municipal subdistrict - northern water...fulfill the subdistrict’s mission: “to provide water...

50
2019 Annual Budget Northern Colorado Water Conservancy District Municipal Subdistrict Municipal Subdistrict

Upload: others

Post on 28-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • 2019Annual Budget

    Northern Colorado Water Conservancy DistrictMunicipal Subdistrict

    MunicipalSubdistrict

  • B

    Municipal Subdistrict, Northern Colorado Water Conservancy District

    Table of Contents

    Transmittal Letter 1

    Our Business Plan 2

    General 3

    History 4

    Service Area and Windy Gap Project Participants 5

    Distinguished Budget Presentation Award 6

    Community Profile of the Eight Largest Windy Gap Participants 7

    Largest Employers 11

    Population and Jobs Trends 12

    Board of Directors 13

    Budget Process 14

    Fiscal Policies 15

    Subdistrict Organizational Chart 16

    Budget Appropriations 17

    Windy Gap Water Activity Enterprise Fund Overview 17

    Windy Gap Firming Project Water Activity Enterprise Fund Overview 33

    Acronyms 39

    Glossary 41

    Appropriation Resolution 46

    Contingency Appropriation Resolution 48

  • 1

    Transmittal Letter

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictIntroduction

    To the President and Board of Directors,

    We are pleased to present a fiscally sound operating and capital budget for fiscal year 2019. The spending plan is just one part of a long-term commitment to provide quality services while preserving long-term financial viability of the Municipal Subdistrict. This budget is designed to fulfill the Subdistrict’s mission: “To provide water resources management, project operations and water conservation services for our project beneficiaries.”

    After receiving the final federal permit needed for the Windy Gap Firming Project in May 2017, the focus for fiscal year 2018 and continuing into 2019 is to advance the project so construction of the Chimney Hollow Reservoir may begin. This project is needed to meet a portion of the existing and future wholesale water supply demands within the boundaries of the Subdistrict. Planning, design and funding of the Colorado River Connectivity Channel will continue during fiscal year 2019. Other activities and programs for the Windy Gap Project will be consistent with the past.

    Fiscal Year 2019 Budget Summary and Highlights

    Windy Gap Water Activity Enterprise Fund

    Total Sources of Funds are estimated to be $5.9 million, $0.5 million or approximately 8 percent lower than fiscal year 2018 • Operating revenues totaling $5.2 million • No change in assessment deferral charge - $36 per acre-foot • Other revenues totaling $0.2 million • Contributions totaling $0.5 million for the Colorado River Connectivity Channel

    Operating expenses of $5.3 million reflect an increase of $0.2 million or approximately 5 percent higher than fiscal year 2018 • Largest expense is carriage costs amounting to $2.6 million • Programs totaling $1.3 million

    Capital Project expenditures of $0.9 million are planned primarily for the Colorado River Connectivity Channel and the pipeline electromagnetic test

    Windy Gap Firming Project Water Activity Enterprise Fund

    Total Sources of Funds are estimated to be $521.6 million, $514.1 million more than fiscal year 2018, due to anticipated funding for project construction

    Capital Project expenditures of $122.5 million are planned for design, mitigation and enhancements and construction for the Chimney Hollow Reservoir

    We believe the budget for the Subdistrict’s 49th year of operation meets the Board’s conservative fiscal management and management’s commitment to accountability and strong fiscal management.

    Respectfully,

    /s/ Bradley D. Wind

    Bradley D. WindGeneral Manager

  • 2

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictOur Business Plan

    Our Mission

    Provide water resources management, project operations and conservation services for project beneficiaries.

    Our Values and Principles

    • Collaborative, proactive and progressive leadership• Water resources conservation• Environmental stewardship• Personal and corporate ethical integrity and professionalism• Solution-oriented service• Regional cooperation

    Our Vision

    The Subdistrict will be a leader in insuring a secure water future for northern Colorado.

    Our Priorities

    • Collect and deliver water• Protect and conserve water supplies• Plan and implement new water supply projects• Cultivate operational and organizational excellence• Maintain and strengthen relationships

    Financial Plan - Revenue

    Program Objectives

    Routine Responsibilities

    Annual Budget

    Long-Term Board Priorities

    Strategic Initiatives

    Major Projects

    Our Planning Road Map

  • 3

    The Subdistrict was organized as a subdistrict of Northern Colorado Water Conservancy District (Northern Water) by decree of the District Court of Weld County, Colorado, on July 6, 1970, pursuant to the Water Conservancy Act. Under the Water Conservancy Act, a subdistrict thus formed is a separate and independent conservancy district with the same powers and legal standing as its parent district and is an independent political subdivision of the State of Colorado. The Subdistrict has the authority to undertake projects separate from those undertaken by Northern Water. The Subdistrict has an agreement with Northern Water whereby Northern Water provides all administrative, operation and maintenance functions for the Subdistrict, and is reimbursed by the Subdistrict for the services rendered.

    The Board of the Subdistrict is, by statute, the same as the Board of Northern Water. It has been the practice of the Subdistrict to elect a different slate of officers from those chosen by Northern Water. The staff of Northern Water serves as the staff of the Subdistrict, with the Subdistrict reimbursing Northern Water for the actual time of such staff plus an additional percentage to cover costs and overhead. Northern Water does not approve or modify the Subdistrict’s budget, hold title to any of the Subdistrict’s water rights, authorize issuance of Subdistrict’s bonds or appoint the Subdistrict’s Board or management. Therefore, the Subdistrict is not under control of Northern Water and is not included in Northern Water’s financial reports. The Subdistrict’s fiscal year end is September 30.

    The Windy Gap Project

    The Windy Gap Project is located just west of the Town of Granby on Colorado’s Western Slope. It consists of a diversion dam on the Colorado River that creates the 445 acre-foot Windy Gap Reservoir, a pumping plant, and a six mile pipeline to Lake Granby. This system is capable of delivering an average of 48,000 acre-feet of water annually, diverted primarily during the spring runoff season between April and July. During these periods of high flows in the Colorado and Fraser rivers, water is pumped from Windy Gap Reservoir to Lake Granby, where it is stored for delivery through the Colorado-Big Thompson Project (C-BT Project) facilities to water users on the Front Range.

    Water Allotment Contracts

    The Subdistrict has entered into water allotment contracts with each of the initial participants and participating transferees. Allotment contracts provide that participants annually receive their proportional share of Windy Gap water. Every unit equals 100 acre-feet of water, or 1/480 of the annual average yield produced. Each water allotment contract requires participants to make annual payments equal to the corresponding share of the costs related to the Subdistrict’s acquisition of water rights and operation, maintenance and replacement of Windy Gap Project features, as well as carriage charges to Northern Water and U.S. Bureau of Reclamation (Reclamation) for using the C-BT Project for storing and delivering Windy Gap water.

    A benefit to Subdistrict allottees is that allotment contract holders are granted total consumptive use of their Windy Gap water. Allottees can use and reuse Windy Gap water because it is imported water not native to the South Platte Basin. After first use within Subdistrict boundaries, participants may lease, transfer or sell the reuse or successive use rights for use within or outside Subdistrict boundaries.

    Carriage Contract

    The Subdistrict has a Carriage Contract with Reclamation and Northern Water specifying how Windy Gap water will be stored and carried to the East Slope through the C-BT Project using the unused capacity of the existing C-BT Project’s storage and conveyance facilities. Windy Gap’s largest annual operating expense is carriage charges, which is over 65 percent of the operating budget or $2.6 million.

    In-lieu Deliveries

    In abnormally dry years, no water may be legally available because other water users in the Colorado River hold water rights similar in priority to Subdistrict’s water rights. In abnormally wet years, storage space may not be available in Lake Granby. Pursuant to the Carriage Contract, the Subdistrict’s Integrated Operations Criterion, C-BT system water may be delivered by the Subdistrict in-lieu of Subdistrict water during times when water would not otherwise be available. In-lieu deliveries are subject to requirements, including replacement water to assure C-BT system beneficiaries are not injured as the result of in-lieu deliveries. The in-lieu service charge is $5.70 per acre-foot.

    Longmont Mayor Ralph Price files for water rights

    How the Windy Gap project came to be

    WINDY GAP TIMELINE

    Six CitiesCommittee formally created

    MunicipalSubdistrict formed

    Reclamation approves project and ground breaking ceremony

    Windy Gap Projectdedicated and water deliveriesbegin

    Establishment of the Windy Gap Firming ProjectWater Enterprise

    Windy Gap Firming Project receives finalfederal permit

    JULY 17 FEBRUARY 24 JULY 6 APRIL/NOVEMBER JUNE 29 NOVEMBER May 1967 1969 1970 1981 1985 1999 2017

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictGeneral

  • 4

    Six Cities

    Formal efforts to develop and construct the Windy Gap Project began in the summer of 1967 when Longmont Mayor Ralph Price filed for water rights on the Colorado River near Granby. Price was acting as trustee for a coalition of six Northern Colorado cities: Boulder, Estes Park, Fort Collins, Greeley, Longmont and Loveland.

    A Geologic Cut Called Windy Gap

    The Windy Gap Project they jointly pursued is located on the West Slope near a natural geologic cut called Windy Gap, just below the confluence of the Colorado and Fraser rivers. The cities envisioned Windy Gap as a water source to meet the future needs of the rapidly growing Northern Front Range.

    After studying growth rates and water supply demand projections, the six cities chose to pursue the Windy Gap Project to meet their future municipal needs.

    Municipal Subdistrict Formed

    In 1969, the participants realized that the work and expertise needed to build the Windy Gap Project required a stronger organization than they could provide independently. The Subdistrict was formally established on July 6, 1970, with the same powers and legal standing as the parent Northern Water.

    Following completion and approval of an Environmental Impact Statement and acquisition of 23 permits and licenses, Windy Gap Project construction began in July 1981. The Windy Gap Project was completed in 1985 and began delivering water to Subdistrict allottees in July.

    Today, the Windy Gap Project consists of a diversion dam on the Colorado River that creates the 445 acre-foot Windy Gap Reservoir, a pumping plant and a six mile pipeline to Lake Granby.

    Windy Gap Project Mitigation

    The Subdistrict is required by the Water Conservancy Act to design, construct and operate the Windy Gap Project in a manner that will not impair the Colorado River Basin or increase costs to its water users. To satisfy this requirement, the Subdistrict provided mitigation measures and additional benefits to the West Slope. These included:

    • $10.2 million payment to the Colorado River Water Conservation District used as seed money to construct Wolford Mountain Reservoir• $550,000 to the U.S. Fish and Wildlife Service for endangered fish species studies• $500,000 to upgrade and provide new pumps for rancher diversions downstream• $420,000 to Hot Sulphur Springs for upgrading water and wastewater treatment facilities

    Windy Gap Firming Project

    The Windy Gap Firming Project is being implemented to provide more reliable Windy Gap water deliveries. The Windy Gap Firming Project would include a 90,000 acre-foot reservoir at Chimney Hollow in the foothills west of Carter Lake. Not all of the owners of the Windy Gap Project are participating in the Windy Gap Firming Project. The City of Boulder and the Town of Estes Park own Subdistrict water units but are not participating in the Windy Gap Firming Project because they have other storage for Subdistrict water or other water supplies that currently meet their needs. The final federal permit needed to construct the Chimney Hollow Reservoir was signed on May 17, 2017.

    Windy Gap Pump Plant construction in the early 1980’s. Snow covers a section of Windy Gap’s pipeline, which was trucked over the Continental Divide in sections.

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictHistory

  • 5

    Participants Water Units Percentage

    Platte River Power Authority 134 30.6%

    Longmont 80 16.7

    Broomfield 56 11.7

    Greeley 52 10.8

    Loveland 40 8.3

    Boulder 37 7.7

    Erie 20 4.2

    Little Thompson Water District 17 3.5

    Superior Metro District No. 1 15 3.1

    Fort Lupton 13 0.6

    Louisville 6 1.3

    Lafayette 3 0.6

    Estes Park 3 0.6

    Berthoud 3 0.6

    Central Weld County Water District 1 0.2

    Windy Gap Participants

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictService Area and Windy Gap Project Participants

    Rawhide Power Plant(Platte River Power Authority)

    Fort Collins

    Greeley

    Longmont

    Fort Lupton

    Denver

    BoulderWindy Gap

    Broomfield

    Loveland

    Central Weld CountyWater District

    Left HandWater District

    Estes Park

    Erie

    Superior Metropolitan District No. 1

    Subdistrict Service AreaC-BT Project Facilities

    LouisvilleLafayette

    South Platte River

    Little ThompsonWater District

    Berthoud

  • 6

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictDistinguished Budget Presentation Award

  • 7

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictCommunity Profile of the Eight Largest Windy Gap Participants

    Eight Largest Windy Gap Project Participants

    City of Boulder

    Established 1871Estimated Population for 2017 109,000Unemployment rate 2.5%Per Capita Income $63,707Land Area (square miles) 26Most Populous City in Colorado 11th

    City of Longmont

    Established 1871Estimated Population for 2017 94,777Unemployment Rate 2.6%Per Capita Income $63,707Land Area (square miles) 22Most Populous City in Colorado 14th

    0

    200,000

    400,000

    600,000

    2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

    Population TrendsSix Largest Windy Gap Project Participants

    Municipalities

    City of Boulder Broomfield, City and County of

    City of Greeley City of Longmont

    City of Loveland Town of Erie

    Source - Colorado Department of Local Affairs, State Demography Office, County website, Bureau of Labor Statistics, US Census - extrapolated from 2018 by US Census, County CAFR’s.

    The Subdistrict has experienced a moderately growing population and service area in the past ten years.

  • 8

    City and County of Broomfield

    Established 2001Estimated Population for 2017 68,552Unemployment Rate 2.5%Per Capita Income $73,129Land Area (square miles) 33.6Most Populous City in Colorado 16th

    City of Greeley

    Established 1870Estimated Population for 2017 104,557Unemployment Rate 2.8%Per Capita Income $50,483Land Area (square miles) 30Most Populous City in Colorado 13th

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictCommunity Profile of Windy Gap Participants

    Eight Largest Windy Gap Project Participants (continued)

    0.0%2.0%4.0%6.0%8.0%

    10.0%12.0%

    2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

    Unemployment RateSix Largest Windy Gap Project Participants

    Municipalities

    City of Boulder Broomfield, City and County of

    City of Greeley City of Longmont

    City of Loveland Town of Erie

    Colorado

    Source - Colorado Department of Local Affairs, State Demography Office, County website, Bureau of Labor Statistics, US Census - extrapolated from 2018 by US Census, County CAFR’s.

    The Subdistrict’s service area is expected to remain strong as the Northern Colorado economy continues to experience solid job growth.

  • 9

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictCommunity Profile of Windy Gap Participants

    Eight Largest Windy Gap Project Participants (continued)

    City of Loveland

    Established 1881Estimated Population for 2017 75,655Unemployment Rate 2.5%Per Capita Income $47,117Land Area (square miles) 35.5Most Populous City in Colorado 15th

    Town of Erie

    Established 1874Estimated Population for 2017 26,250Unemployment rate 2.6%Per Capita Income $63,707Land Area (square miles) 19.8Most Populous City in Colorado 34th

    $-

    $20,000

    $40,000

    $60,000

    $80,000

    2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

    Per Capita IncomeSix Largest Windy Gap Participants

    Municipalities

    City of Boulder Broomfield, City and County of

    City of Greeley City of Longmont

    City of Loveland Town of Erie

    Source - Colorado Department of Local Affairs, State Demography Office, County website, Bureau of Labor Statistics, US Census - extrapolated from 2018 by US Census, County CAFR’s.

    The income growth of the six largest municipal participants continues to be solid.

  • 10

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictCommunity Profile of Windy Gap Participants

    Source - Municipalities’ websites and most recent CAFR’s and Budget Reports

    Platte River Power Authority

    Established 1975

    Colorado political subdivision established to provide wholesale generation and transmission to municipal utilities of its owner communities - Estes Park, Fort Collins, Longmont and Loveland.

    Little Thompson Water District

    Established 1960

    Colorado special district established to provide high-quality drinking water to rural residents in a 300-square mile service area in Larimer, Weld and Boulder counties.

    Eight Largest Windy Gap Project Participants (continued)

  • 11

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictLargest Employers

    Largest Employers by County: 2018 - 2019 (Private Non-Retail)

    Rank

    123456789

    10

    Employer

    UC Health: Poudre Valley HospitalBroadcom, Inc.Woodward, Inc.Banner Health: McKee Medical CenterHewlett PackardQualfonHach CompanyAnheuser-Busch Fort Collins BreweryTolmar, Inc.Otter Products Sum of largest employers Full labor force 2018

    Employment

    7,890 1,600 1,500 1,390 1,130 870 840 760 650 560 17,190 204,795

    Larimer County

    Rank

    12

    3456789

    10

    Employer

    JBS USABanner Health: North Colorado Medical Center (NCMC)VestasState Farm Insurance CompaniesHalliburton Energy Services, Inc.TTEC (formerly Tele Tech)Anadarko PetroleumNoble EnergyLeprino FoodsSTARTEK, Inc. Sum of largest employers Full labor force 2018

    Employment

    4,590

    3,560 2,270 1,200 1,030 620 520 500 480 470 15,240 164,680

    Weld County

    Boulder County Broomfield City and County

    Rank

    1234567

    89

    10

    Employer

    Medtronic PLCBoulder Community HealthIBM CorporationBall Aerospace & Technologies Corp.Good Samaritan Medical CenterSeagate TechnologyLongmont United & Avista Adventist HospitalsGoogleSierra Nevada CorporationKaiser Permanente Sum of largest employers Full labor force 2018

    Employment

    2,460 2,410 1,690 1,510 1,430 1,420

    1,360 800 750 750 14,580 191,551

    Rank

    12345678

    910

    Employer

    CenturyLinkOracleSCL Health Revenue Service CenterHunter Douglas Window FashionsVail ResortsTSYSDanone North AmericaBroadcom, Inc. (formerly Brocade Communications)VMwareBall Corporation Sum of largest employers Full labor force 2018

    Employment

    2,360 2,000 1,200 980 740 580 570

    500 470 420 9,820 39,524

    Source of largest employers: Development Research Partners/Metro Denver EDC/Revised May 2018Source of full labor force data: Colorado Department of Labor and Employment, Labor Market Information

    Largest Employers Combined: Boulder, Broomfield, Larimer & Weld 2018 - 2019 (Private Non-Retail)

    Top Ten Employers - Combined

    Employment

    7,890 4,590 3,560 2,460 2,410 2,360 2,270 2,000 1,690 1,600 30,830 600,550

    County

    Larimer Weld Weld Boulder Boulder Broomfield Weld Broomfield Boulder Larimer

    Employer

    UCHealth: Poudre Valley HospitalJBS USABanner Health: NCMCMedtronic PLCBoulder Community HealthCenturyLinkVestasOracleIBM CorporationBroadcom, Inc. Sum of largest employers Full labor force 2018

    Rank

    123456789

    10

  • 12

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictPopulation and Jobs Trends

    Larimer County

    Year

    20102015202020252030

    Total Jobs

    165,485 185,436 208,071 230,158 247,478

    Population

    300,543 326,803 356,900 388,866 418,814

    0

    5,000

    10,000

    15,000

    20,000

    25,000

    30,000

    35,000

    2015 2020 2025 2030

    Larimer CountyForecast Change in Population & Jobs 2015 - 2030

    Source: State of Colorado Demography Office

    Job Change Population Change

    Weld County

    Year

    20102015202020252030

    Total Jobs

    104,463 132,084 155,574 174,333 192,823

    Population

    254,240 286,575 340,265 401,865 466,716

    Denver Metro Including Boulder and Broomfield Counties

    Year

    20102015202020252030

    Total Jobs

    1,641,311 1,886,272 2,123,138 2,302,714 2,423,855

    Population

    2,797,873 3,053,801 3,306,177 3,540,403 3,758,347

    0

    10,000

    20,000

    30,000

    40,000

    50,000

    60,000

    70,000

    2015 2020 2025 2030

    Weld CountyForecast Change in Population & Jobs 2015 - 2030

    Source: State of Colorado Demography Office

    Job Change Population Change

    0

    50,000

    100,000

    150,000

    200,000

    250,000

    300,000

    2015 2020 2025 2030

    Denver Metro Including Boulder and Broomfield CountiesForecast Change in Population & Jobs 2015 - 2030

    Source: State of Colorado Demography Office

    Job Change Population Change

  • 13

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictBoard of Directors

    The 12-member Board is responsible for establishing policy and strategic direction. Directors from the eight counties within Northern Water boundaries are appointed to 4-year terms by District Court judges. Three Board seats are up for appointment every year. When a Director’s term expires, he or she continues to serve until the judge reappoints or replaces him or her. Subdistrict’s Board Officers are elected by the Board at its annual organizational meeting each October. The Board holds its public meetings twice a month. Directors are paid $100 per meeting to a maximum of $2,400 per year.

    Past Presidents

    William D. Farr Ray Joyce Les Williams

    1970 - 1995 25 years1995 - 2000 5 years2000 - 2013 13 years

    Dennis YanchunasPresidentBoulder CountyAugust 20, 2010 - Sept. 28, 2020

    Bill FischerLarimer CountySept. 28, 2016 - Sept. 28, 2020

    Mike ApplegateLarimer CountySept. 28, 1991 - Sept. 28, 2019

    Bill EmslieVice PresidentLarimer CountySept. 28, 2005 - Sept. 28, 2021

    Rob McClarySedgwick CountySept. 28, 2011 - Sept. 28, 2019

    John RuschMorgan and Washington CountiesMay 10, 2002 - Sept. 28, 2021

    Dale TrowbridgeWeld CountyAugust 15, 2014 - Sept. 28, 2019

    Todd WilliamsBoulder CountySept. 28, 2017 - Sept. 28, 2021

    Brad StrombergerLogan CountySept. 28, 2010 - Sept. 28, 2018

    Don MagnusonWeld CountySept. 28, 2004 - Sept. 28, 2020

    Sue Ellen HarrisonBoulder CountySept. 28, 2009 - Sept. 28, 2018

    Kenton BrunnerWeld CountyMarch 14, 1994 - Sept. 28, 2018

    Current Board of Directors

  • 14

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictBudget Process

    The budget process provides an opportunity to align short-term objectives and actions at the program level to the Subdistrict’s long-term mission and values. The Board, General Manager and staff participate in the development of the budget.

    The proposed budget for the upcoming year is presented to the Board for consideration and adoption in August of each year in order to align it with the adoption of water assessments which are also approved. The Board, at its regular meeting of May 10, 2018, appointed Bradley D. Wind, Jerry Gibbens, Karen Rademacher, Mary Krakow and John Budde as Budget Officers and directed them to prepare and submit the requisite budgets of the Subdistrict for fiscal year 2019. A notice is published, as required by law, in all the counties located wholly or partly within the Subdistrict boundaries stating the annual budget is available for inspection by the public, including the date and time for public hearing. This year’s budget review process included a workshop with the participants on July 10 and a Board workshop on July 20.

    The 2019 budget was prepared utilizing the accrual method of accounting. This is the same basis of accounting used for the Subdistrict’s audited financial statements.

    Budget ScheduleTask Jan  Feb Mar Apr May June July Aug  Sept

    Formulate key goals and objectives

    Identify major budget assumption

    Budget instructions issued to all department managers

    Review and final recommendations of budget by senior managers

    Appointment of budget officers and prepare budget reports

    Deliver budget to the Board

    Hold public hearing and adopt budget by the Board

    File budget with the state

    Amending the Budget

    Senior Management is authorized to add or revise budget amounts between operating expenses and projects. Any revisions that exceed the total appropriation for the fund, must be approved by the Subdistrict Board. All contracts over $35,000, whether budgeted or unbudgeted, must be authorized by the Subdistrict Board. Purchase of capital assets over $35,000, whether budgeted or unbudgeted must be authorized by the General Manager.

    First Subdistrict Budget Resolution adopted in 1970

    WHEREAS, the Municipal Subdistrict, Northern Colorado Water Conservancy District, was created on July 6, 1970, in the District Court Sitting in and for Weld County and is a political subdivision of the State of Colorado and a body corporate with all the powers of a public or municipal corporation; and

    WHEREAS, E. F. Phipps, Secretary of Municipal Subdistrict,

    Northern Colorado Water Conservancy District, and J. c. Nelson, Treasurer of said Subdistrict, were appointed by the Board of Directors to prepare the Budget for the fiscal year commencing November 1, 1970, and have submitted the same to the said Board and caused to be published the requisite Notice of Hearing.

    NOW, THEREFORE, BE IT RESOLVED, that the Board of

    Directors of the Municipal Subdistrict, Northern Colorado Water Conservancy District, hereby approves and adopts the Budget as submitted by the duly appointed Budget Officers and appropriates the aggregate sum of $33,925.00 for the purpose of paying the cost of all con-tractual obligations; meeting the expenses required to conserve,allocate, and control the water supplies of the Subdistrict includingthe expense of design, construction, administration, operation and maintenance of all works, facilities, properties, and functions necessary for the distribution and beneficial utilization of those water supplies; and the expenses for the transaction of all such other business functions and activities found by said Board to be necessary and convenient; and

    BE IT FURTHER RESOLVED, that any revenue in excess of the sums appropriated_in this or any further appropriations for unforeseen contingencies shall be transferred to and deposited in the reserve account of said Subdistrict; and

    BE IT FURTHER RESOLVED, that the funds r quired for the sums

    so appropriated shall be provided in the manner and by the means adopted by the Board of Directors, Municipal Subdistrict, Northern Colorado Water Conservancy District.

    The motion was seconded by Director Nix and upon being put to vote was unanimously adopted.

    The Treasurer presented the Financial Statement for the month of August and explained that the budget officers had now been bonded; that funds had been deposited to the Subdistrict account in Westlake National Bank as shown on the Financial Statement; and that payment of the bills shown on the state- ment could now be made. Thereupon, Director Moffitt moved that the bills be allowed and checks and vouchers be drawn in payment thereof. The motion was seconded by Director Moore and upon being put to vote unanimously carried.

    The bills approved for payment will be found in the financial records of

    the Subdistrict on the Financial Statement dated August 31, 1970.

    There being no further business to come before the Board, Director Moffitt moved adjournment to October 9, 1970.

    Secretary

  • 15

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictFiscal Policies

    Balanced Budget

    The Subdistrict has not adopted a fiscal policy on a balanced budget. Subdistrict considers the budget to be balanced when the sources of funds equals the uses of funds. On occasion, the planned use of reserves, along with budgeted operating revenues are equal to or greater than budgeted expenditures.

    Reserves

    The Windy Gap Water Activity Enterprise Fund (Windy Gap) accumulates reserves sufficient to pay operation, maintenance, pumping energy, capital additions and working capital. These reserves may be drawn upon if unusual or unplanned events occur, or they may not be used at all. In the future, the Board will be reviewing and updating the types and amounts of the reserves.

    The Windy Gap Fund practice is to maintain reserves that are sufficient to provide:

    • 150 percent of expected operation and maintenance expenses• 100 percent of the energy costs to pump 35,000 acre-feet of water• Minimum of 360 unrestricted days cash on hand

    Revenues

    The Windy Gap Fund is fully funded through assessments for wholesale water provided by the Windy Gap Project.

    Expenditures

    The Subdistrict continues to find new ways to operate more efficiently while setting high standards in maintaining its facilities.

    Risk Management

    The Subdistrict is exposed to various risks of loss related to torts, (Colorado Governmental Immunity Act limits general liability to $387,000 per person and $1,093,000 per occurrence) theft of, damage to and destruction of assets; errors and omissions; and natural disasters. The Subdistrict carries commercial insurance for these risks. Settled claims resulting from these risks did not exceed commercial insurance coverage in any of the past three years.

    Investments

    The Board established an Investment Policy Statement (IPS) for funds not used to meet current liquidity requirements. The purpose of the IPS is to establish the investment restriction standards, investment objectives, delegation of authority, prudence, ethics and conflicts of interest, authorized securities and transactions, portfolio maturities and liquidity, safekeeping and custody, portfolio performance and reporting. The investment objectives in order of priority are safety, liquidity, return and diversification.

    Capital Policy

    Assets that have a service life of more than one year and have an initial cost of $5,000 or more are capitalized. Assets not meeting this criteria are expensed. Depreciation is computed using the straight-line method over the estimated useful life.

    Basis Acccounting

    The Subdistrict financial statements are prepared using the accrual basis of accounting with the economic resources measurement focus as prescribed by the Governmental Accounting Standard Board (GASB). Under this approach, all assets, deferred outflow of resources, liabilities and deferred inflow of resources are reported in the Statement of Net Position. Revenues are recorded when earned and expenses are recorded at the time liabilities are incurred.

    Capital Contributions

    Capital contributions consist of payments from participants for the funding of the Windy Gap Firming Project. Also, payments received for the Colorado River Connectivity Channel (Connectivity Channel) are accounted for as contributions. In the Statement of Revenues, Expenses and Changes in Net Position, capital contributions are recognized after nonoperating revenues (expenses).

  • 16

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictSubdistrict Organizational Chart

    General Public of the Subdistrict

    Service Area

    Legal CounselWindy Gap and Windy Gap Firming Project ParticipantsCommittee

    The Subdistrict has no full-timeemployees. All administrative, engineering and operations and maintenance functions are provided through an agreement with Northern Water. The Subdistrictreimburses Northern Water for thecosts of providing these services.

    Board Committees• Audit• Finance and Bene�ts• Legal and Legislative

    12-MemberBoard of Directors

  • 17

    The Subdistrict is comprised of three enterprise funds that use activities of the organization to track financial performance and budgetary oversight of its business-like operations. The two major enterprise funds, Windy Gap Water Activity and Windy Gap Firming Project Water Activity, account for the wholesale water operations of the Subdistrict. The other fund, Municipal Subdistrict District Fund, is the owner of the two water activity enterprise funds. For financial reporting purposes, the Municipal Subdistrict District Fund is included in the Windy Gap Water Activity Enterprise Fund statements. The two water activity enterprise funds are legally distinct and financially independent funds. Both have been established in accordance with Colorado Statutes, as “enterprises” and are excluded from the application of Article X, Section 20, of the Colorado Constitution.

    Windy Gap Water Activity Enterprise Fund Overview

    Windy Gap is self-supporting through water assessments. The purpose of Windy Gap is to account for the wholesale water activities of the Windy Gap Project which provides water supplies to northern Colorado municipalities, rural domestic suppliers and industry. The Windy Gap Project consists of a diversion dam on the Colorado River, a pump station and a pipeline to pump and transport diverted Windy Gap Project water to the C-BT Project for storage and distribution to the fifteen participants. Construction of the $81.7 million Windy Gap Project commenced in July 1981 with operation commencing in July 1985. The fiscal year 2019 operating and capital budget totals $6,422,724. This represents a decrease of $22,008 or .36 percent from the fiscal year 2018 budget. The decrease is primarily due to reduced costs related to the Connectivity Channel. Total revenues of $5,890,745 represents a decrease of $529,630 from the 2018 budget. The decrease was related to lower contributions for the Connectivity Channel. The budget includes a contingency appropriation of $250,000 that can be used with Senior Management authorization for the expenditures that could not be forseen at the time the budget was prepared.

    Beginning Cash and Reserves

    $21,328,641

    Sources ofFunds

    $5,890,745

    Uses ofFunds

    $6,422,724

    Ending Cash andReserves

    $20,796,662

    Fiscal Year 2019 Budget

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictBudget Appropriations

    Fiscal Year 2019Total Funds

    $129,069,557

    Municipal SubdistrictDistrict Fund

    $100,050

    Windy Gap Water ActivityEnterprise Fund

    $6,422,724

    Windy Gap Firming ProjectWater Activity Enterprise Fund

    $122,546,783

    Budget Appropriations by Fund

    5%

    94%

    1%

    Windy Gap Fund

    Windy Gap Firming Fund

    Municipal Subdistrict District Fund

  • 18

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Comparison of Sources and Uses by Fiscal Year

    Beginning Cash and Reserves Unrestricted

    Total

    SOURCES OF FUNDS Revenue Sources Operating Revenues Water Assessments Total operating revenues

    Other Revenues Earnings on Investments Other Nonoperating Revenue Total other revenues

    Contributions Connectivity Channel Total contributions

    Total Sources Funds to Reserves Total Funds Available

    USES OF FUNDS Operating Expenses Carriage Delivery Pumping Energy & Wheeling Pump Station & Pipeline Reservoir and Dam Programs Total Operating Expenses

    Capital Projects Total Projects

    Total Expenditures

    Contingency Appropriation

    Total Uses

    Ending Cash and Reserves Unrestricted Total

    Total funds accounted for

    Fiscal Year2017 Actual

    $ 20,910,645

    20,910,645

    2,959,905 2,959,905

    129,556 43,820 173,376

    30,000 30,000

    3,163,281 ( 27,175 ) $ 24,046,751

    1,238,595

    479,885 5,931 889,619 2,614,030

    383,231 383,231

    2,997,261

    2,997,261

    21,049,490 21,049,490

    $ 24,046,751

    Fiscal Year2018 Budget

    $ 21,866,047

    21,866,047

    5,152,525 5,152,525

    116,550 57,000 173,550

    1,094,300 1,094,300

    6,420,375

    $ 28,286,422

    2,584,525 840,000 513,528 11,855 1,086,144 5,036,052

    1,158,680 1,158,680

    6,194,732

    250,000

    6,444,732

    21,841,690 21,841,690

    $ 28,286,422

    Fiscal Year2018 Estimated

    Actual

    $ 21,049,490 21,049,490

    3,572,525 3,572,525

    152,000 58,000 210,000

    340,000 340,000

    4,122,525

    $ 25,172,015

    1,684,525 160,000 515,921 11,855 1,066,693 3,438,994

    404,380 404,380

    3,843,374

    3,843,374

    21,328,641 21,328,641

    $ 25,172,015

    Fiscal Year2019 Budget

    $ 21,328,641

    21,328,641

    5,152,525 5,152,525

    172,120 26,100 198,220

    540,000 540,000

    5,890,745

    $ 27,219,386

    2,584,525 840,000 561,227 14,564 1,264,083 5,264,399

    908,325 908,325

    6,172,724

    250,000

    6,422,724

    20,796,662 20,796,662

    $ 27,219,386

    PercentageChange from

    Fiscal Year2018 Budget

    47.68% ( 54.21% ) 14.21%

    ( 50.65% ) ( 50.65% )

    ( 8.25% )

    9.29% 22.85% 16.38% 4.53%

    ( 21.61% ) ( 21.61% )

    ( .36% )

    ( .36% )

    Dollar ChangeFrom

    Fiscal Year2018 Budget

    $

    55,570 ( 30,900 ) 24,670

    ( 554,300 ) ( 554,300 )

    ( 529,630 )

    47,699 2,709 177,939 228,347

    ( 250,355 ) ( 250,355 )

    ( 22,008 )

    ( $ 22,008 )

  • 19

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Revenues

    Total revenues are expected to be $5,890,745 which is a decrease of $529,630 or 8.25 percent from the prior year budget. Revenue from wholesale water assessments are estimated to be the same as the fiscal year 2018 budget. Water assessments are estimated on deliveries of 25,000 acre-feet in fiscal year 2019. Pumping energy and wheeling charges associated with pumping at the Windy Gap Pump Plant are projected to be $28.00 per acre-foot on 30,000 acre-feet. For fiscal year 2019, the charge for the assessment deferral will be $36 per acre-foot of ownership in the Windy Gap Project. Other projected revenues for fiscal year 2019 include contributions for the Connectivity Channel of $540,000, interest earnings of $172,120 and other income of $26,100. With no outstanding debt, no charges for debt service are included in water assessments beginning in 2017.

    A summary of total revenues is provided in the chart below:

    $5,152,525

    $540,000

    $172,120 $26,100

    Water Assessments

    Windy Gap Connectivity Channel

    Earnings on Investments

    Other Nonoperating Revenue

    Water Assessments

    The three revenue components of the annual water assessments are provided in the charts below:

    Water AssessmentsConnectivity Channel ContributionsEarnings on InvestmentsOther Nonoperating Revenues

    Total revenues

    Budget

    $ 5,152,525

    540,000 172,120

    26,100

    $ 5,890,745

    Percent ofTotal Sources

    of Funds

    87%

    9 3

    1

    100%

    50%

    34%

    16%

    Carriage Delivery

    Assessment Deferral

    Pumping Energy and Wheeling

    Carriage DeliveryAssessment DeferralPumping Energy and Wheeling

    Total water assessments

    Budget

    $ 2,584,525 1,728,000

    840,000

    $ 5,152,525

    Percent ofTotal Water

    Assessments

    50% 34

    16

    100%

    $-

    $2

    $4

    $6

    $8

    $10

    $12

    $14

    $16

    2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

    Mill

    ions

    Windy GapAnnual Assessments Revenues

    Actual Estimate Budget

    13,046 AF

    No Debt Service Charges

  • 20

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Revenues

    Carriage Delivery Assessment

    Water delivery assessment is the charge to use the C-BT Project storage system and conveyance to transport Windy Gap Project water from the West Slope of Colorado across the Continental Divide to the East Slope. For fiscal year 2019, the charge is projected to be $100 per acre-foot (same as fiscal year 2018) of water delivered. In addition, the fixed carriage charge is $176.09 per ownership unit of Windy Gap Project water. The water delivery assessment is calculated on the costs of providing the service and on total water carried through the C-BT Project Adams Tunnel. When less water is carried through the tunnel, Windy Gap Project water becomes a larger percent of the total, resulting in higher water delivery cost. In 2015, the water carried through the Adams Tunnel was 113,856 acre-feet, the lowest since the Windy Gap Project began delivering water. This was the driver of higher delivery assessments. A summary of carriage delivery charges is provided in the table and charts below:

    $-

    $50

    $100

    $150

    $200

    2010 2011 2012 2013 2014 2015 2016 2017

    Windy GapCarriage Delivery per Acre-Foot

    Carriage Costs per Acre-Foot

    Assessment Deferral

    The assessment deferral is used to support all program costs and to maintain and operate the pump station, reservoir and dam, and stream gauging stations. For fiscal year 2019, the charge is $3,600 per ownership unit of Windy Gap Project water, no change since fiscal year 2014. This assessment is due whether or not the participant takes delivery of water. A summary of assessment deferral charges is provided in the table and chart below:

    Fiscal Year 2019

    Assessment Deferral

    Per unit

    $ 3,600

    Per Acre-foot

    $ 36

    Total

    $ 1,728,000

    $2,700

    $2,800

    $2,900

    $3,000

    $3,100

    $3,200

    $3,300

    $3,400

    $3,500

    $3,600

    $3,700

    2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

    No Increase

    Windy Gap per Unit Assessment

    0

    50,000

    100,000

    150,000

    200,000

    250,000

    300,000

    350,000

    0

    5,000

    10,000

    15,000

    20,000

    25,000

    2009 2010 2011 2012 2013 2014 2015 2016 2017

    Water through Adams Tunnel LowestSince Operating Windy Gap

    Windy Gap and Adams Tunnel Deliveriesper Acre-Foot

    Windy Gap Water Delivered Adams Tunnel

    Fiscal Year 2019

    Carriage DeliveryFixed Annual Carriage

    Acre-Feet

    25,000

    Charge PerAcre-FootPer Unit

    $ 100.00 176.09

    Total

    $ 2,500,000 84,525 $ 2,584,525

    Beginning in fiscal year 2020, an additional charge of $34 per acre-foot (1.79% annual increase) will be assessed to the carriage delivery fee per the carriage contract signed in 2014. Also, the fixed annual carriage charge will no longer be assessed beginning in fiscal year 2020.

  • 21

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund (continued)

    Revenues

    Pumping Energy/Wheeling

    Energy and wheeling assessement is for pumping Windy Gap Project water from the Windy Gap Reservoir on the Colorado River through a six-mile pipeline to Lake Granby. For fiscal year 2019, the charge is projected to be $28.00 per acre-foot of water delivered. Energy costs are calculated based on a tiered pricing structure with three pricing tiers. Tier 3 is the most expensive tier and starts when water pumped is in excess of approximately 32,000 acre-feet. Water was pumped in 2018, the first time since 2013, as water storage space was available in Lake Granby. During the times when Windy Gap water is not available, C-BT system water is delivered by the Subdistrict in-lieu of Subdistrict water. The in-lieu water deliveries must provide replacement water or can be met by certain C-BT system spill conditions. Also, Windy Gap Project water was spilled in 2011 and 2014 to make space for C-BT system water. A summary of pumping energy/wheeling charges and tiered pricing structure is provided in the tables and charts below:

    Windy Gap Pump Plant

    Fiscal Year 2019

    Pumping Energy/ Wheeling

    Acre-Feet

    30,000

    Charge PerAcre-FootPer Unit

    $ 28.00

    Total

    $ 840,000

    $-

    $10

    $20

    $30

    $40

    2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

    Energy Cost per Acre-Foot

    0

    10,000

    20,000

    30,000

    40,000

    50,000

    2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

    Windy GapWater Pumped per Acre-Foot

    Tier

    1 Energy Price2 Energy Price3 Energy Price

    Rate ($/kWH)

    0.03047 0.04624 0.08406

  • 22

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Expenses

    The fiscal year 2019 Windy Gap budgeted expenses are $6,422,724. The fiscal year 2019 budget represents a decrease of $22,008 or .36 percent from the fiscal year 2018 budget of $6,444,732. Operating and maintenance expenditures total $4,000,316, a $50,408 increase from the 2018 budget. Program expenses are projected to be $1,264,083, increasing $177,939. Capital additions total $908,325, a decrease of $250,355. The contingency of $250,000 is unchanged from the 2018 budget. Material and services expenses are projected to increase by $348,244 or 17 percent primarily related to increased costs in water quality. The Subdistrict has no full-time staff and all personnel services are provided by Northern Water. The Subdistrict reimburses Northern Water for the actual time incurred doing Windy Gap activities. Labor reimbursement costs are estimated to increase by $184,048 or 27.6 percent compared to fiscal year 2018. The increase related primarily to engineering resources for the Connectivity Channel project.

    A summary of the total expenditures is provided in the chart below:

    Operating and Maintenance-$3,949,908

    Programs-$1,086,144

    Capital Expenditures-$1,158,680

    Contingency-$250,000

    Carriage DeliveryMaterials and ServicesPumping Energy and WheelingLaborContingency

    Total Major Expenses

    40%

    33%

    13%

    10%

    4%

    Carriage Delivery

    Materials and Services

    Pumping Energy and Wheeling

    Labor

    Contingency

    Percent ofTotal Usesof Funds

    40% 30 13 7 4

    100%

    Fiscal Year2019 Budget

    $ 2,584,525 1,898,433 840,000 849,766 250,000

    $ 6,422,724

    A summary of total expenditures by major expense categories is provided in the charts below:

    0

    2,000

    4,000

    6,000

    8,000

    10,000

    12,000

    2014 Actual 2015 Actual 2016 Actual 2017 Actual 2018 Projection 2019 Budget

    Signed Final ROD (Final Permit) May 2017

    Windy Gap EnterpriseLabor Hours Trend

    Windy Gap Enterprise Windy Gap Firming Enterprise

    Connectivity Channel

    $540 $560 $580 $600 $620 $640 $660 $680 $700 $720 $740

    2014 2015 2016 2017

    Thou

    sand

    s

    Windy Gap EnterpriseActual Labor Costs

    2014 2015 2016 2017

    A summary of labor costs and hours is provided in the charts below:

  • 23

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Operating and Maintenance

    Business Plan Priority - collect and deliver water

    Carriage expenses for the use of the C-BT conveyance and storage system to deliver Windy Gap water are expected to be the same compared to fiscal year 2019 budget.

    Carriage delivery and pumping energy and wheeling are operating expenses driven by volume of water pumped and delivered. Energy and wheeling costs for pumping 30,000 acre-feet of water are projected to be $840,000, no change from 2018 budget. Costs to maintain the pump plant and pipeline are expected to increase $47,699 mainly due to planned scada upgrades.

    A summary of the operating and maintenance expenses (62.3 percent of the total uses of funds) is provided in the table and chart below:

    Carriage DeliveryPumping Energy and WheelingPump Station and PipelineReservoir and Dam

    Total operating and maintenance expenses

    Budget

    $ 2,584,525 840,000 561,227 14,564

    $ 4,000,316

    $0

    $1

    $2

    $3

    $4

    2011 2012 2013 2014 2015 2016 2017

    Mill

    ions

    Windy Gap EnterpriseActual Operating and Maintenance

    Actual Operating and Maintenance

    A summary of carriage delivery costs and pumping energy and wheeling costs is provided in the charts below:

    $-

    $0.5

    $1.0

    $1.5

    $2.0

    $2.5

    2009 2010 2011 2012 2013 2014 2015 2016 2017

    Mill

    ions

    Windy Gap EnterpriseCarriage Delivery Costs

    Pumping Energy and Wheeling Costs

    Carriage Delivery Costs Pumping Energy and Wheeling Costs

    $-

    $500

    $1,000

    $1,500

    $2,000

    2009 2010 2011 2012 2013 2014 2015 2016 2017

    Thou

    sand

    s

    Windy Gap EnterpriseCarriage Delivery Costs by Entity

    Reclamation Northern Water

    A summary of pump station, pipeline and reservoir and dams expenses is provided in the charts below:

    $0

    $5,000

    $10,000

    $15,000

    $20,000

    $25,000

    2014Actual

    2015Actual

    2016Actual

    2017Actual

    2018Estimate

    2019Budget

    Windy Gap EnterpriseReservoir and Dam Expenses

    $-

    $100,000

    $200,000

    $300,000

    $400,000

    $500,000

    $600,000

    $700,000

    2014Actual

    2015Actual

    2016Actual

    2017Actual

    2018Estimate

    2019Budget

    Windy Gap EnterprisePump Station and Pipeline Expenses

  • 24

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Expenses

    Programs

    Programs expenses (19.7 percent of the total uses of funds) include primarily outside services and labor. Five additional tables are provided to show detail for Senior Management, Information Technology, Financial Services, Water Quality and Water Resources programs expense.

    A summary of programs expenses is provided in the chart and table below:

    Senior ManagementWater Quality Financial ServicesCommunicationsWater ResourcesInformation TechnologyContracts Allotments and InclusionsWater Records and AccountingForest HealthField ServicesWater ConservationReal EstateGeneral EngineeringEmergency and SecurityProject ManagementFacilities

    Total Program expenses

    Budget

    $ 487,764 315,683 129,884 78,898 63,992 59,922 56,573 15,893 8,018 5,278 5,000 4,157 1,457 425 139 31,000

    $ 1,264,083

    $ 885,608 378,475

    $ 1,264,083

    Expenses by Category

    Non Labor Labor

    Total

    Percent ofTotal Program

    Expenses

    38.6% 25.0 10.3 6.2 5.1 4.7 4.5 1.3 0.6 0.4 0.4 0.3 0.1 0.0 0.0 2.5

    100.0%

    $-

    $200,000

    $400,000

    $600,000

    $800,000

    $1,000,000

    $1,200,000

    $1,400,000

    $1,600,000

    2014 Actual 2015 Actual 2016 Actual 2017 Actual 2018 Estimate 2019 Budget

    Windy GapEight Largest Programs Expenses

    Communications Financial Services Contracts Allotments and Inclusions

    Facilities Information Technology Senior Management

    Water Quality Water Resources Total for Programs

  • 25

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Expenses, Programs

    Senior Management Program

    Business Plan Priority - cultivate operational and organizational excellence and maintain and strengthen relationships

    Senior Management program expenses are for general oversight of all Subdistrict activities including water rights, water planning, and policies, rules and procedures. In addition to legal, insurance and Board of Director expenses, costs related to participation in various regional and state-wide cooperative water programs including recovery and stream management and river basin studies are included in the Senior Management program. Also, other Senior Management expenses are charged to many individual projects and activities that are managed and budgeted by program managers.

    A summary of Senior Management program expenses is provided in the table below:

    Expenditures by Program and Category

    Senior ManagementFiscal Year

    2017 ActualFiscal Year

    2018 Budget

    Fiscal Year2018 Estimated

    ActualFiscal Year

    2019 Budget

    DollarChange From

    Fiscal Year2018 Budget

    Percentage Change From

    Fiscal Year2018 Budget

    Expenditures:Program SummaryGeneral Programs $129,452 $396,868 $136,468 $112,153 -$284,715 -71.74%

    Colorado River Wild and Scenic 39,854 75,194 76,194 43,097 -32,097 -42.69% Colorado River Stream Management Plan 7,676 13,216 9,216 21,403 8,187 61.95% Colorado River Front Range Council 14,730 10,732 10,732 21,106 10,374 96.66%Colorado Water Congress 2,481 17,775 17,775 13,000 -4,775 -26.86%Colorado River Fire Studies 19,697 17,573 17,573 12,612 -4,961 -28.23%Insurance 4,303 4,500 7,000 8,000 3,500 77.78%Legal Matters 121,765 135,418 100,418 98,599 -36,819 -27.19%Board of Directors 70,348 50,022 51,522 54,744 4,722 9.44%Travel and Training 3,086 6,068 6,068 3,000 -3,068 -50.56%

    Total $413,393 $727,366 $432,966 $387,714 -$339,652 -46.70%

    Summary by CategoryLabor $101,818 $87,266 $87,266 $86,314 -$952 -1.09%Non Labor 311,575 640,100 345,700 301,400 -338,700 -52.91%Total $413,393 $727,366 $432,966 $387,714 -$339,652 -46.70%

  • 26

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Expenses, Programs

    Water Quality Program

    Business Plan Priority - protect and conserve water supplies

    Water Quality expenses are primarily for the Windy Gap portion of expenses incurred for baseline monitoring of streams and reservoirs and water quality studies including a NEPA study in 2019. Baseline monitoring program objectives are to monitor nutrients, metals, general chemistry, phytoplankton and zooplankton depending on the location. The program tracks long and short term water quality changes in receiving streams, upstream and downstream of where the C-BT Project and Project water is released.

    A summary of Water Quality program expenses is provided in the table below:

    Expenditures by Program and Category

    Water QualityFiscal Year

    2017 ActualFiscal Year

    2018 Budget

    Fiscal Year2018 Estimated

    ActualFiscal Year

    2019 Budget

    DollarChange From

    Fiscal Year2018 Budget

    Percentage Change From

    Fiscal Year2018 Budget

    Expenditures:Program SummaryWater Quality Programs $43,814 $47,506 $47,506 $67,317 $19,811 41.70%Baseline Monitoring 88,910 82,212 82,212 129,676 47,464 57.73%Water Quality Studies 11,174 12,218 12,218 90,000 77,782 636.62%Watershed Groups 7,300 7,300 18,418 11,118 152.30%Regulations 5,544 3,310 3,310 --Travel and Training 397 2,500 2,500 6,962 4,462 178.48%

    Total $149,840 $151,736 $151,736 $315,683 $163,947 108.05%

    Summary by CategoryLabor $74,422 $45,236 $45,236 $81,440 $36,204 80.03%Non Labor 75,419 106,500 106,500 234,243 127,743 119.95%Total $149,840 $151,736 $151,736 $315,683 $163,947 108.05%

  • 27

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Expenses, Programs

    Financial Services Program

    Business Plan Priority - cultivate operational and organizational excellence

    The Financial Services program provides financial services including fund accounting, preparation of the Comprehensive Annual Financial Report, cash disbursements, fixed asset reporting, cash management, accounts receivable and financial planning for the annual budget and ad hoc financial analyses for special projects. Expenses include costs for the annual independent audit and cash managment services as well as labor charges for services provided by Northern Water for accounting and budgeting services described herein.

    A summary of Financial Services program expenses is provided in the table below:

    Expenditures by Program and Category

    Financial ServicesFiscal Year

    2017 ActualFiscal Year

    2018 Budget

    Fiscal Year2018 Estimated

    ActualFiscal Year

    2019 Budget

    DollarChange From

    Fiscal Year2018 Budget

    Percentage Change From

    Fiscal Year2018 Budget

    Expenditures:Program SummaryAccounting Services $60,938 $65,509 $65,359 $67,303 $1,794 2.74%Purchasing 176 188 188 -188 -100.00%

    Treasury 19,136 25,891 25,490 26,946 1,055 4.07% Budget 34,328 18,927 18,927 35,635 16,708 88.28%

    Total $114,578 $110,515 $109,964 $129,884 $19,369 17.53%

    Summary by CategoryLabor $79,984 $72,145 $72,145 $89,565 $17,420 24.15%Non Labor 34,594 38,370 37,819 40,319 1,949 5.08%Total $114,578 $110,515 $109,964 $129,884 $19,369 17.53%

  • 28

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Expenses, Programs

    Communications Program

    Business Plan Priority - maintain and strengthen relationships

    The Communications program provides internal and external communications and public outreach for the Municipal Subdistrict. Major functions and responsibilities include: facility tours and public speaking activities; coordinating, editing and writing all web, social media and printed materials; developing, coordinating and maintaining displays, maps and photos; and drafting Board and committee meeting minutes.

    In fiscal year 2019, the Communications program plans to update the Windy Gap informational brochure including associated graphics and videos in support of its continued effort to expand outreach formats to tell the public about the Subdistrict through stories, activities and projects.

    A summary of Communications program expenses is provided in the table below:

    Expenditures by Program and Category

    Communications Fiscal Year

    2017 ActualFiscal Year

    2018 Budget

    Fiscal Year2018 Estimated

    ActualFiscal Year

    2019 Budget

    DollarChange From

    Fiscal Year2018 Budget

    Percentage Change From

    Fiscal Year2018 Budget

    Expenditures:Program SummaryCommunications Programs $12,264 $26,783 $24,783 $73,254 $46,471 173.51%Communications Tours 7,434 5,000 5,000 5,644 644 12.88%

    Total $19,698 $31,783 $29,783 $78,898 $47,115 148.24%

    Summary by CategoryLabor $7,601 $9,283 $9,283 $50,398 $41,115 442.91%Non Labor 12,097 22,500 20,500 28,500 6,000 26.67%Total $19,698 $31,783 $29,783 $78,898 $47,115 148.24%

  • 29

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Expenses, Programs

    Water Resources Program

    Business Plan Priority - protect and conserve water supplies

    The Water Resources program performs engineering activities that support the Subdistrict with specific water rights investigations, operations modeling, river basin modeling, water availability studies, water supply quantifications and stream flow forecasting. Water Resources expenses for streamflow forecasting include the cost of forecast software as well as charges for USGS flow gaging. Budgeted expense for climate change is for outside consultant engineering work.

    A summary of Water Resources program expenses is provided in the table below:

    Expenditures by Program and Category

    Water ResourcesFiscal Year

    2017 ActualFiscal Year

    2018 Budget

    Fiscal Year2018 Estimated

    ActualFiscal Year

    2019 Budget

    DollarChange From

    Fiscal Year2018 Budget

    Percentage Change From

    Fiscal Year2018 Budget

    Expenditures:Program SummaryWater Resources General $2,500 $3,025 $3,025 $3,504 $479 15.83%Stream Flow Forecast 16,810 28,020 28,020 29,918 1,898 6.77%Climate Change 10,000 20,000 20,000 20,000 0 0.00%Riverware System Model 12,305 13,341 13,341 1,635 -11,706 -87.74%CBT Project Operations 1,286 1,748 1,748 2,649 901 51.54%Water Rights 3,774 5,412 5,412 860 -4,552 -84.11%Travel and Training 2,617 5,426 5,426 #DIV/0!

    Total $49,291 $71,546 $71,546 $63,992 -$7,554 -10.56%

    Summary by CategoryLabor $21,517 $22,218 $22,218 $14,664 -$7,554 -34.00%Non Labor 27,774 49,328 49,328 49,328 0.00%Total $49,291 $71,546 $71,546 $63,992 -$7,554 -10.56%

  • 30

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Expenses, Programs

    Information Technology Program

    Business Plan Priority - cultivate operational and organizational excellence

    The Information Technology program provides technical resources for network infrastructure, software maintenance, data management and client services in support of Subdistrict activities. Infrastructure support provides design, maintenance and troubleshooting of the network and other IT infrastructure including computers, switches, firewalls and connections to outside communication entities. Client support services provides a broad range of services including help desk calls, audio visual support and workstation management. Information Technology expenses are primarily incurred by Northern Water and charged to the Subdistrict.

    A summary of Information Technology program expenses is provided in the table below:

    Expenditures by Program and Category

    Information Technology Fiscal Year

    2017 ActualFiscal Year

    2018 Budget

    Fiscal Year2018 Estimated

    ActualFiscal Year

    2019 Budget

    DollarChange From

    Fiscal Year2018 Budget

    Percentage Change From

    Fiscal Year2018 Budget

    Expenditures:Program SummaryIT Support Services $50,379 $55,000 $55,000 $55,000 $0 0.00%

    Geographic Information System 3,176 3,976 3,976 1,550 -2,426 -61.02%Travel and Training 8,034 4,072 4,072 3,372 -700 -17.19%

    Total $61,588 $63,048 $63,048 $59,922 -$3,126 -4.96%

    Summary by CategoryLabor $11,209 $8,048 $8,048 $4,922 -$3,126 -38.84%Non Labor 50,379 55,000 55,000 55,000 0 0.00%Total $61,588 $63,048 $63,048 $59,922 -$3,126 -4.96%

  • 31

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Expenses, Programs

    Contracts, Allotments and Inclusions Program

    Business Plan Priority - cultivate operational and organizational excellence

    The Contracts, Allotments and Inclusions program provides administrative services to assure that all lands receiving Windy Gap water are within the boundaries of the Subdistrict. All petitions for inclusion are reviewed and processed and submitted to the Board of Directors for approval before being submitted to the U.S. Bureau of Reclamation for Secretarial Assent. Once Secretarial Assent is received, all documentation is sent to legal counsel to prepare a motion to District Court for Order including lands into Subdistrict boundaries. In addition, any changes or transfers of allotment contracts for 480 acre-feet units are processed through the Contracts, Allotments and Inclusions program.

    A summary of Contracts, Allotments and Inclusions program expenses is provided in the tables below:

    Expenditures by Program and Category

    Contracts Allotments and Inclusions

    Fiscal Year2017 Actual

    Fiscal Year2018 Budget

    Fiscal Year2018 Estimated

    ActualFiscal Year

    2019 Budget

    DollarChange From

    Fiscal Year2018 Budget

    Percentage Change From

    Fiscal Year2018 Budget

    Expenditures:Program SummaryAllotments $2,264 $2,000 $3,500 $3,500 --Inclusions 48,311 34,084 59,584 53,073 18,989 55.71%

    Total $50,575 $34,084 $61,584 $56,573 $22,489 65.98%

    Summary by CategoryLabor $32,909 $24,084 $24,084 $33,073 $8,989 37.32%Non Labor 17,666 10,000 37,500 23,500 13,500 135.00%Total $50,575 $34,084 $61,584 $56,573 $22,489 65.98%

  • 32

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Water Activity Enterprise Fund Overview (continued)

    Debt Service Expenditures

    At this time, Windy Gap has no noncurrent liabilities. All outstanding indebtedness incurred for the construction of the Windy Gap Project was fully defeased in 2016. There are no future Windy Gap capital projects planned that will be funded by capital financing. The Subdistrict does not have a specific debt limit dollar amount threshold.

    Capital Projects

    Connectivity ChannelPipeline Electromagnetic TestFuels Treatment and Wildfire RiskBuilding Security Upgrade

    Total

    Fiscal Year2019 Budget

    $ 540,000 250,000 103,325 15,000

    $ 908,325

    TotalCost Estimate(1)

    $ 15,000,000

    (1) If no amount is shown, the Fiscal Year 2019 budget amount represents the total project cost estimate.

    Colorado River Connectivity Channel Project $540,000

    Part of the 1041 permit conditions for Windy Gap Firming Project, the Windy Gap Reservoir Modification Study preferred alternative was the Connectivity Channel. The Connectivity Channel Project is a modification to the existing Windy Gap dam as necessary to bypass flows through and/or around the Windy Gap Reservoir. The focus for 2019 will be applying for the needed permits. The project contributions will be from Windy Gap Firming Project and several other organizations. The project is still waiting full funding.

    Cost sharing on projects to improve forest health and protect infrastructure from wildfire risks.

    The Subdistrict initiated a condition assessment on the Windy Gap pipeline in 1999. Initial testing indicated that the prestressing wire in the pipeline may be damaged. The Subdistrict has replaced two sections of damaged pipe and repaired several other. The Subdistrict continues non-destructive testing of the pipeline and the next planned interval is in 2019.

    Fuels Treatment and Wildfire Risk $103,325

    Pipeline Electromagnetic Test $250,000

    Building Security Upgrade $15,000

    Upgrade cameras, card access and other security components.

    Net Cash Flows from (use) OperationsNet Cash Produced

    Beginning Net PositionEnding Net Position

    Fiscal Year2018 Estimated

    Actual

    $ 343,531 343,531

    37,775,056 $ 38,118,587

    Fiscal Year2019 Budget

    $ 86,346 86,346

    38,118,587 $ 38,204,933

    Projected Net Position - Windy Gap

    The projected net position below is for fiscal years 2018 and 2019. Net position is the residual of all other financial statement elements presented in a statement of net position.

    Fiscal Year2017 Actual

    ( $ 1,890,828 ) ( 1,890,828 )

    39,665,884 $ 37,775,056

  • 33

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Firming Project Water Activity Enterprise Fund Overview

    Comparison of Sources and Uses by Fiscal Year

    PercentageChange From

    Fiscal Year2018 Budget

    6,854.67% 50.00%

    6,836.57%

    129.36% ( 100.00% ) ( 100.00% ) 38,660.00% 383.32% N/A

    1,034.49%

    Beginning Cash

    SOURCES OF FUNDS Contributions and Bond Proceeds Interest and Rental Income

    Total Sources

    Balance sheet source

    Total funds available

    USES OF FUNDS Capital Planning Permits Design Land and Improvements Construction Mitigation and Enhancements Proprty Management

    Total Uses

    Ending cash

    Total funds accounted for

    Fiscal Year 2017Actual

    $ 12,605,460

    10,534,897

    10,534,897

    1,919,957

    $ 25,060,314

    $ 8,593 351,780 8,622,916 1,007,570 3,297,923 647,021

    13,935,803

    11,124,511

    $ 25,060,314

    Fiscal year 2018 Budget

    $ 6,564,751

    7,500,000 20,000

    7,520,000

    $ 14,084,751

    $ - 218,000 6,247,000 1,500,000 283,000 2,553,889 -

    10,801,889

    3,282,862

    $ 14,084,751

    Fiscal year2018 Estimated

    Actual

    $ 11,124,511

    9,032,793 20,000

    9,052,793

    $ 20,177,304

    $ - 360,000 11,097,230 375,000 2,692,763 1,435,165 35,600

    15,995,758

    4,181,546

    $ 20,177,304

    Fiscal year 2019 Budget

    $ 4,181,546

    521,600,000 30,000

    521,630,000

    $ 525,811,546

    $ - 500,000 109,690,383 12,343,450 12,950

    122,546,783

    403,264,763

    $ 525,811,546

    Dollar ChangeFrom

    Fiscal Year 2018Budget

    $

    514,100,000 10,000

    514,110,000

    282,000 ( 6,247,000 ) ( 1,500,000 ) 109,407,383 9,789,561 12,950

    $ 111,744,894

    Beginning Cash

    $4,181,546

    Sources ofFunds

    $521,630,000

    Uses ofFunds

    $122,546,783

    Ending Cash

    $403,264,763

  • 34

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Firming Project Water Activity Enterprise Fund Overview (continued)

    Business Plan Priority - plan and implement new water supplies

    The Windy Gap Firming Project Water Activity Enterprise Fund is self-supporting through participants’ contributions. The Subdistrict has undertaken the Windy Gap Firming Project to increase the reliable firm yield of the exisiting Windy Gap Project. The annual delivery of Windy Gap Project water is not reliable in years of low spring runoffs, due to the Windy Gap Project’s junior water rights, and conversely, during some wet periods, storage space in Granby Reservoir is not available for Windy Gap Project water. In 1999, a group of the Windy Gap Project participants working through the Subdistrict, initiated the proposed Windy Gap Firming Project to complement the Windy Gap Project by firming a portion of their Windy Gap Project water units. The Windy Gap Firming Project participants include the Platte River Power Authority, Central Weld County Water District, Little Thompson Water District and the municipalities of Broomfield, Fort Lupton, Greeley, Lafayette, Longmont, Louisville, Loveland, Superior and Erie.

    The specific purpose of the Windy Gap Firming Project is to increase the firm yield to approximately 30,000 acre-feet of water from the existing Windy Gap Project. Additional reliability and yield will be achieved by constructing a new 90,000 acre-foot reservoir, the Chimney Hollow Reservoir, located southwest of Loveland and just west of Carter Reservoir, dedicated to store Windy Gap Project water. Firm water deliveries from the Windy Gap Project are needed to meet a portion of the existing and future demands of the Windy Gap Firming Project partcipants and ultimately the existing and future demands the end users served within the boundaries of the Subdistrict.

    The permitting process for the Windy Gap Firming Project began in 2003 and has included a 1041 permit which was received from Grand County in 2012, and an official Record of Decision (ROD) that was received from the U.S. Bureau of Reclamation in 2014, approving construction and operation of the Chimney Hollow Reservoir and a physical connection of the Chimney Hollow Reservoir and appurtenant facilities to the C-BT Project facilities. The Colorado Department of Public Health and Environment issued its 401 water quality certification for the Windy Gap Firming Project on March 25, 2016. Also, the State of Colorado officially endorsed the Windy Gap Firming Project and Chimney Hollow Reservoir on April 12, 2016. The final ROD and federal 404 Clean Water Act (CWA) permit from the U.S. Army Corps of Engineers was signed on May 17, 2017. This 404 CWA permit is the final federal requirement needed to construct Chimney Hollow Reservoir. Detailed design of the Windy Gap Firming Project facilities is expected to be complete in early 2019, followed by 41 months of construction and is expected to be operational in 2023. The estimated cost of the reservoir and appurtenant facilities is approximately $521.6 million.

    The fiscal year 2019 Windy Gap Firming Project budget totals $122.5 million. This represents an increase of $111.7 million from the fiscal year 2018 budget. The increase is due to the planned construction of Chimney Hollow Reservoir.

    $-

    $100

    $200

    $300

    $400

    $500

    $600

    $-

    $2

    $4

    $6

    $8

    $10

    $12

    $14

    $16

    2012 2013 2014 2015 2016 2017 2018 2019

    Mill

    ions

    Mill

    ions

    Windy Gap Firming EnterpriseContributions

    Actual Projected

    $-

    $50

    $100

    $150

    $200

    2012 2013 2014 2015 2016 2017 2018 2019

    Mill

    ions

    Windy Gap Firming EnterpriseConstruction in Process

    Actual Estimate

    A summary of construction in progress costs and contributions are provided in the charts below:

  • 35

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictWindy Gap Firming Project

    Hansen Feeder Canalto Horsetooth Reservoir

    Saint Vrain Supply Canal to Lyons

    SouthernWater SupplyPipeline

    Flatiron Penstocks

    PowerPlant

    Access Road

    Bald Mountain Tunnelfrom Pinewood Reservoir Chimney Hollow

    Inlet Pipe

    SpillwayChannel

    Dam

    Dam

    Dam

    Dam

    DamDam

    Inlet/Outlet Tunnel

    ChimneyHollow Reservoir

    CarterLakeReservoir

    FlatironReservoir

    Proposed Chimney Hollow

    Facilities

    Flatiron/CarterPressure Tunnel

    Spillway Canal& Stilling Basin18E

    18E

    31

    31

    8E

    C-BT Project Existing FacilitiesChimney Hollow PipelineSpillway ChannelInlet/Outlet TunnelSpillway CanalProposed Dams

    Legend

    Northern Colorado Water Conservancy DistrictMunicipal Subdistrict

  • 36

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Windy Gap Firming Project Proposed Financing Structure

    The anticipated plan for financing consists of a Senior/Subordinate structure in which the Windy Gap Firming Water Activity Enterprise will issue Senior Lien Revenue Bonds (Senior Bonds) and will also enter into a Subordinate Lien Loan (Subordinate Loan) from the Colorado Water Conservation Board (CWCB). The amount of the Subordinate Loan will be up to $90 million. Section 12 of House Bill 17-1248 authorized the CWCB to make the Subordinate Loan for the Windy Gap Firming Project. The Governor signed the bill on May 23, 2017. Final approval of the Subordinate Loan by CWCB was November 15, 2017.

    The Senior Bonds are anticipated to be a fixed-rate bond issuance of approximately $194 to $374 million. The proceeds of the Senior Bonds along with the Subordinate Loan, when combined with other funds provided by the Windy Gap Firming Project participants, will be used to pay the costs associated with the construction and completion of the Windy Gap Firming Project. It is expected that the Senior Bonds will close by the end of 2019.

    Projected Net Position - Windy Gap Firming

    The projected net position below is for fiscal years 2018 and 2019. Net position is the residual of all other financial statement elements presented in a Statement of Net Position.

    ContributionsNet Cash Produced

    Beginning Net PositionEnding Net Position

    Fiscal Year2017 Actual

    $ 10,534,897 10,534,897

    33,161,451 $ 43,696,348

    Fiscal Year2018 Estimated

    Actual

    $ 9,052,793 9,052,793

    43,696,348 $ 52,749,141

    Fiscal Year2019 Budget

    $ 521,600,000 521,600,000

    52,749,141 $ 574,349,141

    The significant increase in net position is the result of receiving contributions with no operation and maintenance expense. This fund has no operations at this time and will start when the Chimney Hollow Reservoir is completed.

    Percent ofTotal Usesof Funds

    89.51% 10.07 0.47 0.01

    100%

    89.51%

    10.07%

    0.41% 0.01%

    Construction

    Mitigation andEnhancements

    Permits

    Property Management

    ConstructionMitigation and EnhancementsPermitsProperty Management

    Total

    Budget

    $ 109,690,383

    12,343,450 500,000 12,950

    $ 122,546,783

    Windy Gap Firming Project Water Activity Enterprise Fund Overview (continued)

    Capital Expenditures

    A summary of the expenses is provided in the table and charts below:

  • 37

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictWindy Gap Firming Project Participants

    N

    C-BT Delivery System

    Northern Water Boundaries

    CARTERLAKE

    HORSETOOTHRESERVOIR

    RAWHIDEEnergy Station

    FLATIRONRESERVOIR

    BOULDERRESERVOIR

    South Platte Rive

    r 2

    4 5

    12

    3

    119

    18

    Cache la Poudre River

    6

    7

    10

    Participants Storage Volume

    (acre-foot) Percent1 Broomfield 26,464 29.40%

    2 PRPA Service Area 16,000 17.78%

    4 Loveland 9,587 10.65%

    5 Greeley 9,189 10.21%

    3 Longmont 8,000 8.89%

    6 Erie 6,000 6.67%

    7 Little Thompson Water District 4,850 5.39%

    8 Superior 4,726 5.25%

    9 Louisville 2,835 3.15%

    10 Fort Lupton 1,103 1.23%

    11 Lafayette 900 1.00%

    12 Central Weld County Water District 346 0.38%90,000 100%

  • 38

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAdopted BudgetFiscal Year 2019

    Municipal Subdistrict District Fund Overview

    The Municipal Subdistrict District Fund, in accordance with Colorado statutes, is the owner of the Windy Gap Water Activity Enterprise Fund and the Windy Gap Firming Project Water Activity Enterprise Fund.

    Comparison of Sources and Uses by Fiscal Year

    PercentageChange From

    Fiscal Year2018 Budget

    Beginning cash

    SOURCES OF FUNDS

    Revenues Contributions Earnings on Investments

    Total Sources

    Total Funds Available

    USES OF FUNDS

    Expenses Board of Directors

    Total Uses

    Ending Cash

    Total Funds Accounted For

    Board Expenses FICA Legal fees Directors’ fees Travel/lodging/meals/data Bonds

    Total

    Fiscal Year2017 Actual

    $ 15,374

    69,500 2

    69,502

    $ 84,876

    $ 68,836

    68,836

    16,040

    $ 84,876

    $ 1,889 22,910 24,700 19,237 100

    $ 68,836

    Fiscal Year2018 Budget

    $ 17,173

    100,050 2

    100,052

    $ 117,225

    100,050

    100,050

    17,175

    $ 117,225

    $ 2,200 37,950 28,800 25,500 5,600

    $ 100,050

    Fiscal year2018 Estimated

    Actual

    $ 16,040

    78,600 2

    78,602

    $ 94,642

    $ 79,480

    79,480

    15,162 $ 94,642

    $ 2,200 24,880 28,800 23,500 100

    $ 79,480

    Fiscal Year2019 Budget

    $ 15,162

    100,050 2

    100,052

    $ 115,214

    100,050

    100,050

    15,164

    $ 115,214

    $ 2,200 37,950 28,800 25,500 5,600

    $ 100,050

    Dollar ChangeFrom

    Fiscal Year 2018 Budget

  • 39

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAcronyms

    AFAcre-foot or Acre-feet

    CAFRComprehensive Annual Financial Report

    C-BTColorado-Big Thompson Project

    CIPCapital Improvement Plan

    COEU.S. Army Corps of Engineers

    COPsCertificates of Participation

    CWCBColorado Water Conservation Board

    CRSColorado Revised Statutes

    CWAClean Water Act

    DEISDraft Environmental Impact Statement

    DOLADepartment of Local Affairs (Colorado)

    EAMEnterprise Asset Management

    EISEnvironmental Impact Statement

    EPAEnviromental Protection Agency

    FEMAFederal Emergency Management Agency

    FTEFull time equivalent

    FONSIFinding of no significant impact

    GAAPGenerally Accepted Accounting Principles

    GASBGovernmental Accounting Standards Board

    GISGeographic Information System

  • 40

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictAcronyms

    IPSInvestment Policy Statement

    NEPANational Environmental Policy Act

    NORTHERN WATERNorthern Colorado Water Conservancy District

    NRCSNatural Resource Conservation Service

    NWRANational Water Resource Association

    RODRecord of Decision

    ROWRight of Way

    SUBDISTRICTMunicipal Subdistrict, Northern Colorado Water Conservancy District

    TABORTaxpayers Bill of Rights, revenue and tax limit amendment. See Amendment 1 (glossary).

    TIFTaxing Increment Finance District

  • 41

    Municipal Subdistrict, Northern Colorado Water Conservancy DistrictGlossary

    Accounting StandardsSubdistrict’s financial statements are prepared in accordance with principles generally accepted in the United States of America (GAAP). Additionally, the Subdistrict applies all applicable pronouncements of the Governmental Accounting Standards Board.

    Acre-foot or Acre-feetVolume of water equal to one foot in depth covering an area of one acre, or 43,560 cubic feet; approximately 325,851 gallons. One acre-foot is roughly the amount needed to serve 2.5 families each year.

    Adopted BudgetThe budget adopted by the Board of Directors at the August Planning and Action meeting. The adopted budget becomes effective annually as of October 1, and appropriations lapse at fiscal year end (September 30).

    AllocationsDistribution of costs.

    Amendment 1Approved by the electorate in the November 1992 election, this amendment is known as the Taxpayers Bill of Rights (TABOR). This is a revenue and expenditure limiting amendment to the Colorado constitution. The limit is determined by whichever is more restrictive to the growth of government.

    AppropriationLegal authorization granted by the Board to make expenditures as specified in the appropriating resolution.

    AssetsEconomic resources owned by the Subdistrict.

    AuditA systematic collection of sufficient, competent evidential matter needed to attest to the fairness of management’s assertions in the financial statements.

    Basis of AccountingThe Subdistrict’s financial statements are accounted for on the flow of economic resources measurement focus, using the accrual basis of accounting. Under this method, all assets and liabilities associated with operations are included on the statement of net assets, revenues and are recorded when earned, and expenses are recorded at the time liabilities are incurred. This is different from the basis of budgeting.

    BoardIn the Subdistrict, this is a 12-member group of appointed officials.

    BudgetA financial plan for a specif