pennyfeathers development isle of wight environmental statement: non-technical summary
TRANSCRIPT
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
1/23
NOVEMBER 2012
FARRELL DESIGN STUDIO
Pennyfeathers Development
Isle of Wight
Environmental statement: Non-technical summary
110405
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
2/23
Pennyfeathers Development: Non-technical summary i
Contents
INTRODUCTION.....................................................................................................................................1The project team...........................................................................................................................1SITE DESCRIPTION...............................................................................................................................2Site and its surroundings ..............................................................................................................2Site landform, watercourses, geology and soil ................................................................................2Site cultural and archaeological heritage......................................................................................3Existing noise and air quality ........................................................................................................3
CONSULTATION....................................................................................................................................6Background to the development...................................................................................................6Public consultation on the scheme...............................................................................................6
NEED FOR THE DEVELOPMENT.........................................................................................................7PROJECT DESCRIPTION......................................................................................................................8
Project alternatives .......................................................................................................................8APPROACH TO THE EIA ....................................................................................................................10EIA ISSUES AND FINDINGS...............................................................................................................12
Construction and environmental management...........................................................................12Soils and geology .......................................................................................................................14Hydrology and flood risk .............................................................................................................14Archaeology................................................................................................................................14Ecology..15Landscape and visual aspects ...................................................................................................15Air quality ..16Noise and vibration.....................................................................................................................16Socio-economics ........................................................................................................................17Traffic.17Sustainability...............................................................................................................................19
WHAT HAPPENS NEXT? ....................................................................................................................21CONTACT DETAILS ............................................................................................................................21
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
3/23
Pennyfeathers Development: Non-technical summary 1
INTRODUCTION
This document is the non-technical
summary (NTS) of the environmental
statement (ES) for the Pennyfeathers
Development, near Ryde on the Isle of
Wight. It describes in non-technical
language the proposed development and
the potential impacts it may have on the
physical and biological environment and on
people. It also lists the measures that the
developer will implement to avoid or reduce
adverse impacts and to enhance potential
social benefits, and describes howenvironmental issues will be managed
during and after construction.
The ES presents the complete findings of the
environmental impact assessment (EIA), and
is one of the documents accompanying the
outline planning application submitted under
the Town and Country Planning Act 1990.
The primary purpose of the ES is to inform
the planning and decision making process by
reporting the results of the EIA, and inparticular any significant environmental
effects. The authority determining the
application is the Isle of Wight (IoW) Council.
They have confirmed that the development
requires an ES to be submitted alongside the
planning application.
If you have any questions or would like to
comment on the application then you can
find out how to do so at the end of this NTS.
The project team
The site developer is The Pennyfeathers
Property Company Limited. The Project
Team working on behalf of the developer on
planning, design and environmental issues
included:
Farrell Design Studio who prepared themaster plan
Hepburns Planning Consultancy Limitedwho is the planning consultant for thescheme
RSK Environment Limited (RSK) whoundertook the EIA and prepared theenvironmental statement.
RSK was responsible for undertaking and
managing the EIA studies, using their in-
house resources supplemented by the
following specialist consultants:
Glanville Consultants Ltd for the transportassessment
Frankham Consultancy Group Ltd for allengineering and design issuesassociated with access and modificationsto the railway, stations/platforms.
Box 1: Project overview
The proposed development on around 53 ha of land will consist of a mainly residential scheme(904 dwellings) comprising a mix of housing types and supporting commercial areas (e.g. officesor local shops), landscaped open space and leisure/recreation areas, and a school, whilstretaining and enhancing features of the existing landscape and valued ecological habitats. Thedevelopment will need to be serviced by supporting infrastructure including sewerage anddrainage, electricity and gas supply, and telecommunications. District heating infrastructure(subject to ongoing feasibility work) will be developed on the site.
Enhanced transport links will be provided. These will include provision for future access to theexisting railway station(s) adjacent to the site, as well as provision of local roads andimprovements to existing road junctions, and extensions of cycleways and footpaths through thedevelopment, which in turn will enhance linkages to the local and regional networks.
Environmental factors were considered from the earliest stage of the proposals and so the
planning and engineering design and layout has been developed in response to awareness of theenvironmental issues of the area. The layout design in the master plan has therefore alreadyincorporated a number of measures designed to avoid or reduce environmental impacts.
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
4/23
Pennyfeathers Development: Non-technical summary 2
SITE DESCRIPTION
Site and its surroundingsLocated on the southern edge of Ryde, Isle
of Wight (Figure 1), the Pennyfeathers site
comprises mainly fields in agricultural use
(currently used for pasture/grazing or
hay/silage) classified as mostly (~70%)
grade 3b (moderate quality) agricultural
land. The site also comprises hedgerows,
woodlands, a permanent stream
(Monktonmead Brook) and some ephemeral
spring-fed streams. Also included in the siteis a farm and associated agricultural
buildings (Prestwood Grange), a pound
store open to the public and a garage with
car showroom. The cemetery and an
adjacent existing electricity substation
compound are not included within the
scheme.
For the purpose of the planning application,
the site area is shown to include parts of
Smallbrook Lane/Great PrestonRoad/Brading Road and the Westridge
Cross junction (see Figure 2). This is to
accommodate planned highways works (re-
alignments and junction improvements)
proposed to be implemented under the
Pennyfeathers scheme as components to
support the development.
Similarly, the site area also spans across the
existing Island Line Railway and steam
railway at Smallbrook junction. This is toaccommodate connection of a cyclepath and
footbridge from the Pennyfeathers
development, ultimately connecting to both
of the railway stations, and further on
towards the Smallbrook stadium.
The southern extension of the site area
down to Harding Shute merges into the
western edge of Whitefield Wood and in this
portion is mostly plantation woodland. A
footpath and cycle track will be formed in
this area together with habitat
enhancements including native tree planting.
Land uses adjoining the site include some
commercial areas along Brading Road to the
east and residential areas of Ryde to the
north. Land to the west is mostly agricultural
holdings whereas the southern boundary
comprises small woodlands.
Site landform, watercourses,
geology and soilThe Monktonmead Brook has sculpted the
topography of the site, the course of the
brook currently following the western site
boundary before discharging into the Solent
at Ryde, some two kilometres to the north.
Ground levels across the site fall gently from
around 48.5 m above Ordnance Datum
(AOD) at Brading Road down to 9.9 m AOD
along Monktonmead Brook. A spring line
approximately follows the 40 m contouracross the site. The spring line roughly
defines the near-surface outcrop of the
geological boundary between the River
Terrace Deposits found at the higher
eastern side of the site (beside Brading
Road) and the underlying Bembridge Marl
Formation, which forms the remainder of the
site geology.
An agricultural land survey concluded that
the topsoils are in grade 3a and 3b. Some12 ha of land located across the eastern
flank of the site, was classified as grade 3a
with typically permeable, loamy topsoil and
the remainder of the existing pasture was
found to comprise grade 3b land, where the
topsoil is a heavy or medium loam and clay
subsoil at shallow depth. There is some
made ground in areas of previous
development (the former farmyard and
slurry pit).
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
5/23
Pennyfeathers Development: Non-technical summary 3
Top of site adjacent to Brading road (behind hedge on left of picture) looking south toward Busy Bee Garden Centre
There is a shallow aquifer in the River
Terrace Deposits across the eastern flank of
site, which seems to feed the local line of
springs. There is a deeper confined but
unproductive aquifer in the deeper
Bembridge Limestone that lies underneath
the negligibly permeable Bembridge Marls.
Site cultural and
archaeological heritage
Although there are no scheduled
monuments, UNESCO World heritage sites,
registered parks and gardens or registered
battlefields within the study area, the Isle of
Wight has known records of human
settlements. From extensive desktop
searches (e.g. archive records, maps, aerial
photographs, etc.) it is considered that the
development site has a moderate potential
for the survival of previously unknown
archaeological remains, particularly with
respect to the Bronze Age, medieval and
post medieval periods. These factors were
taken into account in development of the
master plan.
Existing noise and air quality
The edge of town location and semi-rural
nature of the site means it is not affected by
any large air or noise pollution apart from
existing traffic on Brading Road and
Smallbrook Lane at the site boundary. (The
steam railway emissions are quite localised).
The site has good conditions for dispersion
of any emissions and air quality is thereforegood and concentrations of pollutants are
well below levels of any concern;
background noise levels are also very low.
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
6/23
Pennyfeathers Development: Non-technical summary 4
Figure 1: Site overview and key features of the locality
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
7/23
Pennyfeathers Development: Non-technical summary 5
Figure 2: Site redline area
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
8/23
Pennyfeathers Development: Non-technical summary 6
CONSULTATION
Background to thedevelopment
Parts of the site have been the subject of
several previous smaller planning
applications in relation to existing land uses.
However, the consolidation of land holdings
has allowed the formulation of a larger vision
for the area.
Conceptual plans were developed and two
community consultation events were held in2006 and 2007 to generate local interest
and create input to the development
process. A preliminary master plan was
formulated in 2008 and this was subject to
an environmental appraisal (September
2008) to identify important constraints and
opportunities of the site for optimising the
project design. A further public exhibition
was held in 2009.
The current scheme is of smaller scale thanthat promoted in 2008 (it no longer includes
development to the north of Smallbrook
Lane) and the scheme has been significantly
modified to account for increased knowledge
of the site, greater understanding of the
extent of public interest and aspirations, and
the evolving national/regional planning
framework.
Public consultation on thescheme
In addition to the community consultation
events held in 2006, 2007 and 2009 on an
earlier version of the scheme, a public
exhibition was held at a local hotel in Ryde,
Isle of Wight on 10th September 2011.
Attendance throughout the day was very
good with about 440 people attending. Often
very strongly held views were expressed
with representatives of the developers team
and the EIA team, and there was a large
amount of informed and informative
feedback received, which has been taken
into account in further scheme development
and the impact assessment process.
A request for an EIA screening and scoping
opinion was sent to the IoW Council on 7 th
June 2011 and the accompanying scopingreport was circulated to a range of
consultees/organisations including Natural
England and the Environment Agency. The
screening and scoping opinion was received
from the IoW Council on 14th July 2011.
Copies of the EIA screening and scoping
opinion are contained in the ES Volume 2,
Annex 5.2 and Annex 5.3, respectively. As a
result of this process, it was formally agreed
that the EIA would consider environmental
impacts of the development (both
construction and post-construction) on a
range of topics.
In addition to the formal EIA process, other
correspondence and discussions took place
with a range of organisations including local
landowners, utilities and transport
companies, and local groups.
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
9/23
Pennyfeathers Development: Non-technical summary 7
NEED FOR THE DEVELOPMENT
The proposed development at the
Pennyfeathers site seeks to satisfy the need
to provide a substantial proportion of the
housing supply of the Island. The Core
Strategy of the Island Plan envisages
provision of 8,320 dwellings over the 16
years from 2011 to 2027 (520 units/year)
including 2,100 in the Ryde area.
Furthermore, a fundamental principle
underpinning the policies within the Core
Strategy is to maximise all opportunities
within, close to or adjacent to the settlementboundaries with access to public transport,
local shops and services to encourage
sustainable patterns of development and
sustainable communities. Ryde is a key
regeneration area, and the Pennyfeathers
scheme will satisfy the above stated
sustainable development criteria.
The scheme has high regard to the highly
valued natural and historic environment,
seeking to provide houses, jobs, services,
and supporting infrastructure whilst
conserving and enhancing the natural
environment. The scheme also anticipates
likely demographic change and in particular
seeks to meet the needs of the Islands
increasingly ageing population, as well as to
address the shortage of supply of affordable
housing for people on low incomes and first
time buyers.
Box 2: The main benefits of the development
Significant contribution to meeting the housing supply targets of the region
Provision of accessible open space Provision of leisure facilities including sports pitches
Improved connectivity via extension of cycle routes and footpaths
Improved transport links, in particular the provision of a link road from Smallbrook Lane toBrading Road that would relieve pressure on the junction at Westridge Cross fromeast/southbound traffic
Improved road junctions including additional turning lanes at Westridge Cross to relieveforecast junction capacity problems
Improved junction of Smallbrook Lane and Great Preston Road to improve safety
Improved alignment of Smallbrook Lane over the existing railway bridge to improve safety,including separation of road from the existing cycle track
Ultimately, if acceptable to the rail operators, contribute to sustainable transport objectivesby providing a link to the existing Island Line station at Smallbrook Junction, as well asenabling a connection between the Island Line and the Steam Railway
Contribute to sustainable transport objectives by providing a park & ride facility withconnection to Smallbrook Junction
Relocation of the existing garage from Westridge Cross to a more favourable location,and enabling any necessary land remediation
Enhancing the landscape and habitat connectivity with benefits to areas of ecologicalvalue
Climate change mitigation
Sustainable building design
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
10/23
Pennyfeathers Development: Non-technical summary 8
PROJECT DESCRIPTION
The area subject to the planning application
(the site redline) is shown in Figure 2. This
encloses an area of about 53 hectares,
although only the central part of the site
would be developed for housing. The overall
site master plan, illustrated in Figure 3, sets
out the main development areas and
infrastructure such as roads and paths.
The development will comprise mostly
housing up to a maximum of three storeys
high. The mix of housing types will be as in
Table 1.
The master plan comprises 121 assisted
living units, included in the total of 904 units.
The scheme will be a phased development,
with construction occurring over several
years between 2014 and 2027.
Project alternatives
There are limited areas on the Isle of Wight,and in or around Ryde in particular, of such
a scale that can offer opportunities for a
consolidated village style development,
rather than piecemeal ad hoc
developments such as are possible on
smaller pockets of development land that
may from time to time become available.
The current location is favoured for its
proximity to the town centre via sustainable
means of travel.
Alternative layouts were developed as part
of the scheme design and the most
favourable alternative, which respects the
constraints of the site, has been selected.
For instance, internal roads have been
aligned so as not bisect valued ecological
habit. In addition, some variation in the
development mix has been considered
although the aim has always been to
develop a residential scheme. The objective
of the design put forward is to optimise site
use whilst minimising environmental
impacts. For instance, relatively low-rise
structures have been selected that can be
accommodated within the landscape setting.
Other types of development such as
extensive commercial or industrial were
ruled out due to various factors such as
constraints to development at this location,
the abundant commercial areas to the east
of Brading Road and the proposed industrial
development to the north of Smallbrook
Lane. The do-nothing alternative (to leave
the site undeveloped) would mean that
opportunities to improve sustainable
transport and other linkages in the area, and
the opportunity to meet increasing housing
demand, would be foregone.
Table 1: Housing types
Number of unitsUnit type
Affordable Market Total
Affordable (%)
1-bed 118 8 126 93.7%
2-bed 97 20 117 82.9%
3-bed 94 475 569 16.5%
4-bed 6 86 92 6.5%
Totals 315 589 904 34.8%
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
11/23
Pennyfeathers Development: Non-technical summary 9
Figure 3: Overall site master plan
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
12/23
Pennyfeathers Development: Non-technical summary 10
APPROACH TO THE EIA
Environmental impact assessment (EIA) is a
systematic process established in European
Law1
to identify, predict and evaluate theenvironmental effects of proposed projects.
The authority determining the planning
application2 (the IoW Council) have
confirmed that the development requires
submission of an environmental statement3.
The purpose of the EIA is to:
Provide a baseline against which actualproject impacts will be assessed
Identify and assess the anticipatednegative and positive environmental andsocial impacts of projects
Determine measures designed to avoid,minimise or mitigate negative
1Directive on the Assessment of the Effect of Certain
Public and Private Projects on the Environment(85/337/EC), as amended by Directives 97/11/EC,2003/35/EC and COM/2009/03782
Planning application submitted under the Town andCountry Planning Act 19903
The project falls under Schedule 2, Part 10b, of the Townand Country Planning (Environmental Impact Assessment)Regulations 2011 (S.I. No. 1824), as an urbandevelopment project of more than 0.5 hectare.
environmental or social impacts andoptimise potential positive impacts
Use the results of that assessment toinform option selection and subsequentproject design
Consult with and obtain feedback fromproject stakeholders.
Figure 4 shows the main stages of the EIA
that were followed.
Baseline environmental conditions were
identified from a range of sources and field
surveys as identified in Box 4.
The scheme master plan was developed
iteratively to allow incorporation of
knowledge of site constraints gained from
the baseline evaluations and to allow impact
avoidance and mitigation measures to be
designed-in from the outset as illustrated by
the examples in Box 5.
Box 3: Components of the development
Residential (904 units of 1 and 2 bed apartments, assisted living units, one, two, three andfour bed houses, including 35% affordable housing)
Commercial (including local shops/ caf/ offices, etc.)
Two form intake primary school (420 pupils)
Community centre/polyclinic
Two football pitches and changing facilities within local small community centre (to includecorner/coffee shop location)
Combined heat and power (CHP) station
Cycle ways (north to south and east to west)
Footpath/cycleway bridge linking existing sports stadium to the west of the railway line tothe Pennyfeathers site, with provision for future connection to the railway station
Road and junction improvements
Waterways (ponds and swales) for drainage attenuation
Enhanced landscaping, open space (around 5.7 ha) and play areas Park & ride car ark
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
13/23
Pennyfeathers Development: Non-technical summary 11
Box 4: Environmental baseline surveys
Soil and land survey of site (agricultural land classification)
Phase 1 ecological surveys of site
Botanical (plants and flowers) surveys Mammal surveys (bats, badger, water vole, dormouse, red squirrel)
Breeding bird surveys
Reptile surveys (snakes and lizards)
Invertebrates (such as insects and spiders)
Survey of Great Crested Newt habitat potential
Tree survey
Geophysical survey to identify archaeological remains
Box 5: Environmental design
Ecological surveys guided the layout so as to avoid valued woodland and hedgerows nearMonktonmead Brook and to provide green corridors in landscape design to improveecological connectivity of the habitat.
Layout design has avoided and/ or provided set-back from ecologically valued resourcesand flood risk areas around Monktonmead Brook.
Sustainable drainage has been designed in to the scheme so as to avoid exacerbating(and hopefully to reduce) existing flooding in areas downstream and to provide additionalhabitat.
Design of new/ improved highways junctions and internal road layouts so as to improvetraffic and pedestrian safety.
Buildings will be designed using a terraced arrangement orientated to reduce impact onviews from both within and into the site. Building heights have been limited and aregenerally higher at the top parts of the site (near Brading Road) so as to reduce visualimpacts.
Housing is not proposed alongside Brading Road, to minimise adverse effects of traffic.
Various local community facilities including a primary school and local open space andsports facilities will discourage car use.
Footpaths and cycleways are planned to maximise their usage both within the siteboundaries and also to connect to the surrounding areas, which should reduce the needfor car use.
Roads, paths and tracks through the development will be designed to blend better into the
landscaping by having a boulevard style design with general separation of roads frompaths and extensive use of landscaping.
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
14/23
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
15/23
Pennyfeathers Development: Non-technical summary 13
insulated pipework for the districtheating network
creation of construction platforms andground re-profiling comprisingexcavation and temporary storage of
excavated material for later fill, in orderto maintain a suitable cut & fill balanceon site and minimising off-site removal
drainage works to provide sustainabledrainage systems (SUDS)
highway and bridge works for roads,parking, cycle paths and footpaths
railway works for upgrading ofSmallbrook Junction Railway Station
foundation works for buildings and other
structures superstructure works and internal
building fitting out and associatedbuilding services works
hard and soft landscaping worksincluding planting.
It is anticipated that standard construction
working hours would be adopted, subject to
agreement with the local authority, for
instance Monday to Friday 8 a.m. to 6 p.m.
and Saturday mornings 8 a.m. to 1 p.m.There would be no work on Sundays or
Public Holidays and working is not expected
to take place at night.
Construction activities in the absence of
mitigation measures and controls have the
potential to generate temporary, short term
adverse impacts. Examples of such
mitigation measures include watering to
control dust, and use of noise attenuationplant, which will be under the control of the
main contractor. The EIA has recommended
a range of measures designed to mitigate
and control potential impacts, as
summarised in the above sections.
Prior to the start of construction, a
construction method statement (CMS) will
be agreed with the relevant authorities. The
CMS will define responsibilities and
procedures for the management of thepotential impacts on the environment arising
during demolition, site preparation,
excavation and construction and will include,
among other things, specific measures for
the control of pollution. It is recommended
that the main contractor be required to
register the site under the considerate
constructors scheme. A site waste
management plan will also be prepared and
submitted for approval as required by the
Site Waste Management Plans Regulations
2008.
Box 6: Types of impact considered
Direct impacts may occur when some aspect of the development, physically impinges upon avalued resource, for instance the proposed construction of a house may result in loss of ecologicalhabitat or an archaeological relic. Indirect impacts could occur in either time, or location, from the
source for instance construction works on a slope could result in heavy rainfall washing exposedsoil into a nearby watercourse, which could smother aquatic life.
Cumulative impacts are defined as:
impacts that result from changes caused by the proposed development together withother past, present or future developments
impact interactions that may arise from a combination of separate impacts on one or asmall number of receptors due to the same proposed development.
Information on possible future developments was gathered through discussions with IoW Counciland research of relevant planning documentation. The possibility of cumulative impacts arisinghas been considered in each of the technical chapters of the ES. It was concluded there would beno risk of cumulative impacts arising.
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
16/23
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
17/23
Pennyfeathers Development: Non-technical summary 15
boundary but excavation of trial trenches
confirmed there to be no finds of any merit.
Two listed buildings (outside the site) could
be visually affected by the proposals, but
both are considered of low sensitivity tovisual impact.
It is anticipated that residual impact from the
scheme will be negligible.
Ecology
A desk-based ecological background data
search was undertaken to highlight
conservation areas and records of
internationally, nationally and locallyimportant species.
The following field surveys were carried out
to identify ecological features and provide
information to determine their value: phase 1
habitat survey; detailed botanical survey;
hedgerow surveys; survey of grasslands and
woodlands; invasive plant survey; and
animal surveys for: amphibians; reptiles,
wintering birds; breeding birds; bats,
badgers; red squirrels; dormice; terrestrialinvertebrates; otters, and water voles.
Red squirrel, resident on the Isle of Wight
Best practice measures will be included in a
construction method statement and the
development will include targeted measures
such as translocation of notable plants to
safeguarded receptor sites, as well as the
creation of diverse new habitats includinggreen space, new ponds, landscaping and
wildflower meadows.
Various further surveys and monitoring will
be undertaken, with a full specification
included in an environmental management
plan. Also, a five-year habitat management
plan (HMP) will be produced for the site.
These measures will result in an overall
positive residual impact.
Landscape and visual aspects
The landscape character in this part of the
IoW has a medium sensitivity in the wider
setting and low sensitivity in the immediate
setting, mainly due to its proximity to the
urban area of Ryde. The development will
have little effect since much of the existing
landscape structure will be retained and a
strong landscape framework to reinforce this
structure is provided in the proposal.
The development could be visible from
locations close to the site or from the more
elevated locations to the west but the
screening effects of other nearby buildings
or existing landscape structures mean that
the most visible parts of the proposed
development areas are the higher parts of
the site, particularly the areas near Brading
Road.
Mitigation opportunities have been
suggested in terms of internal site tree
screening and ecological planting to
strengthen the existing landscape
framework and increase screening effects.
The use of dark colour, non-reflective
materials, especially for roofing material
would reduce the anticipated impacts, and
there will be no significant residual effects.
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
18/23
Pennyfeathers Development: Non-technical summary 16
Air quality
Construction of the development has the
potential to affect local air quality, principally
in terms of nuisance dust. Impacts will be
controlled and monitored by means of aconstruction environmental management
plan or construction method statement,
agreed with the local authority. As a
consequence, construction phase impacts
would be negligible.
Detailed assessment of operational impacts
used an atmospheric dispersion computer
model, with assumptions that were designed
to over-predict pollutant concentrations.
Data input to the model included anticipatedchanges in traffic flows and design data for
the energy centre. The primary pollutants
assessed were carbon monoxide (CO),
nitrogen dioxide (NO2) and fine dust
particles4.
Predicted air pollutant concentrations (up to
2027), after adding background pollutant
concentrations, were compared with
relevant air quality objectives. Every
modelled scenario predicted that therelevant short-term and long-term air quality
objectives would be achieved. With
reference to planning guidance provided by
Environmental Protection UK, the results
indicate that the overall air quality impact of
the development would be negligible.
Noise and vibration
The existing noise levels measured at the
site during both day and night are typical of
semi-rural edge of town sites. Noise levels
were also measured during a speedway
event at Smallbrook stadium so this could
be taken into account. Vibration was also
measured during train operations on the
nearby railway tracks.
The assessment concluded that achieving
suitable indoor noise levels (within habitable
4Known as PM10 as the particles have an average
size (mean aerodynamic diameter) of 10 microns
rooms) in proposed residential properties,
would need suitable mitigation to be
provided at some dwellings. This is subject
to detailed design but may include double
glazing and trickle ventilation on some
building facades.
As well, to achieve suitable noise levels at
outdoor living areas, 1.8m high fences will
be provided at properties close to
Smallbrook Lane.
Construction noise will be controlled using
standard procedures that will reduce the
noise to acceptable levels.
The cumulative vibration values at proposed
residential units for both day and night time
are at levels indicating a low probability of
adverse comment; therefore the impact of
ground-borne vibration is considered to be
not significant.
Future increase in traffic flows will generally
be less than 20% and on some roads traffic
will decrease. However, traffic flows on
Carters Road, Smallbrook Lane and Brading
Road could increase more than 20%. The
resultant increase in road traffic noise would
be less than 1.5 dB, which is not significant.
It is therefore concluded that, provided the
recommended mitigation measures are
implemented, the site is suitable for the
proposed development and will not result in
significant impact.
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
19/23
Pennyfeathers Development: Non-technical summary 17
Socio-economics
The development will create employment
opportunities during the construction phase,
which will last for 13 years. There will also
be some new jobs created during theoperational phase.
904 new homes will be created by the
development, which will contribute towards
the IoW Councils target of 2,100 new
dwellings in the Ryde area by 2027.
Affordable housing units will be included to
meet the 35% target.
It is expected that around 167 primary
school age children and 171 secondaryschool age children would live in the
completed development. The primary school
children will be accommodated by a new 2-
form entry junior mixed infant (JMI) school
(ages 4 11) for 420 pupils, which will be
built as part of the development. The
secondary school age children would be
accommodated by the Ryde Academy.
As part of the proposed development, a
polyclinic or doctors surgery will be providedwith at least one GP, which will
accommodate the anticipated 1,800
residents of the development.
Two multi use sports pitches and changing
facilities will be provided as well as a small
community centre (to include corner/coffee
shop location) and play equipment. The
development will provide almost 6 ha of
enhanced landscaping and public open
space. In addition, enhanced transportlinkages such as new bus routes and future
access to the existing railway station(s) and
to the local public right of way network of
footpaths and cycleways would be provided
throughout the development.
The provision of new homes, employment
opportunities, leisure and health facilities, new
school and public open space on-site and
transport linkages on- and off-site are assessed
to be beneficial for the new residents and theexisting neighbouring communities.
Traffic
The proposed development site has been
designed so that it will be accessible by a
range of non-car travel modes. This should
encourage the use of existing public
transport services in the area and reduce
the impact of the development on existing
road junctions.
Footways will be provided alongside all
roads within the site. This will ensure full
inter-connectivity between all elements of
the proposed development as well as
between the proposed development and the
surrounding areas. This should encourage
residents to walk to places in the vicinity of
the site and therefore reduce their
dependence on the car. Controlled
pedestrian crossing facilities will be installed
at major road junctions in and adjacent to
the development.
Cycle routes and cycle parking provision will be
provided within the site to encourage the use of
bicycles rather than private cars. Brading Roadcurrently presents an unattractive environment
for cycling so improvements to this link in the
form of a tree-lined boulevard with separate
cycle lane will be made to better cater for this
mode of transport.
A new footbridge will be provided across the
railway to link the development and
Smallbrook Stadium. As part of a future
upgrade to Smallbrook Junction, the rail
station could also be connected. This wouldreduce private car use.
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
20/23
Pennyfeathers Development: Non-technical summary 18
Vehicular access to the proposed
development site will be provided from three
points around the site connecting to the
existing local road network. Smallbrook
Lane will be re-directed, while a new
junction (a 4-arm roundabout) will beprovided on Brading Road.
The re-directed Smallbrook Lane will be
configured as an attractive boulevard with
landscaped central reservation, forming the
principal route through the site. It would
divert most existing traffic on Smallbrook
Lane away from its junction with Great
Preston Road and through the proposed
development site to the new roundabout on
Brading Road. This is likely to cause asignificant re-distribution of traffic towards
junctions with better capacity and flow
pattern.
The transport assessment (TA) identified the
baseline traffic conditions of the local road
network of the site for 2011, using traffic
counts at key junctions. It looked at the type
of junctions that already exist in the vicinity
of the proposed development site and their
existing capacity (for 2011 traffic flows). The
TA then used this information to consider
the potential impacts that the proposed
development might have on the traffic flows
and junction capacities subsequent to the
completion and occupation of the whole
development in 2027, compared to asituation that would occur in 2027 without
the proposed development.
It is expected that by 2027, six of the nine
existing junctions would operate under
capacity and with little queuing for both the
morning and evening peak periods, an
improvement compared to the situation
predicted in 2027 without the development
(see Table 2). The development proposes to
make modifications to the road network andso reduce the level of congestion at
significant junctions. With the development,
the predicted changes to traffic volume at
the three junctions that would be over
capacity in 2027 will be small and will not be
significant, and two of the three junctions
would be over capacity even without the
development.
Table 2: Predicted effect of the development on capacity of nearby road junctions
Junctions studiedWithoutdevelopment
Withdevelopment
Nicholson Road/Great Preston Road
Smallbrook Lane/Great Preston Road / Over-capacity
Great Preston Road/Marlborough Road/Bullen Road/ Brading
Road (Westridge Cross) Over-capacity
A3055 Brading Road/Cothey Way
A3055 Brading Road/Tesco access
Hornsey Road/A3055 New Road/B3395 MarshcombeShute/A3055 Morton Road (Yar Cross)
Over-capacity Over-capacity
Stroudwood Road/Upton Road/Carters Road/Gatehouse Road
Argyll Street/West Street/Green Street Over-capacity Over-capacity
Carters Road/Ashey Road/Smallbrook Lane Over-capacity
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
21/23
Pennyfeathers Development: Non-technical summary 19
At the junction - Carters Road / Ashey Road
/ Smallbrook Lane - the development would
increase the volume of traffic by 13% in the
morning peak hour and 20% in the evening
peak hour, but the changes would have very
little significance at the junction. Thedevelopment would tip this junction just over
capacity on only one arm of the roundabout
with the other three arms remaining under
capacity. To put this in context, this arm
would be close to capacity in 2027 without
development, with development traffic
adding only a further two vehicles to the
queuing.
SustainabilityInteraction between the master plan
designers and the EIA team ensured that
sustainability concerns were embedded in
the design from the earliest stage. In
addition, a detailed sustainability
assessment was completed for the scheme,
including code for sustainable homes and
BREEAM pre-assessments, district heating/
CHP (combined heat and power) feasibility,
and SAP modelling (energy and carbonperformance of new buildings).
Site construction activities will be managed
and monitored to ensure the potential for
nuisance impacts to local receptors such as
dust, noise and construction traffic/ plant is
minimised. A range of protection measures
will also be implemented to safeguard local
environmental conditions in respect of
ecology, air, ground and water. The
minimisation, sorting and recycling/ re-use ofconstruction materials will form a key
component of the developments
construction-phase sustainability
credentials, for which a site waste
management plan with appropriate targets
will be prepared.
In addition to protecting local ecology during
construction, the completed development
will incorporate a range of ecological
enhancement measures to benefit key
species and habitats, such as those covered
by biodiversity action plans (BAP).
Clean and zero/low carbon energy
technologies are proposed for the
development, including district heating/ CHPand high efficiency gas boilers. Energy
efficiency measures will ensure energy
demand and associated carbon emissions
are minimised. On-site renewable energy is
also anticipated for phase 2 onwards in the
form of roof-mounted photovoltaic (PV)
panels in order to further reduce carbon
emissions. The development will therefore
make a substantial contribution to climate
change mitigation, as well as to climate
change adaptation in the form of floodprotection, surface water runoff attenuation,
rainwater harvesting and potable water use
efficiency.
A high quality internal environment is
anticipated for residents, including noise
insulation above minimum building
regulations standards, good levels of
daylighting and access to private and public
outdoor space, including a range of amenity
and leisure/ play uses for residents andother users. The creation of quality open
spaces promotes healthy living through
providing places to walk, cycle and exercise,
bringing people together and nurturing
community spirit through shared spaces.
In addition to applying the waste hierarchy
during construction, the development will
incorporate convenient and accessible
waste reception and sorting facilities for
residents that promote the separation andrecycling of relevant waste streams.
The selection of construction and finishing
materials will be informed by their
environmental performance among other
considerations, with reference made to the
green guide for specification to optimise the
specification of high scoring materials. All
timber will be FSC certified. The use of
innovative and low environmental impact
construction materials will be explored anddeveloped during detailed design.
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
22/23
Pennyfeathers Development: Non-technical summary 20
Pennyfeathers therefore fulfils the
sustainable development expectations of the
national planning policy framework and Isle
of Wight Core Strategy by supporting
sustainable economic development through
the delivery of high quality homes andcreating a thriving local place.
Illustration of a typical low carbon CHP engine
-
7/29/2019 Pennyfeathers Development Isle of Wight Environmental statement: Non-technical summary
23/23
WHAT HAPPENS NEXT?
The planning authority (IoW Council) will
consider the findings of the ES, of which this
non-technical summary forms a part,
together with other documents submitted as
part of the planning application. There is a
statutory period allowed for comments to be
returned to the IoW Council.
If the IoW Council were to grant planning
permission (with or without conditions) then
it is envisaged that the following would
occur:
developer completes purchase of thesite
detailed design of (each phase of the)development (taking into account anyplanning conditions that may have beenimposed)
contractor tendering and appointment
site investigations
discharge of planning conditions
construction including site preparationand foundations and infrastructure
construction including buildingsuperstructures
building fit-out and completion.
CONTACT DETAILS
The person to contact for further information
on the project is:
Mr Glen Hepburn
Hepburns Planning Consultancy Ltd
Cheeks Farm, Merstone Lane
Merstone
Isle of Wight, PO30 3DE
Tel: (01983) 522100
Email: [email protected]
If you would like to comment on any aspect
of the ES or non-technical summary or you
would like to make an appointment to view
the documents, then please contact Ms
Sarah Wilkinson, principal planning officer,
at the following address:
Planning Services
Isle of Wight Council
Seaclose Offices
Fairlee Road
Newport
Isle of Wight, PO30 2QS
Tel: (01983) 823552
Email: [email protected]