photovoltaic solar array project - cloudinary · notes: all fence materials shall be hot-dipped...
TRANSCRIPT
![Page 1: PHOTOVOLTAIC SOLAR ARRAY PROJECT - Cloudinary · NOTES: ALL FENCE MATERIALS SHALL BE HOT-DIPPED GALVANIZED FINISHED GRADE ... v E u Latin Name } u u v Quantity W o v ^ ] Ì Wetland](https://reader034.vdocument.in/reader034/viewer/2022051807/60077f2331e6ed1fdb4c7ce2/html5/thumbnails/1.jpg)
SHEETC-0.0
Prepared for:
1'=100'
9-14-2015
SSW
2015-017
SBS
Prepared by:
Date:
Scale:
Drawn by:
Checked by:
Proj. #
TITLE SHEETSheet Title:
Project Title:
ACTION
LODESTAR ENGERY, LLC3 ELLSWORTH PLACESUITE 122AVON, CT, 06001
"CENTAURUS SOLAR"PHOTOVOLTAIC SOLAR ARRAY PROJECT
FOR
LODESTAR ENERGYAT
175 BUTTERFIELD DRIVEASHLAND, MASSACHUSETTS
SHEET INDEX:
SHEET No. DESCRIPTION
C-0.0 COVER SHEET C-1.0 EXISTING CONDITIONS PLAN I C-1.1 EXISTING CONDITIONS PLAN II C-2.0 SITE PREPARATION PLAN C-3.0 SITE, GRADING & DRAINAGE PLAN I C-3.1 SITE, GRADING & DRAINAGE PLAN II C-4.0 DETAILS I C-4.1 DETAILS II
PREPARED BY:
Design Consultants, Inc.Consulting Engineers and Surveyors
663'±
810'±
ZONING
INASHLAND, MA
C-1.0C-3.0
C-1.1C-3.1
DATE:
10/8/2015 PANELS & DRIVEWAY LAYOUT
10/22/2015 MOVE FENCE & ADD EASEMENT
![Page 2: PHOTOVOLTAIC SOLAR ARRAY PROJECT - Cloudinary · NOTES: ALL FENCE MATERIALS SHALL BE HOT-DIPPED GALVANIZED FINISHED GRADE ... v E u Latin Name } u u v Quantity W o v ^ ] Ì Wetland](https://reader034.vdocument.in/reader034/viewer/2022051807/60077f2331e6ed1fdb4c7ce2/html5/thumbnails/2.jpg)
SHEETC-1.0
Prepared for:
1'=40'
9-14-2015
SSW
2015-017
SBS
Prepared by:
Date:
Scale:
Drawn by:
Checked by:
Proj. #
EXISTINGCONDITIONSPLAN I
Sheet Title:
Project Title:
ACTION
LODESTAR ENGERY, LLC3 ELLSWORTH PLACESUITE 122AVON, CT, 06001
INASHLAND, MA
DATE:
10/8/2015 PANELS & DRIVEWAY LAYOUT
10/22/2015 MOVE FENCE & ADD EASEMENT
![Page 3: PHOTOVOLTAIC SOLAR ARRAY PROJECT - Cloudinary · NOTES: ALL FENCE MATERIALS SHALL BE HOT-DIPPED GALVANIZED FINISHED GRADE ... v E u Latin Name } u u v Quantity W o v ^ ] Ì Wetland](https://reader034.vdocument.in/reader034/viewer/2022051807/60077f2331e6ed1fdb4c7ce2/html5/thumbnails/3.jpg)
SHEETC1.1
Prepared for:
1'=40'
9-14-2015
SSW
2015-017
SBS
Prepared by:
Date:
Scale:
Drawn by:
Checked by:
Proj. #
EXISTINGCONDITIONSPLAN II
Sheet Title:
Project Title:
ACTION
LODESTAR ENGERY, LLC3 ELLSWORTH PLACESUITE 122AVON, CT, 06001
INASHLAND, MA
DATE:
10/8/2015 PANELS & DRIVEWAY LAYOUT
10/22/2015 MOVE FENCE & ADD EASEMENT
![Page 4: PHOTOVOLTAIC SOLAR ARRAY PROJECT - Cloudinary · NOTES: ALL FENCE MATERIALS SHALL BE HOT-DIPPED GALVANIZED FINISHED GRADE ... v E u Latin Name } u u v Quantity W o v ^ ] Ì Wetland](https://reader034.vdocument.in/reader034/viewer/2022051807/60077f2331e6ed1fdb4c7ce2/html5/thumbnails/4.jpg)
SHEETC2.0
Prepared for:
1'=80'
9-14-2015
SSW
2015-017
SBS
Prepared by:
Date:
Scale:
Drawn by:
Checked by:
Proj. #
SITEPREPARATIONPLAN
Sheet Title:
Project Title:
ACTION
LODESTAR ENGERY, LLC3 ELLSWORTH PLACESUITE 122AVON, CT, 06001
STABILIZED CONSTRUCTION ENTRANCE
INASHLAND, MA
DATE:
10/8/2015 PANELS & DRIVEWAY LAYOUT
10/22/2015 MOVE FENCE & ADD EASEMENT
![Page 5: PHOTOVOLTAIC SOLAR ARRAY PROJECT - Cloudinary · NOTES: ALL FENCE MATERIALS SHALL BE HOT-DIPPED GALVANIZED FINISHED GRADE ... v E u Latin Name } u u v Quantity W o v ^ ] Ì Wetland](https://reader034.vdocument.in/reader034/viewer/2022051807/60077f2331e6ed1fdb4c7ce2/html5/thumbnails/5.jpg)
SHEETC-3.0
Prepared for:
1'=40'
9-14-2015
SSW
2015-017
SBS
Prepared by:
Date:
Scale:
Drawn by:
Checked by:
Proj. #
SITE, GRADING &DRAINAGE PLAN I
Sheet Title:
Project Title:
INASHLAND, MA
DATE: ACTION
LODESTAR ENGERY, LLC3 ELLSWORTH PLACESUITE 122AVON, CT, 06001
TOTAL SOLAR PANELS = 7,968 PANELS
10/8/2015 PANELS & DRIVEWAY LAYOUT
10/22/2015 MOVE FENCE & ADD EASEMENT
11/12/2015 PROVIDE SU-30 ACCESS
![Page 6: PHOTOVOLTAIC SOLAR ARRAY PROJECT - Cloudinary · NOTES: ALL FENCE MATERIALS SHALL BE HOT-DIPPED GALVANIZED FINISHED GRADE ... v E u Latin Name } u u v Quantity W o v ^ ] Ì Wetland](https://reader034.vdocument.in/reader034/viewer/2022051807/60077f2331e6ed1fdb4c7ce2/html5/thumbnails/6.jpg)
SHEETC3.1
Prepared for:
1'=40'
9-14-2015
SSW
2015-017
SBS
Prepared by:
Date:
Scale:
Drawn by:
Checked by:
Proj. #
SITE, GRADING &DRAINAGE PLAN II
Sheet Title:
Project Title:
DATE: ACTION
LODESTAR ENGERY, LLC3 ELLSWORTH PLACESUITE 122AVON, CT, 06001
INASHLAND, MA
10/8/2015 PANELS & DRIVEWAY LAYOUT
SE
E A
BO
VE
V
IE
W F
OR
C
ON
TIN
UA
TIO
N
10/22/2015 MOVE FENCE & ADD EASEMENT
11/12/2015 PROVIDE SU-30 ACCESS
![Page 7: PHOTOVOLTAIC SOLAR ARRAY PROJECT - Cloudinary · NOTES: ALL FENCE MATERIALS SHALL BE HOT-DIPPED GALVANIZED FINISHED GRADE ... v E u Latin Name } u u v Quantity W o v ^ ] Ì Wetland](https://reader034.vdocument.in/reader034/viewer/2022051807/60077f2331e6ed1fdb4c7ce2/html5/thumbnails/7.jpg)
SHEETC4.0
Prepared for:
N.T.S.
8-27-2015
SSW
2015-017
SBS
Prepared by:
Date:
Scale:
Drawn by:
Checked by:
Proj. #
SITE DETAILS I
Sheet Title:
Project Title:
ACTION
LODESTAR ENGERY, LLC3 ELLSWORTH PLACESUITE 122AVON, CT, 06001
D/2 + 6"
24" OR AS
SPECIFIED BY
UTILITY COMPANY
ELECTRIC & COMMUNICATIONS TRENCH
TEMPORARY CONSTRUCTION SILT FENCE
RAIN GARDEN
INASHLAND, MA
WETLAND FINGER CROSSING
NEW PLANTED AREA SECTION
DATE:
10/8/2015 PANELS & DRIVEWAY LAYOUTGRAVEL DRIVE
10/22/2015 MOVE FENCE & ADD EASEMENT
![Page 8: PHOTOVOLTAIC SOLAR ARRAY PROJECT - Cloudinary · NOTES: ALL FENCE MATERIALS SHALL BE HOT-DIPPED GALVANIZED FINISHED GRADE ... v E u Latin Name } u u v Quantity W o v ^ ] Ì Wetland](https://reader034.vdocument.in/reader034/viewer/2022051807/60077f2331e6ed1fdb4c7ce2/html5/thumbnails/8.jpg)
SHEETC4.1
Prepared for:
N.T.S.
9-14-2015
SSW
2015-017
SBS
Prepared by:
Date:
Scale:
Drawn by:
Checked by:
Proj. #
SITE DETAILS II
Sheet Title:
Project Title:
ACTION
LODESTAR ENGERY, LLC3 ELLSWORTH PLACESUITE 122AVON, CT, 06001
10.00' (TYP)
SOLOAR ARRAY SPACING & RACKING
CHAIN LINK FENCE
6'-0"
3'-0"
6" MIN.
12"
12"Ø MIN.
10'-0" CENTER TO CENTER (MAX)
END POST CAP (TYP)
TURNBUCKLE
(6" TAKUP)
BAR BANDS
@ 12" INTERVALS
LINE POST
2
3
8
"Ø (TYP)
STRETCHER BAR
EXPANSION
SLEEVE
CORNER
OR END POST
3"Ø
TRUSS ROD
CEM CONC BASE
(CLASS A)
12" SONOTUBE
CHAIN LINK FABRIC
(2
1
2
" MESH)
WIRE FASTENERS
@ 15" INTERVALS
TOP RAIL 1
3
4
"Ø
FABRIC FOR FENCES 5 FEET OR OVER IN HEIGHT:
BOTH THE TOP AND BOTTOM SELVAGE TO HAVE
TWISTED AND BARBED FINISH UNLESS OTHERWISE NOTED
INSTALL THREE BARBED WIRES WITH 45 DEGREE,
ONE PIECE, THREE WIRE EXTENSION ARMS ABOVE FENCE
NOTES: ALL FENCE MATERIALS SHALL BE HOT-DIPPED GALVANIZED
FINISHED GRADE
GRAVEL ACCESS DRIVE
EROSION CONTROL SILT SOCK
25°
3'-0"
MIN
.
1
2
'-
1
1
"
L
E
N
G
T
H
D
E
T
E
R
M
I
N
E
D
B
Y
P
V
M
O
D
U
L
E
D
I
M
E
N
S
I
O
N
S
I
N
P
O
R
T
R
A
I
T
O
R
I
E
N
T
A
T
I
O
N
3
'-
1
0
5
1
6
"
2
'-
7
1
1
1
6
"
3
'-
1
0
5
1
6
"
6'-3
15
16
" 5'-4
9
16
"
11'-8
1
2
"
8'-5
1
2
"
VA
RIE
S
PO
ST
T
YP
E 'A
' =
6'-0" M
IN
IM
UM
E
MB
ED
ME
NT
4'-7
3
4
"
VA
RIE
S
LINE OFGRADE
SOLAR PANEL AND PILE SUPPORT SECTION
W8 X 10 STEEL POST
POST SECTION
10"
INASHLAND, MA
36" (MIN.)
DATE:
10/8/2015 PANELS & DRIVEWAY LAYOUT
Filtrexx® SiltSoxx™ �
Plan View
Work Area Filtrexx® Compost �SiltSoxx™
Water Flow
Area to be Protected
Stake on3' LinealSpacing
Filtrexx®SiltSoxx™
Notes:1. All material to meet Filtrexx® specifications2. SiltSoxx™ compost/ jsoil /rock/seed fill to meet applicationrequirements.3. Compost material to be dispersed on site, as determined byEngineer.
Filtrexx® SiltSoxx™ Section
Work Area Protected3" - 4"
12"±
2" x 2" Wooden Stake
Filtrexx® SiltSoxx™(18" Typical)
Area to be
11'-8
1
2
" 11'-8
1
2
"
WETLAND REPLICATION CONSTRUCTION
EXIST WETLAND
WE
TLA
ND
B
OU
ND
AR
Y
(V
EG
E. &
S
OILS
)
MATCH
ELEVATION
EROSION CONTROL
SILT SOCK (TYP)
ADJUST FINISHED GRADE TO
MIMIC EXISTING WETLAND
TOPOGRAPHY (PIT & MOUNDING, ETC.
- DO NOT COMPACT SOILS WITHIN
REPLICATION AREAS).
SLO
PE
< 3
%
UPLAND
WETLAND REPLICATION
HYDRIC SOILS
UNDISTURBED GROUND
10/22/2015 MOVE FENCE & ADD EASEMENT
Common Name Latin Name Comments Quantity Plant Size Wetland Status
Steeplebush Spiraea tomentosa 4 to 6 feet on center, small shrub - plant in clusters along edge and do not surround with larger shrubs 24 2-3' FACW
Winterberry Holly Ilex verticillata Group in 6 or more, 5 to 7 feet on center 18 3-4' FACW+
Silky Dogwood Cornus amomum Plant 8 to 10 feet on center with tubelings planted 3 feet on center to fill in area around and between plants 18 3-4' FACW
Red-osier Dogwood Cornus sericea Plant 8 to 10 feet on center with tubelings planted 3 feet on center to fill in area around and between plants 24 3-4' FACW+
Silky Dogwood Cornus amomum Plant 3 feet on center around larger of same species to create dense clusters 110* tubelings FACW
Red-osier Dogwood Cornus sericea Plant 3 feet on center around larger of same species to create dense clusters 144* tubelings FACW+
Pussy Willow Salix discolor Plant in groups of 6 or more, 4 to 6 feet on center 30* Tubelings FACW
plant size based on availability - sizes based on New England Wetland Plants - typical.
NOTES:
Excavate to match surrounding BVW elevation. If original wetlandsoil is not encountered, overexcavate 12 inches and use richorganic soil or soil/weed free compost mix to bring area to grade. Grades to be adjusted and plants located under the supervision ofwetland scientist.
Mulch area after planting with leaf litter or leafy compost. Scatterwoody debris amongst plants as directed by wetland scientist.
*Actual quantities to plant and purchase are higher, - available in trays of 38, round up for ordering purposes
BVW restoration area**
**Species and sizes may be adjusted based on plant availability