networking stacked pt-100'stacked inverters...me-bmk (battery monitor) 2-way phone-splitter...

3
4-8-2016 MASTER SLAVE SLAVE SLAVE SLAVE 1 SLAVE 3 SLAVE 2 MASTER MS-PAE INVERTERS STACKED PT-100 CONTROLLERS STACKED ME-RTR BTS to Battery Bank NETWORK Cable NETW ORK NETW ORK BTS REMOTE REMOTE REMOTE REMOTE Stacking cables Remote cables Stacking cables BTS Cable NETWORKING STACKED PT-100'S WITH STACKED INVERTERS Sta ck (red) Magnum Net (green) Remote (blue) BTS (yellow) Communication Ports CAUTION: Do not network any PT-100 directly to the ME-RTR or damage may occur. Note: A phone-splitter can not be used in any configuration that has the ME-RTR installed.

Upload: others

Post on 26-Jan-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NETWORKING STACKED PT-100'STACKED INVERTERS...ME-BMK (BATTERY MONITOR) 2-way Phone-splitter ME-ARC (ADVANCED REMOTE) 2-way Phone-splitter Note: The ME-AGS-N or PT-100 must be the first

4-8-2016

MASTER SLAVE SLAVE SLAVE

SLAVE 1 SLAVE 3SLAVE 2MASTER

MS-PAE INVERTERS STACKED

PT-100 CONTROLLERS STACKED

ME-RTR

BTS to Battery Bank

NETWORK Cable

NETW

ORK

NETW ORK

BTS

REM

OT

E

REM

OT

E

REM

OT

E

REM

OT

E

Stacking cables

Remote cables

Stacking cables

BTS

Cable

NETWORKING STACKED PT-100'S WITH STACKED INVERTERS

Stack (red)

Magnum Net (green)

Remote (blue)

BTS (yellow)

CommunicationPorts

CAUTION: Do not network any PT-100 directly to the ME-RTR or damage may occur.

Note: A phone-splitter can not be used in any configuration that has the ME-RTR installed.

Page 2: NETWORKING STACKED PT-100'STACKED INVERTERS...ME-BMK (BATTERY MONITOR) 2-way Phone-splitter ME-ARC (ADVANCED REMOTE) 2-way Phone-splitter Note: The ME-AGS-N or PT-100 must be the first

4-8-2016

ME-AGS-N(NETWORK AGS)

Networking the PT-100 with Other Network Devices (Star with Daisy Chain Configuration)

MagnumInverter/charger

PT-100(CHARGE CONTROLLER)

ME-BMK(BATTERY MONITOR)

2-way

Phone-splitter

ME-ARC(ADVANCED REMOTE)

2-way

Phone-splitter

Note: The ME-AGS-N and PT-100 are the first network devices connected to the inverter, followed by the ME-BMK.

ME-AGS-N(NETWORK AGS)

Networking the PT-100 with Other Network Devices (Daisy Chain Configuration)

MagnumInverter/charger

PT-100(CHARGE CONTROLLER)

ME-BMK(BATTERY MONITOR)

2-way

Phone-splitter

ME-ARC(ADVANCED REMOTE)

2-way

Phone-splitter

Note: The ME-AGS-N or PT-100 must be the first network device connected to the inverter, followed by the ME-BMK,

and whatever device wasn’t used as the first network device (ME-AGS-N or PT-100) is connected after the ME-BMK.

Page 3: NETWORKING STACKED PT-100'STACKED INVERTERS...ME-BMK (BATTERY MONITOR) 2-way Phone-splitter ME-ARC (ADVANCED REMOTE) 2-way Phone-splitter Note: The ME-AGS-N or PT-100 must be the first

4-8-2016

Networking the PT-100 with Other Network Devices (Star Configuration using a 3-way splitter)

MagnumInverter/charger

ME-AGS-N(NETWORK AGS)

ME-BMK(BATTERY MONITOR)

3-way

Phone-splitter

ME-ARC(ADVANCED REMOTE)

ME-AGS-N(NETWORK AGS)

Networking the PT-100 with Other Network Devices (Star Configuration using two 2-way splitters)

MagnumInverter/charger

PT-100(CHARGE CONTROLLER)

ME-BMK(BATTERY MONITOR)

Two 2-way

Phone-splitters

ME-ARC(ADVANCED REMOTE)