Overview of Gas Operations UAG analysis activity

Technical Requirements TeamJohn Passey

17th October 2012

Page 2: Overview of Gas Operations UAG analysis activity

2

Purpose of today

� To explain our role

� To talk about UAG and it’s trending

� To give an overview of some of our analysis methods

Page 3: Overview of Gas Operations UAG analysis activity

3

Our Role

• National Grid is the Shrinkage Provider working on behalf of the gas community

• We have incentives to minimise and/or understand causes of shrinkage

• Shrinkage Gas = OUG + UAG + CV shrinkage

• UAG ~ 0.5% of throughput

• Shrinkage costs the community ~ £100m pa

small large very small

Page 4: Overview of Gas Operations UAG analysis activity

4

Our Obligations

Transmission Licence (from 1 April 2012) : -

• Modification of Special Condition C8F – SO external incentives.

• Special Condition C29

• Investigate the causes of UAG

• Report on UAG and our ongoing investigations/work activities to Ofgem via regular report.:

• http://www.nationalgrid.com/NR/rdonlyres/DA20FC28-F348-4F9B-882B-A36048F62203/55319/UAGReportJuly2012.pdf

Page 5: Overview of Gas Operations UAG analysis activity

5

-40,0

00

,00

0

-30,0

00

,00

0

-20,0

00

,00

0

-10,0

00

,00

0 0

10,0

00

,00

0

20,0

00

,00

0

30,0

00

,00

0

40,0

00

,00

0

50,0

00

,00

0

60,0

00

,00

0

70,0

00

,00

0

80,0

00

,00

0

30/03/2007

28/07/2007

25/11/2007

24/03/2008

22/07/2008

19/11/2008

19/03/2009

17/07/2009

14/11/2009

14/03/2010

12/07/2010

09/11/2010

09/03/2011

07/07/2011

04/11/2011

03/03/2012

01/07/2012

UA

G30-d

ay a

vera

ge

Marc

h 2

007 to

Sept 2

012

UAG

Trending U

AG Trending

UAG

Trending U

AG Trending

-40,0

00,0

00

-20,0

00,0

00 0

20,0

00,0

00

40,0

00,0

00

60,0

00,0

00

80,0

00,0

00

20/12/2010

20/01/2011

20/02/2011

20/03/2011

20/04/2011

20/05/2011

20/06/2011

20/07/2011

20/08/2011

20/09/2011

20/10/2011

20/11/2011

20/12/2011

20/01/2012

20/02/2012

20/03/2012

20/04/2012

20/05/2012

20/06/2012

20/07/2012

UA

G a

t Clo

se

-ou

t1U

CL

LC

LM

A 1

4 d

ay

Cum

ula

tive E

rror

-1,0

00,0

00,0

00

-800,0

00,0

00

-600,0

00,0

00

-400,0

00,0

00

-200,0

00,0

00 -

200,0

00,0

00

400,0

00,0

00

600,0

00,0

00

20/12/2010

20/01/2011

20/02/2011

20/03/2011

20/04/2011

20/05/2011

20/06/2011

20/07/2011

20/08/2011

20/09/2011

20/10/2011

20/11/2011

20/12/2011

20/01/2012

20/02/2012

20/03/2012

20/04/2012

20/05/2012

20/06/2012

20/07/2012

Cu

mu

lative

Erro

r

Page 6: Overview of Gas Operations UAG analysis activity

66

Understandingdata

IdentifyingPotential

Sources of UAG

Investigation ofSources of UAG

UAG

Analysis

AnalysisInvestigationChecklist

(42 points)

Offtakes

Terminals

Linepack

VLDMCs &Power Stations

Storage

methods

Compressors

DN contactQuarterly meetings

Metering Liaison meetingsControl Centre Liaison meetings

Site work

Site activity

Systematic approach to UAG investigation

Page 7: Overview of Gas Operations UAG analysis activity

7

Our Activities

(S)MERs

Site Witnessing

UncertaintyAnalysis

DataMining

Power StationEfficiency (PSET)

IFI work

Site workAnalysis

6yrtrending

UnderstandingData

Rapid response (5day)

Liaisonmeetings

CWV

UAG

Page 8: Overview of Gas Operations UAG analysis activity

8

Saltw

ick

H

0

0.5 1

1.5 2

2.5 3

3.5

18/10/2005

18/12/2005

18/02/2006

18/04/2006

18/06/2006

18/08/2006

18/10/2006

18/12/2006

18/02/2007

18/04/2007

18/06/2007

18/08/2007

18/10/2007

18/12/2007

18/02/2008

18/04/2008

18/06/2008

18/08/2008

18/10/2008

18/12/2008

18/02/2009

18/04/2009

18/06/2009

18/08/2009

18/10/2009

18/12/2009

18/02/2010

18/04/2010

18/06/2010

18/08/2010

18/10/2010

18/12/2010

18/02/2011

18/04/2011

18/06/2011

18/08/2011

18/10/2011

18/12/2011

6yr T

ren

din

g s

pre

ad

sh

ee

t –B

ad

da

ta/U

AG

??

?

05/0

606/0

708/0

907/0

809/1

010/1

1

11/1

2

Page 9: Overview of Gas Operations UAG analysis activity

9

Power

EnergyInput

2 SD

3 SD

Power Station Efficiency Tool (SPC chart)

Page 10: Overview of Gas Operations UAG analysis activity

10

CWV Time series plot

Regional CWV vs Demand

0

5

10

15

20

25

01/0

6 /200

801

/08 /2

008

01/1

0/200

801

/12/2

008

01/0

2 /200

901

/04/2

009

01/0

6/200

901

/08 /2

009

01/1

0 /200

901

/12/2

009

01/0

2/201

001

/04 /2

010

01/0

6 /201

001

/08/2

010

01/1

0/201

001

/12 /2

010

01/0

2/201

101

/04/2

011

01/0

6/201

101

/08 /2

011

01/1

0/201

101

/12/2

011

Re

gio

na

l D

em

an

d [

mc

m]

-5

0

5

10

15

20

Co

mp

os

ite

We

ath

er

Va

ria

ble

Regional Demand [mcm]

Composite Weather Variable

???

Page 11: Overview of Gas Operations UAG analysis activity

11

Data mining

•Is the process of analysing data from different perspectives & summarising into useful information

•Finds correlations/patterns in large databases i.e. UAG & “something”

•Importantly, it points towards solutions rather than giving absolute answers

Page 12: Overview of Gas Operations UAG analysis activity

12

� Step Process

� 1 Do site flow figures lie within max for the site?

� 1a Has flow reached maximum of the instrumentation capability (i.e. is it maxed out – reached Qmax?)

� 1b Check behaviour of Offtake outlet temperature (investigate if site is flowing when its not supposed to)

� 2 Do the dates coincide with an MER for Offtakes or known error reports for Power Stations ?

� 2a Did the site under investigation pass ME2, check whether there are any outstanding issues?

� 2b Examine meter validation history, does the site in question have trouble with a key piece of instrumentation ?

� 2c VLDMCs, use the Power Station efficiency tool to see if there are any obvious errors

� 3 Was there any site work going on? Have the NG control room logged any activity?

� 4 Check for amendments by EBT team and has he operator changed (amended) the flows due to say site work, were these done on site?

� 4a Should we change to telemeted data?

� 5 Check F1 profile for anomalies

� 5a JFP to see Andy Lees to write a list of sub-tools for 5 – not just looking for spikes in F1

� 5a Can we check on the commercial data for this site?

� 6 Check for alarms in iGMS

� 6a Malcolm Macdonald has reports on all alarms (probably), see if a query can be run with how many meter suspect alarms are being produced

� 6b Check VLDMC alarms – need to understand more about how these are structured

� 6c Check any site alarms – need to understand their structure.

� 7 Check the behaviour of the Pressure Control Valve PCV and FCV

� 8 Check GEMINI for consistency

� 8a Compare iGMS Dvol vs. GEMINI Dvols (set this up as a Business Objects query)

� 9a Look for contamination, have any of the deltaPs got –ve values?

� 9 Check HPMIS alarms page (need list of what to check)

� 10 Check HPMIS EOD page (need list of what to check, is following complete)

� 10a Compare EOD values in flow computer with GEMINI/iGMS volumes

� 10b Check for amendments made by the operator

� 10c Check for any missing data

� 11 Check HPMIS CV Audit page (need list of what to check)

� 11a Compare CV values in flow computer with GEMINI/iGMS values

� 11b Check HPMIS CV at adjacent sites to that under investigation

� 11c Check whether there was any CV capping on the days in question

� 12 Check HPMIS RBD page (need list of what to check)

� 12a Check Linepack calculation (if this is possible)

� 13 Review MAS visits to site in question

� 13a should trend how often sites have a problem & with what, then check site in question against this list to try to indicate where the problem is.

� 14 Review audit reports

� 15 Raise issue with site owner, we want them to check the following:

� 15a Any issues with low odour

� 15b Ask the site/asset owner for assistance� 15c Check the site behaviour with respect to the Pressure Control Valve PCV and FCV

� 15d Has the operator masked alarms/check their record of alarms?

� 16 Perform CWV analysis of the site

� 17a Re-constitute 4 min flow data as would be done as part of MER investigation.

EASY & QUICK

COMPLICATED &TIME CONSUMING

Analysis Investigation Checklist (42 points)

Page 13: Overview of Gas Operations UAG analysis activity

13

Thank you

Questions?

John Passey 01926 656008

[email protected]

Page 14: Overview of Gas Operations UAG analysis activity

14

Contact Details

Please use the contact details below for help and advice

regarding publication frequencies of gas data, or for any other general queries about gas data availability or

content:

e-mail: [email protected]

Tel: +44 1926 65 6474