mis 5203 week 1 -1 presentation...mis 5203 week 1 -1 presentation author: kumar, vasant created...

24
MIS 5203 Systems & Infrastructure Lifecycle Management 1 Week 3 January 28, 2016

Upload: others

Post on 02-Jun-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

MIS 5203 Systems & Infrastructure Lifecycle

Management 1

Week 3January 28, 2016

Page 2: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

• Project Estimation Contd.– Critical Path Method, PERT

• Project Control Frameworks, practices, and Tool– WBS, Gantt Chart

– Project Plan

– EVA

– Scope Management

• Project success factors and risk

2

Study Objectives

Page 3: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

• Critical Path

– sequence of activities whose sum is longer than any other path

– Slack

• Gantt Charts

– Scheduling activities

– Exhibit 3.6 (CISA Review Manual)

• PERT (Program Evaluation Review Technique)

– More sophisticated than CPM (Critical Path Method)

3

Scheduling

Page 4: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

Critical Path – Exercise (5 mins)

4

Determine the Critical Path Time. What’s “slack”?

Page 5: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

Critical Path – Exercise (5 mins)

5

A-D-E-C is part of the critical path from A to M. A-C has 2 days of “slack”

Page 6: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

PERT– Exercise (10 mins)

6

Determine the PERT Time

Page 7: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

PERT – Exercise (10 mins)

7

Page 8: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

What is Work Break Down Structure?

- Exhibit 3.3 (CISA Review Manual an example)

- Identify the SDLC deliverables and “sequence” them in optimal way

- Microsoft Project is a common tool used for this

Example WBS Template:

http://www.projectmanagementdocs.com/templates/work-breakdown-structure-wbs.html

8

Scheduling - WBS

Page 9: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

WBS Example – Sample Web Project

9

Web Ordering Project

1. Feasibility 2. Requirement 3. Design 4. Development5.

Implementation6. Post

Implementation

1.1 Feasibility

1.2 Business Case

1.3 RFP

2.1 Business Requirements

2.2 Systems Requirements

3.1 Architecture

3.2 HLD

3.3 DD

3.3.1 UI Design

3.3.2 Service Design3.3.3

Database Design

4.1 Coding/UT

4.2 Testing

4.3 Testing

4.3.1 QA

4.3.3 Systems Testing

4.3.2 Integration

Testing

5.1 Deployment Plan

5.2 Change Request

5.3 Operational Readiness

5.4 Data Conversion

5.5 Deployment

6.1 Lesson Learned

Page 10: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

Gantt Chart – Sample Web Project

10

Where do we use Gantt Chart?

Page 11: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

Project Controlling

Which of these a Project Manager do for tracking and oversight?

A. Actual time and resources spent against baseline (EVA –Earned Value Analysis)

B. Cost and OverrunC. Coding when neededD. Scope Management (Change

Control Board)E. Risk ManagementF. CommunicationG. AuditingH. Issues identification and

resolution

11

Page 12: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

• Budget spending to date

• Hours to date

EVA helps understand the progress made in the project

It also helps fine-tune size/cost estimates vs. actuals for future projects

12

EVA – Earned Value Analysis

Page 13: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

13

Understanding Project Plan

• What’s a Project Plan?– A valuable task detailed used by the PMs to schedule

the task, assign the resources, track the progress of the tasks

– Will discuss in detail in the next class (SDLC Phases)

Sample Project Plan (For Better Viewing)http://community.mis.temple.edu/mis5203spring2016/files/2016/01/Sample-Project-Plan-viewing.pdf

Sample Project Plan (For Printing)http://community.mis.temple.edu/mis5203spring2016/files/2016/01/Sample-Project-Plan-viewing.pdf

Page 14: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

• Scope is typically locked after the Specification or Design phase (Baseline)

• Making changes to the original scope may have adverse impact as the time progresses during SDLC. It costs way more to make the changes during testing phase than during requirements or design phases

• Any changes to Baseline is typically managed through CCB (Change Control Board)

14

Scope Management

Page 15: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

Risk Management Related to Software Development

Why Software Risks be analyzed and managed?

• To prevent loss of corruption of Information and IS Assets

• To prevent Disruption of customer service and other operations

• To prevent inefficient Management Decisions

• To help meet software development goals

• To meet Business Objectives

• All of the Above

15

Page 16: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

• Benefit Risks– To avoid a new system may not meet business

goals and expectation

• Delivery Risk– Within the Project across SDLC phase

– With Partners and Suppliers

– Within Organization

– Technology Risk

– With External Environment

16

Software Development Risks

Page 17: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

• Typical Process Steps

1. Inventory Risks – Possible ones

2. Assess Risks – Quantitative and Qualitative Analysis

3. Mitigate Risks – Mitigate, Avoid, Transfer, or Accept

4. Discover Risks – That materialize

5. Review and Evaluate – Effectiveness

17

Risk Management Process Steps

Page 18: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

• Mitigate– Lessen the probability or impact

• Avoid– Where feasible, choose not to implement certain

activities

• Transfer– Deflect, Share with partners, Insurance

• Accept– Acknowledge and monitor

18

Risk Mitigation

Page 19: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

• When can risk occur?– during entire SDLC

• When should the Risk Management Plan be developed?– during entire SDLC– Part of the Planning, Tracking and Oversight

• Section 2.8 of textbook (reference)

• A Risk Management Template Examplehttp://www.projectmanagementdocs.com/templates/risk-management-plan.html

19

Risk Management – More Details

Page 20: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

• Adequacy of the level of oversight by the Steering Committee/ Project Committee

• Adequacy of typical Project Management Areas such the PMI Knowledge areas as below1. Project Integration Management2. Project Scope Management3. Project Time Management4. Project Cost Management5. Project Quality Management (including signoff process, issue

management)6. Project Human Resource Management7. Project Communications Management (including senior

management communication)8. Project Risk Management9. Project Procurement Management

20

Auditing Project Management

Page 21: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

Which of the following risks could result from not baselining the software?

A. Scope creep

B. Sign-off delays

C. Software integrity violations

D. Inadequate controls

E. Financial Overhead

21

Questions

Page 22: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

A project manager is in a process of identifying tasks responsible for project delays. What approach should he take?

A. Create Gantt analysis

B. Use Function point analysis

C. Come up with a Risk Analysis

D. Determine Critical Path

E. Complete PERT

22

Questions

Page 23: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

1. Individual Case Study - 1 (Feasibility Study): Thu 1/28 before the class

2. Quiz 1 (Business Case Development, Project Management Practice, Develop Project Control, etc. Materials covered ion the first 4 Classes – 1/14, 1/21, 1/28, 2/4). Multiple Choice CISA Exam type questions: Thu 2/11

3. Group Project -1 (Business Case, RFP): Thu 2/18 before the class

Questions?

23

Upcoming Assignments/Tests

Page 24: MIS 5203 Week 1 -1 Presentation...MIS 5203 Week 1 -1 Presentation Author: Kumar, Vasant Created Date: 1/29/2016 12:07:55 AM

Systems & Infrastructure Lifecycle Management 1

Vasant Kumar

• Project Estimation

• Project Tracking and Oversight

– WBS

– Project Plan

– Risk Management Applied to Software Development

• Focus of the Next Class and Reading

• Questions

24

Summary of Today’s Class