order based production management john grindley [email protected] xa r7/9 powerlink
TRANSCRIPT
![Page 1: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/1.jpg)
Moving Forward with XA
Order Based Production Management
John [email protected]
Moving Forward with XA
XA R7/9 PowerLink
![Page 2: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/2.jpg)
Moving Forward with XA
Agenda
1. OBPM change from R6.0 to R9.02. Manufacturing order entry and
maintenance3. New Objects in OBPM to replace GS4. MRP Recommendations5. Bells and Whistles
![Page 3: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/3.jpg)
Moving Forward with XA
Who does it ?The production Planners manage the M.O.’s.The Buyers manage PO and MRP “Buy Recommendations”. Keep in mind that a Planner can represent a Buyer which aids in MRP Review.
What do they do ?Identify what needs to be made or bought.Ultimately create an MO or PO.Release Orders to the floor and to the vendors.Manage their orders progress and react to delays or issues.Ensure their completion and closure.
OBPM - Managing Orders and Recommendations
![Page 4: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/4.jpg)
Moving Forward with XA
Application Settings added to OBPM
![Page 5: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/5.jpg)
Moving Forward with XA 5
Who does it in MRP Recommendations- • Production Controller/Planner for mfg items • Buyers for Buy Recommendations
OBPM
![Page 6: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/6.jpg)
Moving Forward with XA
Planner Object adds Mass Delete Option. Display options remain the same
Icons are added to Drop downs – added Post Release 6.0
![Page 7: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/7.jpg)
Moving Forward with XA 7
Use to create and release manufacturing orders to begin production…or to check MO status.
OBPM
![Page 8: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/8.jpg)
Moving Forward with XA
OBPM- Maintenance added import BOM and Router
Added post 6.0
![Page 9: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/9.jpg)
Moving Forward with XA
Create Manual Manufacturing Orders
If using EPDM, you can choose to use alternate bills and/or routings.
![Page 10: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/10.jpg)
Moving Forward with XA
Copy Manufacturing Orders
From Open MO or History Options to Copy−Header−Components−Operations−Misc charges
![Page 11: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/11.jpg)
Moving Forward with XA
Mass Delete Components on Workorder
Highlight each line item and then click On delete ICON. Launches Dialog box below
![Page 12: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/12.jpg)
Moving Forward with XA
Import of BOM with additional Flexibility
Release 9.0
Release 6.0
![Page 13: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/13.jpg)
Moving Forward with XA
Mass Delete Operations on Workorder
Highlight each line item and then click on delete ICON. Launches Dialog box. However if there is activity on the operation the DELETE function is not allowed.
![Page 14: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/14.jpg)
Moving Forward with XA
Creation of Compound Cards can be used inplace of tabbed Card file and workbenches
First section has MWO information
2nd section is Componentsbox to add and change componentswith additional tools.
3rd section is Operationsbox to add and change operationswith additional tools.
![Page 15: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/15.jpg)
Moving Forward with XA
OBPM – MO Components
Ability to track shortages toWorkorders and mass deletecomponents
![Page 16: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/16.jpg)
Moving Forward with XA
MO Components – Mass Delete Components Added
Ability to mass deleteComponents to workordersBy selecting records
![Page 17: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/17.jpg)
Moving Forward with XA
OBPM- MO OPERATIONS
Ability to create schedules byWorkcenter for Open MWO’sand mass delete operations
![Page 18: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/18.jpg)
Moving Forward with XA
MO Operations – Mass Delete Operations to MWO’s
Ability to mass deleteoperations to workordersBy selecting records or subsets
![Page 19: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/19.jpg)
Moving Forward with XA
Public Preference setting on Host Print options .
Can set public preference onWorkspaces or create new onesto set as preference
![Page 20: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/20.jpg)
Moving Forward with XA
Can set “OPEN ACTIONS’ preference which calls up a screen based on click, or holding down “ALT” and “Ctrl” key and then click.
![Page 21: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/21.jpg)
Moving Forward with XA
Client Link and System Link Request added
A System-Link request provides information required to form requests to send information to another system. Each System-Link request contains descriptive information about the request, control information for how to process the request, and audit controls to log the request
![Page 22: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/22.jpg)
Moving Forward with XA
IDF FUNCTIONALITY- Infor Development Framework
• Provides an integrated flow for users when working with information in both Power-Link and in the functions previously only accessible in the XA legacy applications.
• Provides access to the IDF Level 1 tasks related to that application or to the Power-Link functions on the application card.
• Allows a user to enter information or to select the options required to perform the task.
• An IDF Level 1 application window contains the icons users click to start specific tasks. XA organizes the icons in groups of related tasks. Each task icon starts a specific task.
• The IDF Level 1 windows cannot be customized in the same way that Power-Link windows can. Also, some advanced Power-Link functions, such as broadcasting and receiving information among application windows or attaching outside files to application records, are not available for IDF Level 1 functions.
• IDF Level 1 does provide an Additional Tasks feature that allows users to add frequently used options to the IDF Level 1 application windows through the Menu Maintenance function in Cross Application Support
22
![Page 23: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/23.jpg)
Moving Forward with XA
New Object “ Other Order Based Production Tasks”
Launches a series of applications from PCCwhich are normally on green screen (IDF level 1)
![Page 24: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/24.jpg)
Moving Forward with XA
New Object “ Other Order Based Production Tasks”
![Page 25: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/25.jpg)
Moving Forward with XA
New Object “ Other Order Based Production Tasks”
![Page 26: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/26.jpg)
Moving Forward with XA
New Object “ Other Order Based Production Tasks”
Green Screen EntryReplaced by IDF Level 1Option.
![Page 27: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/27.jpg)
Moving Forward with XA
New Object “ DATA COLLECTION Tasks”
Launches dialog boxFor PMC applications In green screen
![Page 28: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/28.jpg)
Moving Forward with XA
New Object “ DATA COLLECTION Tasks”
![Page 29: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/29.jpg)
Moving Forward with XA
New Object “ DATA COLLECTION Tasks”
Dialog box Entry replaces green screen
![Page 30: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/30.jpg)
Moving Forward with XA
New Object “ OTHER RATE BASED PRODUCTION Tasks”
Repetitive parameters in green screen can now beentered thru IDF Level 1
![Page 31: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/31.jpg)
Moving Forward with XA
Repetitive schedules can now be entered thru IDF Level 1.
New Object “ OTHER RATE BASED PRODUCTION Tasks”
![Page 32: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/32.jpg)
Moving Forward with XA
Transaction reason codes are required for key transactions
![Page 33: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/33.jpg)
Moving Forward with XA 33
Ability to create MO’s from MRP Demand Generated Recommendations
OBPM-MRP Recommendations
![Page 34: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/34.jpg)
Moving Forward with XA
MO’s, PO’s, Requisitions and Inter-site orders.Full view/subset/sort capability from MRP now.
OBPM manages demand from MRP
![Page 35: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/35.jpg)
Moving Forward with XA
Deal with routine recommendations in bulk
Appending (connecting) subsets lets you select by planner and then “append” by selected exception (or due date or ?).
OBPM manages demand from MRP
![Page 36: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/36.jpg)
Moving Forward with XA
Mass process MRP recommendations
![Page 37: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/37.jpg)
Moving Forward with XA
If shortages appear, use icons on right to check for substitutes or alternate process.
Check Availability
![Page 38: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/38.jpg)
Moving Forward with XA 38
Perform single normal or force close actions. Or multi-select random MO’s for maintenance.
Mass cancel, normal, or force close
![Page 39: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/39.jpg)
Moving Forward with XA
• Favorites• Sort arrow designators• Graph cards• Column statistics• Workspaces – multiple
preference settings• Logical attribute text• Locate button• Workbench enhance-
ments• Rounding choice when
changing view decimals
Quick change Subset additional range options (last, current, or next week, qtr, year) Host job notification and e-mail of reports Public preferences Customizable toolbars Workbench enhance- ments Presentation schemes
Other Bells and Whistle
![Page 40: Order Based Production Management John Grindley John.Grindley@cistech.net XA R7/9 PowerLink](https://reader036.vdocument.in/reader036/viewer/2022062318/551b6e73550346a6148b4e12/html5/thumbnails/40.jpg)
Moving Forward with XA
Thank you for attending!