optimizing material-related costs using dynamic site ... · incorporating lean tools along with the...

28
Optimizing Material-Related Costs Using Dynamic Site Layout and Supply Chain Planning Sarah Abou Dargham1 | Karim Faour2 | Sena Assaf1 | Farook Hamzeh3 Presenting Co-Author: Sena Assaf 1 Graduate Student, Civil and Environmental Engineering Department, American University of Beirut, Lebanon 2 Civil Engineering Graduate, Civil and Environmental Engineering Department, American University of Beirut, Lebanon 3 Associate Professor, Civil and Environmental Engineering Department, University of Alberta, Canada

Upload: others

Post on 20-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Optimizing Material-Related Costs Using Dynamic Site Layout and

Supply Chain PlanningSarah Abou Dargham1 | Karim Faour2 |Sena Assaf1 | Farook Hamzeh3

Presenting Co-Author: Sena Assaf

1 Graduate Student, Civil and Environmental Engineering Department, American University of Beirut, Lebanon2 Civil Engineering Graduate, Civil and Environmental Engineering Department, American University of Beirut, Lebanon3 Associate Professor, Civil and Environmental Engineering Department, University of Alberta, Canada

Page 2: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Outline

1Topic Introduction

3Methodology

5Discussion

2 Problem Statement

4 Simulation Results

Conclusion6

2

Page 3: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Space in a Construction Site

Temporary facilitiesMaterial storage

areasOngoing construction

works

(Said & El-Rayes, 2013), (Mossman, 2007)

Often Considered LIMITED

Introduction3

Page 4: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Seven groups of resource flow needed to complete a certain task

Construction Design

Components and Materials

Workers

Equipment

Space

Connecting Works

Addition to External Conditions

Right Time

Right Quantity

Desired Quality

Cost Reduction&

Value Addition

Introduction

(Koskela, 2000), (Lange & Schilling, 2015)

4

Page 5: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

When Are Material-Related Costs Incurred on Site?

Material movement into the site from laydown areas or storage facilities

Push nature of activitiesMaterial transportation to installation area

Introduction

(Tommelein, 1994), (Alves, Tommelein, & Ballard, 2006)

5

Page 6: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Why Dynamic Site Layouts?

Introduction

(Said & El-Rayes, 2013)

6

Page 7: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Gap Statement

(El-Rayes 2013) , (Turanoglu & Akkaya, 2017), (Bascoul and Tommelein, 2017), (Tommelein and Zouein 1993)

Different methods and models in the academic literature addressing material handling ina construction site have focused on:

- On-site congestion- Logistics cost- Project schedule- Material flow to the site- Dynamic site layout planning

The impact of how all those individual factorsact and interact with one another in a singleproduction system to incur material movingcosts has been understudied.

7

Page 8: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

What’s the Main Problem?

How can we decrease material-related costs on site throughthe use of dynamic site layout and supply chain strategies?

Research Objective8

Page 9: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

23

45

Case StudyConceptual

Model

Base Case Scenario

Improved Scenario

1

Gathering Intel

Methodology9

Page 10: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

GRC units Held on Rack

Zone 1

GRC Installation Zones

Case Study10

Page 11: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Zone

number

Number of

GRC units

(Qzi, i = 1:8)

Total GRC

area

per zone

(m2)

Installation

period

(weeks)

Zones 1,3,5 350 4550 8

Zones 2,4,6 700 9100 8

Zones 7,8 175

4550 6

GRC Quantities and Equivalent Areas per Zone GRC Installation Schedule

Case Study11

Page 12: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

800

Available storage area for GRC units equivalent to 100 units

Site Layout Plan

Case Study12

Page 13: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

One delivery = ¼ of the quantity

per zone

Bi-weekly delivery per

zone W0 W2 W4 W6

Conceptual Model13

Page 14: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

On Site

Conceptual Model14

Page 15: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Conceptual Model15

Page 16: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

W0 W2 W4 W6

Conceptual Model16

Page 17: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

On Site

(1/8) QZn+1

(1/8) QZn+1

(1/8) QZn+1

(1/8) QZn+1

Conceptual Model17

Page 18: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Base Model18

Page 19: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Material Deterioration

Costs

No Space for Other Material

Trucks Accumulating

on Site Hindering Movement

Storage Costs

Labor Overutilization

Base Model Concerns 19

Page 20: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

- Decrease the # of trucks from 4 to 2- Make deliveries weekly instead ofbiweekly

- Crane moves a GRC rack (10 units) insteadof moving one unit- Labors of both activities should work at thesame time- Requires less time than if the activities wereseparated (less movement)

Pull SystemDecrease Lead Time

of Trucks on Site

Merging ActivitiesCombine the

activities “Clean GRC” and “Install

GRC” into one

Improved Model20

Page 21: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

0

Improved Model21

Page 22: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Model A

• Reduced L.T. = 1 Week(pull system)

Model B• Merging activities• Longer L.T. = 2 Weeks

Model AB

• Merging activities• Reduced L.T. = 1 Week

Models Developed

Developed Models22

Page 23: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Total hours

The Truck Delay Cost ($)

Deterioration Cost ($)

Turnover Rate (hours/occurrence)

Total Cost ($)

Model simulation time

Cost incurred by trucks waiting to be unloaded instead of performinganother delivery

Cost of the total time a GRC unit spends on site before its final installation

Time needed for the storage space on site to be replenished by a newGRC rack.

Cost of the trucks, labour, crane, the GRC units’ deterioration cost, andtruck delay cost.

Assessment Criteria23

Page 24: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Simulation Results & Analysis24

Page 25: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Simulation Results & Analysis25

Page 26: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Reducing Lead Time Effect Combining Activity Effect

Decreased transportation delay cost

Satisfy site and schedule demand

Reduced site congestion

Decreased total material handling cost

Increased space utilization

Decease unneeded movement

Simulation Results & Analysis26

Page 27: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Conclusions & Future Work27

Incorporating lean tools along with the proper supply chain

---> Reduced the material related costs on site by 15-16%---> Reduced the process time by 15%

Future work aims at improving the existing model to better reflectthe actual site conditions regarding labour productivity and truckcapacity of the site.

Page 28: Optimizing Material-Related Costs Using Dynamic Site ... · Incorporating lean tools along with the proper supply chain---> Reduced the material related costs on site by 15-16%--->

Thank you for your time!

28