navigation square block a€¦ · albert quay build to rent shd progressive commercial construction...
TRANSCRIPT
UP
+2.900
+ 3.300
+3.800ENTRANCE
ESCAPE BASEMENT
?
UPPER ESCAPE
RAMP TO CAR PARK
WC
WCService Area
Comms Room
+3.800
+ 3.8
+2.900
+2.900
+3.800
+ 3.100
+ 2.900+4.1
+4.1
+4.5
ALBERT STREET
ALB
ER
T Q
UA
Y E
AS
T
NAVIGATION SQUARE BLOCK A
ONE ALBERT QUAY
CAREY
HOUSE
FO
RM
ER
STA
TIO
N T
ER
MIN
US
(PR
OP
OS
ED
RE
STA
UR
AN
T/B
AR
)
+3.800
+3.800
+3.200
+4.5
PROPOSED
CAFE
WORK/STUDY SPACE
+3.500
+3.800 +3.800
RECEPTION
SWITCH ROOM
SUBSTATION
MANAGEMENT
SUITE
SWITCH ROOM
SUBSTATION
1:21GENTLY SLOPED
1:21
1:21
+3.800+ 2.900 1:21
GENTLY SLOPED
+3.250
+ 3.300
1:21GENTLY SLOPED
+ 3.050
+2.900
+2.900
6140
20006000
3250
3000
9000
1500
4092
+3.800
UPGRADED PUBLIC REALM INDICATED (INCUDING PROVISION OF CYLCE LANES, BUS LANE AND BOARDWALK AND ADJUSTMENTS TO ROADS, FOOTPATHS AND LANDSCAPING) AS PROPOSED UNDER 'CORK DOCKLANDS TO CITY CENTRE ROAD NETWORK IMPROVMENT SCHEME'
NOTE: FOR FULL LANDSCAPING INFORMATION, PLEASE REFER TO CSR DRAWINGS INCLUDED IN PLANNING APPLICATION
BUS LANE
(PROPOSED BY CORK CITY COUNCIL AS NOTED ABOVE)
CYCLE LANE
(PROPOSED BY CORK CITY COUNCIL AS NOTED ABOVE)
PEDESTRIAN CROSSING
FOOTPATH EXTENSION
(PROPOSED BY CORK CITY COUNCIL AS NOTED ABOVE)
SOFT LANDSCAPING
PUBLIC REALM HARD LANDSCAPING
N
ALL DIMENSIONS TO BE CHECKED ON SITE
NO DIMENSIONS TO BE SCALED FROM THIS DRAWING
DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT CONSULTANTS DRAWINGS
CLIENT
PROJECT
SCALE@ A1:
DRAWING
DRAWN/CHECKED:
DATE
DRAWING NUMBER REVISIONSTATUS CODE:
PROJECT NUMBER
Architecture + Interiorshenryjlyons.com
+353 21 422 [email protected]
16 Lavitt's QuayCork T12 ED74
STATUS CODE DESCRIPTION
PLANNING
ALBERT QUAY BUILD TO RENT SHD
PROGRESSIVE COMMERCIAL CONSTRUCTION LTD
ALL MEASUREMENTS ARE METRIC. ALL LONGITUDINAL MEASUREMENTS AND SELECTEDVERTICAL SEPERATION DISTANCES IN MM (ie 4020). ALL VERTICAL REFERENCE HEIGHTS IN METRES OD (ie +27.600). ALL FFL IN METRES OF (ie +3.800)
P2
1 : 200
Public Realm
07/10/19
EC/ KMM
950491
P6600
1 : 200
SITE PLAN_PUBLIC REALM1
EXISTING
PEDESTRIAN
CROSSING EXISTING
PEDESTRIAN
CROSSING
REV DATE DESCRIPTION CKH DRN
P1 19/07/0219 ISSUED TO AN BORD PLEANÁLA KMM ECP2 25/10/2019 ISSUED FOR PLANNING KMM EC