilities maintained 100%
057 Organise capacity building training for
Staff and D/A members
Asiwa Capacity building organised for D/A
members and staff
100%
058 Organise fire fighting campaign Asiwa Anti bush fire campaign organised 100%
059 Organise National Farmers Day Dwoamin National farmers day organised 100%
13
060 Embark on Social Education Districtwide Social education organised 100%
061 Support to Disabled persons Districtwide Disable persons supported 100%
062 Support to Districtwide Tree Planting
Exercise
Districtwide Disrict Tree planing activities
supported
100%
063 Maintenance of Feeder Road Districtwide Feeder Roads maintained 100%
064 Support to Disaster Management Asiwa Disaster management activites
supported
100%
14
2.2 M&E Activities Report
2.2.1 Programme / Project status for the year 2015
During the year under review the District Worked on about thirty-one (31) infrastructural projects. About half of the projects (15) of them were
projects which were started earlier whilst the other 50% were started in the year. At the close of the year the projects were at various level of
completion as indicated from the tables below. Among the sources of funding for the projects were the District Assemblies Common Fund (DACF),
Districts Development Fund (DDF), Community Based Development Project (CBRDP) and the Ghana Education Trust Fund (GETFund).
PROGRAMME AND PROJECTS STATUS AS AT 31ST DECEMBER 2015
Reporting Period: January – December 2015
Table1: District’s Development Fund (DDF) Projects
No. Project Title Location Funding
Source
Contractor Contract Sum
(Gh¢)
Rev.
Contrac
t Sum
Payment
To Date
Award
Date
Start
Date
Expected
Completion
Actual
Compl.
Status Stage
(%)
01 Supply of 1,000
Dual Desk
Districtwide DDF Anapim
Company
Limited
69,000.00
69,000
25/10/10
15/11/1
0
28/02/2011 13/12/
2010
1,000 pcs of
furniture supplied
100%
02 Cladding of 2 No.
3-Unit Classroom
Block with office
and store
Anyanso DDF Mountplex
Limited
52,838.73
51,612.00
28/10/10
15/11/1
0
28/02/2011
02/03/
2 011
Project
Completed
100%
15
03 Construction of 1
No. 12 Seater Aqua
Privy Toilet and
Urinal
Nsuta DDF Gyensuaa
Company
Limited
44,932.23
43,851.60
25/10/10 12/11/
2010
25/02/2011
14/03/2
011
Project
Completed
100%
04 Construction of 2
No. 10- Unit
Market Stalls
Nsuta DDF Anapim
Company
Limited
44,988.93
40,487 25/10/10
12/11/
2010
25/02/2011
28/01/
2011
Project
Completed
100%
05 Construction of 1
No. 3- Unit
Classroom Block
with Office and
Store
Esaase DDF Gafak Elect.
And Const.
Works
55,505.47
54,007.9 28/10/10 12/11/
2010
12/03/2011
20/06/
2011
Project
Completed
100%
06 Construction of 6-
Unit Market Stores
and Banking Hall
Asiwa DDF Ernboat
Const. and
Trading Ent.
123,813.80 123,735.0
8
28/10/10 12/11/
2010
28/04/2011 06/04/
2011
Project
Completed
100%
07 Cladding of 1 No.
6-Unit Classroom
Block with Office
and Store
Korkyekrom DDF Oppong
Kwabia
Enterprise
53,243.40
49,227.5 28/10/10
12/11/
2010
28/02/2011 25/05/
2011
Project
Completed
100%
08 Construction of 3-
unit Market Stores,
10Unit Mkt Stalls
and Banking Hall
Asiwa DDF Ernboat
Const. and
Trading Ent.
118,307.75 118,547.5 07/03/12 15/03/1
2
15/09/12 9/07/12 Project
Completed
100%
09 Construction of
7Unit Market
Stores with Police
Post attached
Nsuta DDF Osbel
Enterprise
Ltd.
129,791.20 123,197.9
0
07/03/12 13/03/1
2
13/11/12 26/10/
12
Project
Completed
100%
10 Rehabilitation of
1No. 4Unit
Classroom Block
for Ahmadiyya JHS
Anyanso DDF Osbel
Enterprise
Ltd.
39,907.01 37,803.40 07/03/12 14/02/1
2
14/06/12 19/09/1
2
Project
Completed
100%
16
11 Construction of
1No. 3Unit
Classroom Block
for Freboye D/A
JHS
Freboye DDF Osorommoa
Construction
Ltd.
69,985.30 66,373.65 07/03/12 14/03/1
2
14/07/12 10/07/1
2
Project
Completed
100%
12 Construction of
2No. 2Unit
Kindergarten
Blocks
Awheaso
and Ampaha
DDF Illimitable
Ghana Co.
Ltd.
69,897.30 69,897.00 07/03/12 15/3/12 15/8/12 13/812 Project
Completed
100%
13 Clearing of
Ankaase-
Mmorontuo feeder
road
Mmorontuo
– Ankaase
DDF Works
Dept(Direct
Labor)
15,000 15,000 Project
Completed
100%
14 Construction of 50-
Unit Market Stalls
Anyanso DDF M/S Osbel
Limited
189,789.00 - 186,739 08/02/13 08/10/2013 18/06/2
013
Works Completed 100%
15 Construction of
1No. 2-Unit KG
Block with Office
and Store
Danso DDF Panquit 40,222.35 - 39,987.00 25/02/13 27/05/2013 4/07/13 Project
Completed
100%
16 Construction of
1No. 12-Seater
Aqua Privy Toilet
Nyamebekye
re
DDF Ernboat
Const. and
Trading Ent.
70,289.52 - 63,655 08/02/13 10/06/2013 22/5/13 Project
Completed
100%
17 Rehabilitation of
2No. 3Unit
Classroom Block
with Office and
Store for Methodist
Prim. School
Ankaase DDF Ernboat
Const. and
Trading Ent.
113,581.47 - 79,696.50 08/02/13 10/06/2012 22/5/13 Works Completed 100%
17
18 Construction of
1No. 3Unit
Classroom Block
Nsuaem I DDF Almay
Construction
Limited
125,111.36 - 112,340.3
4
19/06/14 19/09/14 Project
Completed and is
in use
100%
19 Construction of
6Units Lockable
Stores
Anyanso DDF OSBEL ENT.
LTD.
156,895.09 135,898.9
2
19/06/14 19/09/14 22/12/1
4
Works Completed
100%
20 Construction of
1No 12-Seater
Aqua Privy Toilet
Anyinase DDF Amenfi
Building &
Trad. Ent.
72,104.23 64,893.81 19/06/14 31/12/14 22/12/1
4
Project completed
and is in use
100%
21 Construction of
1No 12-Seater
Aqua Privy Toilet
Dunkuraa DDF Panquit
Company
Limited
72,150.78 64,935.88 19/06/14 19/09/14 23/12/1
4
Works completed 100%
23 Construction of
1No. 3Unit
Classroom Block
with Office and
Store
Kwamentow
krom
DDF Panquit
Company
Limited
131,724.69 19,758.70 08/09/15 08/01/16 Laying of
superstructure
block work is in
pro19,gress
50%
24 Cladding of 2No.
3Unit Pavillion
Classroom and
Construction of
Office and Store
Beposo DDF Obeline
Company
Limited
74,833.86 11,225.08 08/09/15 08/01/16 Mobilisation is in
progress
25 Construction of
6Unit 1st floor
Stores for the
completion of
Anyanso Market
Anyanso DDF M/S Osbel
Enterprise
limited
100,000.00 15,000.00 08/09/15 08/01/16 Mobilisation is in
progress
18
Construction of
1No. 3Unit
Classroom Block
with Office and
Store
Supom DDF ASCOTUR
K Company
Limited
130,149.36 19,522.40 08/09/15 08/01/16 Work is at
superstructure
level
45%
19
Table 2: Project: District Assemblies Common Fund (DACF) No. Project Title Location Funding
Source
Contractor Contract Sum Rev.
Contract
Sum
Payment To
Date
Award
Date
Start Date Expected
Compl.
Actual
Compl.
Status Stage
(%)
01 Construction of
Police Station
Nsuaem
II
DACF M/S Kayak
Enterprise
68,712.69 66,019.49 4/07/07 20/07 /07 04/02/08 June
2010
Works Completed 100%
02 Construction of
1No. 3Unit
Classroom Block
Appiah
krom
DACF M/S 49,986.55 45,035.17 09/05/07 9/6/2007 09/09/07 15/6/20
09
Project Completed 100%
03 Construction of
1No. 3-Unit
Dormitory Block
with Sanitary
House, Kitchen
and Dining Hall
and 1No. 6Unit
Classroom Block
for Bosome Freho
Secondary School
Asiwa DACF M/S Ernogyan
Company Ltd
301,92.08 124,757.96 26/07/07 30/08/07 10/04/08 Nov.
2011
Works Completed.
Const. of Kitchen
and Dining Hall
terminated
100%
04 Construction of
1No. 2-Bedroom
Semi Detached
Staff Bungalow
(No. 1)
Asiwa DACF M/S Philip
Duba Co. Ltd
62,599.29 61,549.92 22/02/08 10/10/09 25/10/08 Feb.
2010
Project
Completed
100%
05 Construction of
1No. 3-Bedroom
Staff Quarters
Asiwa DACF M/S Edu-K 75,048.82 90,915.
46
90,915.46 25/01/08 25/07/08 25/10/08 July
2010
Project
Completed
100%
06 Construction of
Executive
Bungalow
Asiwa DACF Ernogyan
Company Ltd.
115,709.05 115,709.05 25/01/08 22/02/08 25/10/08 July
2009
Project
Completed
100%
20
07 Completion of
Const. of
Enhanced Rural
Clinic
Nsuta DACD/SIF M/S
Obodantwi
Const. Ltd.
49,598.79 49,598.79 10/11/08 10/11/08 05/02/09 25/03 /
09
Work Completed 100%
08 Construction of
1No. 2 Bedroom
Staff Bungalow at
Asiwa (No. 2)
Asiwa DACF M/S Nickseth
Construction
Co. Ltd
83,011.40 82,136.50 30/09/09 1/9/09 5/4/10 24/03/1
0
Project Completed 100%
09 Construction of
1No. 3-Unit
Classroom Block
with Office, Store
and Sanitary
Facility for
Presby Primary
Asiwa DACF M/S Nickseth
Construction
Co. Ltd
55,877.08 53,298.29 14/10/09 20/10/09 15/04/10 13/10/2
010
Project Completed 100%
10 Construction of 1
No. 12 Seater
Aqua Privy Toilet
Asiwa
Health
Center
DACF M/S Opong
Kwabia
Enterprise
32,046.10 32,046.10 14/10/09 20/10/09 15/04/10 10/6/10 Project
Completed
100%
11 Construction of 1
No. 12 Seater
Aqua Privy Toilet
Ankaase DACF M/S
Boakyewah
Enterprise
30,982.46 30,981,.49 14/01/10 18/01/10 18/04/20
10
17/05/1
0
Project Completed 100%
12 Construction of 2-
Storey 44-Offices
Administration
Block
Asiwa DACF M/S Osbel
Enterprise
limited
863,613 1,573,
322.58
1,257,132.
61
21/01/11 26/01/11 26/07/12 Work is
substantially
completed
94%
13 Fencing of DCE’s
Bungalow
Asiwa DACF M/S Opong
Kwabia
Enterprise
65,374.10 35,181.73 22/2/12 02/03/12 22/2/213 Contract
Terminated
70%
21
14 Construction of
1No. 12-Room
Nurses Quarters
Asiwa DACF M/S Osbel
Enterprise
Ltd.
400,000 434,96
4.00
160,551.95 08/10/13 07/10/13 08/10/14 Plastering and
fixing of door and
window frames is
in progress
65%
15 Construction of
1No. Semi
Detached Staff
Quarters No. 3
Asiwa DACF Obeline
Company Ltd
356,343.3
5
309,107.32 15/05/14 15/05/15 Works completed 100%
16 Construction of
3room office
with store and
sanitary facility
for District
Electoral Office
Asiwa DACF Direct Labour 29,000 24,000.00 04/08/14 04/04/12 Works completed 100%
17 Construction of
1No. 6Unit
Classroom Block
with Office, Store
and Library with
Sanitary Facilities
(Model School)
Asiwa DACF True
Engineers
Const. Ltd.
340,000.00 12,782.09 29/09/1
5
12/08/16 Laying of footing
walls is in progress
10%
18 Construction of
CHPS Compound
Anomaw
obi
DACF True
Engineers
Const. Ltd.
85,213.96 51,410.96 29/09/1
5
29/09/16 Work is at
superstructure level
45%
22
Table 3: GETFund Project
No. Project Title Location Funding
Source
Contractor Contract
Sum
Rev.
Contract
Sum
Payment
To Date
Award
Date
Start
Date
Expected
Completion
Actual
Compl.
Status Stage
(%)
01 Construction of 1No.
6Unit Classroom
Block with office
store and library
Morontu
o
GETFund 110,000 01/04/0
8
01/04
/08
01/12/08 28/11/
13
Works
Completed
100%
02 Construction of 1No.
6Unit Classroom
Block with office
store and library
Dagyans
o
GETFund 110,000 01/04/0
8
01/04
/08
01/12/08 01/03/1
1 Project
Completed
100%
03 Construction of 1No.
6Unit Classroom
Block with office
store and library
Anoma-
wobi
GETFund Ernboat Const.
and Trading
Ent.
156,891.02 135,770.
71
26/07/1
0
17/04/2011 14/12/
11
Project
Completed
100%
04 Construction of 1No.
6Unit Classroom
Block with office
store and library
Semdadi
e -so
GETFund Osrommoa
Const.
Company
156,644.6
2
149,034.
35
26/07/
2010
12/04/2011 14/12/
11
Project
Completed
100%
05 Construction of
2Storey Dormitory
Block for Bosome
Senior High
Technical School
Asiwa
GETFund
Invergold
Construction
Company Ltd.
353,337 353,337 7/11/07 7/11/
07
24/03
/11
Completed
and
Inaugurated
100%
23
06 Construction of 1No.
3-Unit Classroom
Block with Office
and Store
Yapesa MP’s
GETFund
Kwamok
Enterprise
45,895.30 49,613.6
0
13/05/
2010
21/05
/2010
21/09/2010 17/09/2
010
Project
Completed
100%
07 Construction of 1No.
6Unit Classroom
Block with office
store and library
Nsuaem
II
GETFund M/S Amfrank
Company Ltd
181,447.6
3
39,815.4
4
7/10/20
11
14/10
/11
14/06/12 Plastering is
ongoing
70%
08 Construction of 1No.
6Unit Classroom
Block with office
store and library
Duase GETFund F-Nyark
Enterprise
181,350.5
4
39,815.4
4
07/10/1
1
14/10
/11
14/06/12 Work is at
plastering
level
65%
09 Construction of 1No.
6Unit Classroom
Block with Office,
Store and Sanitary
Facilities
Ampento GETFund Project
Completed
100%
10 Construction of 1No.
6Unit Classroom
Block with Office,
Store and Sanitary
Facilities
Freso GETFund Project
Completed
100%
11 Construction of
District Education
Office Block for
Bosome Freho
District Assembly
Anyinase DANIDA M/S Okorogya
EnterpriseLtd
Works
completed
100%
24
Table 4: Other Projects
No. Project Title Location Funding
Source
Contractor Contract
Sum (Gh¢)
Rev.
Contract
Sum
Payment
To Date
Award
Date
Start
Date
Expected
Compl.
Actual
Compl.
Status Stage
(%)
01 Rehabilitation of
Asiwa Health
Centre
Asiwa NHIS/MPs M/S K.
KUMI
56,283.51 _ 39,398 30/03/11 15/04
/11
1/08/11 March2
013
Project
completed
100%
02 Extension of
Electricity
Brofoyedru,
Ampantubuo
m, Yapesa,
Kokoben,
Adeito,
Anumso,
Freboye,
Nsutem
GOG Project
Completed
100%
03 Partial
Reconstruction of
Bomfa Jn.-Asiwa
Road (km 0.0-26.2
Bomfa
Junction
Asiwa
GoG Ussuya Gh.
Ltd.
Construction
of Culverts
Completed.
Bitumen
surfacing has
been done up
to Peminase.
04 Rehabilitation of
Bekwai (Amoaful)
Ampah – Asiwa
Road
Amoaful –
Ampaha –
Asiwa
GoG Surfacing has
been done up
to Abosoma
25
05 Construction of
2No. 3-Unit Aqua
Privy Toilet
Tebeso II &
Nsuaem II
GPEG M/S Ofei
Brothers
Const.
Works
38,728.73 33,196.0
5
16/07/20
13
20/08
/2013
7/10/20
13
Project
completed
100%
06 Construction of
2No. 3-Unit Aqua
Privy Toilet
Anyinase &
Dunkuraa
GPEG M/S Ofei
Brothers
Const.
Works
38,623.73 33,106.0
5
16/07/20
13
20/08
/2013
7/10/20
13
Project
completed
100%
26
2.3 Update of Disbursement from Funding Sources
The Assembly has two major sources of revenue for its programmes and projects.
These are the Internally Generated Funds (IGF) and External Inflows
Sources of Internally Generated Funds for the Assembly are;
Rates
Lands Revenue
Fees and Fines
Licenses
Rent
Investment income
Miscellaneous
2.3.1 The Sources of External Inflow included;
District Assembly Common Fund
GOG Grants (GETFUND, MP’s Fund etc)
Development Partners Grant (World Bank, GETFund, DDF, MSHAP etc.)
During the year under review revenues accruing to the Bosome Freho District Assembly was
as follows;
27
Table 3: Revenue Mobilisation Performance as at 31st December 2015
Revenue
Source
2011 2012 2013 2014 2015
Approved
Estimate
2011
Actual
Performance
2011
%
2011
Approved
Budget for
2012 Gh¢
Actual to
Date
Gh¢
%
2012
Approved
Estimate
2013
Actual
Performance
2013
%
2013
Approved
Estimate
2014
Actual
Performance
2014
%
2014
Approved
Estimate
2015
Actual
Performance
2015
%
2015
DACF 1755674.87 540,402.39 31 1,596,068.6
6
290,514.48 18 2,123,445.5
9
715,402.62 34 2,662,491.00 601,458.27 2,401,099.76 1,309,738.04 151
IGF 150,297 172,717.95 115 112,675 89,461.97 79.4 197,878.00 116,755.34 59 200,243.40 87,273.19 223,687.00 183,158.30 82
MP’S
C’ Fund
112137.12 43,047.39
38 93,447 92,527.66 99 142,898.24 54,230.08 38 142,898.24 59,663.37 142,898.24 292,781.24 205
MSHAP 8000
4,000.00 50 5,800 - 5,000.00 2,400.00 48 - - 50,000.00 8,164.75 163
CWSA 35,000 - - 3,5000 144.02 0.42 - - - - - = = =
CBRDP/
GSOP
68,000 18,081.00 27 45,000 - - - - - -
GSFP 120,000
123,597.20
103 180,000 363,051.40 202 441,285
.00
604,945
.40
137 441,285.00 782,115.50 441,285.00 417,265.00 94
DDF 548643.19 631,297.99 115 649,733.14 - 427,563.00 244,798.00 47 538,031.00 331,048.03 555,588.00 52,599.02 9
Disability - - - - - - - - - - 21,402.06 48,684.00 34,064.43 69
Source: District Finance Office, (BFDA) February 2015
28
From the table above, it could be realized that, the Assembly could not achieve its target under
any of the revenue source. Yet the performance under Rates, Lands and rent were encouraging.
The Assembly’s performance on Fees and Fines, licenses, and grants was poor. This indicates
that the Assembly is not performing well in revenue mobilisation. The Assembly should
therefore come out with strategies to improve upon internally generated revenue.
2.3.2 Comments on the Releases of Funds
The District Assembly Common Fund remains the singular major source of funds for
investment to the District Assembly. The problem with this fund is the high statutory
deductions made at source which at times are not planned at the District level. Also there has
been shortfall in the District’s allocation in the fund in recent years which makes it impossible
for the District to implement all its planed programmes and projects for the year. The
introduction of the District Development Facility (DDF) has supplement the common fund to
finance investment activities in the District though the releases per year is not comparable in
value to that of the common Fund. Yet it has been very reliable. The District’s Internally
Generated Fund (IGF) sources were also limited which made it difficult to finance the
Assembly’s recurrent expenditure solely from IGF sources.
2.3.3 Efforts to Generate More Revenue
On the IGF, the Assembly was not able to generate enough revenue to meet its recurrent
expenditure let alone get additional funds for capital projects. Improving the collection of IGF
would involve the following measures:
Widening the revenue base to bring in more revenue items which were not covered
previously
Engaging more commission revenue collectors to work in communities where there
are no collectors
Continued and sustained tax education
Formation of revenue mobilization task force.
Motivating hard-working collectors and supervisors
Improving the data base of the district, by enumeration of the rateable population
and the preparation of valuation list of all properties?
Formation of revenue mobilization task force to improve the IGF
Motivating hard-working collectors and supervisors to improve the IGF
Ceding certain revenue items to the Area councils for collection.
29
2.3.4 Challenges with Regard to Disbursement.
Inadequate funding for programmes and projects
Delays in the release of funds which affect project implementation.
Poor Records keeping in the District Assembly’s which affects the extraction of
information for report writing
Difficulty in tracking funds from GOG paid direct to beneficiaries without
records to the Assembly.(e.g. GETFUND etc)
3.0 UPDATES ON CORE INDICATORS AND TARGETS
3.1.1 Agriculture
The District’s agriculture is mainly rain fed. During the year under review, the season remained
wet and dry. There was moderate rainfall during the first half of the year coupled with
intermittent sunny conditions. Performance of crops was general satisfactory. However, the
prolonged drought in the third quarter which affected crop yields adversely especially cereals
and vegetables.
Table 4: District Indicators and Parameters Agriculture
District Indicators and
Parameters
2013 Indicator
Level
2014 Indicator
Level
2015Target 2015Achievement
1. Percentage (%) increase in
yield of selected crops,
livestock and fish
Staples
i. Maize
ii. Cassava
iii. Rice
iv. Plantain
v. Yam
vi. Cocoyam
Vegetables
i. Cabbage
ii. Garden Eggs
Livestock
i. Sheep/Goats
8,027
9,112
620
79,520
4,200
21,250
11,850
184
9,950
8,100
9,200
650
80,000
4,200
21,500
11,900
240
10,000
6,306
8,127
620
8,901
396
3,858
527
219
3000
12,668
136,817
985
12,675
5,704
93,277
741
296
110
30
i. Organisation of Field Days
One field day was held maize sites during fertilizer application. Two filed days were organised
for cassava sites at Semdadieso and Ankaase . a field day was also organised on maize and the
emphasis was on reducing post-harvestb losses.
ii. Farm Demonstration by MOFA
Maize
The department organised five (5) demonstration farms at Mmorontuo, Beposo, Anhwiaso,
Anyinase and Abosamso. The sites were used to educate farmers on planting technology and
they were also used for post harvest management.
Cowpea
Cowpea demonstration farms were organised in all 16 operational areas.
Farmers were invited witness the use of improved planting materials, spacing of the crop, weed
control, pest control and disease management techniques.
Root and Tuber Improvement and Marketing Programme on Tertiary Distribution of Planting
Materials to the Tertiary Farmers
During the year 700 farmers registered for improved cassava planting materials and out of the
number three hundred and fifteen were supplied the District Agric Development Unit has a
capacity for 500 farmers which implies 200 farmers could not be supplied with planting
materials.
iii. Extension Services
Extension services agric technologies were delivered to farmers through home visits
educational meetings, training workshops, field demonstration, method demonstration, field
days and farmers day. Technologies extended to farmers included; row planting, soil erosion,
use of improved planting materials, post harvest management, sustainable land and water
management practices, improved housing etc.
iv. Lands under irrigation
There is no organised irrigation facility in the district yet, however, irrigation is done mainly
by motorised pumping machines along the Anum, Fre, and other streams in the District. An
estimated area of fifty (54) hectares is under irrigated cultivation. Irrigation is mainly practiced
by vegetable farmers in the district who grow hot pepper, tomatoes, okro, garden eggs and
cabbage.
v. Field Demonstration
Four demonstration farms were established during the year for maize, cowpea and cabbage.
Field days was organised on six occasions for cabbage, maize and cowpea production,
vi. Block Farm Project
31
Under the programme, the government give support to group farmers in the form of
agricultural inputs so that they pay back after harvesting their crops.
The district benefited und the President’s Block Farm Project under the Better Ghana Agenda.
Since 2011, three farm crops (i.e. cowpea, rice and cabbage) were cultivated on 100 acre land
at Yapesa, Kokoben, Freso, Brofoyedru, Nsonamoa and Adeito. During the year farm credit
worth GH₵33,000.00). An additional amount of GH₵7,000.00 extended to 30 farmers at
Fereso enabled them to crop an 80 acre land with Jasmine Rice which engaged 200 additional
hands for land preparation, farm maintenance and harvesting.
However the recovery of the assistance extended in the form of cash has been very difficult.
In 2011, cabbage farmers in Aeito, kokoben, Yapesa and Nsonoamoa were assisted with
insecticides and fertilizers to the tune of GH₵33,000.00 but only 60% of the amount has been
recovered as of 3013.
Also, only 30% of an assistance of GH₵7,000.00 extended to Freso Rice farmers had been
recovered by the end of December 2013.
vii. Fertiliser Subsidy Programme
Under the government’s programme 50 kg of NPK was supplied at GH₵51.00, 50kg of SOA
at GH₵44.00, 50kg Urea at GH₵50.00.
During the year 230 bags of NPK, 100bags SOA and 20 bags Urea were sold to farmers.
viii. National Farmers Day Celebration.
The District’s celebration of the National Farmers Day took place on Friday, 4th December
2015 at Ampento.
ix. Farmer Registration
A total of 200 farmers were registered in the year bringing total registered farmers in the
District to 14,000. The trend of farmers registration in the District is as follows;
Table 5: Registered Farmers in Bosome Freho
No. Year No. of Farmers
Male Female Total
01 2011 2,800 1,200 3000
02 2012 1,500 1,300 2800
03 2013 120 89
200
04 2014 210 116 326
05 2015 150 200 350
Total 4,630 2,705 6676
32
x. Cocoa Diseases and Pest Control (CODAPEC) programme
CAPSID Control
There has been a major shift in the implementation of the CODAPEC programme.
Unfortunately the District now does not have a central store or input distribution point.
Communities in the Bosome and Bosomtwe East Area councils access their inputs from
Bekwai cocoa district, whilst those from susnso freho are zoned for Adansi-Brofodru cocoa
district in the Adansi North District. Communities in the Nsuta Area Council are now part of
the New Edubiase (Adansi South) Cocoa District.
This situation has resurfaced the myriad of problems the programme when the District was first
created when the projects was being managed in a similar arrangement. The programme is thus
fraughted with a lot of challenges among which are non-supply of inputs to many farmers who
continuously complain to the Assembly which has virtually no clout to resolve them.
It was therefore difficult to get statistics of the programme as part of this report because the
District Agric Development Unit could not provide a report on the project.
xi Fish Farming
There is only one farmer into fish farming in the district with a pond measuring 50ft by 50ft
located at Nyamebekyere. However, there is rising interest in fish farming in the District.
xii. Challenges of the District Agric Sector
i. Lack of irrigation facility
ii. High cost of labour
iii. Poor road network
iv. Activities of illegal mining
v. Lack of staff accommodation
vi. Inadequate office accommodation
vii. High cost of agricultural inputs
viii. Unreliable rainfall pattern
3.1.2 Education
1 Overview of Directorate
The District is divided into Six (6) Circuits which are supervised by Six Circuit Supervisors.
The Circuits are; Asiwa, Abosamso, Dunkura, Dompa, Nsuaem, and Nsuta. The District has
fifty-six (58) kindergartens, fifty-five (55) Primary Schools, thirty-eight (38) Junior High
Schools, one (1) Senior High School at Asiwa.
33
The directorate performed creditably well in all the key activity indicators. As shown below
1.0 Key activities identified for performance during the period
Table 2.1: Key Activities identified for performance by objectives Strategic Key
objective
Activity/ Project Implemented Funding
source
Unit/Department/Agency
responsible
Access -Organized a sensitization durbar on GPASS Scholarship
Scheme
- embarked on enrolment drive in communities
- organized a SPAM at Esaase Basic School and community
DFID Girls’ Education Unit
HRMD Unit
Gender - Performed a yearly harvest of schools and communities
- Distributed GPASS Scholarship packages
- A talk show on girls on the need to appreciate the GPASS
packages
DFID Girls’ Education Unit
Special
Education
Quality - Attended the planning meeting at the regional and district
levels on the activities of the year.
Girls’ Education Unit
Management - Interviewed 74 Head Teachers in the district with the view
of reassessing their management prowess.
GPEG Management Unit
BECE 2015 - Organization of mock examination for BECE candidates
help improved the District’s performance
District
Assembly,
Hon.
Member of
Parliament.
Examination Unit
i. The distribution of the District’s teacher population was as follows;
Table 6: Staffing Situation in Public Schools Level 2013 2014 2015
Teaching Staff
at Post
No.
Trained
No.
Untrained
Total Teaching Staff
at Post
No.
Trained
No.
Untrained
Total Teaching
Staff
Trained Untrained Total
Male Female Male Female M F
KG 69 144 43 170 213 60 150 47 163 210 87 130 81 136 217
Primary 384 84 211 257 468 335 90 241 184 425 303 102 265 140 405
JHS 93 49 204 138 342 283 51 232 102 334 272 64 252 84 336
SHS 25 8 22 11 33 29 6 28 7 35 30 8 29 9 38
TVET 4 1 5 0 5 3 2 5 0 5 -
34
Total 575 286 485 576 1061 710 299 553 456 1009 692 304 627 369 996
Table 7: District Indicators and Parameters (Education)
No.
District Indicators and
Parameters
2013 Indicator
Level
2014 Indicator
Level
2015 Target 2015
Achievement
1 Gross Enrolment Rate
(indicates the number of pupils/
students at a given level of
schooling-regardless of age –
as proportion of the number of
children in the relevant age
group)
- Pre-School
- Primary
- JHS
- SHS
Net Admission Rate in primary
Schools (indicates primary one
enrolment pupils aged 6 years)
99
68.8
15.7
81.5
134.2
98.6
71.8
19.5
84.2
130
99.8
63.7
12.9
67.6%
138.8%
85.8
66.2
14.3
45.8
2 Gender Parity Index (ratio
between girls and boys
enrolment rate, the balance of
parity is 1.00)
- Preschool
- Primary
- JHS
- SHS
0.96
0.99
0.84
0.97
1.12
1.03
0.87
1.06
1.01
0.92
0.95
1.45
0.96
0.88
0.78
0.81
3 BECE Pass Rate
- JHS
- SHS
67%
29.07
82.9
46.8
86.7
87.7
92.3
4 Improvement in Pupils /
Teachers Ratio:
Pre-school Primary JHS
24:1
22:1
9:1
26:1
23:1
12:1
26
24
11
22
23
10
5 Increase in % of Trained and
untrained Teachers Ratio:
Pre-school Primary JHS
20%
45%
59%
24.8
47.5
63.4
-
-
-
60.65
6.8
24
35
Table 8: BECE Pass Rate 2011-2015
Year Enrolment Registered Candid. Candidates Sitting
Exams
Candidates Passing Rate
Male Fem. Total Male Fem Total Male Fem. Total Male Fem Total %
2011 541 293 834 541 293 834 540 293 833 315 171 171 58.3
2012 530 376 906 530 376 906 527 322 899 243 147 390 43
2013 486 307 793 486 307 793 486 301 793 331 201 532 67
2014 502 390 892 515 392 907 513 387 900 150 114 264 29.07
2015 477 380 857 447 380 857 474 379 853 425 323 748 87.7
Generally the pass rate has been unpredictable being a little high initially dipping in 2012
rising in 2013 and falling in 2014 again. Over the past five years the results in 2015 was the
best. Rising as high as 87%. Mechanism should therefore be put in place to ensure
consistency in the pupils’ performance.
From the table above it has been shown that number of girls completing JHS 3 has been
increasing steadily. However girls registering for BECE exams and passing showed a
downward trend. 2015 was exceptional year in the sense that total number of JHS leavers was
highest since 2011. Female candidates and performance was also the best for the past five
years.
vi. Challenges to Education Service Delivery in the District
Large proportion of untrained teaching staff in the classrooms
Lack of ICT infrastructure
Inadequate permanent structures for KGs
Inadequate store room for the Education directorate
High incidence of child labour
Low pass BECE pass rate
vii. The way forward
Upgrade the knowledge and skill of untrained teachers through the UTDBE
programme
Strengthen supervision
Provide logistics for technical education
36
3.1.3 Health
4.1.2 Performance of service indicators
1. Expanded Programme on Immunization (EPI)
a. The district recorded 64.3% for Penta-3 which is a proxy indicator for routine childhood
vaccination services. Measles and Yellow fever vaccination for children under 5yrs achieved
66.7%.
b. The district carried out Sub-National Polio Immunization Days (SNIDs) campaign exercise in
October, 2015 with coverage of 101.4% of children under 5yrs vaccinated for Polio and 94.4%
dosed Vitamin A.
OPD clinical services
The OPD health services saw 47.7% of the total population in the district accessing health care
at various health facilities in the district. Among the client who sought for service, 62.2% were
insured whiles the other 37.8% came without national health insurance.
c. Coverage for antenatal services was 45% of expected pregnancies.
4.1.3 Some key activities
Disease Control/Prevention
1. Malaria control
a. Continuous distribution of Long Lasting Insecticide Nets (LLIN) to pregnant women during their
first antenatal clinic and children eighteen (18) months and above to prevent malaria
transmission. There was also continuous administration of Sulfadoxine Pyramethamine (SP)
prophylactic treatment of pregnant women against malaria.
b. Mass campaign of LLIN point distribution exercise was also carried out in December, 2015 to
households where an average of every two persons received a treated bed net. A total of 40,031
treated bed nets were given to 70,810 people in 17,163 registered households, giving coverage
of 99.8% achieved in the district.
2. HIV/AIDS control
The District Assembly, Health Directorate and other partners collaborated in HIV/AIDS control
activities.
a. Routine PMTCT/HTC services were carried out in all health facilities. Know your status
campaign was also carried out.
37
b. Midwives, Public Health Nurse and other health workers were trained on HIV/AIDS
updates.
c. Aware creation activities in all 5 sub-districts were done.
d. World AIDS Day was celebrated on 1st December, 2015 in the district with grand durbar at
Asiwa.
3. Onchocerciasis control
The district is hyper-endemic for Onchocerciasis. Three rounds Mass Ivermectin drug
distribution for Onchocerciasis control has been carried out in the district. Geographic
coverage for all 61 endemic communities was 100% with therapeutic coverage of 87%.
4. School deworming exercise
A total of 11,913 out of 15,036 pupils per class enrolment were treated, giving a therapeutic
coverage of 79.2%. The exercise achieved geographic coverage of 92.1%, where 105 of 114
schools were covered. Out of school children treated were 1645.
4.14 CHPS Implementation
The District Assembly, Health Directorate, Community leaders and other key stakeholders
have are working hard to roll-out CHPS to increase access to health services.
a) The district has demarcated 27 CHPS zones in 21 electoral areas for implementation. All 27
zones are functional with 8 compounds. Two new compounds have been completed for
commissioning in January, 2016 at Tebeso I and Abosamso, making total compounds 10.
b) The District Assembly has awarded contract for the construction of new CHPS compound at
Anomawobi in Nsuta sub-district and work is ongoing.
c) A total of 115 health staff has been oriented/trained on CHPS with resource persons from
National, Region and District Health Directorate.
d) Series of community and key stakeholder sensitization on CHPS concept and meetings have
been carried in all 27 zones.
e) Community Health Management Committees (CHMCs) have been selected through due
process and trained for twenty four (24) of twenty seven (27) zones.
f) Community Health Volunteers (CHVs) have been selected through due process and trained
for twenty four (24) of twenty seven (27) zones.
g) Community leaders and stakeholders have been very supportive with office, residential
accommodation and some basic equipment.
h) Extensive work has also been done for the implementation of the Community Health Worker
1million CHW) programme in the district.
4.1.5 Health Promotion
Other health promotion activities included;
38
1. Focus group discussion on reproductive health, teenage pregnancy, etc under Adolescent
Health
2. Health talkS to identifiable groups such as Churches, Mosques, information centres and
durbars.
4.1.6 Trainings
1. CHPS training for all Health Staff at Bosome Freho District.
2. Training of Community Health Management Committees and Community Health Volunteers
3. Training of Community-Based Surveillance Volunteers on Onchocerciasis drug distribution
4. TB case management training for Health Staff
5. Malaria case management training for selected staff
6. Facilitative supervision for health staff
7. HIV/AIDS training for health staff
8. Training and sensitization of health staff on Mental Health ACT
9. Family planning (FP) training on longterm contraceptives including jadel insertion and
removal, logistics management for health staff.
4.1.67Transport System
a. The district has 24 motorbikes but only 6 are functional with as high as 18 broken down. b. The only pick-up for the Health activities is also broken down.
The District Assembly and other departmental vehicles including staff personal vehicles and
motorbikes are used to support health service delivery.
4.1.8 Infrastructure
Both office and staff accommodation for health have remain a challenge though there has been
some improvement. Getting rooms to even hire at Asiwa the district capital for officers is
difficult and expensive. The following were achieved:
a. The District Assembly completed construction of residential accommodation for District
Director of Health Services.
b. CHPS rollout; ongoing activities to commission CHPS compounds at Abosamso and Tebeso I.
c. The Assembly has awarded the construction of a new CHPS compound at Anomawobi in Nsuta
sub-district.
d. A shed was constructed at Nsuta CHPS Compound for routine services.
e. Some community leaders and individuals have provided free rooms as accommodation for
some health workers in CHPS zones.
4.1.9 Way forward for the year 2016
1. Strengthen CHPS/MCHNP/CHW implementation;
39
a. Commissioning of two CHPS compounds at Tebeso I and Abosamso
b. Ensure all staff stay in their assigned zones
c. Launching all CHMCs/CHVs/CHOs in CHPS zones
d. Providing basic equipment/tools
e. Train/retrain CHOs/CHMCs/CHVs
f. Reporting CHPS performance into District Health Information Management Systems
software (DHIMS)
2. Strengthen Integrated Disease Surveillance and Response (IDSR) activities to detect cases such
as Tuberculosis (TB), Cholera, Acute Flaccid Paralysis, etc.
3. Intensification of health promotion activities.
4. Continue to advocate for improvement in staff and office accommodation.
5. Advocate for strong motorbikes and 4WD vehicles for health
6. Ensure routine servicing and proper maintenance of motorbikes and vehicle.
7. Improve technical support through monitoring and supervision of health activities
8. Ensure periodic DHIMS (District Health Information Management System) validation to check
accuracy, timeliness and completeness of indicators.
9. Continuous orienting of newly and existing staff on the objectives of the District to achieve
desired results.
10. Conduct staff appraisal as performance improvement tool
The situation of key health indicators in the district is as presented below;
Table 9: District Indicators and Parameters (Health)
No. DISTRICT INDICATORS AND
PARAMETERS
2013
Performance
2014
Performance
Target 2015 Achievement 2015
1 No. of ANC registrants 1437 (73%) 1332 1500 1392
2 No. of clients making 4+ visits 752 914 1,500 992
3 ANC registrants receiving IPT 1 906 (63%) 534 995 654
4 ANC registrants receiving IPT 2 746 (51.9%) 238 1200 460
5 ANC registrants receiving IPT 3 407 (28.3%) 139 500 185
6 No. of pregnant women receiving TT2
+
1434 (73%) 1078 1500 110
7 Total Deliveries 1036 (52.8%) 953 1100 983
8 No. of deliveries by skilled attendants 624 (60.2%) 602 700 630
9 No. of deliveries by TBAs 412 (39.8%) 351 200 329
10 No. of maternal deaths (institutional) - 1
11 Institutional Maternal Mortality Ratio
(per 100,000)
- 118
12 No. of institutional maternal deaths
audited
- 1
40
13 Total number of still births 3 6 0 4
14 Total Number of fresh still births 1 2 0 3
115 No of PNC registrants 1124 (57.3%) 1468 1600 1300
16 No. of family planning acceptors 7541 2784 8,00 2890
17 % WIFA accepting family planning 2563 (14.7%) 15.5 14
18 Total couple years of protection (CYP) 835.5 2080.5 1704
19 No. of institutional infants deaths 0 0 0 0
20 No. of infants admission 0 0 0 0
21 Clients (15-24yrs) who accepted FP
Service
526 (20.5%) 504 612
22 No. of pregnant women sleeping under
ITN
1885 350 123
23 No. of Children immunized OPV 1 2207 (112.4%) 2155 1940
24 No. of Children immunized OPV 3 2090 (109.6%) 2094 1850
25 No. of children immunized measles 2040 (103.9%) 2073 1900
26 No. of children immunized yellow fever 2040 (103.9%) 2073 1890
27 No. of Children receiving at least one
dose of Vitamin A
12261 1748 1790
28 No. of children immunized by age 1
(BCG)
12261 1983 1901
29 No. of children immunized Penta 1 2207 (112.4%) 2155 2207
30 No. of children immunized Penta 3 2090 (109.6%) 2094 2120
31 No. of Non polio AFP detected 3 2 2
32 No. of Leprosy cases 6 2 1
33 No. of OPD cases due to malaria 16410 (53.0%) 13413 1550
34 Total no. of OPD cases that is lab
confirmed (Mic. & RDT)
5062 (16.3%) 8388 8930
35 No. of TB cases notified 11 9 8
36 No. of TB cases cured (sputum
microscopy)
6 2 2
37 No. of TB cases completing treatment 2 3 2
41
Table 10: Situation of Core Health Staff
S/No. Indicator 2012
Indicator
2013
Indicator
2014
Indicator
2015
Target
2015
Indicator
01 Doctor 0 0 0 1 0
02 No. of Med. Assistants 2 2 2 4 3
03 No. of Nurses (all
categories)
57 92 91 100 83
04 No. of midwives 3 6 8 12 11
3.1.4 HIV/AIDS
The District monitoring of HIV/ AIDS cases is hampered by lack of a hospital. Also the District
do not have a sentinel site hence it difficult to calculate the prevalence rate. The only indicator
used is the numbers of people who tested positive during the District know your status
campaign. In 2009 during the District-wide know your status campaign, forty-five (45) adults
between the ages of 15-49 years of age whilst in 2010, one hundred and fifteen (115) persons
in the same age bracket tested positive. However in 2011, only twenty-four (24) out of three
thousand, two hundred and forty-nine tested positive. In 2012 through ‘know your status
campaign’ and prevention of mother to child transmission programme 68 cases were
diagnosed.
Table 11: District Indicators and Parameters (HIV)
HIV / AIDS HIV/AID Cases
2012 2014 2015
Male Female Total Male Female Total Male Female Total
No. of HIV positive
diagnosed
35 33 68 7 11 18 8 14 22
No. of HIV+ cases
receiving ARV therapy
13 26 39 3 5 8 4 8 12
No. Tested (PMTT) 511 511 - 702 702 41 816 830
No. HIV+ (PMTCT) - 10 10 - - - 1 2 3
No. Tested (HIV Know
Your Status Campaign)
1115 1208 2,323 128 182 310 496 864 1360
No. HIV+ ( KYSK) 33 35 68 - - - 13 18 31
1,
42
Table 12: District Indicators and Parameters (Transparent and Accountable Governance)
No District Indicators and
Parameters
2013 Indicator
Level
2014 Indicator
Level
Target 2015 Achievement
2015
01 Total amount of internally
generated revenue
89,561.97
197,878.00
1,046,846
02 Amount of Development
Partners and NGO funds
contribution to DMTDP
implementation
649,847.14
432563.00
432563.00
247,198.00
03 % of DA expenditure within
the DMTDP budget (how much
of DA’s expenditure was not in
the annual budget?)
80%
90%
90%
78%
04 Number of reported cases of
abuse (children, women and
men)
- - - -
05 Police citizen ratio. 1:8,629 1:3271 1:3271 1:8178
The District’s revenue situation improved over the previous year but it could not match the
performance in 2011. The amount of support from development partners towards the
implementation of planed programmes and projects in the district reduced had reduced
drastically. This is attributable to the fact that support after the implementation of the CBRDP
and CWSP projects there has not been any other major projects in the District, also funding
from the Ghana AIDS Commission (GAC) towards implementation of HIV/AIDS programmes
had virtually ceased.
The problem is further compounded by the fact that three major departments in the district (i.e.
the Department of Agriculture, Department of Education and Department of Health) refuse to
report on their sources revenue and its corresponding expenditure hence the Administration
finds it difficult to report on the inflows of development partners support through these
departments who happens to be major recipients.
Birth and Death Registry
The registry exists to register compile data on all births and deaths for planning purposes.
Though it is evident that not all births and deaths are registered in the district, the following
the data captured for the District for from January – December 2013
Table13: No. of Births Registered for 2014
Month New Births Late Registration
2014 2015 2014 2015
43
Male Fem Total Male Female Total Male Female Total Male Fem Total
January 16 56 177 9 10 19 4 2 6 6 6 12
February 39 24 63 81 73 154 8 1 9 5 2 7
March 32 32 64 30 29 59 1 9 10 1 4 5
April 40 33 73 29 28 57 7 3 10 5 1 6
May 67 63 130 87 91 178 4 1 5 1 7 8
June 57 52 109 51 55 106 3 4 7 6 4 10
July 24 26 50 15 8 23 5 5 10 4 1 5
August 81 84 165 74 62 136 8 3 11 7 1 8
September 79 63 142 43 38 81 4 3 7 2 - 2
October 67 61 128 29 26 55 4 3 7 5 4 9
November 65 71 136 99 113 212 1 - 1 12 6 18
December 87 121 208 41 63 104 3 4 7 5 1 6
Total 699 686 1385 588 596 1184 52 38 90 59 37 96
Deaths Registered Month 2014 2015
Male Female Total Male Female Total
January 1 2 3 6 6 12
February 1 1 2 5 2 7
March 1 1 2 1 4 5
April 1 1 2 5 1 6
May 2 - 2 1 7 8
June - - - 6 4 10
July 2 1 3 4 1 5
August - 2 2 7 1 8
September 1 1 2 2 - 2
October - - - 5 4 9
November 1 1 2 12 6 18
December - - - 5 1 6
Total 10 10 20 59 37 96
Challengers of the Registry
i. The CBS volunteers find it difficult to refer people to the district capital to register
their births.
ii. Most of the inhabitants of the District register their birth and death in other districts
such as Bekwai Municipal, Asante Akim South, Bosomtwe and Adansi South
Districts due to limited accessibility and their proximity to these places.
44
The Way Forward
i. The registry intends to liaise with midwives and CBS volunteers in the District to help
offer door to door services to the new born in other to improve the number of new born
registered
ii. The registry will also embark on intensive and extensive education campaign through
the District Information Services Department on the importance of registering births
and deaths especially in the districts where they occur.
3.2 Updates on Critical Development and Poverty Issues
3.2.1 The School Feeding Programme
Currently the number of schools under the School Feeding Programme has been increased to
30. During 2012 seventeen more schools were added and the number of beneficiary pupils
increased from one thousand, three hundred and sixty-six (1,366) to eight thousand, six
hundred and fifty-six (8,656).
Over the year there has been a 1percent increase in the enrolment figures of schools benefiting
from the School Feeding Programme. The number of schools benefiting from the programme
remained constant. Neither the government nor the NGO operating the programme increased
the number schools.
Madamfo Ghana, a non-governmental Organisation operating in the District continues to
support three schools in the District, i.e. Banso, Detieso and Apewu Primary Schools.
Major challenges to the efficient running of the programme in the District are;
i. Excessive delay in the release of grants to caterers.
Beside the feeding grant being low, the release is always overly delayed which further
burden the caterers by payment of high interest on loans secured to run the programme.
ii. Payment of Taxes on grant
The five percent tax deducted on the 80p grant further worsen the woes of caterers
operating under the programme
iii. Under payment of feeding grant
Majority of the caterers recorded high discrepancies in their enrolment figures
resulting in underpayment of school grant due them for services they had already
performed.
45
3.2.2 Incentives for Business Development
i. Employment Generation and Business Development
The level of commercial activities in the District is very low. The major occupation in the
District is farming, which engages about 80% of the population. The farming system is mainly
subsistence with the exception of some cocoa farmers whose activity is for commercial
purpose. Vegetable farming is gaining popularity with emphasis on cabbage production. This
account for mass exodus of the youth who are not interested in farming to urban centres such
as Bekwai, Obuasi, Konongo, Kumasi, Cape Coast, Takoradi and Accra after they complete
basic education. The recent emergence of alluvial gold mining saw laour movement to small
scale artisanal mining but farming remains the main stay of the people.
ii. The Rural Enterprises Programme
In an attempt to diversify the economy, the District in 2010 established District Business
Advisory Centre to promote skill training and small and medium scale businesses development.
The Rural Enterprises Project which was the financier of the activities of the Business Advisory
Centre ended in December 2011, fortunately the programme was re-launched in 2012 and
implementation continued through 2013. In the year under review the centre continued to
monitor the groups trained and formed new groups. The emphasis of the second phase of the
programme is on mushroom production, improving palm oil production and cassava
processing.
Table 15: Beneficiaries of Rural Enterprises Project Training
Location of Group Type of Activity No. of Persons Trained
Male Female Total
Ankaase Soap Making 3 19 22
Korkyekrom Baking and Confectionery 28 28
Nyamebekyere Soap Making 5 25 30
Tebeso II Baking and Confectionery 0 26 26
Total 8 98 106
Support for Start-up Kits to Clients Under Business Development Services
No. Activity Area Location Male Female Total
Hair dressers Asiwa, Bobiam,
Ampaha
- 8 8
Dressmakers - 8 8
Carpentry 5 - 5
Mason 2 - 2
Welder 3 - 3
Car Spraying 1 - 1
Barber 2 - 2
46
Total 13 16 29
iv. National Youth Employment Programme NYEP / GYEEDA
At the beginning of the year seven modules of the Ghana Youth Employment and
Entrepreneurial Development Agency were operational in the District. These included;
Health Extension Workers
Community Education Teaching Assistants
Community Protection Assistants
Youth in Prisons Service
Youth in Dressmaking
Youth in Hairdressing and
Youth in Waste and Sanitation Management
By July 2014 all beneficiaries under six of the modules exited and their and allowances had
been in areas for two months. The only operating module by the end of the year was Youth in
Waste and Sanitation. The District Office is currently waiting for directives from the head
office to commence recruitment.
Table 18: Update on Indicators and Targets (GYEEDA)
Indicators 2011
Performance
level
2012
Performance
Level
2013
Targets
2013 performance
Level
Proportion of unemployed
youth benefiting from skills/
entrepreneurial training
N/A N/A N/A N/A
Number of operational
modules ( health Extension
Workers
80 80 95 80
Community Policing 4 4 4 4
Teaching 78 78 92 78
Prison Assistants - 2 2 2
Apprenticeship -Hairdressing - - - -
Apprenticeship -Dressmaking - 50 - -
From the table it is evident that the District operates two main modules, Health Extension
Workers and Community Education Teaching Assistants though beneficiaries have exited. The
other modules had just a skeletal representation. This implies that youth who had the ambition
of acquiring skills to establish their own micro enterprises could not have the opportunity to do
so. It could be deduced that the youth in apprenticeship modules were rather a more sustainable
means of crating livelihoods for the youth because the employment modules were only giving
47
short term support. It would then be prudent for the district to focus on the apprenticeship
training modules.
v. Water and Sanitation
Water and sanitation coverage in the district is not the best. Over the years the people’s access
to potable water and approved sanitation facilities is worsening. This might be due to lack of
intervention in these areas. Prior to the creation of the district communities had benefited from
development partners and government of Ghana interventions such as the CWSP 1 & II, RWSP
1V & and its addendum but since 2011 there had not been any intervention in the water and
sanitation sector.
Another contributing factor to the problem has been poor maintenance of existing water and
sanitation facilities on the part of communities who own the water points and toilet facilities.
This has led to the breakdown of existing boreholes, this coupled with increase in population
from natural factors and the influx of small scale miners in most communities in the district
has contributed to reducing access and coverage of potable water.
Table 19: Access to Safe Water and Sanitation
No. District Indicators and
Parameters
2011
Indicator
Level
2012
Indicator
Level
2013
Indicator
2014
Target
2014
Achievement
1 Percentage of population with
sustainable access to safe
water sources
35% 40% 45% 50% 47%
2 % of population with access
to improved sanitation (flash
toilet, KVIPs, households
latrine)
6% 8% 10 20% 10%
3.2.4 The Lake Bosomtwe Man and Biosphere (MAB) Project
Activities of man on the lake and the immediate surroundings is believed to be having negative
impact on the lake which is seen to pose serious threat to the continuous existence of the lake.
Over the years it’s been observed that shoreline of the lake has receded and fish stock had also
reduced drastically. The problems being encountered has been attributed to overfishing and
poor farming practices along the lake, natural reduction in annual rainfall and increasing
population numbers. Also the rise in other activities of man such as pig rearing, washing of
cars and utensils and bathing with soap in the lake are major contributing factors to problems
associated with the management of the lake.
48
To promote sustainable management of the Lake, the United Nations Educational Scientific
and Cultural Organisation (UNESCO) through stakeholders, (e.g, District Assemblies, Chiefs
and partner organisations) had proposed the creation of the lake basin as a Biosphere Reserve
to promote sustainable management of the lake.
Currently, processes are ongoing for the demarcation of the lake as a Biosphere reserve.
Work done so far is itemised as follows;
Formation of Lake Bosotwe Community Resource Management Area(CREMA)
Formation of CREMA Executive Committee (CEC)
Research and Monitoring of water quality
Research into dying cultures that promote preservation of the lake
Research and monitoring of climatic conditions along the lake
Research into soil fertility and management
As part of the projects sustainability strategy, UNESCO Ghana, has established a desk office
at the Bosome Freho District Assembly at Asiwa.
3.2.4 Social Welfare
The Department has one officer in charge who is assisted by two National Service Persons.
During the year the department registered 114 persons with disabilities and they were able to
form a disable Association. Five aged persons were also registered. The categories of
physically challenged registered was as follows;
Table 20: Categories of Disabled Persons Registered
No. Type of Disability 2013 Total 2014 Total %
Male Female Male Female
01 Difficulty Seeing 6 4 10 15 9 24 140
02 Difficulty moving 23 17 40 47 39 86 115
03 Difficulty Hearing
/Speech
11 8 19 7 9 16 100
04 Other 8 6 14 - - - 0
Total 48 35 83 66 48 114 37
The office mainly handle child welfare issues, embark on working visits to disabled persons,
and adjudicate Family welfare cases among others. During the period under review, the
distribution of case handled by the department is as presented below;
Table 21: Family Welfare Cases Handled From 2009 to 2014
49
Year
Total No.
Cases
Reported
Child
Maintenance
Welfare/
Reconciliation
Paternity Child
Custody
Boys Girls Men Women Boys Girls Boys Girls
2009 7 2 1 - - 2 - 1 1
2010 19 4 2 - 1 2 4 3 2
2011 17 4 2 - 1 2 2 2 2
2012 14 5 3 - 1 - 1 2 2
2013 31 6 5 - 3 2 - 5 3
2014 181 28 31 19 39 8 18 16 23
3.2.6 Poverty Status of the District
Poverty in the district manifests in its agrarian economy. Agricultural production is mainly on
subsistence level and food crop production is key. Farm sizes has also diminished greatly which
implies that output from household food crop producers cannot feed themselves and leave a
adequate surplus for marketing.
Another dimension of poverty that is exhibited in the District is lack of social amenities such
as schools, health facilities, banking, and telephone facilities. The key District specific poverty
indicators are poor food and nutritional status, poor infrastructural facilities and low school
enrolment rates in these areas, inability to access health facilities despite the health insurance
policy, low employment and income levels, water and sanitation problems which affects the
quality of life of the people. This manifestation is prevalent in the remote communities which
are characterized by low incomes, limited accessibility by road and generally poor living
condition in areas such as Ohwimase, Anwiaso, Nsuta, Simedadieso, Fereso, Yapesa and
Tebeso.
The spatial dimension of poverty is positively correlated to surface accessibility. The Nsuta
Area Council, which is farthest from the District Capital and has the poorest road network
happens to be the most poverty stricken area of the District. Similarly, the District part of the
lake Bosomtwe basin which happens to be the next most poverty endemic zone at the same
time have major poverty problems.
4.1 The Way Forward
Given the persistent weak financial position of the Assembly the District’s top priority
continues to be the improvement of revenue mobilisation by embarking on an intensive revenue
mobilisation campaign. The Assembly shall strengthen its task force to educate the people and
enforce the payment of levies to support the Assembly. Effort shall also be made property rates
and building permits where very small amount was collected during the previous years.
50
The Assembly will continue collaborate with other institutions suport departments like the
District Education Office, District Agric Development Unit, District Health Management Unit,
District Department of Social Welfare and Community Development among others. The
Assembly shall also concentrate on completion of the construction of Junior Staff Quarters to
improve housing situation for staff.
Attention will also be given to the operationalization of the four Area Councils, Revenue items
shall be ceded for the councils and community development officers placed within the area
councils. There is the need then to give them further training, encouragement and motivation
for them to do their work and generate revenue to support their operation. The statutory
allocation from the District Assemblies Common Fund will also be used to provide logistical
support and capacity building for the newly elected members.
To realise her major aspirations, the District envisage the need to receive the backing of
governmental institutions like the Ministry of Local Government Rural Development and
Environment, Energy, Works and Housing, Community Water and Sanitation Agency, Head
of Local Government Service, Finance and Economic Planning among others. As institutions
of governance these shall provide the broader policy framework within which the Assembly’s
initiatives shall conform to receive support from the broader national development agenda.
With this mind set the Assembly’s priorities shall be in conformity with national priorities in
order for her programmes and project to conform to national objectives.
4.2 Conclusion
It is highly advocated that for the Assembly to fulfil its core mandate of bringing development
to the people, there is the need to pursue policies that will trigger sustainable economic
activities which will empower the local people and improve upon their livelihoods. Skill
upgrading for tradesmen such as carpenters, mechanics, weavers, food processors and small
scale manufacturers of industrial products such as soap, powder etc should be at the centre of
the training.
Also, the Assembly should not relent on her efforts to improve upon second cycle education
and provision of social infrastructure such as markets, water and sanitation facilities, electricity
provision and improvement in the road system because this forms the basis for industrial
development.
The Assembly should also support agricultural production especially in the food crop
production sector. Major rivers in the District such as the Anum, Pra and the Fre has wide flood
plains that are suitable for rice cultivation, cabbage production along the slopes and valleys of
the Bosomtwe ranges had also proved very profitable. Citrus and oil palm production are also
51
major potentials of the district beside cocoa. The Assembly should therefore liaise with the
District Agric Development Unit to come up with interventions to support production of these
crops which has ready market and has proved profitable.