national highways authority of india - nhai.org.innhai.org.in/spw/iereport/quarterly report for the...

74
NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) NATIONAL HIGHWAY PROJECT PHASE II CONSULTANCY CONTRACT NO: IE Independent Engineer Services for four Lining of Chenani to Nashri (New Alignment) of NH 1A including 9 KM Long Tunnel (2 Lane) with Parallel Escape Tunnel on BOT (Annuity) basis in the State of Jammu & Kashmir (Package no. IE/NHDP-Phase-II/BOT/V/J&K) QUARTERLY PROGRESS REPORT NO: 21 JUNE 2016 TO AUGUST 2016 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd.

Upload: phungnhu

Post on 03-Jul-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

NATIONAL HIGHWAYS AUTHORITY OF INDIA

(Ministry of Shipping, Road Transport & Highways)

NATIONAL HIGHWAY PROJECT PHASE – II

CONSULTANCY CONTRACT NO: IE

Independent Engineer Services for four Lining of Chenani to Nashri (New Alignment) of NH 1A including 9 KM Long Tunnel (2 Lane) with Parallel Escape Tunnel on BOT (Annuity) basis in the State of Jammu & Kashmir

(Package no. IE/NHDP-Phase-II/BOT/V/J&K)

QUARTERLY PROGRESS REPORT NO: 21

JUNE 2016 TO AUGUST 2016

Euroestudios S. L. Spain

in Association with

Segmental Consulting & Infrastructure Advisory (P) Ltd.

Page 2: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 1

TABLE OF CONTENTS

1. PROJECT OVERVIEW ...................................................................................................................................... 3

1.1. INTRODUCTION ...................................................................................................................................... 3

1.2. THE PROJECT ROAD ............................................................................................................................. 3

1.3. THE PROJECT ROAD CONSTRAINTS .................................................................................................. 3

1.4. PROPOSED PATNITOP TUNNEL ALIGNMENT .................................................................................... 4

1.5. PROJECT MAP ........................................................................................................................................ 5

2. PROJECT ASSIGNMENT .................................................................................................................................. 6

2.1. BACKGROUND ........................................................................................................................................ 6

3. MOBILIZATION OF AGENCIES ........................................................................................................................ 6

3.1. INDEPENDENT ENGINEER .................................................................................................................... 6

3.2. ROLE AND FUNCTIONS OF IE .............................................................................................................. 6

3.3. ORGANISATION CHART AND STAFF LIST........................................................................................... 7

3.4. DRAWL OF AGREEMENT WITH C0NCESSIONAIRE ........................................................................... 9

3.5. PIU............................................................................................................................................................ 9

4. PRE-CONSTRUCTION ACTIVITIES ................................................................................................................. 9

4.1. SHIFTING OF UTILITIES ......................................................................................................................... 9

4.2. UTILITIES SHIFTING & OTHER HINDRANCES ................................................................................... 10

4.2.1 STATUS OF UTILITY SHIFTING ........................................................................................................... 10

4.2.2 HINDRANCES ........................................................................................................................................ 10

5. CONSTRUCTION SCHEDULE ........................................................................................................................ 11

5.1. CONSTRUCTION SHEDULE AS PER MILESTONE TARGET ............................................................ 11

5.2. INAUGURATION .................................................................................................................................... 11

5.3. TUNNEL BREAKTHROUGH’S .............................................................................................................. 11

6. CONTRACTOR´S RESOURCES .................................................................................................................... 12

7. MEETINGS/SITE VISIT/REVIEW OF DOCUMENTS ...................................................................................... 13

7.1. MEETINGS ............................................................................................................................................. 13

7.2. SITE VISITS ........................................................................................................................................... 13

7.3. REVIEW OF DOCUMENTS/DRAWINGS ............................................................................................. 14

8. INVOICES PAYMENT & REIMBURSEMENT ................................................................................................. 20

Page 3: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 2

9. EXECUTING AGENCIES AND CONTRACT DATA ....................................................................................... 20

9.1 AGENCIES ........................................................................................................................................ 20

9.2 CONTRACT DATA ............................................................................................................................ 20

9.2.1 PROJECT COST .............................................................................................................................. 20

9.2.2. CIVIL WORKS CONTRACT DETAILS ............................................................................................. 21

9.2.3 SCOPE OF WORK ........................................................................................................................... 21

10. WEATHER REPORT ....................................................................................................................................... 22

11. PROGRESS OF THE PROJECT ..................................................................................................................... 25

11.1 ESTIMATION OF PHYSICAL PROGRESS IN GLOBAILITY ........................................................... 25

11.2 TUNNEL WORKS MONITORING ..................................................................................................... 26

11.3 PHYSICAL PROGRESS CHART .................................................................................................... 28

12 QUALITY CONTROL AND TESTING OF MATERIALS ................................................................................ 34

12.1 UP TO DATE STATUS OF TEST ..................................................................................................... 34

12.2 TEST RESULT OF CONCRETE CORE & CUBES .......................................................................... 35

13 SAFETY REPORT ........................................................................................................................................... 67

14 MINUTES OF MONTHLY PROGRESS MEETING......................................................................................... 68

15 PHOTOGRAPHIC REPORT ............................................................................................................................ 69

Page 4: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 3

1. PROJECT OVERVIEW

1.1. INTRODUCTION

The Ministry of Road Transport and Highway (MORT&H) has taken a strategic decision to develop the

North-South corridor connecting Srinagar (J&K) to Kanya Kumari (Tamilnadu). The National Highways

Authority of India (NHAI) has been appointed by MORT&H, to implement this development.

NHAI have appointed the Louis Berger Group, Inc., USA, in Joint Ventures with LRP Consultants,

India and in association with L&T Ramboll, India, and D2 Consultant for Tunnel as consultants to carry

out the detailed design, for the Patnitop Tunnel of the NH-1A, between Udhampur and Banihal (Km 66

to Km. 188) in the state of Jammu and Kashmir.

1.2. THE PROJECT ROAD

The NH-1A National Highway will be upgraded from its present two-lane layout, to a four-lane divided

carriageway configuration. The design of the road between Udhampur and Banihal, Km 67 to Km. 188

is being carried out in five separate packages. The project will require the construction of numerous

structures, including one approx. 9 Km. long Tunnel (Patnitop Tunnel) and six short Tunnels (Tunnels

with length below 1 km).

1.3. THE PROJECT ROAD CONSTRAINTS

The existing road alignment of the NH-1A between Km 67 and Km 188 is typified by sub-standard, and

often steep curves and gradients, in the horizontal and vertical planes. The proposed improvement will

entail widening towards the valley side along most of the road, which will also involve the construction

of many new structures, including viaducts, bridges, retaining walls and Tunnels.

The project road area is within a region that is prone to frequent earthquakes of sizeable magnitude.

Much of the rock in the area is well jointed and highly fragmented. Combining seismic activity, with the

extreme prevailing weather conditions, also means the area experiences constant landslides.

The Kashmir region, with its exceptional scenic landscapes, abundant wildlife, culture diversity and

profuse number of historic and religion building, is a ‘Mecca’ for tourists from every corner of the globe.

The NH-1A being the main route between the principal cities of Jammu and Srinagar carries most of

the tourist for the entire area. Tourism peaks during the summer months of July and August, but spring

and autumn, can also be busy.

Page 5: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 4

1.4. PROPOSED PATNITOP TUNNEL ALIGNMENT

In previous design stages different alternatives have been investigated for Tunnel, crossing of the

Patnitop range in approx. station Km 90 to Km 130 of the existing NH-1A. Five Tunnel alternatives

varying from 1.2 Km length have been assessed and presented in earlier design stages. As the

optimum alternative, the longest one, a base Tunnel at elevation of approx. 1220 m a.s.l. was

approved for further investigation and elaboration of the Tunnel civil tender design documents.

Concerned section Km. 67 to Km. 188 is being carried out in five separate packages 1 – 5.

Patnitop Tunnel is designed as a base Tunnel. Passing under the Patnitop mountain range with

overburden more than 1 Km and belongs to NHDP Phase- II. This contract package start at existing

road starts from Km 89 and ends at Km 130 of existing road. Tunnel mined portals are located at

approx. start of Km 90 (southern portal) close to village of Chenani and Km 130 (northern portal) close

to township of Batote of existing road at elevations 1230 m and 1210 m respectively. Tunnel profile

grade is of a roof character with 0.5 % longitudinal profile grade. Tunnel horizontal alignment starts

and ends with curves of 300 m radius, and the rest of mid-section is straight. Main Tunnel direction is

South to North. Travel distance will be reduced for more than 30 Km and climbing and descending of

approx. 1000 m shall be avoided. Tunnel shall be 2-lane, bidirectional tunnel with parallel escape

Tunnel and cross connections into escape Tunnel for emergency exit.

The Existing road (2-lane, bidirectional) will be utilized to accommodate the local traffic in the area as

well as over-sized and other vehicles non-suitable for tunnel operation. The existing carriageway will

be upgraded with minor improvement to both the horizontal and vertical alignment.

Page 6: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 5

1.5. PROJECT MAP

Page 7: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 6

2. PROJECT ASSIGNMENT

2.1. BACKGROUND

NHAI have appointed the Louis Berger Group, Inc., USA, in Joint Venture with LRP Consultants, India

and in association with L&T Ramboll, India, as consultant to carry out the Feasibility Study and DPR

for 4-Laning of the section Udhampur to Banihal, Km. 66 to Km 188 of NH-1A in the State of Jammu

and Kashmir. The Complete project length is divided into 5 packages.

3. MOBILIZATION OF AGENCIES

3.1 INDEPENDENT ENGINEER

It was decided that Independent Engineer may be invited to participate for project management so as

to have proper management and quality assurance. Accordingly Bids were invited from pre-qualified

and shortly listed consultants and the work was allotted to M/s Euroestudios.S.L. In Association with

M/s Segmental Consulting and Infrastructure Advisory (Pvt.) Ltd. In an agreement for Independent

Engineer, services were entered into between National Highways Authority of India, Plot No. G-5 and

G-6, Sector No.10, Dwarka, New Delhi- 110045 and M/s M/S Euroestudios.S.L., Castelló 128, E-

28006 MADRID, ESPAÑA in Association with M/s Segmental Consulting and Infrastructure Advisory

(P) Ltd., Unit No. 419A-421, Spaze I Tech Park, Tower B-4.Sector 49, Sohna Road Gurgaon-122002–

India, by Letter No. NHAI/12015/GM (N-1)/CS-88-92/JK/2010/512 dated 05th April 2011 for

commencement of service and accordingly mobilization of Key/ Sub Key Personnel was done. M/S

Euroestudios, S.L. in Association with M/s Segmental Consulting and Infrastructure Advisory (P) Ltd.,

as Independent Engineer in accordance with the terms of the agreement in MOU, have deployed

personnel to look after the project.

Office Building for Team has been hired at Ekta Vihar, Near M.H. Hospital, Udhampur (J&K) and office

is fully operational.

3.2 ROLE AND FUNCTIONS of IE

The role of IE has been described in schedule “Q” of Concession Agreement between NHAI and CNTL

(SPV created by IL&FS) the main points are described below.

Review of Drawings & Documents.

Review, Inspection and Monitoring of construction work.

Conducting testing on completion of construction & issuing completion/ provisional certificate.

Review, Inspection & Monitoring of Divestment requirements.

Determining as required under the Agreement, the costs of any works or services and / or their

reasonableness.

Determining, as required under the Agreement, the period or any extension thereof, for

performing any duty or obligation.

Assisting the parties in resolution of disputes.

Undertaking all other duties and functions in accordance with Agreement.

Page 8: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 7

3.3 ORGANIZATION CHART AND STAFF LIST

Key Staff S.No Position Name Date of Joining Remarks

1 Team Leader cum Sr. Tunnel Expert Mr. Valentín Salcedo 25.05.2011

2 Tunnel Design Engineer 31.05.2011 Completed

3 Sr. Geologist 01.06.2011 Completed 4 Sr. Geotechnical Engineer Mr. Cesar Andia 11.08.2011 5 Sr. E & M Expert Mr. José Manuel Pineda 28.04.2012 6 Tunnel Safety Expert Mr. Sanjay Kr. Sharma 02.06.2011 7 Tunnel Ventilation Expert Mr. Ajit Kumar Swain 18.02.2015 8 9

10 11 12 13 14 15

Tunnel Excavation Expert Tunnel Lining Expert Tunnel Lighting Expert Senior Quality Cum Material Expert Bridge / Structural Engineer Financial Expert Legal Expert

Mr. Subash Chander Mr. Mihir Kumar Sahu Mr. Manish Kr. Sharma

01.06.2011 13.08.2015 30.06.2011 03.06.2011 03.06.2011 30.03.2016 28.06.2011

Completed

Completed Completed Completed

Tunnel Engineer-1 25.05.2011 Completed 16 Tunnel Engineer-2 Mr. Neeraj Singh Datta 01.06.2011

Sub-Professional Staff S.No Position Name Date of Joining Remarks

1 Tunnel Fire Fighting Expert Mr. Z.K. Khaishagi 04.04.2016

2 Environmental Expert 01.09.2011 Completed

3 4

Hydrologist/Drainage Expert Hydrologist/Drainage Expert

01.09.2011 15.09.2011

Completed Completed

5 Geologist 12.09.2011 Completed 6 Geo-technical Engineer 13.07.2011 Completed

7 Material Engineer 08.07.2011 Completed 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23

Material Engineer Quantity Surveyor Highway Engineer Bridge Engineer Traffic & Transportation Expert Survey Engineer Survey Engineer Assist. Tunnel Excavation Expert Assist. Tunnel Excavation Expert Assist. Tunnel Lining Expert Assist. Tunnel Lining Expert Horticulturalist Lab. Technician Lab. Technician HTMS/Toll Expert CAD Expert

Mr. Vikas Gupta Mr. Rajesh Mishra Mr. Bharat Goel

03.10.2011 02.01.2012 01.10.2013 03.01.2014 15.07.2013 02.04.2012 01.08.2011 01.11.2014 13.06.2011 17.06.2011 20.06.2011 14.07.2014 01.01.2013 24.06.2011 21.09.2015 02.01.2012

Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed

Completed

Support Staff S.No Position Name Date of Joining Remarks

1 Office Manager Ms. Akanksha Dubey 04.04.2016

2 Accountant Mr. Pankaj Gupta 01.10.2013

3 Cashier Mr. J.S. Jaswal 12.04.2012

4 Steno Mr. Akash Anand 01.08.2016

5 Computer Operator Mr. Sahil Gupta 01.08.2016

6 Photocopier Mr. Sanat Kr. Mishra 25.05.2011

7 Office Boy Mr. Subash Chander 01.07.2011

8 9

Security Guard Security Guard

Mr. Kewal Singh Mr. Jeevan Lal

01.02.2015 01.07.2016

Page 9: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 8

ORGANISATION CHART

Page 10: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 9

3.4 DRAWL OF AGREEMENT WITH CONCESSIONAIRE

Agreement was drawn by NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI) with Chenani

Nashri Tunnel way Limited. (CNTL) on 28th July 2010. For this project IL&FS Transportation

Networks Ltd has formed a Special Purpose Vehicle (SPV) by the name of Chenani Nashri Tunnel

way Limited (CNTL) (hereinafter referred as the “Concessionaire”).

3.5 PIU

PROJECT DIRECTOR.

National Highway Authority of India – PIU

315/1, 2nd

Floor, Channi Himmat

Jammu (J&K) 180015

4. PRE-CONSTRUCTION ACTIVITIES

4.1. SHIFTING OF UTILITIES

Km.89.00 to 90.20

(0.00-1.20)

Hilly Section

Revenue Land /Private Land

Km 00.00 to Km 00.300

Land Handed over, however

compensation for trees

pending payment by ADC.

Km 00.300 to 1.20

Compensation for Land,

Structures & Trees pending

payments by ADC.

Km. 90.20 to 130 Hilly Section

Forest Land

Km 1.20-10.70

Land Handed Over. Forest

Diversion Cost Deposited.

Page 11: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 10

4.2. UTILIES SHIFTING & OTHER HINDRANCES

4.2.1. STATUS OF UTILITY SHIFTING

North Portal

S. No. List of Utilities Chainage Unit Total Status

1 OFC Pillar 129.100-129.500 & 129.500- 130.00 Nos. 11 Completed

2 Electrical Pole 129.100-129.500 & 129.500-130.00 Nos. 41 Completed

3 Transformer 129.100-129.500 Nos. 2 Completed

4 Hand Pump 129.500- 130.00 Nos. 2 Completed

5 Shops 129.500- 130.00 Nos. 6 Completed

South Portal

S. No. List of Utilities Chainage Unit Total Status

1 OFC Pillar 89.000-90.000 Nos. 8 Completed

2 Electrical Pole 89.050-90.00 Nos. 15 Completed

3 Transformer 89.950 Nos. 1 Completed

4 33KVA ELECTRICAL POLE at Km 89.500 Nos. 18 Completed

5 HT Tower 89.680 Nos. 1 Completed

6 440 VA line near Toll Plaza 89+850 Completed

7 Electrical Pole Line 89.600-90.000 Nos. 5 Completed

8 Water Line 89.900-90.000 Nos. 2 Completed

9 House 89.650-89.700, 89.900-90.000 Nos. 6 Completed

10 Shops 89.000-89.300,89.350- 89.400,89.950-90.000

Nos. 17 Completed

11 Religious Structure 89.100,89.400,89.800 Nos. 3 Completed

12 Telephone Pole 89.050-89.200,89.750- 89.900,89.950-90.000

Nos. 7 Completed

13 Hand Pump 89.100 Nos. 1 Completed

14 PMGSY/Public Path Nos. 1 Completed

15 House beyond Km 89.0 Nos. 1 Completed

15 Telephone Tower 89.100 Nos. 1 Completed

4.2.2. HINDRANCES

NIL

Page 12: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 11

5. CONSTRUCTION SCHEDULE

5.1 CONSTRUCTION SHEDULE AS PER MILESTONE TARGETS.

Milestone Financial Percentage

Date of Achievement of Milestone as envisaged

in Concession Agreement

Remarks

Appointed Date (As per Agreement)

0% 23-05-11 Appointed Date of the Project

Project Milestone 1 10% 23-11-11 Achieved

Project Milestone 2 20% 23-05-12 Achieved

Project Milestone 3 30% 23-11-12 Achieved

Project Milestone 4 40% 23-05-13 Achieved

Project Milestone 5 50% 23-11-13 Achieved

Project Milestone 6 60% 23-05-14 Achieved

Project Milestone 7 70% 23-11-14 Achieved

Project Milestone 8 80% 23-05-15 Achieved

Project Milestone 9 90% 23-11-15 Achieved

Project Milestone 10 100% 23-05-16

5.2 INAUGURATION

Escape Tunnel (South Portal) First blast taken on 8th

August 2011

Main Tunnel (South Portal) First blast taken on 18th

August 2011

Escape Tunnel (North Portal) First blast taken on 8th

October 2011

Main Tunnel (North Portal) First blast taken on 22nd

October 2011

5.3 TUNNEL´S BREAK THROUGHS

Escape Tunnel 2nd

June 2014

Main Tunnel 13th July 2015

Page 13: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 12

6. CONTRACTOR´S RESOURCES

Description Model

Quantity

Brought From South Portal

North Portal

Boomer Drill E2C with Protection Roof(ROPS) 02 01 IMPORTED-SWEDEN

Boomer Drill XE3C with Protection Roof(ROPS) 02 01 IMPORTED-SWEDEN

Shotcrete Machine Aliva 263/Aliva 265 01/01 00/00 LOCAL-INDIA

Shotcrete Machine Spraymec 7110 / Spraymec 8100 00/01 02/00 IMPORTED-FINLAND

Shotcrete Machine Aliva 264 01 00 LOCAL-INDIA

Concrete Spraying Machine SIKA PM 500PC 01 01 LOCAL-INDIA

Plat Form Ashok Leyland 01 00 LOCAL-INDIA

Wheel Loader 2021Z 01 01 LOCAL-INDIA

Wheel Loader 500 Mega with 4.8 Bucket 00 01 IMPORTED

Wheel Loader 980H 01 01 IMPORTED

Tunnel Trucks 05 05 IMPORTED-GERMANY

Rock Header / Cutting Machine TC-E Hydraulic (140 KW max) 02 00 IMPORTED-USA

Crane-Truck Mounted HB120E3M 01 01 LOCAL-INDIA

Fuel Bowser Tanker 12000 Ltr. / 8000 Ltr/ 950 Ltr. 00/01/01 01/01/00 LOCAL-INDIA

Transit Mixers 13 00 LOCAL-INDIA

Air Compressor 05 07 LOCAL-INDIA

Generator Set 11 10 LOCAL-INDIA

Concrete Static Pump SP 1400 with Leaf Spring & 100 Mtr 01 01 LOCAL-INDIA

Batching Plant 03 03 LOCAL-INDIA

Main Tunnel Form-Gantry 02 02 LOCAL-INDIA

Main Tunnel Membrane Carrier Platform

02 02 LOCAL-INDIA

Main Tunnel Layby Form 01 01 LOCAL-INDIA

Main Tunnel Layby Membrane Carrier Platform

01 01 LOCAL-INDIA

Escape Tunnel Form-Gantry 01 01 LOCAL-INDIA

Escape Tunnel Membrane Carrier Platform

02 02 LOCAL-INDIA

Cross Passages Form-Gantry 01 01 LOCAL-INDIA

Cross Passage-Membrane Carrier Platform

02 02 LOCAL-INDIA

Ventilation Slab Platform 03 03 LOCAL-INDIA

Ventilation Slab Carrier 01 01 LOCAL-INDIA

Partion Walls Form Work 01 01 LOCAL-INDIA

LV Separation Walls Form Work 01 01 LOCAL-INDIA

LV Niches Form 01 01 LOCAL-INDIA

Niches Single 01 01 LOCAL-INDIA

Niches-Double 02 02 LOCAL-INDIA

Collar Form-ET 01 01 LOCAL-INDIA

Collar Form-MT 01 01 LOCAL-INDIA

Side Wall Member Form-MT 01 01 LOCAL-INDIA

Side Wall Panel-MT 01 01 LOCAL-INDIA

Page 14: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 13

7. MEETINGS /SITE VISITS / REVIEW OF DOCUMENTS

7.1 MEETINGS

Team Leader attending meeting at South Portal Conference Hall on dated: 13.07.2016.

Acting Team Leader attending meeting at DC Office Udhampur on dated: 17.07.2016

Team Leader attending meeting with PD NHAI at PD office Jammu on dated: 22.08.2016

Team Leader attending meeting at Mada Office Chenani on dated 27.08.2016.

7.2 SITE VISITS

Team Leader visit South and North Portal on dated: 08.06.2016.

Team Leader visit South and North Portal on dated: 15.06.2016.

Team Leader visit South Portal on dated: 24.06.2016.

Team Leader visit North Portal on dated: 28.06.2016.

Team Leader visit SAR, Toll Plaza & Main Tunnel South Portal on dated: 01.07.2016.

Team Leader visit SAR and Main Tunnel South Portal dated: 13.07.2016.

Acting Team Leader visit South Portal on dated: 23.07.2016.

Acting Team Leader visit South Portal on dated: 27.07.2016.

Team Leader visit SAR Land Slide dated: 06.08.2016

Team Leader visit SAR Land Slide and Main Tunnel South Portal on dated: 10.08.2016.

Team Leader visit MT, North Dumping Area and North Toll Plaza Hill on dated: 12.08.2016.

Team Leader visit to SAR Landslide at Chainage 0+925 on dated: 16.08.2016.

Team Leader visit Main Tunnel South, Surface Drain on dated: 27.08.2016.

Team Leader visit Main Tunnel South and North, North Dumping Area and North Approach

Road on dated: 31.08.2016.

Page 15: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 14

7.3 REVIEW OF DOCUMENTS / DRAWINGS:

Concessionaire has submitted documents regarding rock mass drainage for final lining shotcrete

alternate solution in cross passage, Reminder for not compliance HSE shortcomings inside tunnel,

Fire Fighting System, Change of Scope Notice of resurfacing of Existing Highway for Km 89 to Km

130, Material being used in sub grade, Site Visits, Review of Monthly Environmental Monitoring Report

for the month of April, May & June 2016, Running of Vehicular Traffic construction works over PQC in

Escape Tunnel, Traffic Aid, First Aid and Vehicular Rescue Post, Tunnel Works Drainage System,

MEP Site Visits, Status of NCR’s, Mix Design, Drain for Culverts North Portal, Technical Submission of

ITCS Documents, Technical Submission of Toll Collection System, Submission of weekly report on the

status of Plantation on regular basis, RFI of 132 KV Transmission Tower Line, Rock Mass Drainage

for Final Lining Shotcrete Alternate solution in Cross Passage, Slide of berms from slope protection at

SAR, Site Inspection Report Main Tunnel dated 02.08.2016, Third Party testing of PVC Membrane,

Data Sheets of Sealant, Precast Kerb Stone for Project Highway Median, Failure of Gradation of

GSB, Regarding Fee Notification, FFS Technical Submission of Fire Pumps, Culvert at Km 104 on

Existing Highway, Intimation of Issuance of Provisional Completion Certificate, Status of NCR-02, etc.

Most of these documents have been reviewed and sent back to the Concessionaire after reviewing.

Below it can be found the documents which have been reviewed.

Page 16: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 15

Letter Date Subject

S-CO-TE.TW-3543 01.06.2016 Regarding Rock Mass Drainage for Final Lining Shotcrete alternate solution in Cross Passage

S-CO-TE.SF-3544 01.06.2016 Reminder for not Compliance HSE shortcomings inside tunnel.

S-CO-TE.EM-3546 03.06.2016 Submission of Updated Material Procurement Schedule & Shop Drawings Schedule.

S-CO-TE.TW-3547 03.06.2016 Regarding submission of pending documents of provide final recommendation for CP’s Final Lining Shotcrete Solution.

S-CO-TE.EM-3548 03.06.2016 Fire Fighting System in Tunnel

S-CO-TE.EM-3552 06.06.2016 FFS: Technical Submission of Stainless Steel Expansion Bellows

S-CO-TE.RO-3553 07.06.2016 Change of Scope Notice of Resurfacing of Existing Highway from Km 89 to Km 130.

S-CO-TE.PP-3554 08.06.2016 Regarding review of Project Progress and program of Balance activities.

S-CO-TE.QL-3555 08.06.2016 Material being used in subgrade

S-CO-TE.QL-3556 08.06.2016 Use of unapproved PVC waterproofing material.

S-CO-TE.TW-3557 09.06.2016 Running of Vehicular Traffic for construction works over PQC in Escape Tunnel.

S-CO-TE.EM-3558 10.06.2016 Joint Site Visit on 08.06.2016, regarding MEP Works.

S-CO-TE.BG-3561 10.06.2016 Drains for Culverts North Portal.

S-CO-TE.TW-3562 10.06.2016 Site Visit Main Tunnel, 28.01.2016

S-CO-TE.EM-3563 13.06.2016 Joint MEP Site Visit on 11.06.2016

S-CO-TE.VT-3564 13.06.2016 Slope Protection at Switchyard, South Portal.

S-CO-TE.EM-3568 14.06.2016 FFS-Arrangement of linear expansion and lateral movement of the firefighting piping

S-CO-TE.SP-3570 16.06.2016

Confiscation proceedings regarding seizure of 3 no. Tippers & 4 no. JCB (excavator) Machines at Nashri and Peerah under section-26 of J&K Forest Act 1987 for violation of Section-6 of the Said act & section-5 of J&K Forest Conservation Act, 1997.

S-CO-TE.TW-3571 17.06.2016 Site Visit South Portal and North Portal, 15.06.2016

S-CO-TE.SF-3572 17.06.2016 Review of Monthly Environmental monitoring report for the month of April 2016.

S-CO-TE.EM-3573 17.06.2016 Technical Submission of Fire Pumps for Fire Fighting System.

S-CO-TE.EM-3574 17.06.2016 FFS: Arrangement of linear expansion and lateral movement of the firefighting piping.

S-CO-TE.TW-3575 17.06.2016 Running of Vehicular Traffic for construction works over PQC in Escape Tunnel.

Page 17: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 16

Letter Date Subject

S-CO-TE.BG-3578 18.06.2016 Traffic Aid, First Aid and Vehicular Rescue Post.

S-CO-TE.SF-3580 20.06.2016 Review of Monthly Environmental monitoring report for the month of May 2016.

S-CO-TE.EW-3581 20.06.2016 List of mitigation & preparedness activities in view of impeding Monsoon season, and completion of all the preventive works required in Premonsoon.

S-CO-TE.TW-3582 21.06.2016 WMS for road PQC/ Surface Drainage works in Main Tunnel and PQC Trial.

S-CO-TE.TW-3583 21.06.2016 Tunnel Works: Drainage System.

S-CO-TE.TW-3584 22.06.2016 Physical Thickness report of Shotcrete Main Tunnel (TM 2900-4500) & Escape Tunnel (TM 2880-4500)

S-CO-TE.RO-3585 22.06.2016 Change of Scope Order for resurfacing Existing Highway from KM 89 to KM 130.

S-CO-TE.QL-3586 22.06.2016 Dry Lean concrete Mix design with Ultratech OPC 53 Grade of Cement.

S-CO-TE.QL-3587 22.06.2016 PQC Mix Design (M40) with Ultratech OPC 53 Grade of

Cement.

S-CO-TE.SF-3589 22.06.2016 Directions under section-5 of Environment (Protection) Act,

1986.

S-CO-TE.QL-3590 22.06.2016 Material being used in Subgrade.

S-CO-TE.SP-3591 22.06.2016

Reminder for submission of Justificative design and Drawings

of slope protection at South Switchyard platforms (S and N

Portal)

S-CO-TE.EM-3592 22.06.2016 PSS-Approval of Fire Fighting Rated Isolaters.

S-CO-TE.EM-3593 23.06.2016 FFS-Arrangement of linear expansion and lateral movement of the firefighting piping.

S-CO-TE.EM-3594 23.06.2016 MEP Site Visit- I on 25.04.2016

S-CO-TE.EM-3595 23.06.2016 PSS-Approval of Fire Rated Isolators.

S-CO-TE.QL-3596 24.06.2016 Dry Lean Concrete Mix Design with Ambuja OPC 53 Grade of Cement.

S-CO-TE.OT-3597 24.06.2016 Status of NCR’s issued to the Concessionaire by IE.

S-CO-TE.TW-3599 25.06.2016 Site Inspection Report for Main Tunnel during visit on 24.06.2016

S-CO-TE.QL-3602 30.06.2016 Dry Lean Concrete (DLC) Mix Design with Ambuja OPC 53 Grade of Cement.

S-CO-TE.TW-3604 30.06.2016 Regarding Clearing/Clearance of Cross Drainage Structure Before Coming Monsoon Season 2016.

S-CO-TE.DR-3605 01.07.2016 Drains for Culverts North Portal.

S-CO-TE.EM-3609 02.07.2016 MEP works Joint Site Visit on 11.06.2016.

S-CO-TE.TW-3610 02.07.2016 Regarding Rock Mass Drainage for Final Lining Shotcrete Alternate Solution in Cross Passage.

Page 18: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 17

Letter Date Subject

S-CO-TE.EW-3611 02.07.2016 Inspection Report for Visit to North Dumping Yard selected location on 28.06.2016.

S-CO-TE.EM-3616 05.07.2016 RFI of 132 KV Transmission Tower Line.

S-CO-TE.TW-3618 05.07.2016 WMS for Road PQC-Surface Drainage works in Main Tunnel and PQC Trial.

S-CO-LE.TW-3619 05.07.2016 Regarding final recommendation for CP’s Final Lining Shotcrete Solution.

S-CO-TE.EM-3620 05.07.2016 Site Visit of MEP & Civil Related works on Dated 01.07.2016

S-CO-TE.TW-3621 06.07.2016 Tunnel works Drainage System.

S-CO-TE.EM-3622 06.07.2016 Technical Submission of ITCS Documents.

S-CO-TE.EM-3623 06.07.2016 Technical Submission of ITCS Documents.

S-CO-TE.EM-3624 06.07.2016 Technical Submission of ITCS Documents.

S-CO-TE.TW-3625 06.07.2016 Inspection Report for visit to North Portal MT on 28.06.2016 and South Portal on 01.07.2016

S-CO-TE.EM-3626 07.07.2016 Technical Submission of Toll Collection System.

S-CO-TE.VT-3628 07.07.2016 SOS Niche Issue during site visit on dated 04.07.2016

S-CO-TE.SF-3629 08.07.2016 Submission of weekly report on the status of plantation on regular basis.

S-CO-TE.TW-3630 08.07.2016 Site Inspection Report- Main Tunnel

S-CO-AD-MC-3631 08.07.2016 Intimation from IE regarding overtake of completion dated with project works finalized

S-CO-TE.TU-3632 09.07.2016 Submission of Cross Section Drawing of road alignment.

S-CO-TE.QL-3634 12.07.2016 Test Report of material used in the subgrade

S-CO-TE.QL-3635 12.07.2016 Test Report of material used in the subgrade from source Chenab River.

S-CO-TE.RO-3636 12.07.2016 Change of Scope Order for Resurfacing of Existing Highway from KM 89 to KM 130.

S-CO-TE.EM-3638 15.07.2016 MEP Works Joint site visit on 08.06.2016

S-CO-TE.TW-3639 15.07.2016 Site regarding Clearing / Clearance of Cross Drainage structures Before Coming Monsoon season 2016.

S-CO-TE.EM-3643 16.07.2016 MEP works joint site visit on 08.06.2016 (Supplement to our letter ref. S-CO-TE.EM-3638 Dated: 15.07.2016)

S-CO-TE.VT-3645 21.07.2016 Data Sheet for 33 KV CRP North Portals.

Page 19: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 18

Letter Date Subject

S-CO-TE.EM-3646 21.07.2016 MEP Works 10 KVA & 20 KVA UPS.

S-CO-TE.TU-3647 21.07.2016 Physical Thickness report of shotcrete for Main Tunnel & Escape Tunnel and CP’s at South Portal

S-CO-TE.RO-3648 21.07.2016 Reply of CTEO’s/CVO’s Para 5.2.2, 5.2.6, 8.8.3, 9.1.2 and 10.1 as Annexure Q.

S-COT-E.EM-3649 22.07.2016 FFS Technical submission of Stainless Steel Expansion Bellow.

S-PD-TE.OT-3650 22.07.2016 Regarding Final Recommendation for CP Final Lining Shotcrete Solution.

S-CO-TE.EM-3652 25.07.2016 FFS Drawing and calculation report for Air Vessel.

S-CO-TE.SF-3654 26.07.2016 Review of Monthly Environmental Monitoring report for the Month of June 2016.

S-CO-TE.VT-3657 28.07.2016 Regarding Augmentation of 132 / 33 Kv Grid Station Batote.

S-CO-TE.EM-3659 28.07.2016 MEP Works 10 KVA & 20 KVA UPS.

S-CO-TE.SF-3660 28.07.2016

Minutes of the District Road Safety Committee meeting held on 28.06.2016 under the chairmanship of Sh. Niraj Kumar, IAS Deputy Commissioner, Udhampur (Chairman District Road Safety Committee)

S-CO-TE.TU-3661 29.07.2016 Regarding Flushing pipes in Concrete Lining – Main & Escape Tunnel

S-CO-TE.EM-3662 29.07.2016 Submission of ACS, EFS and ECS Drawings.

S-CO-TE.TU-3665 01.08.2016 Tunnel Works Drainage System.

S-CO-TE.SF-3669 01.08.2016 Slide of berms from slope protection at SAR

S-CO-TE.TU-3671 03.08.2016 Site Inspection report -Main tunnel, dated 02.08.2016 .

S-CO-TE.QL-3672 04.08.2016 PQC Mix Design (M 40) with Ambuja OPC 53 Grade of Cement .

S-CO-TE.VT-3673 04.08.2016 Use of EOT Crane at Ventilation Building, North Portal.

S-CO-TE.EM-3674 04.08.2016 Technical Submission of ITCS Documents.

S-CO-LE.TU-3675 06.08.2016 Tunnel Works Drainage System.

S-CO-TE.QL-3679

08.08.2016

Third Party testing of PVC Membrane

S-CO-TE.QL-3680

08.08.2016

Data Sheets of Sealent.

S-CO-TE.QL-3682

10.08.2016

Intensive Examination Conducted by CTEO (PARA 12.1 to 12.4).

Page 20: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 19

Letter Date Subject

S-CO-TE.BG-3683 11.08.2016 Culvert at Km 104 on Existing Highway.

S-CO-TE.RW-3684 11.08.2016 Precast Kerb Stone for Project Highway median.

S-CO-TE.DR-3685 11.08.2016 Drain for Culverts North Portal.

S-CO-TE.EM-3687 13.08.2016 Accuracy of Measuring devices of Batching Plant.

S-CO-TE.VT-3690 13.08.2016 Failure of Gradation of GSB.

S-CO-FI.TP-3692 13.08.2016 Regarding Fee Notification.

S-CO-TE.SP-3693 16.08.2016 Slide of Berms from Slope protection at SAR.

S-CO-TE-TU-3696 16.08.2016 Tunnel Drainage Construction Methodology.

S-CO-TE.EM-3698

17.08.2016 FFS Technical Submission of Fire Pumps.

S-CO-TE.TW-3699

17.08.2016 Site Inspection on 12-08-2016 to Main Tunnel and Cross Passages, North Toll Plaza and Dumping Yard.

S-CO-TE.NCR-3700

17.08.2016

NCR regarding blockade of transverse PVC pipe outlet (right side) in Manhole P1- Main Tunnel and manhole P2 in CP and ET junction.

S-CO-TE.EM-3703 19.08.2016 Fire Fighting System Notes & Legends

S-CO-TE.EM-3704 19.08.2016 MEP Works Fire Fighting System Drawings

S-CO-TE.EM.3705 19.08.2016 ITCS-Speed Limit Variable message signs (SLVS)

S-CO-TE.QL-3706 23.08.2016 Intensive Examination conducted by CTEO (Para 12.1 to 12.4)

S-CO-TE.NCR-3709

23.08.2016

NCR regarding placing of PQC in 925mm wide edge (left side) not as per approved design in Main Tunnel. .

S-CO-TE.PC-3710 24.08.2016 Intimation for Issuance of Provisional Completion Certificate.

S-CO-TE.EM-3712 26.08.2016 Pending Compliances/Replies of our letters for MEP works.

S-CO-TE.QL-3714 29.08.216 Failure of Gradation of GSB.

S-CO-TE.TU-3715 29.08.2016 Site Inspection Report-South Portal (Night Shift), dated 26-08-2016.

S-CO-TE.VT-3719 29.08.2016 Site Inspection Report regarding surface finishing of Ventilation building at South Portal. .

S-CO-TE.TU-3721 30.08.2016 Status of NCR-02 (Regarding).

S-CO-TE.RO-3724 31.08.2016 Status of maintenance of existing road from km 89 to km 130.

Page 21: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 20

8. INVOICES PAYMENT & REIMBURSEMENT

Invoice for the month of June 2016 has been submitted to Project Director NHAI (PIU Jammu) on

01.07.2016.

Invoice for the month of July 2016 has been submitted to Project Director NHAI (PIU Jammu) on 01.08.2016.

Invoice for the month of August 2016 has been submitted to Project Director NHAI (PIU Jammu) on

01.09.2016

9. EXECUTING AGENCIES AND CONTRACT DATA

9.1 AGENCIES

9.1.1 Developer:

M/s IL & FS Transportation Networks Ltd is the Developer.

9.1.2 Concessionaire:

They have created SPV in the name of M/s CNTL for this Project. CNTL is the Concessionaire

for this project; they have mobilized staff and established its office C/o Lower Mada Village

Gujjard Tehsil Chenani Distt. Udhampur. M/s CNTL is represented by Mr. J.S. Rathore Project

Director.

9.1.3 EPC Contractor:

M/s ITNL has demobilized M/s Leighton and Project highway and tunnel activities is divided into

three section and contractor has deployed the separate construction for following sections.

Section 1: Excavation Works From North Portal-M/s AIMPL-BCC(JV).

Excavation Works From South Portal-M/s Nagyan Construction.

Section 2: Lining Works South Portal: M/s New India Infra Build tech Pvt. Ltd.

Lining Works North Portal: M/s Savronik- BCC (JV).

Section 3 Surface Works:

M/s Vinay Construction

M/s Chudhary Construction

M/s Kamlashi Construction.

9.2 CONTRACT DATA

9.2.1 PROJECT COST Project Cost (As per Concession Agreement) – Rs. 2519 Crore.

Page 22: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 21

9.2.2 CIVIL WORKS CONTRACT DETAILS

a) Concessionaire Chenani Nashri Tunnel way Ltd.

b) Contract Section Chenani to Nashri Section of NH 1A From Km. 89.00 to 130.00

c) Contract Length 10.800 Km

d) Agreement /MOU Date 28th July 2010

e) Agreement Amount Rs. 2519 Crs.

f) Commencement Date 23rd

May 2011

g) Intended date of Completion 20th May 2016

h) Performance Security Released

i) Mobilization Advance and Date of payment (s) Nil

j) Equipment Advance and Date of Payment (s) Nil

k) Net Material Advance Nil

l) Retention Money upto date Nil

m) Liquidated damages, if any -

n) Defect Liability Period Nil

9.2.3 SCOPE OF WORK

Main Tunnel: 9.00 km (As per CA)

Escape Tunnel: 9.00 Km

Cross Passage: 29 nos.

Rigid Pavement: 18.000 km (including Main Tunnel, Escape Tunnel and Bridges)

Flexible Pavement: 1.800 km (four lane)

Rotary Junction: 02 Nos.

Minor Bridge: 02 nos.

Culvert: 07 Nos. Box Culvert

Toll Plaza: 02 Nos.

Drainage pipe in Main Tunnel: 9.0 km (3 nos.)

Drainage pipe in Escape Tunnel: 9.0 km (2 nos.)

Drainage pipe in Cross passages: 29 Nos. (On both the ends)

Slope Protection works at Valley Side: 1520 m

Slope Protection works at Hill Side: 1750 m

Lay bays: 14 nos.

Firefighting Niches: 58 nos.

Vehicular emergency exit: 07 nos.

Ventilation Building: 02 nos.

Tunnel Control Centre (Building): 02 nos

Traffic, Medical Aid Post: (01 No. Per Side)

Page 23: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 22

10. WEATHER REPORT

WEATHER REPORT FOR THE MONTH OF JUNE 2016

Max.

Temp.

(°C)

Min.

Temp.

(°C)

Max.

Humidity

(%)

Min.

Humidity

(%)

Rainfall

Max.

Temp.

(°C)

Min.

Temp.

(°C)

Max.

Humidity

(%)

Min.

Humidity

(%)

Rainfall

1 1/6/2016 24.2 21.6 72.0 45.0 NIL 36.0 15.2 71.0 35.0 NIL

2 2/6/2016 24.8 22.4 75.0 47.0 NIL 37.1 15.6 74.0 37.0 NIL

3 3/6/2016 25.6 23.2 70.0 41.0 NIL 36.9 15.7 76.0 32.0 NIL

4 4/6/2016 24.8 23.6 77.0 45.0 NIL 36.4 15.9 75.0 30.0 NIL

5 5/6/2016 22.4 20.8 72.0 43.0 NIL 37.1 15.1 79.0 35.0 NIL

6 6/6/2016 24.0 22.4 75.0 45.0 NIL 37.4 14.8 75.0 36.0 NIL

7 7/6/2016 26.1 24.2 78.0 48.0 NIL 35.8 15.6 68.0 35.0 NIL

8 8/6/2016 23.1 21.0 73.0 41.0 1.4 35.1 15.9 77.0 32.0 NIL

9 9/6/2016 24.0 22.0 76.0 46.0 NIL 36.4 16.2 79.0 50.0 NIL

10 10/6/2016 23.6 21.2 73.0 41.0 NIL 37.1 16.1 70.0 39.0 NIL

11 11/6/2016 24.4 23.0 78.0 46.0 NIL 37.4 15.8 79.0 44.0 NIL

12 12/6/2016 26.4 24.0 77.0 48.0 NIL 35.5 15.0 84.0 48.0 NIL

13 13/6/2016 24.0 23.6 74.0 45.0 NIL 36.7 14.8 79.0 39.0 19

14 14/6/2016 24.6 23.8 77.0 47.0 NIL 35.8 14.2 76.0 39.0 NIL

15 15/6/2016 23.8 22.8 74.0 41.0 NIL 36.3 15.4 77.0 36.0 NIL

16 16/6/2016 24.4 23.6 76.0 45.0 NIL 36.9 15.8 75.0 38.0 NIL

17 17/6/2016 23.8 22.0 73.0 41.0 NIL 36.5 15.6 77.0 37.0 NIL

18 18/6/2016 26.4 24.6 79.0 46.0 NIL 35.5 14.7 89.0 39.0 16

19 19/6/2016 25.4 23.8 81.0 48.0 NIL 36.4 15.2 78.0 36.0 NIL

20 20/6/2016 24.0 22.6 79.0 45.0 NIL 35.6 14.5 84.0 39.0 36

21 21/6/2016 20.0 18.6 75.0 41.0 3.5 35.8 14.6 82.0 40.0 18

22 22/6/2016 21.8 18.4 73.0 40.0 NIL 35.2 14.4 80.0 39.0 10

23 23/6/2016 23.2 17.8 75.0 43.0 2.4 36.4 15.3 76.0 37.0 NIL

24 24/6/2016 24.6 20.2 78.0 44.0 NIL 35.2 14.5 80.0 39.0 10

25 25/6/2016 27.6 23.4 80.0 42.0 NIL 36.4 15.4 76.0 37.0 NIL

26 26/6/2016 26.1 22.4 75.0 43.0 NIL 35.2 15.3 75.0 38.0 NIL

27 27/6/2016 26.8 23.1 78.0 45.0 NIL 35.6 15.2 78.0 39.0 NIL

28 28/6/2016 24.2 18.6 73.0 41.0 NIL 36.0 14.9 75.0 38.0 NIL

29 29/6/2016 23.6 17.8 75.0 43.0 NIL 35.8 15.1 77.0 37.0 NIL

30 30/6/2016 24.6 18.8 78.0 45.0 NIL 36.2 15.0 79.0 35.0 NIL

North Portal South Portal

DateSr.

No.

Page 24: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 23

WEATHER REPORT FOR THE MONTH OF JULY 2016

Page 25: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 24

WEATHER REPORT FOR THE MONTH OF AUGUST 2016

Max.

Temp.

(°C)

Min.

Temp.

(°C)

Max.

Humidity

(%)

Min.

Humidity

(%)

Rainfall

Max.

Temp.

(°C)

Min.

Temp.

(°C)

Max.

Humidity

(%)

Min.

Humidity

(%)

Rainfall

1 1/8/2016 36.8 21.4 88.0 40.0 0 28.5 20.8 78.0 43.0 0

2 2/8/2016 36.9 20.6 83.0 39.0 18 28.7 21.5 79.0 45.0 0

3 3/8/2016 34.6 23.4 80.0 38.0 10 29.3 20.7 78.0 42.0 0

4 4/8/2016 37.1 24.0 82.0 40.0 0 28.9 22.6 80.0 41.0 0

5 5/8/2016 37.6 21.9 89.0 41.0 0 29.9 22.7 78.0 43.0 0

6 6/8/2016 35.5 20.4 88.0 44.0 8 27.5 22.1 75.0 42.0 66.8

7 7/8/2016 33.6 19.8 93.0 38.0 6 18.8 15.4 68.0 35.0 38.6

8 8/8/2016 32.4 22.0 86.0 37.0 88 23.5 20.3 56.0 40.0 0

9 9/8/2016 35.8 23.1 85.0 42.0 0 24.8 19.7 86.0 48.0 0

10 10/8/2016 35.9 22.8 92.0 41.0 0 23.9 20.2 99.0 88.0 3.92

11 11/8/2016 34.7 23.7 88.0 43.0 52 27.1 22.9 88.0 86.0 0.2

12 12/8/2016 35.1 23.9 87.0 42.0 8 32.6 21.3 88.0 53.0 0.2

13 13/8/2016 36.4 22.9 85.0 39.0 3 33.7 21.2 96.0 64.0 0

14 14/8/2016 35.2 23.8 81.0 40.0 0 34.2 21.7 97.0 43.0 0

15 15/8/2016 36.2 24 82.0 38.0 0 34.6 22.3 96.0 43.0 0

16 16/8/2016 36.3 23.8 80.0 37.0 0 34.3 22.1 92.0 43.0 0

17 17/8/2016 36.5 24.5 81.0 39.0 0 33.7 22.4 97.0 41.0 0

18 18/8/2016 37.4 26.2 83.0 38.0 0 31.6 22.1 92.0 51.0 0

19 19/8/2016 34.7 25.8 82.0 39.0 0 31.7 22.5 94.0 46.0 0

20 20/8/2016 35.8 26.5 85.0 42.0 0 30.6 21.1 87.0 43.0 0

21 21/8/2016 34.5 21.8 89.0 40.0 0 30.8 21.3 96.0 62.0 0

22 22/8/2016 32.5 25.4 88.0 41.0 6 29.8 20.9 91.0 56.0 0

23 23/8/2016 34.4 25.5 87.0 40.0 4 30.6 20.6 95.0 52.0 0

24 24/8/2016 35.2 24.7 89.0 41.0 4 24.7 20.4 99.0 71.0 8.8

25 25/8/2016 35.4 21.8 89.0 40.0 0 29.6 20.1 86.0 57.0 0

26 26/8/2016 32.5 21.0 84.0 43.0 0 29.8 19.9 92.0 62.0 0

27 27/8/2016 30.6 21.3 83.0 42.0 0 24.6 19.7 97.0 56.0 5.4

28 28/8/2016 31.5 22.0 86.0 41.0 0 29.7 19.9 87.0 53.0 0

29 29/8/2016 31.7 21.9 82.0 46.0 5 29.6 20.1 91.0 57.0 5.6

30 30/8/2016 31.5 21.5 80.0 45.0 4 30.5 20.3 92.0 61.0 3.6

31 31/8/2016 31 21.6 86.0 42.0 7 29.5 20.2 81.0 65.0 9.8

South Portal North Portal

DateSr.

No.

Page 26: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 25

11. PROGRESS OF THE PROJECT

11.1 ESTIMATION OF PHYSICAL PROGRESS IN GLOBALITY

Physical Progress has not to be taken as reference for financial progress, because it does not

include cost incurred (i) Construction of Labour camps, Batching plants and Labs (ii)

Procurement of machinery and advanced materials for construction.

Page 27: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 26

11.2 Tunnel works monitoring

SOUTH PORTAL

Tunnel Excavation in Mtrs.

S.No. Location

Tunnel Meter Cumulative

Remarks

Initial Final Targets* Achieved % age

Progress

1 MT (Heading) 4403.5 4403.50 4403.50 4403.50 100.00 Completed

2 MT (Benching) 4403.0 4403.0 4403.00 4403.00 100.00 Completed

3 ET 4573.0 4573.00 4573.00 4573.00 100.00 Completed

4 Cross Passage 459.1 459.10 459.10 459.10 100.00 14 No’s completed

Final Lining:

Qtr

June-Aug

16

Qtr

June-Aug

16

Qtr

June-Aug

16

Target Achieved%

ProgressMTs Target Achieved % Progress MTs Target Achieved

%

ProgressMTs Target Achieved % Progress

1 MT 4506.00 4506.00 100 149.5 4773.50 4773.50 100.00 976.5 4800.00 4728.5 98.51 2000.5 4800.00 4475.50 93.24

2 ET 4573.00 4573.00 100 185 4485.00 4485.00 100.00

3 CP 459.05 459.05 100 32.25 459.05 425.75 92.75

Partion wall

Cumulative Cumulative CumulativeSno. Location

Ground Beam (M)

Cum

Final Linnig Ventilation slab

Tunnel Road Works:

TotalAchieved

% Progress Total Achieved % Progress

1 MT M 4479.00 1339.00 29.90 4479.00 0.00 0.00

2 ET M 4481.00 4050.00 90.38 4466.00 3747.00 83.90

3 CP Nos 15.00 10.00 66.67 15.00 10.00 66.67

Unit

Progress PCC/ DLC (cum) Progress PQC (cum)

Sno. Location

Tunnel Drainage Works

TotalAchieved

% Progress Total Achieved % Progress

1 MT M 4479.00 2400.00 53.58 4479.00 3900.00 87.07

Unit

Progress Surface Drain (cum) Progress Main Drain Collector (cum)

Sno. Location

Page 28: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 27

NORTH PORTAL

Tunnel Excavation in Mtrs.

S.No Location

Tunnel Meter Cumulative Remarks

Initial Final Targets Achieved % age

Progress

1 MT (Heading) 4576.5 4576.5 4576.5 4576.5 100.0 Completed

2 MT

(Benching) 4576.0 4576.5 4576.5 4576.5 100.0 Completed

3 ET 4393.0 4393.0 4593.0 4593.0 100.0 Completed

4 Cross

Passage 486.40 486.4 486.4 486.40 100.0 15 No’s completed

Final Lining:

Qtr

June-Aug

16

Qtr

June-Aug

16

Qtr

June-Aug

16

Target Achieved%

ProgressMTs Target Achieved % Progress MTs Target Achieved

%

ProgressMTs Target Achieved % Progress

1 MT 4473.00 4473.00 100 162.8 4205.50 4205.50 100.00 1332 4179.00 4149 99.28 1523.5 4179.00 3761.00 90.00

2 ET 4393.00 4393.00 100 410 4481.00 4481.00 100.00

3 CP 486.33 486.33 100 211.9 486.33 471.33 96.92

Cumulative

Partion wall

Sno. Location

Ground Beam (M)

Cum

Final Linnig

Cumulative

Ventilation slab

Cumulative

Tunnel Road Works:

TotalAchieved

% Progress Total Achieved % Progress

1 MT M 4479.00 1339.00 29.90 4479.00 0.00 0.00

2 ET M 4481.00 4050.00 90.38 4466.00 3747.00 83.90

3 CP Nos 15.00 10.00 66.67 15.00 10.00 66.67

Unit

Progress PCC/ DLC (cum) Progress PQC (cum)

Sno. Location

Tunnel Drainage Works:

TotalAchieved

% Progress Total Achieved % Progress

1 MT M 4479.00 2400.00 53.58 4479.00 3900.00 87.07

Unit

Progress Surface Drain (cum) Progress Main Drain Collector (cum)

Sno. Location

Page 29: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 28

11.3 PHYSICAL PROGRESS CHARTS

Main Tunnel

Page 30: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 29

Escape Tunnel

Page 31: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 30

Cross Passages

Page 32: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 31

STRIP CHART

SOUTH PORTAL

PQC

DLC

GSB

Sub-Grade

Earthwork

-Other Hindrances

-Clearance Pending

-LA Pending

Workfront Available

Chainage (0+……) 14

0

20

0

25

0

30

0

35

0

40

0

45

0

50

0

55

0

60

0

65

0

70

0

75

0

80

0

85

0

90

0

95

0

10

00

10

50

11

00

11

50

12

00

12

50

13

00

13

50

14

00

14

82

workfront Available

Workfront Available

-LA Pending workfront Unavailable

-Clearance Pending

-Other Hindrances

Earthwork

Sub-Grade

GSB

DLC

PQC

Number of Structures SB

Type of Stuctures NB

Number of Structures NB

Status of Structures

LHS

-MC

W

Co

stru

ctio

n

(No

rth

Bo

un

d)

LHS

-MC

W

Wo

rkfr

on

t

(No

rth

Bo

un

d)

Type of Stuctures SB

Status of Structures

Bypass

RH

S-M

CW

Wo

rkfr

on

t

(So

uth

Bo

un

d)

RH

S-M

CW

Wo

rkfr

on

t

(So

uth

Bo

un

d)

Page 33: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 32

MAIN TUNNEL

PQC

DLC

GSB

Sub-Grade

Earthwork

-Other Hindrances

-Clearance Pending

-LA Pending

Workfront Available

Chainage (0+……)

1482

1782

2082

2382

2682

2982

3582

3882

4182

4482

4782

5082

5382

5682

5982

6282

6582

6882

7182

7482

7782

8082

8382

8682

8982

9282

9582

9882

1018

2

1048

2

Number of Structures NB

Status of Structures

LHS-

MCW

Cost

ruct

ion

(Nor

th B

ound

)

LHS-

MCW

Wor

kfro

nt

(Nor

th

Boun

d)

3282

Type of Stuctures NB

ESCAPE TUNNEL

PQC

DLC/PCC

GSB

-Other Hindrances

-Clearance Pending

-LA Pending

Workfront Available

Chainage (0+……)

1482

1782

2082

2382

2682

2982

3582

3882

4182

4482

4782

5082

5382

5682

5982

6282

6582

6882

7182

7482

7782

8082

8382

8682

9282

9582

9882

1018

2

1048

2

8982

Type of Stuctures NB

Number of Structures NB

Status of Structures

LHS-

MCW

Cost

ruct

io

n

(Nor

th

Bou

nd)

3282

LHS-

MCW

Wor

kfro

nt

(Nor

th

Bou

nd)

CROSS PASSAGE

PQC

DLC/PCC

Cross Passage Nos. CP-01 CP-02 CP-03 CP-04 CP-05 CP-06 CP-07 CP-08 CP-09 CP-10 CP-11 CP-12 CP-13 CP-14 CP-15 CP-16 CP-17 CP-18 CP-19 CP-20 CP-21 CP-22 CP-23 CP-24 CP-25 CP-26 CP-27 CP-28 CP-29

LH

S-M

CW

Co

str

ucti

on

(No

rth

Bo

un

d)

Number of Structures NB

Status of Structures

Page 34: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 33

NORTH PORTAL

PQC

DLC

GSB

Sub-Grade

Earthwork

-Other Hindrances

-Clearance Pending

-LA Pending

Workfront Available

Chainage (0+……)

10

48

2

10

53

2

10

58

2

10

63

2

10

68

2

10

73

2

10

78

2

10

83

2

10

88

2

10

93

2

10

98

2

11

03

2

workfront Available

Workfront Available

-LA Pending workfront Unavailable

-Clearance Pending

-Other Hindrances

Earthwork

Sub-Grade

GSB

DLC

PQC

Type of Stuctures SB

Type of Stuctures NB

Number of Structures SB

RH

S-M

CW

Wo

rkfr

on

t

(So

uth

Bo

un

d)

LHS-

MC

W

Wo

rkfr

on

t

(So

uth

Bo

un

d)

Bypass

Status of Structures

Number of Structures NB

Status of Structures

LHS-

MC

W

Co

stru

ctio

n

(No

rth

Bo

un

d)

LHS-

MC

W

Wo

rkfr

on

t

(No

rth

Bo

un

d)

Page 35: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 34

12. QUALITY CONTROL AND TESTING OF MATERIALS.

12.1 UP TO DATE STATUS OF THE TESTS.

Total no.

of Tests

Required

No. of

Tests

Performed

No. of

Tests

Passed

No. of

Tests

Failed

Total no.

of Tests

Required

No. of

Tests

Passed

No. of

Tests

Failed

Action taken in case of

Failied Tests./Remarks

1

a 16 155 155 0 914 7648 34

b 8 21 21 0 472 961 0

c 8 17 17 0 478 677 0

d 0 0 0 0 13 13 0

e 120 240 240 0 7147 9963 0

g 4 8 8 0 236 449 0

h 4 8 8 0 249 469 0

2

a 16 88 88 0 1067 3372 68

b 120 240 240 0 7917 11755 0

c 0 0 0 0 10 10 0

3

a 4 4 4 0 169 169 0

b 4 4 4 0 169 169 0

c 4 4 4 0 169 169 0

d 4 4 4 0 169 169 0

4

a 9 9 9 0 477 477 0

b 9 9 9 0 483 483 0

c 3 3 3 0 489 489 0

5

0 0 0 0 2582 2582 0

6

07 Days 93 93 93 0 1644 1644 0

28 Days 129 129 129 0 4179 4179 0

b M10 DLC 07 Days 354 354 354 0 714 714 0

07 Days 126 126 126 0 7461 7461 0

28 Days 195 195 195 0 18150 18150 0

07 Days 3 3 3 0 327 327 0

28 Days 0 0 0 0 354 354 0

07 Days 0 0 0 0 87 87 0

28 Days 0 0 0 0 345 345 0

07 Days 393 393 393 0 14370 14370 0

28 Days 1479 1479 1479 0 60621 60621 0

07 Days 645 645 645 0 7593 7593 0

28 Days 792 792 792 0 13245 13245 0

07 Days 0 0 0 0 183 183 0

28 Days 0 0 0 0 1123 1123 0

07 Days 150 150 150 0 660 660 0

28 Days 162 162 162 0 570 570 0

07 Days Flexural

Strength150 150 150 0 660 660 0

28 Days Flexural

Strength162 162 162 0 570 570 0

07 Days 0 0 0 0 45 45 0

28 Days 0 0 0 0 111 111 0

7

3 3 3 0 5411 5411 0

M45

17.0 Up to Date Status of the Tests Up to August 2016

S.

No

For the month August 2016 Cumulative upto August 2016

Soundness

Specific gravity

Gradation

FI + EI

Moisture Content

Gradation

AIV

Log Angles

Crushing value

Fine Aggregate

M25

Cement Ambuja 53 Grade

Pullout Test for Rock Bolts at

North/South Portals

M15

Insitu Cores Compressive

Strengthat North/South

Portals

Insitu Cores Compressive Strength Test

a

h M40

f

k

c

M40 PQC

CUBE

UPTO DATE STATUS

Name of the Tests

Shortcrete / Concrete / Course Aggregate

IST & FST

Concrete Cube's Compressive Strength Test

07 days

Pullout Testing

28 days

Cement Cube Strength

Consistency

Moisture content

Specific Gravity

M10

M30

03 days

Fineness

M20

i

M40 PQC

BEAMj

M35

d

g

e

Page 36: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 35

12.2 TEST RESULT OF CONCRETE CORES AND CUBES.

FOR THE MONTH OF JUNE 2016

DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF JUNE 2016.

SOUTH PORTAL

DATE

INSITU CORES PANEL CASTED

Remarks Pass Fail 1 days 7 days 28 days

01.06.2016 00 00 05 00 00

02.06.2016 00 00 05 00 00

03.06.2016 00 00 00 00 00

04.06.2016 00 00 00 00 00

05.06.2016 00 00 05 00 00

06.06.2016 00 00 00 00 00

07.06.2016 00 00 00 05 00

08.06.2016 00 00 00 05 00

09.06.2016 00 00 00 00 00

10.06.2016 00 00 00 00 00

11.06.2016 00 00 00 05 00

12.06.2016 00 00 00 00 00

13.06.2016 00 00 05 00 05

14.06.2016 00 00 00 00 00

15.06.2016 00 00 00 00 00

16.06.2016 00 00 00 00 00

17.06.2016 00 00 05 00 00

18.06.2016 00 00 00 00 00

19.06.2016 00 00 00 05 00

20.06.2016 00 00 00 00 00

21.06.2016 00 00 00 00 00

22.06.2016 00 00 00 00 00

23.06.2016 00 00 00 05 00

24.06.2016 00 00 05 00 00

25.06.2016 00 00 00 00 00

26.06.2016 00 00 00 00 00

27.06.2016 00 00 00 00 00

28.06.2016 00 00 00 00 05

29.06.2016 00 00 00 00 00

30.06.2016 00 00 00 05 00

Total 00 00 30 30 10

Page 37: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 36

DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF JUNE 2016.

NORTH PORTAL

DATE

INSITU CORES PANEL CASTED

Remarks

Pass Fail 1 days 7 days 28 days

01.06.2016 00 00 00 00 00

02.06.2016 00 00 00 00 00

03.06.2016 00 00 00 00 00

04.06.2016 00 00 00 00 00

05.06.2016 00 00 00 00 00

06.06.2016 00 00 00 00 00

07.06.2016 00 00 00 00 00

08.06.2016 00 00 00 00 00

09.06.2016 00 00 00 00 00

10.06.2016 00 00 00 00 00

11.06.2016 00 00 00 00 00

12.06.2016 00 00 00 00 00

13.06.2016 00 00 00 00 00

14.06.2016 00 00 00 00 00

15.06.2016 00 00 00 00 00

16.06.2016 00 00 00 00 00

17.06.2016 00 00 00 00 00

18.06.2016 00 00 00 00 00

19.06.2016 00 00 00 00 00

20.06.2016 00 00 00 00 00

21.06.2016 00 00 00 00 00

22.06.2016 00 00 00 00 00

23.06.2016 00 00 00 00 00

24.06.2016 00 00 00 00 00

25.06.2016 00 00 00 00 00

26.06.2016 00 00 00 00 00

27.06.2016 00 00 00 00 00

28.06.2016 00 00 00 00 00

29.06.2016 00 00 00 00 00

30.06.2016 00 00 00 00 00

Total 00 00 00 00 00

Page 38: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 37

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

SOUTH PORTAL

DATE Grout Cube Testing

Remarks

3 days 7 days 28 days

01.06.2016 00 05 00

02.06.2016 00 05 00

03.06.2016 00 05 05

04.06.2016 00 05 05

05.06.2016 00 05 00

06.06.2016 00 05 05

07.06.2016 00 05 05

08.06.2016 00 05 05

09.06.2016 00 05 05

10.06.2016 00 05 05

11.06.2016 00 05 00

12.06.2016 00 05 00

13.06.2016 00 05 00

14.06.2016 00 05 05

15.06.2016 00 05 05

16.06.2016 00 05 05

17.06.2016 00 05 05

18.06.2016 00 05 05

19.06.2016 00 05 05

20.06.2016 00 05 05

21.06.2016 00 05 00

22.06.2016 00 05 05

23.06.2016 00 00 05

24.06.2016 00 05 05

25.06.2016 00 05 05

26.06.2016 00 05 05

27.06.2016 00 00 05

28.06.2016 00 00 05

29.06.2016 00 00 05

30.06.2016 00 00 05

Total 00 125 115

Page 39: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 38

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

NORTH PORTAL

DATE Grout Cube Testing

Remarks

3 days 7 days 28 days

01.06.2016 00 00 05

02.06.2016 00 00 00

03.06.2016 00 00 05

04.06.2016 00 00 05

05.06.2016 00 00 00

06.06.2016 00 00 00

07.06.2016 00 00 00

08.06.2016 00 00 00

09.06.2016 00 00 00

10.06.2016 00 00 00

11.06.2016 00 00 00

12.06.2016 00 00 05

13.06.2016 00 00 00

14.06.2016 00 00 00

15.06.2016 00 00 00

16.06.2016 00 00 00

17.06.2016 00 00 00

18.06.2016 00 00 00

19.06.2016 00 00 00

20.06.2016 00 00 00

21.06.2016 00 00 00

22.06.2016 00 00 00

23.06.2016 00 00 00

24.06.2016 00 00 00

25.06.2016 00 00 00

26.06.2016 00 00 00

27.06.2016 00 00 00

28.06.2016 00 00 00

29.06.2016 00 00 00

30.06.2016 00 00 00

Total 00 00 20

Page 40: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 39

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.06.2016 03 00 00 00 03 06 00 00 00 00 21 24

02.06.2016 00 00 09 00 03 09 00 00 00 00 03 51

03.06.2016 00 00 09 00 09 15 00 03 00 00 15 72

04.06.2016 00 00 00 00 09 00 00 03 00 00 12 69

05.06.2016 00 00 09 00 03 03 00 00 00 00 09 27

06.06.2016 03 00 00 00 00 03 00 03 00 00 18 66

07.06.2016 03 00 00 00 03 06 00 06 00 00 12 48

08.06.2016 00 00 00 00 06 00 00 03 00 00 06 39

09.06.2016 00 15 00 00 00 00 00 03 00 00 15 48

10.06.2016 00 06 09 00 00 09 00 03 00 00 03 21

11.06.2016 03 00 00 00 03 03 00 03 00 00 09 12

12.06.2016 00 00 00 00 03 00 00 03 00 00 06 48

13.06.2016 03 00 00 00 00 09 00 03 00 00 06 12

14.06.2016 00 00 00 00 00 00 00 03 00 00 15 72

15.06.2016 03 15 00 00 03 00 00 03 00 00 09 78

16.06.2016 03 09 09 00 03 15 00 03 00 00 06 39

17.06.2016 03 00 00 00 06 18 00 03 00 00 21 75

18.06.2016 03 00 18 00 00 15 00 03 00 00 06 45

19.06.2016 00 00 00 00 03 06 00 03 00 00 12 33

20.06.2016 03 00 00 00 03 00 00 03 00 00 00 69

21.06.2016 03 15 09 00 03 00 00 03 00 00 12 36

22.06.2016 03 06 00 00 03 06 00 00 00 00 03 99

23.06.2016 03 00 00 00 03 03 00 00 00 00 12 06

24.06.2016 03 00 09 00 06 15 00 00 00 00 09 90

25.06.2016 06 00 00 00 06 24 00 00 00 00 12 69

26.06.2016 03 00 00 00 03 09 00 00 00 00 12 60

27.06.2016 03 06 00 00 00 00 03 00 00 00 06 72

28.06.2016 00 03 09 00 00 15 00 00 00 00 12 66

29.06.2016 00 00 00 00 03 12 00 00 00 00 12 54

30.06.2016 03 00 00 00 03 00 00 00 00 00 09 69

Total 57 75 90 00 90 201 03 57 00 00 303 1569

Page 41: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 40

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.06.2016 03 00 00 00 03 06 00 00 00 00 21 24

02.06.2016 00 00 09 00 03 09 00 00 00 00 03 51

03.06.2016 00 00 09 00 09 15 00 03 00 00 15 72

04.06.2016 00 00 00 00 09 00 00 03 00 00 12 69

05.06.2016 00 00 09 00 03 03 00 00 00 00 09 27

06.06.2016 03 00 00 00 00 03 00 03 00 00 18 66

07.06.2016 03 00 00 00 03 06 00 06 00 00 12 48

08.06.2016 00 00 00 00 06 00 00 03 00 00 06 39

09.06.2016 00 15 00 00 00 00 00 03 00 00 15 48

10.06.2016 00 06 09 00 00 09 00 03 00 00 03 21

11.06.2016 03 00 00 00 03 03 00 03 00 00 09 12

12.06.2016 00 00 00 00 03 00 00 03 00 00 06 48

13.06.2016 03 00 00 00 00 09 00 03 00 00 06 12

14.06.2016 00 00 00 00 00 00 00 03 00 00 15 72

15.06.2016 03 15 00 00 03 00 00 03 00 00 09 78

16.06.2016 03 09 09 00 03 15 00 03 00 00 06 39

17.06.2016 03 00 00 00 06 18 00 03 00 00 21 75

18.06.2016 03 00 18 00 00 15 00 03 00 00 06 45

19.06.2016 00 00 00 00 03 06 00 03 00 00 12 33

20.06.2016 03 00 00 00 03 00 00 03 00 00 00 69

21.06.2016 03 15 09 00 03 00 00 03 00 00 12 36

22.06.2016 03 06 00 00 03 06 00 00 00 00 03 99

23.06.2016 03 00 00 00 03 03 00 00 00 00 12 06

24.06.2016 03 00 09 00 06 15 00 00 00 00 09 90

25.06.2016 06 00 00 00 06 24 00 00 00 00 12 69

26.06.2016 03 00 00 00 03 09 00 00 00 00 12 60

27.06.2016 03 06 00 00 00 00 03 00 00 00 06 72

28.06.2016 00 03 09 00 00 15 00 00 00 00 12 66

29.06.2016 00 00 00 00 03 12 00 00 00 00 12 54

30.06.2016 03 00 00 00 03 00 00 00 00 00 09 69

Total 57 75 90 00 90 201 03 57 00 00 303 1569

Page 42: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 41

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M35 M40 M40

PQC

M40

PQC Flexural Strength

M45

Remarks

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.06.2016 15 00 00 00 03 03 03 03 00 00

02.06.2016 09 03 00 00 00 03 00 03 00 00

03.06.2016 21 18 00 00 00 03 00 03 00 00

04.06.2016 12 12 00 00 00 03 00 03 00 00

05.06.2016 09 15 00 00 03 03 03 03 00 00

06.06.2016 15 09 00 00 03 06 03 06 00 00

07.06.2016 12 15 00 15 03 03 03 03 00 00

08.06.2016 03 09 00 00 00 03 00 03 00 00

09.06.2016 15 15 03 00 03 03 03 03 00 00

10.06.2016 09 12 00 00 03 03 03 03 00 00

11.06.2016 03 15 00 00 00 00 00 00 00 00

12.06.2016 12 27 00 00 00 03 00 03 00 00

13.06.2016 06 06 00 03 00 00 00 00 00 00

14.06.2016 12 12 00 00 03 03 03 03 00 00

15.06.2016 12 12 00 00 03 03 03 03 00 00

16.06.2016 12 12 00 00 03 03 03 03 00 00

17.06.2016 18 18 00 00 00 03 00 03 00 00

18.06.2016 18 12 00 00 03 00 03 00 00 00

19.06.2016 12 12 00 00 03 00 03 00 00 00

20.06.2016 15 15 00 00 03 03 03 03 00 00

21.06.2016 21 09 00 15 06 00 06 00 00 00

22.06.2016 18 18 00 00 06 03 06 03 00 00

23.06.2016 06 09 00 00 03 00 03 00 00 00

24.06.2016 09 21 00 00 06 00 06 00 00 00

25.06.2016 12 12 00 00 03 00 03 00 00 00

26.06.2016 12 09 00 00 03 03 03 03 00 00

27.06.2016 12 15 00 00 03 03 03 03 00 00

28.06.2016 15 15 00 00 03 03 03 03 00 00

29.06.2016 06 03 00 00 06 00 06 00 00 00

30.06.2016 12 15 00 15 03 03 03 03 00 00

Total 363 375 03 48 78 66 78 66 00 00

Page 43: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 42

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

NORTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

S

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.06.2016 00 00 00 00 06 06 00 00 00 00 03 15

02.06.2016 00 09 00 00 00 00 00 00 00 00 09 36

03.06.2016 00 12 00 00 00 00 00 00 00 00 15 72

04.06.2016 00 09 00 00 00 15 00 00 00 00 09 21

05.06.2016 03 00 00 00 00 00 00 00 00 00 06 15

06.06.2016 03 00 00 00 00 00 00 00 00 00 12 27

07.06.2016 00 00 00 00 00 00 00 00 00 00 09 42

08.06.2016 00 06 00 00 03 00 00 00 00 00 06 15

09.06.2016 00 00 00 00 03 00 00 00 00 00 06 42

10.06.2016 00 06 00 00 03 06 00 00 00 00 06 24

11.06.2016 03 00 00 00 00 00 00 00 00 00 06 45

12.06.2016 00 06 00 00 00 00 00 00 00 00 03 36

13.06.2016 00 00 00 00 00 00 00 00 00 00 09 51

14.06.2016 00 00 00 00 03 00 00 00 00 00 09 33

15.06.2016 00 00 00 00 00 00 00 00 00 00 12 15

16.06.2016 03 06 00 00 00 00 00 00 00 00 03 66

17.06.2016 03 06 00 00 00 00 00 00 00 00 03 33

18.06.2016 00 00 00 00 00 03 00 00 00 00 09 42

19.06.2016 03 00 00 00 03 00 00 00 00 00 06 06

20.06.2016 03 00 00 00 00 09 00 00 00 00 00 36

21.06.2016 00 00 00 00 03 00 00 00 00 00 09 09

22.06.2016 00 00 00 00 00 12 00 00 00 00 06 42

23.06.2016 03 00 00 00 00 00 00 00 00 00 06 39

24.06.2016 03 00 00 00 00 00 00 00 00 00 06 78

25.06.2016 06 00 00 00 00 00 00 00 00 00 03 39

26.06.2016 00 06 00 00 00 00 00 00 00 00 03 36

27.06.2016 00 03 00 00 06 00 00 00 00 00 00 33

28.06.2016 03 00 00 00 00 00 00 00 00 00 09 66

29.06.2016 00 00 00 00 03 06 00 00 00 00 06 15

30.06.2016 00 00 00 00 00 09 00 00 00 00 09 30

Total 36 69 00 00 33 66 00 00 00 00 198 1059

Page 44: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 43

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

00

NORTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M35 M40 M40

PQC

M40

PQC Flexural Strength

M45

Remarks

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.06.2016 00 00 00 00 03 00 03 00 00 00

02.06.2016 00 00 00 00 03 03 03 03 00 00

03.06.2016 00 00 00 00 03 00 03 00 00 00

04.06.2016 00 00 00 00 03 03 03 03 00 00

05.06.2016 00 00 00 00 03 00 03 00 00 00

06.06.2016 00 00 00 00 03 03 03 03 00 00

07.06.2016 00 00 00 00 03 00 03 00 00 00

08.06.2016 00 00 00 00 03 03 03 03 00 00

09.06.2016 00 00 00 00 03 00 03 00 00 00

10.06.2016 00 00 00 00 03 03 03 03 00 00

11.06.2016 00 00 00 00 03 03 03 03 00 00

12.06.2016 00 00 00 00 00 03 00 03 00 00

13.06.2016 00 00 00 00 00 03 00 03 00 00

14.06.2016 00 00 00 00 00 00 00 00 00 00

15.06.2016 00 00 00 00 03 03 03 03 00 00

16.06.2016 00 00 00 00 03 00 03 00 00 00

17.06.2016 00 00 00 00 03 03 03 03 00 00

18.06.2016 00 00 00 00 03 00 03 00 00 00

19.06.2016 00 00 00 00 03 00 03 00 00 00

20.06.2016 00 00 00 00 06 03 06 03 00 00

21.06.2016 00 00 00 00 09 03 09 03 00 00

22.06.2016 00 00 00 00 06 03 06 03 00 00

23.06.2016 00 00 00 00 06 03 06 03 00 00

24.06.2016 00 00 00 00 03 03 03 03 00 00

25.06.2016 00 00 00 00 03 03 03 03 00 00

26.06.2016 00 00 00 00 00 03 00 03 00 00

27.06.2016 00 00 00 00 00 03 00 03 00 00

28.06.2016 00 00 00 00 03 03 03 03 00 00

29.06.2016 00 00 00 00 06 03 06 03 00 00

30.06.2016 00 00 00 00 06 03 06 03 00 00

Total 00 00 00 00 96 63 96 63 00 00

Page 45: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 44

FOR THE MONTH OF JULY 2016

DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF JULY 2016.

SOUTH PORTAL

DATE

INSITU CORES PANEL CASTED

Remarks Pass Fail 1 days 7 days 28 days

01.07.2016 00 00 05 00 00

02.07.2016 00 00 00 00 00

03.07.2016 00 00 00 00 00

04.07.2016 00 00 00 00 00

05.07.2016 00 00 00 00 00

06.07.2016 00 00 05 00 00

07.07.2016 00 00 00 05 00

08.07.2016 00 00 00 00 00

09.07.2016 00 00 00 00 00

10.07.2016 00 00 05 00 05

11.07.2016 00 00 00 00 00

12.07.2016 00 00 00 05 00

13.07.2016 00 00 05 00 00

14.07.2016 00 00 00 00 05

15.07.2016 00 00 00 00 00

16.07.2016 00 00 05 05 00

17.07.2016 00 00 00 00 00

18.07.2016 00 00 00 00 00

19.07.2016 00 00 00 05 00

20.07.2016 00 00 00 00 00

21.07.2016 00 00 05 00 05

22.07.2016 00 00 00 05 00

23.07.2016 00 00 05 00 00

24.07.2016 00 00 00 00 00

25.07.2016 00 00 05 00 00

26.07.2016 00 00 00 00 00

27.07.2016 00 00 05 05 00

28.07.2016 00 00 00 00 05

29.07.2016 00 00 00 05 00

30.07.2016 00 00 00 00 00

31.07.2016 00 00 00 00 00

Total 00 00 45 35 20

Page 46: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 45

DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF JULY 2016.

NORTH PORTAL

DATE

INSITU CORES PANEL CASTED

Remarks

Pass Fail 1 days 7 days 28 days

01.07.2016 00 00 00 00 00

02.07.2016 00 00 00 00 00

03.07.2016 00 00 00 00 00

04.07.2016 00 00 00 00 00

05.07.2016 00 00 00 00 00

06.07.2016 00 00 00 00 00

07.07.2016 00 00 00 00 00

08.07.2016 00 00 00 00 00

09.07.2016 00 00 00 00 00

10.07.2016 00 00 00 00 00

11.07.2016 00 00 00 00 00

12.07.2016 00 00 00 00 00

13.07.2016 00 00 00 00 00

14.07.2016 00 00 00 00 00

15.07.2016 00 00 00 00 00

16.07.2016 00 00 00 00 00

17.07.2016 00 00 00 00 00

18.07.2016 00 00 00 00 00

19.07.2016 00 00 00 00 00

20.07.2016 00 00 00 00 00

21.07.2016 00 00 00 00 00

22.07.2016 00 00 00 00 00

23.07.2016 00 00 00 00 00

24.07.2016 00 00 00 00 00

25.07.2016 00 00 00 00 00

26.07.2016 00 00 00 00 00

27.07.2016 00 00 00 00 00

28.07.2016 00 00 00 00 00

29.07.2016 00 00 00 00 00

30.07.2016 00 00 00 00 00

31.07.2016 00 00 00 00 00

Total 00 00 00 00 00

Page 47: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 46

DETAILS OF CUBES TESTED IN THE MONTH OF JULY 2016.

SOUTH PORTAL

DATE Grout Cube Testing

Remarks

3 days 7 days 28 days

01.07.2016 00 05 05

02.07.2016 00 05 05

03.07.2016 00 00 05

04.07.2016 00 00 05

05.07.2016 00 00 05

06.07.2016 00 05 05

07.07.2016 00 00 05

08.07.2016 00 05 05

09.07.2016 00 05 05

10.07.2016 00 05 05

11.07.2016 00 05 05

12.07.2016 00 00 05

13.07.2016 00 00 05

14.07.2016 00 00 00

15.07.2016 00 05 05

16.07.2016 00 05 05

17.07.2016 00 05 05

18.07.2016 00 05 05

19.07.2016 00 05 05

20.07.2016 00 05 05

21.07.2016 00 05 05

22.07.2016 00 05 05

23.07.2016 00 05 05

24.07.2016 00 05 00

25.07.2016 00 05 00

26.07.2016 00 05 00

27.07.2016 00 05 05

28.07.2016 00 05 00

29.07.2016 00 05 05

30.07.2016 00 00 05

31.07.2016 00 05 05

Total 00 115 130

Page 48: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 47

DETAILS OF CUBES TESTED IN THE MONTH OF JULY 2016.

NORTH PORTAL

DATE Grout Cube Testing

Remarks

3 days 7 days 28 days

01.07.2016 05 00 00

02.07.2016 05 00 00

03.07.2016 05 00 00

04.07.2016 05 00 00

05.07.2016 00 05 00

06.07.2016 00 00 00

07.07.2016 00 05 00

08.07.2016 00 05 00

09.07.2016 00 00 00

10.07.2016 00 00 05

11.07.2016 00 00 00

12.07.2016 00 00 00

13.07.2016 00 00 05

14.07.2016 00 00 00

15.07.2016 00 00 05

16.07.2016 00 00 05

17.07.2016 00 00 05

18.07.2016 00 00 00

19.07.2016 00 00 00

20.07.2016 00 00 05

21.07.2016 00 00 05

22.07.2016 00 00 00

23.07.2016 00 00 00

24.07.2016 00 00 00

25.07.2016 00 00 00

26.07.2016 00 00 00

27.07.2016 00 00 05

28.07.2016 00 00 05

29.07.2016 00 00 05

30.07.2016 00 00 00

31.07.2016 00 00 00

Total 20 15 50

Page 49: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 48

DETAILS OF CUBES TESTED IN THE MONTH OF JULY 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.07.2016 00 15 09 00 06 00 00 00 00 00 21 45

02.07.2016 00 12 00 00 00 18 00 00 00 00 09 105

03.07.2016 00 00 00 00 00 15 00 00 00 00 00 18

04.07.2016 00 09 00 00 00 00 00 00 00 00 00 45

05.07.2016 03 00 00 00 00 00 00 00 00 00 12 66

06.07.2016 06 12 09 00 00 18 00 00 00 00 09 108

07.07.2016 03 12 00 00 03 12 00 00 00 00 18 72

08.07.2016 00 15 00 00 06 30 00 00 00 00 21 114

09.07.2016 00 39 09 00 06 00 00 00 00 00 30 42

10.07.2016 03 00 00 00 00 18 00 00 00 00 09 84

11.07.2016 06 00 00 00 03 06 00 00 00 00 12 21

12.07.2016 06 00 00 00 03 09 00 00 00 00 03 75

13.07.2016 00 06 00 00 00 03 00 00 00 00 00 15

14.07.2016 15 15 09 00 00 18 00 00 00 00 12 129

15.07.2016 00 06 09 00 00 15 00 00 00 00 18 12

16.07.2016 00 18 09 00 00 30 00 00 00 00 18 81

17.07.2016 00 12 00 00 03 21 00 00 00 00 15 51

18.07.2016 00 21 00 00 00 00 00 00 00 00 15 24

19.07.2016 00 09 18 00 03 00 00 00 00 00 09 78

20.07.2016 00 00 18 00 00 12 00 00 00 00 03 66

21.07.2016 00 15 09 00 00 06 00 00 00 00 15 51

22.07.2016 03 00 00 00 00 15 00 00 00 00 09 63

23.07.2016 00 00 09 00 00 00 00 00 00 00 15 45

24.07.2016 00 00 00 00 00 00 00 00 00 00 15 00

25.07.2016 00 00 09 00 03 00 00 00 00 00 09 00

26.07.2016 00 03 09 00 06 00 00 00 00 00 12 45

27.07.2016 00 06 09 00 00 00 03 00 00 00 18 30

28.07.2016 03 03 09 00 03 15 00 00 00 00 15 54

29.07.2016 00 00 00 00 00 06 00 00 00 00 06 54

30.07.2016 00 00 00 00 06 24 00 00 00 00 09 75

31.07.2016 00 15 09 00 03 00 00 00 00 00 15 33

Total 48 243 153 00 54 291 03 00 00 00 372 1701

Page 50: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 49

DETAILS OF CUBES TESTED IN THE MONTH OF JULY 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.07.2016 00 15 09 00 06 00 00 00 00 00 21 45

02.07.2016 00 12 00 00 00 18 00 00 00 00 09 105

03.07.2016 00 00 00 00 00 15 00 00 00 00 00 18

04.07.2016 00 09 00 00 00 00 00 00 00 00 00 45

05.07.2016 03 00 00 00 00 00 00 00 00 00 12 66

06.07.2016 06 12 09 00 00 18 00 00 00 00 09 108

07.07.2016 03 12 00 00 03 12 00 00 00 00 18 72

08.07.2016 00 15 00 00 06 30 00 00 00 00 21 114

09.07.2016 00 39 09 00 06 00 00 00 00 00 30 42

10.07.2016 03 00 00 00 00 18 00 00 00 00 09 84

11.07.2016 06 00 00 00 03 06 00 00 00 00 12 21

12.07.2016 06 00 00 00 03 09 00 00 00 00 03 75

13.07.2016 00 06 00 00 00 03 00 00 00 00 00 15

14.07.2016 15 15 09 00 00 18 00 00 00 00 12 129

15.07.2016 00 06 09 00 00 15 00 00 00 00 18 12

16.07.2016 00 18 09 00 00 30 00 00 00 00 18 81

17.07.2016 00 12 00 00 03 21 00 00 00 00 15 51

18.07.2016 00 21 00 00 00 00 00 00 00 00 15 24

19.07.2016 00 09 18 00 03 00 00 00 00 00 09 78

20.07.2016 00 00 18 00 00 12 00 00 00 00 03 66

21.07.2016 00 15 09 00 00 06 00 00 00 00 15 51

22.07.2016 03 00 00 00 00 15 00 00 00 00 09 63

23.07.2016 00 00 09 00 00 00 00 00 00 00 15 45

24.07.2016 00 00 00 00 00 00 00 00 00 00 15 00

25.07.2016 00 00 09 00 03 00 00 00 00 00 09 00

26.07.2016 00 03 09 00 06 00 00 00 00 00 12 45

27.07.2016 00 06 09 00 00 00 03 00 00 00 18 30

28.07.2016 03 03 09 00 03 15 00 00 00 00 15 54

29.07.2016 00 00 00 00 00 06 00 00 00 00 06 54

30.07.2016 00 00 00 00 06 24 00 00 00 00 09 75

31.07.2016 00 15 09 00 03 00 00 00 00 00 15 33

Total 48 243 153 00 54 291 03 00 00 00 372 1701

Page 51: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 50

DETAILS OF CUBES TESTED IN THE MONTH OF JULY 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M35 M40 M40

PQC

M40

PQC Flexural Strength

M45

Remarks

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.07.2016 15 09 00 00 03 03 03 03 00 00

02.07.2016 12 03 00 00 00 00 00 00 00 00

03.07.2016 00 12 00 00 00 00 00 00 00 00

04.07.2016 00 06 00 00 00 00 00 00 00 00

05.07.2016 06 12 00 00 00 03 00 03 00 00

06.07.2016 15 12 00 00 06 03 06 03 00 00

07.07.2016 09 12 00 00 00 03 00 03 00 00

08.07.2016 18 21 00 00 03 00 03 00 00 00

09.07.2016 15 18 00 00 00 03 00 03 00 00

10.07.2016 12 12 00 00 03 03 03 03 00 00

11.07.2016 12 15 00 00 00 03 00 03 00 00

12.07.2016 18 24 00 00 06 03 06 03 00 00

13.07.2016 03 18 00 00 00 06 00 06 00 00

14.07.2016 15 09 00 00 00 03 00 03 00 00

15.07.2016 15 09 00 00 06 06 06 06 00 00

16.07.2016 21 125 00 00 06 03 06 03 00 00

17.07.2016 03 12 03 00 03 03 03 03 00 00

18.07.2016 18 12 00 00 00 03 00 03 00 00

19.07.2016 21 15 00 00 03 03 03 03 00 00

20.07.2016 18 06 03 00 03 03 03 03 00 00

21.07.2016 27 12 00 00 03 03 03 03 00 00

22.07.2016 21 18 06 00 03 03 03 03 00 00

23.07.2016 18 15 03 00 00 00 00 00 00 00

24.07.2016 21 00 00 00 00 00 00 00 00 00

25.07.2016 18 00 00 00 03 00 03 00 00 00

26.07.2016 18 06 03 00 03 00 03 00 00 00

27.07.2016 18 18 00 00 03 06 03 06 00 00

28.07.2016 21 09 00 00 03 00 03 00 00 00

29.07.2016 15 18 00 00 03 03 03 03 00 00

30.07.2016 15 21 00 00 03 00 03 00 00 00

31.07.2016 18 12 06 00 03 03 03 03 00 00

Total 456 378 24 00 69 72 69 72 00 00

Page 52: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 51

DETAILS OF CUBES TESTED IN THE MONTH OF JULY 2016.

NORTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

S

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.07.2016 00 00 00 00 03 03 00 00 00 00 06 27

02.07.2016 00 06 00 00 03 00 00 00 00 00 03 45

03.07.2016 00 00 00 00 03 00 00 00 00 00 03 00

04.07.2016 00 00 00 00 03 00 00 00 00 00 09 51

05.07.2016 00 00 00 00 06 06 00 00 00 00 06 33

06.07.2016 00 00 00 00 03 00 00 00 00 00 00 51

07.07.2016 00 06 00 00 00 00 00 00 00 00 09 30

08.07.2016 03 06 00 00 03 00 00 00 00 00 06 06

09.07.2016 00 00 00 00 00 00 00 00 00 00 06 33

10.07.2016 00 09 00 00 00 06 00 00 00 00 00 48

11.07.2016 00 12 00 00 00 00 00 00 00 00 09 00

12.07.2016 00 00 00 00 03 00 00 00 00 00 00 63

13.07.2016 00 00 00 00 03 00 00 00 00 00 00 18

14.07.2016 00 12 00 00 00 00 00 00 00 00 09 45

15.07.2016 00 12 00 00 00 00 00 00 00 00 03 21

16.07.2016 00 21 00 00 00 00 00 00 00 00 06 15

17.07.2016 00 00 00 00 03 00 00 00 00 00 06 21

18.07.2016 03 00 00 00 00 18 00 00 00 00 06 00

19.07.2016 03 06 00 00 00 00 00 00 00 00 03 69

20.07.2016 03 00 00 00 00 03 00 00 00 00 03 27

21.07.2016 00 00 00 00 00 00 00 00 00 00 09 48

22.07.2016 06 00 00 00 00 12 00 00 00 00 06 21

23.07.2016 00 00 00 00 00 15 00 00 00 00 03 06

24.07.2016 00 00 00 00 00 18 00 00 00 00 03 12

25.07.2016 00 00 00 00 00 18 00 00 00 00 09 30

26.07.2016 03 00 00 00 03 30 00 00 00 00 03 18

27.07.2016 06 00 00 00 06 18 00 00 00 00 12 00

28.07.2016 03 00 00 00 03 00 00 00 00 00 06 48

29.07.2016 03 06 00 00 09 03 00 00 00 00 09 18

30.07.2016 03 00 00 00 03 03 00 00 00 00 09 18

31.07.2016 03 00 00 00 00 00 00 00 00 00 03 18

Total 39 96 00 00 57 153 00 00 00 00 165 837

Page 53: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 52

DETAILS OF CUBES TESTED IN THE MONTH OF JULY 2016.

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

00

NORTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M35 M40 M40

PQC

M40

PQC Flexural Strength

M45

Remarks

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.07.2016 06 06 00 00 03 03 03 03 00 00

02.07.2016 03 06 00 00 00 03 00 03 00 00

03.07.2016 03 06 00 00 00 00 00 00 00 00

04.07.2016 03 06 00 00 00 00 00 00 00 00

05.07.2016 06 06 00 00 00 00 00 00 00 00

06.07.2016 03 06 00 00 00 03 00 03 00 00

07.07.2016 03 06 00 00 03 03 03 03 00 00

08.07.2016 03 06 00 00 03 03 03 03 00 00

09.07.2016 03 06 00 00 03 03 03 03 00 00

10.07.2016 00 06 00 00 00 03 00 03 00 00

11.07.2016 03 06 00 00 03 06 03 06 00 00

12.07.2016 03 06 00 00 00 09 00 09 00 00

13.07.2016 00 06 00 00 00 06 00 06 00 00

14.07.2016 03 06 00 00 00 06 00 06 00 00

15.07.2016 03 06 00 00 03 03 03 03 00 00

16.07.2016 03 06 00 00 03 03 03 03 00 00

17.07.2016 06 06 00 00 00 00 00 00 00 00

18.07.2016 06 06 00 00 00 00 00 00 00 00

19.07.2016 06 06 00 00 03 03 03 03 00 00

20.07.2016 03 06 00 00 03 06 03 06 00 00

21.07.2016 06 06 00 00 03 03 03 03 00 00

22.07.2016 03 06 00 00 03 03 03 03 00 00

23.07.2016 03 06 00 00 00 00 00 00 00 00

24.07.2016 03 06 00 00 00 00 00 00 00 00

25.07.2016 03 06 00 00 03 00 03 00 00 00

26.07.2016 03 09 00 00 03 00 03 00 00 00

27.07.2016 03 09 00 00 00 00 00 00 00 00

28.07.2016 03 06 00 00 03 03 03 03 00 00

29.07.2016 09 06 00 00 03 03 03 03 00 00

30.07.2016 06 09 00 00 06 03 06 03 00 00

31.07.2016 03 00 00 00 03 00 03 00 00 00

Total 114 189 00 00 54 78 54 78 00 00

Page 54: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 53

FOR THE MONTH OF AUGUST

DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF AUGUST 2016.

SOUTH PORTAL

DATE

INSITU CORES PANEL CASTED

Remarks Pass Fail 1 days 7 days 28 days

01.08.2016 00 00 00 05 00

02.08.2016 00 00 00 05 05

03.08.2016 00 00 00 00 00

04.08.2016 00 00 00 00 00

05.08.2016 00 00 00 00 00

06.08.2016 00 00 00 00 05

07.08.2016 00 00 00 00 00

08.08.2016 00 00 00 00 00

09.08.2016 00 00 00 00 05

10.08.2016 00 00 00 00 00

11.08.2016 00 00 00 00 00

12.08.2016 00 00 00 00 05

13.08.2016 00 00 00 00 00

14.08.2016 00 00 00 00 00

15.08.2016 00 00 00 00 00

16.08.2016 00 00 00 00 00

17.08.2016 00 00 00 00 05

18.08.2016 00 00 00 00 00

19.08.2016 00 00 00 00 05

20.08.2016 00 00 00 00 00

21.08.2016 00 00 00 00 00

22.08.2016 00 00 00 00 05

23.08.2016 00 00 00 00 05

24.08.2016 00 00 00 00 00

25.08.2016 00 00 00 00 00

26.08.2016 00 00 00 00 00

27.08.2016 00 00 00 00 00

28.08.2016 00 00 00 00 00

29.08.2016 00 00 00 00 00

30.08.2016 00 00 00 00 00

31.08.2016 00 00 00 00 00

Total 00 00 00 10 40

Page 55: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 54

DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF AUGUST 2016.

NORTH PORTAL

DATE

INSITU CORES PANEL CASTED

Remarks

Pass Fail 1 days 7 days 28 days

01.08.2016 00 00 00 00 00

02.08.2016 00 00 05 00 00

03.08.2016 00 00 00 00 00

04.08.2016 00 00 00 00 00

05.08.2016 00 00 05 00 00

06.08.2016 00 00 05 00 00

07.08.2016 00 00 00 00 00

08.08.2016 00 00 00 05 00

09.08.2016 00 00 00 00 00

10.08.2016 00 00 00 00 00

11.08.2016 00 00 05 05 00

12.08.2016 00 00 00 05 00

13.08.2016 00 00 05 00 00

14.08.2016 00 00 00 00 00

15.08.2016 00 00 05 00 00

16.08.2016 00 00 00 00 00

17.08.2016 00 00 00 05 00

18.08.2016 00 00 05 00 00

19.08.2016 00 00 00 05 00

20.08.2016 00 00 05 00 00

21.08.2016 00 00 00 05 00

22.08.2016 00 00 05 00 00

23.08.2016 00 00 00 00 00

24.08.2016 00 00 05 05 00

25.08.2016 00 00 00 00 00

26.08.2016 00 00 05 05 00

27.08.2016 00 00 00 00 00

28.08.2016 00 00 00 05 00

29.08.2016 03 00 00 00 05

30.08.2016 00 00 00 05 00

31.08.2016 00 00 00 00 00

Total 03 00 55 50 05

Page 56: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 55

DETAILS OF CUBES TESTED IN THE MONTH OF AUGUST 2016.

SOUTH PORTAL

DATE Contact Grout Cube Testing

Remarks

3 days 7 days 28 days

01.08.2016 00 00 05

02.08.2016 00 00 00

03.08.2016 00 00 00

04.08.2016 00 00 00

05.08.2016 00 00 05

06.08.2016 00 00 05

07.08.2016 00 00 05

08.08.2016 00 00 05

09.08.2016 00 00 05

10.08.2016 00 00 05

11.08.2016 00 05 05

12.08.2016 00 05 05

13.08.2016 00 05 05

14.08.2016 00 00 05

15.08.2016 00 00 00

16.08.2016 00 05 10

17.08.2016 00 10 05

18.08.2016 00 05 05

19.08.2016 00 05 05

20.08.2016 00 05 00

21.08.2016 00 05 05

22.08.2016 00 00 00

23.08.2016 00 05 00

24.08.2016 00 05 00

25.08.2016 00 05 00

26.08.2016 00 00 00

27.08.2016 00 00 00

28.08.2016 00 00 00

29.08.2016 00 00 00

30.08.2016 00 00 00

31.08.2016 00 00 00

Total 00 65 85

Page 57: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 56

DETAILS OF CUBES TESTED IN THE MONTH OF AUGUST 2016.

NORTH PORTAL

DATE Grout Cube Testing

Remarks

3 days 7 days 28 days

01.08.2016 00 05 00

02.08.2016 00 05 00

03.08.2016 00 05 00

04.08.2016 00 00 00

05.08.2016 05 00 00

06.08.2016 05 00 00

07.08.2016 00 00 00

08.08.2016 00 00 00

09.08.2016 00 05 00

10.08.2016 00 05 00

11.08.2016 05 00 00

12.08.2016 00 00 00

13.08.2016 00 00 05

14.08.2016 00 00 05

15.08.2016 00 0 00

16.08.2016 00 05 10

17.08.2016 00 00 05

18.08.2016 00 00 05

19.08.2016 00 00 05

20.08.2016 00 00 05

21.08.2016 00 00 05

22.08.2016 00 00 05

23.08.2016 00 00 05

24.08.2016 00 00 05

25.08.2016 00 00 00

26.08.2016 00 00 00

27.08.2016 00 00 00

28.08.2016 00 00 00

29.08.2016 00 00 00

30.08.2016 00 00 05

31.08.2016 00 00 05

Total 15 30 70

Page 58: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 57

DETAILS OF CUBES TESTED IN THE MONTH OF AUGUST 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

3901.08.2016

00 12 09 00 03 09 00 00 00 00 09 12

02.08.2016 00 00 09 00 03 03 00 00 00 00 03 18

03.08.2016 03 00 09 00 00 00 00 00 00 00 03 09

04.08.2016 00 00 09 00 03 00 00 00 00 00 06 12

05.08.2016 00 00 09 00 03 00 00 00 00 00 09 18

06.08.2016 00 00 09 00 03 03 00 00 00 00 09 27

07.08.2016 00 00 09 00 03 00 00 00 00 00 12 27

08.08.2016 00 00 09 00 00 06 00 00 00 00 03 33

09.08.2016 00 00 00 00 03 00 00 00 00 00 09 39

10.08.2016 03 00 00 00 00 00 00 00 00 00 12 18

11.08.2016 03 00 09 00 00 00 00 00 00 00 03 33

12.08.2016 06 06 09 00 03 00 00 00 00 00 03 12

13.08.2016 06 00 09 00 03 00 00 00 00 00 03 18

14.08.2016 06 00 00 00 00 00 00 00 00 00 09 09

15.08.2016 00 00 00 00 00 00 00 00 00 00 00 00

16.08.2016 06 00 09 00 06 09 00 00 00 00 09 36

17.08.2016 06 00 00 00 00 00 00 00 00 00 06 18

18.08.2016 00 03 00 00 09 03 00 00 00 00 06 30

19.08.2016 03 00 09 00 03 00 00 00 00 00 06 27

20.08.2016 03 00 00 00 03 06 00 00 00 00 03 27

21.08.2016 00 00 00 00 03 00 00 00 00 00 09 24

22.08.2016 00 00 00 00 00 06 00 00 00 00 03 30

23.08.2016 03 00 00 00 06 03 00 00 00 00 03 30

24.08.2016 03 09 00 00 03 00 00 00 00 00 06 39

25.08.2016 03 00 00 00 06 06 00 00 00 00 09 33

26.08.2016 00 00 00 00 03 03 00 00 00 00 03 24

27.08.2016 00 00 09 00 00 06 00 00 00 00 12 12

28.08.2016 00 00 09 00 06 03 00 00 00 00 03 30

29.08.2016 03 00 09 00 09 00 00 00 00 00 03 30

30.08.2016 03 00 00 00 06 03 00 00 00 00 03 18

31.08.2016 03 06 09 00 06 00 00 00 00 00 06 24

Total 63 36 153 00 96 69 00 00 00 00 183 717

Page 59: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 58

DETAILS OF CUBES TESTED IN THE MONTH OF AUGUST 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M35 M40 M40

PQC

M40

PQC Flexural Strength

M45

Remarks

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.08.2016 18 21 00 00 03 00 03 00 00 00

02.08.2016 12 15 00 00 00 06 00 06 00 00

03.08.2016 18 00 00 00 00 00 00 00 00 00

04.08.2016 15 12 00 00 03 00 03 00 00 00

05.08.2016 18 15 00 00 03 06 03 06 00 00

06.08.2016 15 18 00 00 03 06 03 06 00 00

07.08.2016 27 00 00 00 03 03 03 03 00 00

08.08.2016 12 27 00 00 03 00 03 00 00 00

09.08.2016 18 24 00 00 03 03 03 03 00 00

10.08.2016 21 15 00 00 03 03 03 03 00 00

11.08.2016 21 30 00 00 03 03 03 03 00 00

12.08.2016 21 18 00 00 03 03 03 03 00 00

13.08.2016 21 12 00 00 00 00 00 00 00 00

14.08.2016 06 21 00 00 00 00 00 00 00 00

15.08.2016 00 00 00 00 00 00 00 00 00 00

16.08.2016 39 30 00 00 06 06 06 06 00 00

17.08.2016 24 15 00 00 03 03 03 03 00 00

18.08.2016 24 21 00 00 03 03 03 03 00 00

19.08.2016 18 12 00 00 03 03 03 03 00 00

20.08.2016 15 12 00 00 03 03 03 03 00 00

21.08.2016 24 18 00 00 03 03 03 03 00 00

22.08.2016 00 15 00 00 03 03 03 03 00 00

23.08.2016 12 12 00 00 03 00 03 00 00 00

24.08.2016 24 18 00 00 03 00 03 00 00 00

25.08.2016 18 15 00 00 03 03 03 03 00 00

26.08.2016 21 18 00 00 03 03 03 03 00 00

27.08.2016 15 18 00 00 03 03 03 03 00 00

28.08.2016 09 27 00 00 03 06 03 06 00 00

29.08.2016 09 12 00 00 03 03 03 03 00 00

30.08.2016 24 18 00 00 03 03 03 03 00 00

31.08.2016 12 21 00 00 03 03 03 03 00 00

Total 531 510 00 00 81 81 81 81 00 00

Page 60: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 59

DETAILS OF CUBES TESTED IN THE MONTH OF AUGUST 2016.

NORTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

S

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.08.2016 03 00 00 00 03 00 00 00 00 00 09 60

02.08.2016 00 00 00 00 03 12 00 00 00 00 06 00

03.08.2016 00 00 00 00 00 00 00 00 00 00 09 00

04.08.2016 00 00 00 00 00 06 00 00 00 00 09 24

05.08.2016 00 00 00 00 00 00 00 00 00 00 12 03

06.08.2016 00 00 00 00 00 00 00 00 00 00 15 21

07.08.2016 00 00 00 00 00 15 00 00 00 00 09 57

08.08.2016 00 12 00 00 03 00 00 00 00 00 03 21

09.08.2016 03 06 00 00 00 00 00 00 00 00 06 09

10.08.2016 00 03 00 00 00 00 00 00 00 00 09 06

11.08.2016 03 00 00 00 00 00 00 00 00 00 09 57

12.08.2016 00 09 00 00 00 00 00 00 00 00 03 21

13.08.2016 00 00 00 00 00 00 00 00 00 00 06 27

14.08.2016 00 00 00 00 00 00 00 00 00 00 06 27

15.08.2016 00 00 00 00 00 00 00 00 00 00 00 30

16.08.2016 06 06 00 00 03 03 00 00 00 00 12 06

17.08.2016 03 21 00 00 00 21 00 00 00 00 06 39

18.08.2016 00 06 00 00 03 15 00 00 00 00 09 15

19.08.2016 00 06 00 00 00 30 00 00 00 00 09 24

20.08.2016 00 06 09 00 03 06 00 00 00 00 06 30

21.08.2016 00 06 00 00 00 00 00 00 00 00 06 06

22.08.2016 00 06 00 00 00 06 00 00 00 00 00 27

23.08.2016 03 00 00 00 00 06 00 00 00 00 06 18

24.08.2016 03 00 09 00 03 00 00 00 00 00 06 33

25.08.2016 00 00 09 00 03 00 00 00 00 00 09 33

26.08.2016 00 00 09 00 03 00 00 00 00 00 03 30

27.08.2016 03 00 09 00 00 00 00 00 00 00 06 33

28.08.2016 00 00 09 00 03 00 00 00 00 00 03 24

29.08.2016 00 00 00 00 00 06 00 00 00 00 06 12

30.08.2016 00 06 09 00 00 00 00 00 00 00 06 27

31.08.2016 03 00 09 00 00 00 00 00 00 00 06 42

Total 30 93 72 00 30 126 00 00 00 00 210 762

Page 61: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 60

DETAILS OF CUBES TESTED IN THE MONTH OF AUGUST 2016.

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

00

NORTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M35 M40 M40

PQC

M40

PQC Flexural Strength

M45

Remarks

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.08.2016 03 09 00 00 03 03 03 03 00 00

02.08.2016 06 06 00 00 03 00 03 00 00 00

03.08.2016 06 00 00 00 03 00 03 00 00 00

04.08.2016 06 06 00 00 06 00 06 00 00 00

05.08.2016 03 06 00 00 06 03 06 03 00 00

06.08.2016 09 09 00 00 06 03 06 03 00 00

07.08.2016 03 12 00 00 03 00 03 00 00 00

08.08.2016 06 12 00 00 03 00 03 00 00 00

09.08.2016 03 12 00 00 03 03 03 03 00 00

10.08.2016 03 06 00 00 03 03 03 03 00 00

11.08.2016 03 12 00 00 03 03 03 03 00 00

12.08.2016 03 09 00 00 03 03 03 03 00 00

13.08.2016 06 06 00 00 00 00 00 00 00 00

14.08.2016 03 06 00 00 03 00 03 00 00 00

15.08.2016 00 00 00 00 00 00 00 00 00 00

16.08.2016 09 12 00 00 03 06 03 06 00 00

17.08.2016 03 06 00 00 03 00 03 00 00 00

18.08.2016 03 06 00 00 00 03 00 03 00 00

19.08.2016 03 15 00 00 00 03 00 03 00 00

20.08.2016 03 12 00 00 00 06 00 06 00 00

21.08.2016 03 06 00 00 03 03 03 03 00 00

22.08.2016 00 06 00 00 00 03 00 03 00 00

23.08.2016 03 12 00 00 03 03 03 03 00 00

24.08.2016 03 09 00 00 00 03 00 03 00 00

25.08.2016 03 12 00 00 00 06 00 06 00 00

26.08.2016 03 06 00 00 00 06 00 06 00 00

27.08.2016 03 18 00 00 00 06 00 06 00 00

28.08.2016 03 06 00 00 00 03 00 03 00 00

29.08.2016 03 33 00 00 03 03 03 03 00 00

30.08.2016 03 06 00 00 03 03 03 03 00 00

31.08.2016 03 06 00 00 03 03 03 03 00 00

Total 114 282 00 00 69 81 69 81 00 00

Page 62: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 61

12.3 DETAILS OF AGGREGATES TESTING

FOR THE MONTH OF JUNE

DETAILS OF TESTING IN THE MONTH OF JUNE 2016.

SOUTH PORTAL

MOISTURE CONTENT % GRADATION

DATE 10 & 20

mm Crusher

Dust Sand

10 mm

Crusher Dust

20 mm

Sand Combine

d F.I AIV

01.06.2016 04 02 02 01 01 01 01 01 00 00

02.06.2016 04 02 02 01 01 01 01 01 00 00

03.06.2016 04 02 02 01 01 01 01 01 00 00

04.06.2016 04 02 02 01 01 01 01 01 00 00

05.06.2016 04 02 02 01 01 01 01 01 00 00

06.06.2016 04 02 02 01 01 01 01 01 00 00

07.06.2016 04 02 02 01 01 01 01 01 00 00

08.06.2016 04 02 02 01 01 01 01 02 02 01

09.06.2016 04 02 02 01 01 01 01 01 00 00

10.06.2016 04 02 02 01 01 01 01 01 00 00

11.06.2016 04 02 02 01 01 01 01 01 00 00

12.06.2016 04 02 02 01 01 01 01 01 00 00

13.06.2016 04 02 02 01 01 01 01 01 00 00

14.06.2016 04 02 02 01 01 01 01 01 00 00

15.06.2016 04 02 02 01 01 01 01 02 02 01

16.06.2016 04 02 02 01 01 01 01 01 00 00

17.06.2016 04 02 02 01 01 01 01 01 00 00

18.06.2016 04 02 02 01 01 01 01 01 00 00

19.06.2016 04 02 02 01 01 01 01 01 00 00

20.06.2016 04 02 02 01 01 01 01 01 00 00

21.06.2016 04 02 02 01 01 01 01 02 02 01

22.06.2016 04 02 02 01 01 01 01 01 00 00

23.06.2016 04 02 02 01 01 01 01 01 00 00

24.06.2016 04 02 02 01 01 01 01 01 00 00

25.06.2016 04 02 02 01 01 01 01 01 00 00

26.06.2016 04 02 02 01 01 01 01 01 00 00

27.06.2016 04 02 02 01 01 01 01 01 00 00

28.06.2016 04 02 02 01 01 01 01 01 00 00

29.06.2016 04 02 02 01 01 01 01 02 02 01

30.06.2016 04 02 02 01 01 01 01 01 00 00

Total 120 60 60 30 30 30 30 34 08 04

Page 63: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 62

DETAILS OF TESTING IN THE MONTH OF JUNE 2016.

NORTH PORTAL

MOISTURE CONTENT % GRADATION

DATE 10 & 20

mm Crusher

Dust Sand

10 mm

Crusher Dust

20 mm

Sand Combined F.I AIV

01.06.2016 04 02 02 00 00 00 00 00 00 00

02.06.2016 04 02 02 01 01 01 01 01 01 01

03.06.2016 04 02 02 00 00 00 00 00 00 00

04.06.2016 04 02 02 00 00 00 00 00 00 00

05.06.2016 04 02 02 00 00 00 00 00 00 00

06.06.2016 04 02 02 01 01 01 01 01 01 01

07.06.2016 04 02 02 00 00 00 00 00 00 00

08.06.2016 04 02 02 00 00 00 00 00 00 00

09.06.2016 04 02 02 01 01 01 01 01 01 01

10.06.2016 04 02 02 00 00 00 00 00 00 00

11.06.2016 04 02 02 00 00 00 00 00 00 00

12.06.2016 04 02 02 01 01 01 01 01 01 01

13.06.2016 04 02 02 00 00 00 00 00 00 00

14.06.2016 04 02 02 00 00 00 00 00 00 00

15.06.2016 04 02 02 01 01 01 01 01 01 01

16.06.2016 04 02 02 00 00 00 00 00 00 00

17.06.2016 04 02 02 00 00 00 00 00 00 00

18.06.2016 04 02 02 01 01 01 01 01 01 01

19.06.2016 04 02 02 00 00 00 00 00 00 00

20.06.2016 04 02 02 00 00 00 00 00 00 00

21.06.2016 04 02 02 01 01 01 01 01 01 01

22.06.2016 04 02 02 00 00 00 00 00 00 00

23.06.2016 04 02 02 01 01 01 01 01 01 01

24.06.2016 04 02 02 00 00 00 00 00 00 00

25.06.2016 04 02 02 00 00 00 00 00 00 00

26.06.2016 04 02 02 00 00 00 00 00 00 00

27.06.2016 04 02 02 01 01 01 01 01 01 01

28.06.2016 04 02 02 00 00 00 00 00 00 00

29.06.2016 04 02 02 00 00 00 00 00 00 00

30.06.2016 04 02 02 01 01 01 01 01 01 01

Total 120 60 60 10 10 10 10 10 10 10

Page 64: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 63

FOR THE MONTH OF JULY 2016

DETAILS OF TESTING IN THE MONTH OF JULY 2016.

SOUTH PORTAL

MOISTURE CONTENT % GRADATION

DATE 10 & 20

mm Crusher

Dust Sand

10 mm

Crusher Dust

20 mm

Sand Combine

d F.I AIV

01.07.2016 04 02 02 02 02 02 02 01 00 00

02.07.2016 04 02 02 02 02 02 02 01 00 00

03.07.2016 04 02 02 02 02 02 02 01 00 00

04.07.2016 04 02 02 02 02 02 02 01 00 00

05.07.2016 04 02 02 02 02 02 02 01 00 00

06.07.2016 04 02 02 02 02 02 02 01 00 00

07.07.2016 04 02 02 02 02 02 02 01 00 00

08.07.2016 04 02 02 02 02 02 02 02 04 02

09.07.2016 04 02 02 02 02 02 02 01 00 00

10.07.2016 04 02 02 02 02 02 02 01 00 00

11.07.2016 04 02 02 02 02 02 02 01 00 00

12.07.2016 04 02 02 02 02 02 02 01 00 00

13.07.2016 04 02 02 02 02 02 02 01 00 00

14.07.2016 04 02 02 02 02 02 02 01 00 00

15.07.2016 04 02 02 02 02 02 02 02 04 02

16.07.2016 04 02 02 02 02 02 02 01 00 00

17.07.2016 04 02 02 02 02 02 02 01 00 00

18.07.2016 04 02 02 02 02 02 02 01 00 00

19.07.2016 04 02 02 02 02 02 02 01 00 00

20.07.2016 04 02 02 02 02 02 02 01 00 00

21.07.2016 04 02 02 02 02 02 02 01 00 00

22.07.2016 04 02 02 02 02 02 02 02 04 02

23.07.2016 04 02 02 02 02 02 02 01 00 00

24.07.2016 04 02 02 02 02 02 02 01 00 00

25.07.2016 04 02 02 02 02 02 02 01 00 00

26.07.2016 04 02 02 02 02 02 02 01 00 00

27.07.2016 04 02 02 02 02 02 02 01 00 00

28.07.2016 04 02 02 02 02 02 02 01 00 00

29.07.2016 04 02 02 02 02 02 02 01 00 00

30.07.2016 04 02 02 02 02 02 02 01 00 00

31.07.2016 04 02 02 02 02 02 02 02 04 02

Total 124 62 62 62 62 62 62 35 16 08

Page 65: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 64

DETAILS OF TESTING IN THE MONTH OF JULY 2016.

NORTH PORTAL

MOISTURE CONTENT % GRADATION

DATE 10 & 20

mm Crusher

Dust Sand

10 mm

Crusher Dust

20 mm

Sand Combined F.I AIV

01.07.2016 04 02 02 00 00 00 00 01 00 00

02.07.2016 04 02 02 00 00 00 00 01 00 00

03.07.2016 04 02 02 01 01 01 01 01 01 01

04.07.2016 04 02 02 00 00 00 00 01 00 00

05.07.2016 04 02 02 00 00 00 00 00 00 00

06.07.2016 04 02 02 00 00 00 00 00 00 00

07.07.2016 04 02 02 00 00 00 00 00 00 00

08.07.2016 04 02 02 01 01 01 01 02 01 01

09.07.2016 04 02 02 00 00 00 00 01 00 00

10.07.2016 04 02 02 00 00 00 00 00 00 00

11.07.2016 04 02 02 01 01 01 01 01 01 01

12.07.2016 04 02 02 00 00 00 00 01 00 00

13.07.2016 04 02 02 00 00 00 00 01 00 00

14.07.2016 04 02 02 00 00 00 00 01 00 00

15.07.2016 04 02 02 01 01 01 01 01 01 01

16.07.2016 04 02 02 00 00 00 00 00 00 00

17.07.2016 04 02 02 00 00 00 00 00 00 00

18.07.2016 04 02 02 00 00 00 00 01 00 00

19.07.2016 04 02 02 00 00 00 00 02 00 00

20.07.2016 04 02 02 00 00 00 00 00 00 00

21.07.2016 04 02 02 01 01 01 01 02 01 01

22.07.2016 04 02 02 00 00 00 00 00 00 00

23.07.2016 04 02 02 00 00 00 00 00 00 00

24.07.2016 04 02 02 01 01 01 01 02 01 01

25.07.2016 04 02 02 00 00 00 00 01 00 00

26.07.2016 04 02 02 00 00 00 00 01 00 00

27.07.2016 04 02 02 01 01 01 01 02 01 01

28.07.2016 04 02 02 00 00 00 00 00 00 00

29.07.2016 04 02 02 00 00 00 00 01 00 00

30.07.2016 04 02 02 01 01 01 01 01 01 01

31.07.2016 04 02 02 00 00 00 00 00 00 00

Total 124 62 62 08 08 08 08 25 08 08

Page 66: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 65

FOR THE MONTH OF AUGUST 2016

DETAILS OF TESTING IN THE MONTH OF AUGUST 2016.

SOUTH PORTAL

MOISTURE CONTENT % GRADATION

DATE 10 & 20

mm Crusher

Dust Sand

10 mm

Crusher Dust

20 mm

Sand Combine

d F.I AIV

01.08.2016 04 02 02 01 01 01 01 01 00 00

02.08.2016 04 02 02 01 01 01 01 01 00 00

03.08.2016 04 02 02 01 01 01 01 01 00 00

04.08.2016 04 02 02 01 01 01 01 01 00 00

05.08.2016 04 02 02 01 01 01 01 01 00 00

06.08.2016 04 02 02 01 01 01 01 02 02 01

07.08.2016 04 02 02 01 01 01 01 01 00 00

08.08.2016 04 02 02 01 01 01 01 01 00 00

09.08.2016 04 02 02 01 01 01 01 01 00 00

10.08.2016 04 02 02 01 01 01 01 01 00 00

11.08.2016 04 02 02 01 01 01 01 01 00 00

12.08.2016 04 02 02 01 01 01 01 01 00 00

13.08.2016 04 02 02 01 01 01 01 02 02 01

14.08.2016 04 02 02 01 01 01 01 01 00 00

15.08.2016 00 00 00 00 00 00 00 00 00 00

16.08.2016 04 02 02 01 01 01 01 01 00 00

17.08.2016 04 02 02 01 01 01 01 01 00 00

18.08.2016 04 02 02 01 01 01 01 01 00 00

19.08.2016 04 02 02 01 01 01 01 01 00 00

20.08.2016 04 02 02 01 01 01 01 01 00 00

21.08.2016 04 02 02 01 01 01 01 01 00 00

22.08.2016 04 02 02 01 01 01 01 02 02 01

23.08.2016 04 02 02 01 01 01 01 01 00 00

24.08.2016 04 02 02 01 01 01 01 01 00 00

25.08.2016 04 02 02 01 01 01 01 01 00 00

26.08.2016 04 02 02 01 01 01 01 01 00 00

27.08.2016 04 02 02 01 01 01 01 01 00 00

28.08.2016 04 02 02 01 01 01 01 01 00 00

29.08.2016 04 02 02 01 01 01 01 01 00 00

30.08.2016 04 02 02 01 01 01 01 01 00 00

31.08.2016 04 02 02 01 01 01 01 02 02 01

Total 120 60 60 30 30 30 30 34 08 04

Page 67: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 66

DETAILS OF TESTING IN THE MONTH OF AUGUST 2016.

NORTH PORTAL

MOISTURE CONTENT % GRADATION

DATE 10 & 20

mm Crusher

Dust Sand

10 mm

Crusher Dust

20 mm

Sand Combined F.I AIV

01.08.2016 04 02 02 02 02 01 02 02 02 02

02.08.2016 04 02 02 00 00 00 00 01 00 00

03.08.2016 04 02 02 00 00 00 00 01 00 00

04.08.2016 04 02 02 00 00 00 00 01 00 00

05.08.2016 04 02 02 00 00 00 00 02 00 00

06.08.2016 04 02 02 01 01 01 01 02 01 01

07.08.2016 04 02 02 00 00 00 00 01 00 00

08.08.2016 04 02 02 00 00 00 00 00 00 00

09.08.2016 04 02 02 01 01 01 01 01 01 01

10.08.2016 04 02 02 00 00 00 00 01 00 00

11.08.2016 04 02 02 01 01 00 01 00 00 00

12.08.2016 04 02 02 01 01 01 01 02 01 01

13.08.2016 04 02 02 00 00 00 00 01 00 00

14.08.2016 04 02 02 00 00 00 00 00 00 00

15.08.2016 00 00 00 00 00 00 00 00 00 00

16.08.2016 04 02 02 01 01 01 01 02 01 01

17.08.2016 04 02 02 00 00 00 00 01 01 01

18.08.2016 04 02 02 00 00 00 00 01 00 00

19.08.2016 04 02 02 01 01 01 01 02 00 00

20.08.2016 04 02 02 00 00 00 00 01 00 00

21.08.2016 04 02 02 00 00 00 00 02 00 00

22.08.2016 04 02 02 02 02 01 02 02 02 02

23.08.2016 04 02 02 00 00 00 00 02 00 00

24.08.2016 04 02 02 00 00 00 00 02 00 00

25.08.2016 04 02 02 01 01 01 01 02 00 00

26.08.2016 04 02 02 00 00 00 00 01 01 01

27.08.2016 04 02 02 00 00 00 00 00 00 00

28.08.2016 04 02 02 01 01 01 01 01 01 01

29.08.2016 04 02 02 00 00 00 00 01 00 00

30.08.2016 04 02 02 00 00 00 00 00 00 00

31.08.2016 04 02 02 02 02 01 02 02 02 02

Total 120 60 60 14 14 10 14 37 13 13

Page 68: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 67

13. SAFETY REPORT

S.no. Particulars Up to last Month Current Month Cumulative

1 Total Man-hours Worked 15,291,992 2,97,623 15,589,615

2 Average No of Employees 1,88,455 6,250 1,94,705

3 Incidents 17 0 17

4 Environment Incidents 0 0 0

5 Training (Man Hours) 4,77,841 87 4,77,928

Page 69: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 68

14 MINUTES OF MONTHLY PROGRESS MEETING

No Meeting during Quarter (June 2016- August 2016)

Page 70: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 69

15 PHOTOGRAPHIC REPORT

LAYING OF DLC AT SOUTH APPROACH ROAD

PQC AT SOUTH APPRAOCH ROAD

Page 71: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 70

LAYING OF PQC AT SOUTH APPROACH ROAD

PQC AT TOLL PLAZA LOCATION SAR

Page 72: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 71

PIPE CONDUCTOR FOR CABLES AT NORTH PORTAL TECHNOLOGY BUILDING

Page 73: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 72

TECHNOLOGY BUILDING SOUTH PORTAL

VIEW OF NORTH PORTAL

Page 74: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of June to... · is being carried out in five separate ... with its exceptional

Quarterly Progress Report June 2016 to August 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 73

CHUTE DRAIN NEAR NORTH PORTAL

TOLL PLAZA AREA VIEW AT SOUTH PORTAL