SUBMITTAL NUMBER: 230558-01.00 OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL SUBMITTAL DETAILS: REVIEWERS: SUBJECT: PREINSULATED UNDERGROUND PIPING SYSTEMS SD DATE RECIEVED: Oct 06, 2014 DISCIPLINE: Mechanical PRIMARY: KEVIN KING [email protected] TAD RIVENBARK [email protected] MATERN ENGINEERING PHN: (407) 740-5020 FAX: (407) 740-0365 MATERN ENGINEERING PHN: (407) 740-5020 FAX: (407) 740-0365 SECONDARY: PRIORITY STATUS: 2-STANDARD REVIEWER DUE DATE: 10/16/2014 SPECIFICATION REF: 23 05 58 DWG REF. NONE DWG TITLE: NO OF ITEMS: ITEM DESCRIPTI REVIEW STATUS: COMMENTS: CONTRACTOR/CM: : WILLIAMS COMPANY : BRAD KUBIN 2301 SILVER STAR RD. ORLANDO, FL, 32809 (407) 295-2530 FAX:(407) 297-0459 PLEASE SEE A/E COMMENTS. FURNISH AS MARKED RETURNED ITEMS: DATE RETURNED TO CM: 10/9/2014 BUILDING REFERENCE: 1 Shop Drawing(s) PAGE 1 OF 1 RHODES + BRITO ARCHITECTS INC. : 605 E. ROBINSON STREET, SUITE 750 : ORLANDO, FL. : 32801 : 407.648.7288 : FAX.648.7289 cc: OWNER : CALVIN WOOLFOLK 6501 MAGIC WAY, BLDG. 200 ORLANDO, FL, 32809 (407) 317-3700 FAX:(407) 317-3768 R+B FILE: : 13017-0001.X6

Upload: vanthuy

Post on 01-Sep-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench

SUBMITTAL NUMBER: 230558-01.00

OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL

SUBMITTAL DETAILS:

REVIEWERS:

SUBJECT: PREINSULATED UNDERGROUND PIPING SYSTEMS SD

DATE RECIEVED: Oct 06, 2014DISCIPLINE: Mechanical

PRIMARY: KEVIN KING

[email protected]

TAD RIVENBARK

[email protected]

MATERN ENGINEERING

PHN: (407) 740-5020

FAX: (407) 740-0365

MATERN ENGINEERING

PHN: (407) 740-5020

FAX: (407) 740-0365

SECONDARY:

PRIORITY STATUS: 2-STANDARD

REVIEWER DUE DATE: 10/16/2014

SPECIFICATION REF: 23 05 58

DWG REF. NONE

DWG TITLE:

NO OF ITEMS: ITEM DESCRIPTI

REVIEW STATUS:

COMMENTS:

CONTRACTOR/CM:

: WILLIAMS COMPANY: BRAD KUBIN 2301 SILVER STAR RD. ORLANDO, FL, 32809 (407) 295-2530 FAX:(407) 297-0459

PLEASE SEE A/E COMMENTS.

FURNISH AS MARKED

RETURNED ITEMS:

DATE RETURNED TO CM: 10/9/2014

BUILDING REFERENCE:

1 Shop Drawing(s)

PAGE 1 OF 1RHODES + BRITO ARCHITECTS INC. : 605 E. ROBINSON STREET, SUITE 750 : ORLANDO, FL. : 32801 : 407.648.7288 : FAX.648.7289

cc:OWNER : CALVIN WOOLFOLK

6501 MAGIC WAY, BLDG. 200 ORLANDO, FL, 32809 (407) 317-3700 FAX:(407) 317-3768

R+B FILE: : 13017-0001.X6

michele
Rick
Page 2: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench

SUBMITTAL NUMBER: 23055801.00

OCPS CLAY SPRINGS ES SUBMITTAL ASSIGNMENT MEMO

SUBMITTAL DETAILS: REVIEWERS:

SUBJECT: PREINSULATED UNDERGROUND PIPING SYSTEMS SD

DATE RFI RECIEVED: Oct 06, 2014DISCIPLINE: Mechanical

PRIMARY: KEVIN KING

[email protected]

TAD RIVENBARK

[email protected]

MATERN ENGINEERING

PHN: (407) 740-5020FAX: (407) 740-0365

MATERN ENGINEERING

PHN: (407) 740-5020FAX: (407) 740-0365

SECONDARY:

PRIORITY STATUS: 2-STANDARD

REVIEWER DUE DATE: 10/16/2014

SPECIFICATION REF: 23 05 58

DWG REF. NONEDWG TITLE:

REVIEW STATUS:

THIS SUBMITTAL IS ISSUED TO YOU FOR YOUR REVIEW. PLEASE RESPOND AND RETURN...WITH THIS COMPLETED SAM TRANSMITTAL...TO MICHELE BUDAY-URDANETA NO LATER THAN: 10/16/2014. PLEASE COMPLETE REVIEW STATUS AT RIGHT

SUBMITTAL CONTENTS:

NO OF ITEMS: ITEM DESCRIPTION

(please print)THIS SUBMITTAL WAS REVIEWED BY :

RE-SUBMIT WITH ITEMS

NOT REVIEWED

REJECTED

REVISE AND RESUBMIT

FURNISHED AS MARKED

REVIEWED

COMMENTS:

1 SHOP DRAWING(S)

cc:OWNER : CALVIN WOOLFOLK

6501 MAGIC WAY, BLDG. 200 ORLANDO, FL, 32809

R+B FILE: : 13017-0001.X6CONTR/CM: : WILLIAMS COMPANY: BRAD KUBIN 2301 SILVER STAR RD.

Page 3: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench

Submittal Approval Form

PROJECT: CLAY SPRINGS ELEMENTARY SCHOOL

DATE: _______________________________________

SUBCONTRACTOR NAME: ________DHR Mechanical Services Inc.______

SUBCONTRATOR ADDRESS: ____801 Central Park Drive Sanford FL. 32771_

NUMBER AND TITLE OF SPECIFICATION SECTION: 23 05 58 Preinsulated Underground Piping Systems SD

Contractor’s Submittal Stamp Architect/ Engineer’s Submittal Stamp

9/30/14

mrowland
Typewritten Text
mrowland
Typewritten Text
mrowland
Typewritten Text
mrowland
Typewritten Text
9/29/14
katrinae
WCBD - Trent
katrinae
Accepted
jwalden
10-08-02
Page 4: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench

Corporate Office: 130 Candace Drive, Maitland, Florida 32751-3331 Phone: 407.740.5020 Orlando | Fort Myers | Jacksonville | Tampa | www.matern.net

Registered: FLORIDA * GEORGIA* LOUISIANA * NORTH CAROLINA * SOUTH CAROLINA * TEXAS * TENNESSEE * VIRGINIA

SUBMITTAL DATA REVIEW COMMENTS Date: October 8, 2014 Project: OCPS-Clay Springs ES By: J. Walden for Kevin King Submittal: Pre-Insulated

Underground Pipe

MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: 001 Contractor’s I.D.: DHR

Class: Basis of Design (1) Equal (2) Substitution (3)

ACTION CODE A No exceptions taken. X B Make corrections noted. C Revise and Resubmit. D Submit Specified Item. E Rejected. N Review not required.

THE FOLLOWING COMMENTS SHALL BE CONSIDERED AN INTEGRAL PART OF THE SUBMITTAL DATA REVIEW. REVIEW OF THIS DATA IS ONLY FOR CONFORMANCE WITH THE DESIGN CONCEPT AS GIVEN IN THE CONTRACT DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR: QUANTITIES, FUNCTIONS, DIMENSIONS AND COORDINATION OF THE WORK WITH OTHER TRADES. 1. After installation and prior to backfilling, the manufacturers representative of all piping

components provided in this section shall field inspect the piping system and certify in writing to the Owner's representative and the Engineer of Record that the piping system has been assembled and installed within the guide lines of the manufacturer's written installation instructions. This certification shall include but not be limited to trench preparation, anchor, guide and thrust block construction and location, backfill material, expansion loop and joint construction.

END OF SUBMITTAL DATA REVIEW COMMENTS

Page 5: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench

2475 Clark St • Apopka, Fl 32703 • 407-523-3770 • 407-523-3722

Steam and Condensate Piping • Chilled Water Systems • Hot Water Systems • Chemical Containment Piping • Cryogenics

PRE-INSULATED PIPESubmittal Data

Specification Section 23 05 58

Project Name: Clay Springs Elementary SchoolOrange County Public Schools

Engineer: Matern Professional Engineering PAMaitland, Florida

Mechanical Contractor: DHR Mechanical ServicesSanford, Florida

September 23, 2014

Page 6: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench

2501 Clark St • Apopka, Fl 32703 • 407-523-3770 • 407-523-3722

Steam and Condensate Piping • Chilled Water Systems • Hot Water Systems • Chemical Containment Piping • Cryogenics

Bill of Material

Re: Clay Springs Elementary School

September 23, 2014

Energy Task Force LLC is pleased to offer the following bill of material for the above project:

Carrier Pipe: Schedule 40 A-53 Grade B ERW SteelJacket: Type 1 / Grade 1 PVCInsulation: Factory injected polyurethane foamEnd Seal: Mastic End sealsFittings: Insulation Kits Included – weld fittings are not includedJoint closures: Sleeve, poured foam and heat shrinkNo taxes, wall sleeves, link seals, valves, or flanges included.

Length PipeSize

InsulationThickness

Jacket Size 90 Elbow Kit 45 Elbow Kit Reducer TeeKit

Joint Closure

105’ 6” 1.7” 10” 4 0 0 5

1) Thrust blocks, or other methods of expansion compensation, are not required with this pipingsystem.

2) Field service is provided as specified in section 23 05 58 – 1.3.F, with Field Service Reportprovided as shown in Attachment A.

Page 7: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench
Page 8: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench

2475 Clark St • Apopka, Fl 32703 • 407-523-3770 • 407-523-3722

Steam and Condensate Piping • Chilled Water Systems • Hot Water Systems • Chemical Containment Piping • Cryogenics

ETF-MT Product Specification

Pre-insulated piping system designed for above ground or direct buried ChilledWater, Hot Water and all other 20˚ to 250˚ medium temperature systems.

Carrier Pipe: Schedule 40 A53 Grade B ERW Steel.

Insulation: Polyurethane foam: K Factor 0.14, Density 2.0 to 3.0 PCF, 90-95% closed cell conforming to mil spec –1-24172 and ASTM-C-591 completely filling the annular space between carrier pipeand jacket. Maximum service temperature of 250˚.

Jacketing Material: High impact seamless polyvinyl chloride (PVC) class 12454 Bcompound conforming to ASTM 1784 Type 1, Grade 1. Forjacket thickness see attached schedule.

End Seal: Mastic end seal factory applied to insulation ends.

Insulation ofStraight Joints:

Prior to joining carrier pipe a PVC sleeve is slid onto jacketingon either side of joint. After welding and hydro testing, the PVCsleeve is slid in place and sealed with Canusa Heat Shrink.Polyurethane foam is then mixed and poured into the annularspace and sealed watertight.

Fittings: All fittings are field welded and insulated utilizing Energy TaskForce fitting insulation kits. Fitting kits consist of hard shellmiter PVC, polyurethane foam and Canusa Heat Shrink.

Backfilling: Underground systems shall be buried in a trench of not lessthan 24 inches deeper than the top of the pipe jacket and notless than 18 inches wider than the combined O.D. of all pipingsystems. Backfill should be tamped compactly in place. Norock shall be used in the first foot of the backfill. To meet H-20highway loadings, there must be 24 inches from top of jacket tograde of the compacted fill.

Page 1 of 2

Page 9: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench

Steam and Condensate Piping • Chilled Water Systems • Hot Water Systems • Chemical Containment Piping • Cryogenics

2475 Clark St • Apopka, Fl 32703 • 407-523-3770 • 407-523-3722

Table 1: Steel Carrier Pipe / PVC Jacket

Nominal PipeSize

Minimum InsulationThickness

Nominal Jacket Size Jacket Thickness

½” 1.83 4.5 70 mils¾” 1.81 4.5 70 mils1” 1.60 4.5 70 mils

1 ¼” 1.42 4.5 70 mils1 ½” 1.34 4.5 70 mils

2” 1.81 6.0 70 mils2 ½” 1.56 6.0 70 mils3” 1.25 6.0 70 mils4” 1.75 8.0 80 mils5” 1.22 8.0 80 mils6” 1.68 10.0 100 mils8” 1.68 12.0 120 mils

10” 1.64 14.0 140 mils12” 1.46 16.0 160 mils

ENERGY TASK FORCE LLC WARRANTYEnergy Task Force LLC warrants its products only to the extent that it will replace those proved tohave manufactured defects, within a one-year period from date of delivery. Energy Task Force mustbe provided an opportunity to inspect an alleged defective product and the installation application.This warranty does not provide for the expenses incurred for removal, re-installation or consequentialdamages arising from the defective material. There is no warranty other than that described above,and no one is authorized to issue any other warranty related to Energy Task Force LLC products.

Page 2 of 2

JayNewell
Highlight
JayNewell
Highlight
JayNewell
Highlight
JayNewell
Highlight
JayNewell
Highlight
JayNewell
Highlight
JayNewell
Highlight
JayNewell
Highlight
101374
Rectangle
101374
Text Box
The approved energy calculations are calling for 1.50 thick insulation on a 3" pipe. The proposed 1.25 thick insulation on the 3" pipe is not in compliance with the approved documents. 107.4 FBC mjs 10/10/14
101374
Line
Page 10: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench

ET

FW

ES

TL

LC

PR

E-IN

SU

LA

TE

DP

IPE

770

0W

ES

TO

LIV

EA

VE

-P

EO

RIA

,AZ

85345

-623-8

78-4377

-623-878-6683

Page 11: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench
Page 12: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench

Field installation instruction for 90˚ kit with PVC jacket Prior to installing fittings slide all fitting covers over pipe

With fitting installed slide sleeve into position Apply heat shrink tape to all seams

on pipe use torch with billowy flame

Drill 1” hole on each side for foam on each side of fitting Pour foam in the 1” hole

Apply heat shrink tape over 1” hole Finished 90˚ use torch with billowy flame

Page 13: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench
Page 14: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench

Field installation instruction for field joint kit with PVC jacket Prior to connecting pipe slide all fitting covers over pipe

With pipe connected installed slide sleeve into position on pipe Apply heatshrink tape to all seams

use torch with billowy flame

Drill 1” hole on each side for foam on each side of sleeve Pour foam in the 1” hole

Apply heatshrink tape over 1” hole Finished Joint use torch with billowy flame

Page 15: OCPS CLAY SPRINGS ES SUBMITTAL TRANSMITTAL€¦MPE Project No: 2013-224 Data No.: 23 05 58 Submittal No.: ... instructions. This certification shall include but not be limited to trench

Field Insulation KitInstallation Instructions

FIELD KIT FOAM & TAPE TABLE

Feet of Tape TOTAL Liquid Ouncesof A & B Foam (1,2,3)

FieldJoint

orRed.

90 Ell 45 Ell Tee Anchor (6)

FieldJoint

orRed.

90 Ell 45 Ell Tee AnchorTape Width

(5)

Fitting Cover # 90/other

Jacket Size

Pipe Size (4)

3 9 2 4.9 14 11 21 4.9 3.0 3.5 3.5 5.0 3.5 4 11 2 5.9 21 18 31 5.9 5.0 5.5 5.5 8.5 5.5 6 15 2 7.6 37 28 55 7.6 9.5 10.5 10.5 16.5 10.0 3 9 2 4.9 14 11 21 4.9 3.0 3.5 3.5 5.5 3.5 4 11 2 5.9 21 16 31 5.9 5.0 5.5 5.5 9.5 5.5 6 15 2 7.6 37 28 55 7.6 9.5 10.5 10.5 17.5 10.0 3 9 2 4.9 14 11 21 4.9 3.0 3.5 3.0 5.5 3.0 4 11 2 5.9 21 16 31 5.9 5.0 5.5 5.5 9.5 5.5 6 15 2 7.6 37 28 55 7.6 9.5 10.5 10.5 17.5 10.0 3 9 2 4.9 14 11 21 4.9 3.0 3.0 3.0 5.5 3.0 4 11 2 5.9 21 16 31 5.9 5.0 5.5 5.5 9.5 5.0 6 15 2 7.6 37 28 55 7.6 9.5 10.5 10.0 18.5 10.0 3 11 2 5.9 21 16 31 5.9 4.5 5.0 5.0 9.5 5.0 4 15 2 7.6 37 28 55 7.6 9.0 10.5 10.0 18.5 9.5 6 18 2 9.7 62 47 93 9.7 16.5 19.0 18.0 34.0 17.5 3 11 2 5.9 21 16 31 5.9 4.5 5.0 5.0 9.5 4.5 4 15 2 7.6 37 28 55 7.6 9.0 10.0 10.0 19.0 9.5 6 18 2 9.7 62 47 93 9.7 16.0 19.0 18.0 35.0 17.0 4 11 2 5.9 21 16 31 5.9 5.5 6.0 5.5 8.5 6.0 6 15 2 7.6 37 28 55 7.6 12.0 12.5 12.0 18.5 13.0 8 18 2 9.7 62 47 93 9.7 23.0 24.0 23.0 35.0 25.0 6 15 2 7.6 37 28 55 7.6 7.5 9.5 8.5 18.0 8.0 8 18 2 9.7 62 47 93 9.7 15.0 18.5 17.0 35.5 16.0 10 20 2 11.8 93 70 140 11.8 24.5 30 28.0 58.0 26.0 6 15 2 7.6 37 28 55 7.6 10.5 12.5 12.0 22.5 11.5 8 18 2 9.7 62 47 93 9.7 21.5 26.0 24.5 46.0 23.0 10 20 2 11.8 93 70 140 11.8 36.0 43.0 40.5 76.5 38.5 6 15 2 7.6 37 28 55 7.6 6.5 8.0 7.5 16.0 7.0 8 18 2 9.7 62 47 93 9.7 14.0 17.5 16.0 34.5 15.0 10 20 2 11.8 93 70 140 11.8 23.5 29.5 27.0 58.0 25.0 6 15 2 7.6 37 28 55 7.6 7.5 9.5 9.0 17.5 8.5 8 18 2 9.7 62 47 93 9.7 19.0 23.5 21.5 43.0 20.0 10 20 2 11.8 93 70 140 11.8 33.0 41.0 38.0 76.0 35.0 12 22 4 13.9 53 40 80 13.9 50.5 62.5 58.0 116.0 54.0 6 15 2 7.6 37 28 55 7.6 4.5 6.0 5.0 11.5 4.5 8 18 2 9.7 62 47 93 9.7 11.5 15.5 14.0 31.5 12.5 10 20 2 11.8 93 70 140 11.8 21.0 28.5 25.5 57.0 22.5 12 22 4 13.9 53 40 80 13.9 33.0 43.5 39.5 88.5 35.0 8 18 2 9.7 62 47 93 9.7 15.0 19.5 18.0 37.5 16.0 10 20 2 11.8 93 70 140 11.8 29.5 38.0 34.5 73.0 31.5 12 22 4 13.9 53 40 80 13.9 46.5 60.0 55.0 116.0 50.0 8 18 2 9.7 62 47 93 9.7 9.0 12.5 11.0 25.5 9.5 10 20 2 11.8 93 70 140 11.8 18.5 25.5 22.5 53.0 19.5 12 22 4 13.9 53 40 80 13.9 30.0 42.0 37.0 86.5 32.0 10 20 2 11.8 93 70 140 11.8 25.0 33.0 30.0 66.0 26.5 12 22 4 13.9 53 40 80 13.9 42.0 56.5 50.5 112.5 45.0 14 23 4 16.0 69 52 104 16.0 62.5 84.0 75.5 167.5 67.0 10 20 2 11.8 93 70 140 11.8 15.0 22.0 19.0 46.0 16.0 12 22 4 13.9 53 40 80 13.9 26.5 39.0 33.5 82.0 28.5 14 23 4 16.0 69 52 104 16.0 40.0 59.0 51.0 124.5 43.0 10 20 2 11.8 93 70 140 11.8 7.0 11.0 9.0 23.5 7.5 12 22 4 13.9 53 40 80 13.9 18.5 29.5 24.5 64.0 20.0 14 4 16.0 69 52 104 16.0 32.0 51.5 43.0 111.5 34.5 14 4 16.0 69 52 104 16.0 21.5 37.0 30.0 82.0 23.0 15 4 17.0 78 59 117 17.0 29.0 50.0 40.5 111.5 31.0 16 4 17.8 85 64 128 17.8 34.5 59.5 48.5 133.0 37.0 15 4 17.0 78 59 117 17.0 16.5 31.0 24.5 70.5 18.0 16 4 17.8 85 64 128 17.8 22.0 41.0 32.5 94.0 23.5 18 4 20.2 108 81 162 20.2 42.5 79.5 62.5 181.5 45.5 18 4 20.2 108 81 162 20.2 34.0 67.5 52.0 153.0 36.0 20 4 22.3 131 98 197 22.3 54.0 107.5 82.5 244.0 57.5 20 4 22.3 131 98 197 22.3 38.0 81.0 61.0 182.5 40.5

1/2” Copper

1/2” IPSor

3/4” Copper3/4” IPS

or1” Copper

1” IPSor

1-1/4” Copper1-1/4” IPS

or1-1/2” Copper

1-1/2” IPSor

2” Copper2” IPS

or2-1/2” Copper

2-1/2” IPS

3” Copper

3” IPS

4” Copper

4” IPS

5” Copper

5” IPS

6” Copper

6” IPS

8” IPS

10” IPS

12” IPS

14” IPS

16” IPS

8x3 2310x2 2310x2-1/2 2510x3 2612x1-1/2 2512x2 2612x3 2814x2 2814x3 3016x2 30

(1) Foam quantity listed is the total of both A & B components.(2) Keep foam containers sealed when not in use.(3) Use multiple pours for foam quantities over 64 oz. total.(4) IPS sizes include Steel, PVC, PE, and FRP pipe.

JayNewell
Oval
JayNewell
Oval
JayNewell
Oval
JayNewell
Oval
JayNewell
Highlight
JayNewell
Oval
JayNewell
Oval
JayNewell
Oval
JayNewell
Oval
JayNewell
Oval
JayNewell
Oval
JayNewell
Oval
JayNewell
Oval
JayNewell
Oval
JayNewell
Oval
JayNewell
Oval
JayNewell
Oval
JayNewell
Oval