Namdeb Operations29 March 2006
Presented by: Chris SivertsenGeneral Manager
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Agenda1. WHAT IS NAMDEB?
• Location• Deposit• History
2. SAFETY, HEALTH and ENVIRONMENTAL3. FINANCIAL TRENDS4. PRODUCTION5. CONTINUOUS IMPROVEMENT6. STRATEGIC BUSINESS PLAN7. EXPLORATION and SAMPLING 8. STRATEGIC PROJECTS
• Capital program• Pocket Beaches • Marine Dredging Project• Elizabeth Bay LoM Extension• Inshore Project
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
What is Namdeb?
A collection of Mines
Northern Areas
Orange River Mines
Mining Area 1
Pocket Beaches
Atlantic 1
ETOSHA PAN
Republic of
SPERRGEBIET
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
… on a World Class Placer deposit
What is Namdeb?
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
UPINGTONUPINGTONORANGEORANGE
VAALVAAL
ORANGE
ORANGE
ORANJEMUNDORANJEMUNDKIMBERLEYKIMBERLEY
JOHANNESBURGJOHANNESBURG
Where did the diamonds come from?
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
• First Diamond found in 1908 by Zacharias Lewala
• Extensive Mining by 1912, around Luderitz
• CDM formed in 1920
• Focus around Oranjemund from 1934
• Marine Mining first tested in 1960
• Namdeb created in 1994
• Over 80 million carats produced to date
History
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Agenda
1. WHAT IS NAMDEB?• Location• Deposit• History
2. SAFETY , HEALTH and ENVIRONMENTAL3. FINANCIAL TRENDS4. PRODUCTION5. CONTINUOUS IMPROVEMENT6. STRATEGIC BUSINESS PLAN7. EXPLORATION and SAMPLING 8. STRATEGIC PROJECTS
• Capital program• Pocket Beaches • Marine Dredging Project• Elizabeth Bay LoM Extension• Inshore Project
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
2005 ACHIEVEMENTS
Safety
• 4 Million Fatality Free Man Shifts reached
• 30% Reduction in Minor Injuries against 2004
• Retained triple NOSCAR status
• Lowest ever LTI Severity rate
• All 3 operations placed on the International top 100 list for world class SHE performance
• MA1 – Best Surface Plant
• All operations awarded 5 Star Platinum status
NOSA NAMIBIA AWARDS
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
20% REDUCTION IN LOST TIME INJURIES
15
810
29
149 8
37
711 10
5
10
15
20
25
30
35
1997 1998 1999 2000 2001 2002 2003 2004 2005
LTI LTI Target 2005 Fatalities
Safety - 2
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
0.18
0.60
0.320.23
0.200.07 0.20
0.35
0.230.17
0.000.100.200.300.400.500.600.70
1997 1998 1999 2000 2001 2002 2003 2004 2005
L.T.I.F.R. Target 2005
GROUP AVERAGE 2005 = 0.22
Reduction in Lost Time Injury Frequency Rate
Safety – 3
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Namdeb Hospital
AIDS RELATED DEATHS (ART benefit)
0
1
2
3
4
5
6
7
8
2002 2003 2004 2005
Deaths
163 Employees and/or Life Partners now on ART
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Environmental
ISO 14001 Audits– Namdeb to be recommended for certification to
new ISO 14001: 2004 version
Simplified Environmental Management System Pilot Study
– Pocket Beaches site 2,3 and 4 selected
Rehabilitation and Closure
– Draft plans for Orange River Mines and Pocket Beaches
– Class 0 Closure cost estimate completed
– Pilot studies initiated
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Skilpadberg Rehabilitation Trial
before
after
Environmental - 2
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Agenda
1. WHAT IS NAMDEB?• Location• Deposit• History
2. SAFETY, HEALTH and ENVIRONMENTAL3. FINANCIAL TRENDS4. PRODUCTION5. CONTINUOUS IMPROVEMENT6. STRATEGIC BUSINESS PLAN7. EXPLORATION and SAMPLING 8. STRATEGIC PROJECTS
• Capital program• Pocket Beaches • Marine Dredging Project• Elizabeth Bay LoM Extension• Inshore Project
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
SBP Revenue Analysis by Area
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
2006 2007 2008 2009 2010
MA1 excl MDP Marine Dredge Orange River Northern AreasBeach & Marine Midwater Atlantic 1
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Agenda
1. WHAT IS NAMDEB?• Location• Deposit• History
2. SAFETY, HEALTH and ENVIRONMENTAL3. FINANCIAL TRENDS4. PRODUCTION5. CONTINUOUS IMPROVEMENT6. STRATEGIC BUSINESS PLAN7. EXPLORATION and SAMPLING 8. STRATEGIC PROJECTS
• Capital program• Pocket Beaches • Marine Dredging Project• Elizabeth Bay LoM Extension• Inshore Project
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Production – Trend
Namdeb Carat Production
0.0
500.0
1000.0
1500.0
2000.0
2500.0
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
Car
ats
'000
Atlantic1MidwaterBeach & MarineNorthern AreasOrange RiverMarine DredgeMA1 excl MDP
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Agenda
1. WHAT IS NAMDEB?• Location• Deposit• History
2. SAFETY and ENVIRONMENTAL3. FINANCIAL TRENDS4. PRODUCTION5. CONTINUOUS IMPROVEMENT6. STRATEGIC BUSINESS PLAN7. EXPLORATION and SAMPLING 8. STRATEGIC PROJECTS
• Capital program• Pocket Beaches • Marine Dredging Project• Elizabeth Bay LoM Extension• Inshore Project
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Continuous Improvement
Longer life
Total mineable accreted 2.4m tons & 115 000 cts
U 70 to U 90 accreted1.3 m tons & 65 000
cts
3 Plant Accreted Beaches
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
– Configure Process for Maximum Recovery
– Optimise Plant Flow Sheet
– Minimise Working Cost
– Maintain a Skilled & Motivated Team
2 Plant Turnaround Strategy
Continuous Improvement - 2
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Elizabeth Bay Mine Reconciled MCF
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06
Focus group initiated
Mine Call Factor Focus Group
Continuous Improvement - 3
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Agenda
1. WHAT IS NAMDEB?• Location• Deposit• History
2. SAFETY, HEALTH and ENVIRONMENTAL3. FINANCIAL TRENDS4. PRODUCTION5. CONTINUOUS IMPROVEMENT6. STRATEGIC BUSINESS PLAN7. EXPLORATION and SAMPLING 8. STRATEGIC PROJECTS
• Capital program• Pocket Beaches • Marine Dredging Project• Elizabeth Bay LoM Extension• Inshore Project
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
JUNE 2005 SBP PRODUCTION PROFILE2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
2 Plant Dump3 Plant3 Plant Dump4 Plant4 Plant DumpPTFPTF DumpDredgeRTRPocket BeachesMarine DredgeDaberasSendelingsEBayFluvial Footwall1 Plant DumpOMS SouthOMS NorthAuchasObibAuchas LowerArrisdrifBogenfels LandInter TidalUltra Shallow
Base Case Most Likely Blue Sky
Strategic Business Planning
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
June 2004 SBP Carat Profile
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Years
Car
at P
rodu
ctio
n ('0
00)
Blue SkyMost LikelyBase Case
16.1
30.720.5
Declining Land Resource
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Sendelingsdrif
Where are our Projects?
ORANGERIVERMINING
LICENCE
MININGAREANo1
MININGLICENCE
BOGENFELSMINING
LICENCE
ATLANTIC1MINING
LICENCE
ORA
NG
E RI
VER
ALEXANDER BAY
Auchas
.
Daberas
Bogenfels Arch
ORANJEMUND
DOUGLASBAY
MININGLICENCE
LÜDERITZ
ELIZABETHBAY
MININGLICENCE
ELIZABETH BAY MINE
NN
Elizabeth Bay
Recovery ProjectsMarine Dredging
Dump Retreatment
Pocket Beaches
Wet Overburden Mining South
Sendelingsdrift
Inshore Projects
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
ORANJEMUNDORANJEMUND
HOTTENTOTS BAY
Elizabeth Bay
Chameis
1.00.8
0.6
0.5
0.4
0.40.4
0.30.2
0.1
0.25
0.15
0.25
....
1.0 - 2.0
LUDERITZLUDERITZ....
Average Stone Size varies
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Where do we focus?
Bubble Size Represent Capital Investment (N$)
AMV 2
Sendelings Off-Beach System
AMV 3WOMS(Dredge2)
Risk
Rew
ard
Invest to Invest to Invest to reduce riskreduce riskreduce risk
ParkParkParkShare?Share?Share?
Do it !Do it !Do it !
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
TOTAL CARATS MINED SPERRGEBIET & COAST1908 - 2003
LAND70.4 m
SEA8.2 m
Atlantic 15.8 m
MDC1.7 mNamdeb
Midwater0.8 m
SEA PRODUCTION1962 - 2003
Historical Recoveries from Land and Sea
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Focus moving from Land to the Sea
June 2004 SBP Carat ProfileBase Case
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Years
Car
at P
rodu
ctio
n ('0
00)
LandMarine
June 2004 SBP Carat ProfileMost Likely
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Years
Car
at P
rodu
ctio
n ('0
00)
LandMarine
June 2004 SBP Carat ProfileBlue Sky
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Years
Car
at P
rodu
ctio
n ('0
00)
LandMarine
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Agenda
1. WHAT IS NAMDEB?• Location• Deposit• History
2. SAFETY, HEALTH and ENVIRONMENTAL3. FINANCIAL TRENDS4. PRODUCTION5. CONTINUOUS IMPROVEMENT6. STRATEGIC BUSINESS PLAN7. EXPLORATION and SAMPLING 8. STRATEGIC PROJECTS
• Capital program• Pocket Beaches • Marine Dredging Project• Elizabeth Bay LoM Extension• Inshore Project
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Sampling & Prospecting
N$
MIL
LIO
N
EXPENDITURE – 1994 TO 2005Today’s Money
LAND SEA
0
50
100
150
200
250
'94 '95 '96 '97 '98 '99 '00 '01 '02 '03 '04 '05
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
JUNE 2005 SBP PRODUCTION PROFILE2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
2 Plant Dump3 Plant3 Plant Dump4 Plant4 Plant DumpPTFPTF DumpDredgeRTRPocket BeachesMarine DredgeDaberasSendelingsEBayFluvial Footwall1 Plant DumpOMS SouthOMS NorthAuchasObibAuchas LowerArrisdrifBogenfels LandInter TidalUltra Shallow
Base Case Most Likely Blue Sky
BG36
Liberation Plant
DUMPS
FLUVIAL FOOTWALL
ORANGE RIVER
Sampling linked to SBP
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
100 000 cts
INFERRED RESOURCE
*
*
**
*
**
**
* 2006 Sample pits
315 000 cts
INDICATED RESOURCE
Sendelingsdrif Bulk Sample (2007)
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Drilling confirms gravels extensionto south and west
Mega trench complete• Theft during treatment• Cementation in west
Resource extension confirmed north and south
Pocket Beach Site 2 Extension
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
JUNE 2005 SBP PRODUCTION PROFILE
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
2 Plant Dump3 Plant3 Plant Dump4 Plant4 Plant DumpPTFPTF DumpDredgeRTRPocket BeachesMarine DredgeDaberasSendelingsEBayFluvial Footwall1 Plant DumpOMS SouthOMS NorthAuchasObibAuchas LowerArrisdrifBogenfels LandInter TidalUltra Shallow
Base Case Most Likely Blue Sky
0 0 0 1.04 0.09 0 0 0
0.14 0.09 0.36 0.48 0.23 0.1 0 0 0 0
0.1 0.1 0 0.17 0.54 0.12 0 0 0 0 0
0 0 0 0.39 0.37 0.15 0 0 0 0
0.09 0.09 0 0 0.85 0.34 0.34 0 0 0
0.08 0.1 0.4 0 0 0 0
0 0.36 1.24 0.56 1.97 0.12 0
0.3 0 0.85 0.61 0.56 0.69 0.23
Jetrig
Seawalker
Resource Estimation
(Geostatistical Analysis)
BOGENFELS
ITC
ULTRA SHALLOW
Sampling linked to SBP - 2
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Agenda
1. WHAT IS NAMDEB?• Location• Deposit• History
2. SAFETY, HEALTH and ENVIRONMENTAL3. FINANCIAL TRENDS4. PRODUCTION5. CONTINUOUS IMPROVEMENT6. STRATEGIC BUSINESS PLAN7. EXPLORATION and SAMPLING 8. STRATEGIC PROJECTS
• Capital program• Pocket Beaches • Marine Dredging Project• Elizabeth Bay LoM Extension• Inshore Project
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Other, 50
Earthmoving, 115
Atlantic 1 Dredging Trial,
400
Accommodation Upgrade, 35
Geological Sampling
Recovery, 28
No. 3 Plant Upgrade, 93
Strategic Projects, 12
Exploration, 45Inshore, 21
ORBIT, 21
Pocket Beaches, 136
CAPITAL PROGRAM FOR 2006 IS N$956m
Strategic Projects
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
SITESITE 22
SITESITE 33 && 44
SITESITE 1111 && 1212
LUDERITZ
ORANJEMUND
DREIMASTER BAY
BUNTFELDSCHUH
CHAMEIS BAY
FORT REEF
SOUTH ROCK
NORTH ROCK
BAKERS BAY CAMP
ATLA
NTIC
OCEA
N
ATLA
NTIC
OCEA
N
Chamais Chamais GateGate
54
3
21
Plant Location Site 2
Plum Pudding Island
Sinclair Island
Roast Beef Islets
GREEN PRECIPICE
DERNBERG
Bogenfels Arch
Seal Colony
Barge 77
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Pocket Beaches Site 2 – new concept
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
A
B
C
D
E
F
A
BC
B234B235XB
5
5
5
5
5
5
5
5
5
5
5
5
5 10
10
5
10 15
5
2.52.5
7.5 2.5
7.5
7.5
7.5
7.57.5
7.5
7.5
10
10
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
5
7.5
7.5
10
2.5
2.5
5
55
52.5
2.5
2.5
2.5
2.5
0 0
0
0
0
0
0
00
2.5
5
55
2.5
5 2.5
2.52.5
2.5
2.5
2.5
Cut-off WallSite 11 & 12 - Project Concept
Stripping : 21.5 million tonsGravel : 1.1 million tonsCarats : 365 000
Gravel Mining
Dredge Overburden Removal
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
PBA Phase 2 – Major Risks
• Cut-off Wall Integrity• Security when mining & treating high
grade material• Dredge water supply• Duration of pond dewatering• Environmental & Stakeholder Issues• Project timing
!
!
!!
!!
- 3rd Party Audits- Testwork- Prototype Equipment (SWI Trials)- Specialist Studies- Contingency Plans- Stakeholder Involvement
Assurance Plan
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
• Evaluate the potential to economically extract lower grade marine resources with TSHD technology. ( ≤ 0.1 ct/m2)
• High mining rates (Target > 900m2/hr)
• Carat Production from January 2007
• Lower capital / high working cost operation
• Expansion potential in low grade deposit
OBJECTIVES
Marine Dredging Project
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
The concept
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
How?
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
The Pipeline
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Pumping!!!
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
BEFORE DREDGING
AFTER DREDGING
SURVEY DURING DREDGING OPERATIONS
MINING AREA
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
All marine life:• Baseline surveys done• Monitoring will continue for 14 months
Overflow monitoring• Overflow appears very clean• Monitor samples taken
Environmental (8%)
Sea overflow Land overflow
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
• Mining Rate– 7 weeks of dredging
completed– 1 086 000 m2 mined– Average 920 m2 / hr
• Depletion– Initial test panel depletion low ( < 60%)– Draghead changes made– Additional mining and sampling – Significant improvement ( 75%)
RESULTS
Atlantic 1 Trial
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
87% 65%
82% 64%
P1D06 depletion 75%
Atlantic 1 Trial
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Elizabeth Bay Project: N$ 450 million
New Primary Liberation Area with water-flush
primary crusher
New Secondary Liberation
Building, with secondary
crushers, tertiary crushers and
mills.New Sea Water Intake system, new CCR, new fine tailings disposal
system, new workshop, new Recovery and other
infrastructure
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
A World Class Plant with a long future
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Key Statistics of a fast track project
• Project feasibility launched: October 2001
• Project approval: March 2003
• Construction began: September 2003
• Construction completed: November 2004
• Ramp-up slower than expected – Series 3
• Construction Contractors were 84% Namibian overall
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Inshore Project - Area of interest
R & D Project
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
We have come a long way!
Attempts in the 1980’s
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
The Jet Rig
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
The Jet Rig - 2
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
The Seawalker
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Gully Mining Machine Prototype
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
We are changing our paradigms . . .
O D W BN I A M O N D S E U I L D
BNAMDE
On
Dia
mon
ds W
e B
uild
Thank you !