MRB Report September 2010– August 2011

No 13 Jalan Trompet 33/8, Seksyen 33,40400 Shah Alam, Selangor Darul Ehsan,

MALAYSIA

Management Information System

Page 2: Mrb march 2011   october 2011(cloud)

Table Of Contents

1.1 - MIS Motto

1.2 - MIS Vision

1.3 - MIS Organization Chart

1.4 - KPI and MAP

1.5 - MIS New KPI and MAP

Management Information System

Page 3: Mrb march 2011   october 2011(cloud)

O OTT

Management Information System

M

Supporting Your Growth

Page 4: Mrb march 2011   october 2011(cloud)

Management Information System

V I S I O N

Towards migration of IT infrastructure to support and integrate within TIC organization

Page 5: Mrb march 2011   october 2011(cloud)

MIS Organization Chart

MIS Organization Chart

Pn Adrina(Head MIS) Roslan

(IT EXE)

Page 6: Mrb march 2011   october 2011(cloud)

MISKPI and Management Action Plan

September 2010 – August 2011

Management Information System

Page 7: Mrb march 2011   october 2011(cloud)

COP / MP / SP

KPI Target Result Status

Information Technology

(IT)

Response Turnaround Time

*Logistic Department( < 1.5 Hours)Target: 80%

Not Achieved (42.8%)

*Others Department( <36 Hours)Target: 80%

Achieved (100%)

Hardware Turnover <30k / Years Achieved

ERP System Implementation within 2 years

Not Achieved

KPI & Management Action PlanSeptember 2010– August 2011

*Exclude hardware failure and involving third party problem (Etc: Service provider by Telekom and Rental Vendor).

Page 8: Mrb march 2011   october 2011(cloud)

Management Information System

MIS Summary ReportResponse Turnaround Time

LOGISTIC DEPARTMENTPercentage (%) Status

42.8< < 43.0 achieved

57.1< < 58.0

Not achieved

Page 9: Mrb march 2011   october 2011(cloud)

Bil Department Description / Problem Hours Complete Status

1 Logistics Change CELCOM USB to DIGI Broadband / Remove software CELCOM and install DIGI Software.

2 Hours

2 Logistics Internet and wireless network connection not display / seem wireless card not seat properly.

15 Minute

3 Logistics Sharing Printer / Install printer driver and share the printer 1 Hour

4 Logistics Can’t start IE and other programs / Install ‘Malware bytes’ and scan, 2 Hours

5 Logistics Windows corrupted and D-Link wireless access point failure / Reformat windows and install TP-Link usb wireless

36 Hours

6 Logistics Can’t on computer / Change power supply and reformat the PC 36 Hours

7 Logistics Internet problem and symentac AV got error / Full format and install new AV (Free edition)

6 Hours

8 Logistic Problem with IE (internet explore) and virus infected with spyware win – windows error connection / uninstall spyware and reinstall ‘malware anti-malware’ and scan

1 hour

9 Logistic Windows file corrupt and D-link access point failure / brought the station to MIS room and reformat and install theApplication software

26 hours

10 Logistic Computer cannot turn on (power supply failure) / brought to MIS room and testing with another power supply. Also reformat to tune up the performance

24 hours

11 Logistic Infected by virus and no connection to internet / uninstall avira free edition and replace with kaspersky antivirus and internet security

2 hours

12 Logistic Upgrade Antivirus avg free edition to Avira Antivirus Premium(2 stations)

1 hour

13 Logistic Virus detected (computer perform slow) / reformat and install windows and application software

2 hours

14 Logistic Digi Broadband can’t start / checking bill (have to pay) 1hour

Page 10: Mrb march 2011   october 2011(cloud)

Management Information System

Percentage (%) Status

= 100 achieved

= 0 Not achieved

MIS Summary ReportResponse Turnaround Time

OTHER DEPARTMENT

Page 11: Mrb march 2011   october 2011(cloud)

Bil Department Description / Problem Hours Complete

Status

1 QC New printer (RICOH) SP 3410DN / setup and install 1 hour

2 QC Printer cannot print out (not detect cartridge) / restart computer Unplug cable printer and plug in back, reset

½ hour

3 QC station suddenly restart itself and virus detected / backup data , reformat and re-install windows and application software

1 hour

4 FINANCE Upgrade Antivirus (AVG free version to Avira Antivirus Premium) for 3 unit station / remove antivirus and replace installation with Avira

2 hours

5 FINANCE Internet connection got problem (unstable) with usb wireless problem (TP-LINK) / change to wireless PCI card (level one WNC-0301) ½ hour

6 MIS Network problem(streamyx) become unstable. Reset modem and still not ‘working’ and have direction from technical support from TM center and still not ‘working’. In fact, TM center will call back for passing information and after lead-time(15 minutes) try test the connection and it’s working

1 hour

7 MIS Kaspersky license key out of date (notebook HP540 and desktop DC7900) / called technical support from rental vendor (ICT Zone) 2 hours

8 HR Microsoft office cannot activate (some file.exe was missing or corrupt) and also for another program (exp: IE), virus infected / backup file and reformat to install new windows system

2hours

9 PUCHASING Relocate and setup the station / reinstall wireless driver and sharing printer 1 hour

10 TOOLING Transfer station Malaysia Plastic to tooling department / reconfigure printer, and backup file 2 hours

11 EDO Internet got problem (TP-LINK usb) with list of wireless not shown / update wireless driver and restart 1/2hour

Page 12: Mrb march 2011   october 2011(cloud)

Response Turnaround Time Chart

NUM DEPARTMENTTARGET

PERCENTAGE ACHIEVED

NOT ACHIEVED

PERCENTAGE

STATUS

1 Logistic 100% 6 8 42.90%

2 Others 100% 11 0 100.0%

Cas

e

Departments

Logistic Others0

5

10

15

Case vs department

Achieved

Not Achieved

11

86

Page 13: Mrb march 2011   october 2011(cloud)

Fish Bone Diagram

METHOD

MACHINEMONEY

MAN

Did not reach the Turnaround Time Targeted

A few stations are outdated and need to be upgraded or replaced to the latest specification (*preferably, native specification)

Clash between more than 1 case at the same time

Time to purchase equipment or spare part delayed and some purchases need lead time to order

The initial method used to rectify problems 1,4,5,6,7,9,10 &13 was inaccurate.

Page 14: Mrb march 2011   october 2011(cloud)

Counter Measure

ROOT CASE PROBLEM ACTION / SOLUTION

Money Take time to purchase equipment or spare part

1. To look for IT supplier willing to give credit terms

2. To request petty cash for MIS dept

3. Follow up with finance department on PR issued

Machine -a few station need to upgrade or replace to the latest specification

- if upgrade or replace, have to be the same specification

1. To buy new PC or reallocate better specification PC from other dept to logistic dept.

2. Need to ‘ghost ‘all PC system (OS) in order to keep all system environment running healthily to ensure lead time to repair is shorter.

Man Try to avoid clash between more than 1 case at the same time

1. To perform preventive maintenance from time to time and not wait for incident report to react.

Page 15: Mrb march 2011   october 2011(cloud)

Hardware Turnover

MIS Summary ReportHardware Turnover

Percentage (%) Status

= 100achieved

Page 16: Mrb march 2011   october 2011(cloud)

PURCHASE NUM DATE SUPPLIER DESCRIPTION QUANTITY PRICE (RM) AMOUNT REQUESTED

BY

No Item Purchased between Sep 2010 – August 2011

*Excluding Repairing by third party (exp: data recovery)/cartridge printer / Rental

Page 17: Mrb march 2011   october 2011(cloud)

Management Information System

ERP SYSTEM PLANNINGSeptember 2011 – August 2012

Page 18: Mrb march 2011   october 2011(cloud)

Month of 2010-2012

Sept 2010

Oct 2010

Nov 2010

Dec 2010

Jan 2011

Feb 2011

Mar 2011

Apr 2011

May 2011

Jun 2011

Jul 2011

Aug 2011

Sep 2011

Oct 2011

Nov 2011

Dec 2011

Jan 2012

Feb 2012

Mar 2012

Apr 2012

May 2012 ……..

Subject and Details

ERP Software Conduct needs analysis

Search for ERP vendor with support in Malaysia-

1. Server or web based ERP system2. Cost management3. IT infrastructure 4. After sales support

Study benefits of using ERP system. Its advantages and disadvantages

Shortlist vendors who meet initial criteria

Conduct demo or discussion

1. Between MIS & vendorBetween vendor & end user

Conduct comparison & evaluation process by:

1. Cost analysis2. Meeting functional & needs objectives3. Maintenance & support

Final Selection of ERP system and recommendation to Board of Directors report preparation includes:

1. Needs analysis2. Cause and benefits of ERP3. Selection criteria4. Shortlisted vendors’ profile5. Comparison & evaluation of shortlisted vendor 6. Hardware requirements7. Recommendation 8. Suggested implementation program

Roll out implementation program to staff.

1. Selected vendor2. Budget allocation3. Time line4. Preparation of IT infrastructure: hardware &

network readiness 5. Installation of software6. Training for users7. Data migration8. Pilot run

Page 19: Mrb march 2011   october 2011(cloud)

Management Information System

New KPI and MAPSeptember 2011 – August 2012

Page 20: Mrb march 2011   october 2011(cloud)

COP / MP / SOP Objective

Target

Action Plan PIC

September2011

August2012

Old NewSep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Response Turnaround Time

To reduce actiontime for logisticsDepartment, so thatAll tasks can be doneMore quickly andEfficiently.

Logistics<1.5 Hours

Others<36 Hours

Logistics<1.5 Hours

Others<36 Hours

Ensure that allComputer hardware andDevice equipment is In the bestCondition. Some PC needs to be upgraded or changed for better specification. (PM)

MIS

Hardware Turnover

Increase to RM 30K (Due to possibility of purchasing servers and some higher spec computers to support ERP, also upgrading of Cadem facilities and others departments)

<30k/ Year <30k/ Year

OS Software-Upgrade all Client PC to OS XP version.(Minimum)-Licensing (select agreement / open license)-Server upgradeand migration. Hardware/ Devices.-CentralizedNetwork printer-Network Infrastructure

MIS

ERP System

Integrate all activitiesor tasks of different Functional department into oneSystem.

1 Year 1 Year

Refer TimelineScheduleERP ImplementationPlanning MIS

Page 21: Mrb march 2011   october 2011(cloud)

Thank youPrepared by :MIS Department