please note: this document was updated on 2-19-2019 ...€¦ · 2. assignment of a fast track...

43
Revised 2/19/2019 PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 (Development Impact Fee Increase) Community Development Department / Building Division 201 North Broadway, Escondido, CA 92025 (760) 839-4647 FAX (760) 432-6819

Upload: others

Post on 30-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 2/19/2019

PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 (Development

Impact Fee Increase)

Community Development Department / Building Division

201 North Broadway, Escondido, CA 92025 (760) 839-4647 FAX (760) 432-6819

Page 2: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 2/19/2019

Fees in the Downtown Specific Plan Area

Development Fee Category

CURRENT1 1 For Multi-Family Development (2 units or more) located in the Downtown Specific Plan Area, the Current Fees identified by Resolution 2017-154(RR) shall remain in effect until 2/19/19 and 2/19/20. Increase implemented in 3 equal installments.

FEE

PUBLIC FACILITIES Res. $3,740.14 DU

PARK DEV. Res.$4,655.40/DU

DRAINAGE FACILITY MF Res.$428.34/DU

PUBLIC ART $0.15/SF first 2000sf exempt

Page 3: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 2/19/2019

A1

Page 4: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 2/19/2019

F E E G U I D E F O R D E V E L O P M E N T P R O J E C T S I N D E X

Subject Page No.

IMPORTANT FEE INFORMATION ..................................................................................... A1

Introduction............................................................................................................................ 1

Other City Department Fees ................................................................................................. 2

Other Agency Fees ............................................................................................................... 3

Fee Incentives ....................................................................................................................... 4

Fee Credits ............................................................................................................................ 6

Fees Applicable to Building Permit Issuance ........................................................................ 7

Processing Fees ................................................................................................................... 7

Permit/Inspection Fees ......................................................................................................... 7

Connection Fees ................................................................................................................... 8

Development Fees ................................................................................................................ 8

Regional Fees ....................................................................................................................... 9

State Fees ............................................................................................................................. 10

Other City Fees ..................................................................................................................... 10-11

School Fees .......................................................................................................................... 11

Valuation Multipliers .............................................................................................................. 12-13

Plumbing, Electrical & Mechanical Fee Worksheet .............................................................. 15

School Fees Information ....................................................................................................... 16

Art In Public Places Fee (Public Art) ..................................................................................... 17

Traffic Fees ........................................................................................................................... 18

Connection and Regional Schedule ...................................................................................... 19

Examples:

Single-Family Dwelling ........................................................................................... 21

Duplex .................................................................................................................... 22

Apartment Building ................................................................................................. 23

Condominium Project ............................................................................................. 24

Industrial Building ................................................................................................... 25

Office Building ........................................................................................................ 26

Medical/Dental Office Building ............................................................................... 27

Industrial Building Addition ..................................................................................... 28

Tenant Improvement .............................................................................................. 29

Fee Worksheet ...................................................................................................................... 30

Growth Management Tier Map ............................................................................................. 31

Region of Influence Map ....................................................................................................... 32

Permit Processing Fee Waivers for Targeted Commercial Area …………………………… . 33

San Diego County Water Authority (SDCWA) Capacity Charge……………………………… 34-35

Nonprofit Organization Fee Reduction Policy…………………………………………………… 36

Incentives for Increased Energy Efficiencies…………………………………………………… 37

Page 5: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

OTHER CITY DEPARTMENT FEES

Fees are collected at various stages of development projects. This guide provides information on those fees applicable to Building Division plan check submittal and to Building Permit issuance. FINAL PROJECT FEES ARE THOSE FEES IN EFFECT AT THE TIME OF PERMIT ISSUANCE.

Plan Check Fee Park Fee

Building Plan Review Fee (Planning) Traffic Fee

Building Plan Review Fee (Fire) Regional Traffic Fee (RTCIP)

Building Permit Fee Drainage Facilities Fee

State Seismic Fee (SMIP) Region of Influence Infrastructure Deposit Fee

State Green Building Fee CATV Fee

Public Facility Fee Plumbing, Electrical and Mechanical Permit Fees

Wastewater Connection Fee School Fees

Water Connection Fee Microfilming Fee

SDCWA Capacity Charge (Currently Art Fee

collected with water meter charges) Citywide Facilities Plan Reimbursement Fee

Other City departments and agencies which have fees that may impact your project are also listed.

City Departments Other Agencies

Planning San Diego County Health (Haz. Materials)

Engineering San Diego County Health (Environmental Services)

Finance Air Pollution Control District

Fire Other Sewer/Water Agencies

Business License San Diego Gas and Electric Co. (SDG&E)

AT&T (formerly Pacific Bell, SBC)

Cox Communications

This guide also provides information regarding fee incentives for the following types of projects.

Qualified projects in the Escondido Fee Deferrals

Business Enhancement Zone Historical Buildings

Restaurants Changes in Use in Existing Buildings

Second Dwelling Units

Fee estimates for proposed projects are available upon request. Please provide the following information. If you are unsure of the applicable fees for your project please contact Building Division staff for assistance.

Description of project (use, etc.) Size and use of any structures

being demolished (for fee credits)

Proposed water meters (number & sizes) Existing water meters (number & sizes)

Floor plan showing uses, square High water users may have to submit water bill

footage, seating (if applicable), etc. records from previous locations or estimates of

Land area, plot plan usage

Type of construction

Page 6: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

OTHER CITY DEPARTMENT FEES

PLANNING - CITY HALL (760) 839-4671

Fees for subdivisions, CUP's, Plot Plans, P.D.'s, Design Review, Grading Plans, Development Agreements, etc.

ENGINEERING - CITY HALL (760) 839-4651

Fees for plan check and inspection, improvement plans, grading plans, subdivisions, encroachment permits, repayments, etc.

Annual Industrial Waste Discharge Permits - Contact the Industrial Waste Inspector at (760) 839-6282.

FINANCE - CITY HALL (760) 839-4682

Fees for water meters and construction meters.

FIRE - 201 NORTH BROADWAY (760) 839-5400

Fees for Fire Code Permits, blasting permits, research, hazardous material consulting and inspection.

CITY BUSINESS LICENSE - CITY HALL (760) 839-4659

Required for all businesses operating in the City. Must be renewed annually.

Page 7: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

OTHER AGENCY FEES

COUNTY OF SAN DIEGO DEPARTMENT OF HEALTH SERVICES

Fees for plan check and inspection and annual permits for:

• Food and Miscellaneous Facilities ................... (760) 471-0730

• X-Ray Installations ........................................... (619) 338-2969

• Hazardous Materials ........................................ (619) 338-2222

AIR POLLUTION CONTROL DISTRICT

Fees for plan check and inspection and annual permits for certain businesses… (858) 650-4700

OTHER WATER/WASTEWATER DISTRICTS

Projects not served by City wastewater and water facilities will be subject to plan check, inspection, installation and connection fees from the serving agency:

• Rincon Del Diablo Municipal Water District ..... (760) 745-5522

• Vallecitos Water District ................................... (760) 744-0460

• Vista Irrigation District ...................................... (760) 597-3100

• Valley Center Municipal Water District............. (760) 749-1600

• Olivenhain Municipal Water District ................. (760) 753-6466

To determine if your project is served by City sewer and water, please contact the Engineering Department (760) 839-4651.

GAS AND ELECTRIC SERVICE

SAN DIEGO GAS AND ELECTRIC CO. (SDG&E) (800) 611-7343

TELEPHONE

AT&T (Formerly Pacific Bell).(800) 310-2355 (Residential) (800) 750-2355 (Commercial)

COX COMMUNICATIONS

North County (760) 806-9809

Page 8: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

FEE INCENTIVES

THE ESCONDIDO BUSINESS ENHANCEMENT ZONE

On May 24, 2006, the City Council adopted Ordinance 2006-12, and Resolution 2006-56 modifying the existing Business Enhancement Zone (BEZ). The ability to request incentives for development was expanded to all commercial and industrial zoned properties in the City of Escondido. In order to be considered for incentives, the development must meet one or more of the Public Benefit Criteria in the associated Council policy. Generally, the BEZ applies to new construction projects.

Contact the Planning Division at 760-839-4671 or the Economic Development Division at 760-839-4563 for more information and the eligibility criteria. Requests for incentives must be made in writing to the Assistant City Manager and be accompanied by appropriate supporting materials.

Please refer to the Escondido Zoning Code Article 69, Sections 33-1450 through 33-1457, for the complete description of requirements and incentives

http://www.qcode.us/codes/escondido/view.php?topic=33-69&showAll=1&frames=on

For the complete Business Enhancement Zone Policy described in Resolution 2006-56, Exhibit “A”, please see in the following link:

http://www.escondido.org/Data/Sites/1/media/pdfs/Business/BusinessEnhancementZone.pdf

Economic Incentive Fund and Incentive Policy (brief description)

Purpose: The City Council has established an Economic Incentive Fund that is utilized to offset development and connection fee reductions granted to eligible projects. The City Council Economic Development Subcommittee and the City Council may grant fee reduction incentives as follows. Policy:

1. Granting of fee reductions of up to 25% of the project’s connection and development fees with a $25,000 maximum cap.

Fee reductions are backfilled from the City Council Economic Incentive Fund.

Incentive does not apply to high-demand service users.

Pass-thru fees to other agencies and costs involving processing, inspection and/or construction costs to the City of Escondido will not be eligible for fee incentive reductions. The Public Art Fee will not be reduced.

2. Ability to request fast-track processing.

Additional Incentives Policy

1. Granting of fee reductions of up to 50% of the project’s connection and development fees with a $50,000 maximum cap.

Up to 50% of the project’s connection and development fees can be requested to be reduced for businesses that provide exemplary financial or job benefits to the City.

Fee reductions are backfilled from the City Council Economic Incentive Fund.

Incentive does not apply to high-demand service users.

Pass-thru fees to other agencies and costs involving processing, inspection and/or construction costs to the City of Escondido will not be eligible for fee incentive reductions. The Public Art Fee will not be reduced.

2. Assignment of a fast track interdepartmental City staff project processing and permitting team.

FEE DEFERRAL

On June 13, 2012, City Council Approved Resolution 2012-103, which amends the existing fee deferral program for commercial and industrial projects, to include residential development with 5 or more units. Please contact Building Division staff for further information regarding the process.

Page 9: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

FEE INCENTIVES

NONPROFIT ORGANIZATIONS (Per City Council Resolution 2008-21(R) October 22, 2008)

The City of Escondido recognizes the importance of community based service organizations. Qualified organizations will receive a 50% reduction in connection, development and art fees with a maximum total reduction in fees not to exceed $10,000. Where a property is eligible for multiple fee credits, the credit generating the greater amount shall be used. See page 36.

INCENTIVES FOR INCREASED ENERGY EFFICIENCIES

On Sept. 19, 2001 City Council approved Resolution No. 2001-209 which provides that commercial and residential projects can receive incentives of expedited processing and reduced fees for energy efficiencies above current Title 24. See page 37.

NONRESIDENTIAL BUILDING ADDITIONS

Per City Council action on November 21, 2008, expansions in floor area of existing nonresidential buildings will be required to pay development fees on the expanded area:

• Wastewater Connection Fee •Traffic Fee • SDCWA Capacity Charge •Public Facility Fee • Drainage Facilities Fee •Art Fee • Water Connection Fee (if increase in meter size)

HISTORICAL BUILDINGS

On June 17, 1992, in an effort to encourage historic preservation, the City Council approved Resolution No. 92-266 adopting an incentives program for qualified preservation projects.

Numerous incentives are offered, including fee reductions.

For further information, please contact the Planning Division at (760) 839-4671.

CHANGES IN USE IN EXISTING BUILDINGS (Council Agenda Item 4/22/1992)

To encourage revitalization efforts for our existing building stock, tenant improvement permits, such as restaurants, will not be charged wastewater, water, and/or traffic fees, unless the project requires an increased water meter, or sewer line size, or adds significant parking. This policy does not apply to intensive uses such as Laundromats, car washes, breweries, etc., or to the first use in new buildings. Buildings in which the previous use was abandoned for 10 years or more are subject to development fees. (See Fee Example #9, page 29.)

SECOND DWELLING UNITS

In an effort to provide affordable housing in areas where adequate public facilities and services are available, and impacts upon the residential neighborhoods directly affected would be minimal, the City Council adopted Ordinance No. 92-42 on November 4, 1992.

The ordinance added Article 70 to the Escondido Zoning Code which establishes standards for second dwelling units.

These units will be considered as room additions for Building Permit fees and will not be charged wastewater, water, traffic, public facility, drainage, and park fees. EMC Section 33-140.

One limitation on these units is that the owner of the property must reside on the parcel on which the unit is located. For further information on Article 70, please contact the Planning Division at (760) 839-4671.

Page 10: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

FEE INCENTIVES

PERMIT PROCESSING FEE INCENTIVES – TARGETED COMMERCIAL AREAS

To encourage improvement and enhancement of existing businesses, the processing and permit fees shown below will be waived. Targeted areas are South Escondido Boulevard, East Valley Parkway and the Downtown Revitalization Area (see map on page 33).

• Minor Plot Plan Review – $1,025 • Design Review Fee – $450 • Project Plan Review – up to $200 • Encroachment Permit – $100 • Landscape Plan Check – up to $1040 • Building Sign Permit – up to $50 • Sign Permit – $78 • Building Awning Permit – up to $100 • Facade Improvements – up to $200

Criteria for incentive approval:

• Cumulative fee incentives for any single business shall not exceed $500 • Fee waivers shall involve exterior (street visible) improvements only • Waivers for new construction shall be limited to additions to existing businesses

For further information, contact the Planning Division (760) 839-4671.

FEE CREDITS

BUILDING DEMOLITIONS & ABANDONED USES

On October 22, 2008, the City Council modified City policy regarding fee credits for demolished buildings and buildings with abandoned uses. This action established a 10-year time limit on the use of fee credits. The time limit shall not apply to single-family dwellings demolished due to natural disaster.

The fee credits have the following limitations:

• Satisfactory documentation must be presented on the existence of the previous building; • Credits are applied to the fees for new projects on the same property (no monetary refunds are

given); • Credit applies only to the property on which the demolitions occurred; • Credit cannot be transferred elsewhere. • Where a property is eligible for multiple fee credits, the credit generating the greater amount shall

be used.

Fee credits apply to the following fees:

• Water Connection Fee (if on City water) • Traffic Fee Local portion only (see below) • Wastewater Connection Fee (if on City sewer) • Park Fee • SDCWA Capacity Charge (if on City water) • Region of Influence Infrastructure Deposit • Public Facility Fee • Drainage Facilities Fee Art Fee

Credits for Traffic Fees for a demolished residential use applied to a commercial use will be 25% of the fees shown in this guide, since commercial traffic fee rates are based on 25% of the residential rates.

AGRICULTURAL WATER METERS

On October 22, 2008, the City Council modified City codes to allow fee credits for agricultural water meters taken out of service.

Fee credits apply as follows:

• Ten-year time limit, and other limitations as listed under Building Demolitions • Given to owner of the subdivision at the time of Final Map recordation • Applies to the Water Connection Fee at the time of meter removal or last service, and SDCWA

Capacity Charge as allowed per the agency • Will be divided among the new lot(s) created

Page 11: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 7-01-2014

FEES APPLICABLE TO BUILDING PERMIT ISSUANCE

The fees shown below are applicable to Building Permit issuance for your project. Processing fees are payable at Plan

Check submittal. School fees are payable to the school district prior to permit issuance. All remaining fees are payable at

permit issuance. Final project fees are those fees in effect at the time of permit issuance.

PROCESSING FEES

PURPOSE: To cover City costs in processing your project and reviewing your plans for compliance with model

codes, local ordinances and state and federal regulations.

APPLICABLE TO: All projects, except as noted below.

FEE AMOUNT

PLAN CHECK FEE* ................................................................. 65% of Building Permit Fee

PLAN CHECK SURCHARGES (for State regulations)

Nonresidential State Disabled Access Reg. Plan Check .... 10% of Plan Check Fee

Residential State Disabled Access Reg. Plan Check .......... 10% of Plan Check Fee

All buildings - State Energy Regulations .............................. 20% of Plan Check Fee

PLANNING DIVISION - BUILDING PLAN REVIEW FEE ........ $35 (MIN) room additions; patio covers, decks,

retaining walls; pools, spas and miscellaneous

projects requiring zoning review.

$195 (RES)-single family dwelling; up to four

residential units.

$380 (MINOR)-T.I.’s; commercial/industrial

additions 1 or 2 story, up to 10,000 sf.

$1,100 (MAJOR)-Tracts; Parcel Maps (5 or more

dwellings); Multi-family residential; new

commercial/industrial buildings; non residential

additions over 2 stories or 10,000 sf.

FIRE DEPARTMENT - BUILDING PLAN REVIEW FEE $50 ____0-500 sq. ft. (Typical Building;

Additions;

(Projects regulated by the Fire Code, includes inspection) $100 ___500-2,000 sq. ft. Single Family Dwellings;

Tracts/Phase/production 1-10 units same application $200; $150 ___2,001-5,000 sq. ft. Tract Models;

each 5 additional units $100 same application (SFD R-3 occupancy) $200 ___>5,000 sq. ft. Tenant Improvements)

$275/bldg ___Multi Family, Commercial,

Industrial AUTHORITY: Local Ordinances. $100/each ___ Access Roadway Gate

PERMIT/INSPECTION FEES

PURPOSE: To cover City costs in inspecting your project for compliance with model codes, local ordinances and state and

federal regulations.

APPLICABLE TO: All projects, except as noted below.

FEE AMOUNT

BUILDING PERMIT FEE* ................................................................... Based on building valuation table

BUILDING PERMIT SURCHARGES (for State regulations) on page 14. Valuation determined

by using multipliers on page 12.

Nonresidential Disabled Access Inspection ................................... 10% of Building Permit Fee

Residential Disabled Access Inspection ......................................... 10% of Building Permit Fee

All buildings - State Energy Regulation Inspection ........................ 20% of Building Permit Fee

PLUMBING PERMIT FEES................................................................. See schedule, page 15.

ELECTRICAL PERMIT FEES ............................................................. See schedule, page 15. MECHANICAL PERMIT FEES............................................................ See schedule, page 15.

AUTHORITY: Escondido Municipal Code & Local Ordinances.

*For subdivisions with 10 or more single-family dwellings which have building permit issuances in groups of 10 or more, the

production unit building permit fees will be decreased by 10% (Resolution #99-199, August 26, 1999). Plan check fees for

all subdivision production, repeat units shall be $70/unit (Resolution #2002-100, May 1, 2002).

Page 12: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 7-01-2014

FEES APPLICABLE TO BUILDING PERMIT ISSUANCE

CONNECTION FEES

PURPOSE: These fees represent a new connection's proportional share of existing capital facilities which will be

used to provide service to the new connection.

APPLICABLE TO: All new projects, served by City water and wastewater.

FEE AMOUNT

WATER CONNECTION FEE ................................ Residential: Detached single-family dwelling,

$7,930 (see page 19)

All Other Uses: Based on water meter size

(see pages 19 and 20)

FEE AMOUNT

WASTEWATER CONNECTION FEE ................... Residential: Detached single-family dwelling,

$7,500 (see page 19)

All Other Uses: Based on an EDU (Equivalent

Dwelling Unit) of 250 gallons per

day (minimum of 1 EDU)

(see pages 19 and 20)

NOTE: Water Connection Fee does not include water meter fees.

AUTHORITY: Local Ordinance

DEVELOPMENT FEES (Established By City Council)

Please refer to Page A1 for Important Fee information

PURPOSE: These fees reflect a development’s proportionate share of improvements necessary to meet facility

demands created by such development at established City service level standards.

FEE AMOUNT

TRAFFIC FEE (LOCAL) ....................................... Residential: Single-family dwelling, $4,029

(see page 18)

All Other Uses: See schedule, page 18

PURPOSE: To ensure that the traffic and transportation facility standards established by the City are met with respect

to the additional needs created by such development.

APPLICABLE TO: All new development projects.

AUTHORITY: Local Ordinance.

FEE AMOUNT

PUBLIC FACILITY FEE ........................................ $4,777 per dwelling unit; $2.17 per sq. ft. of

Commercial building area; $1.64 per sq. ft. of

Industrial building area.

PURPOSE: To ensure that public facility standards established by the City are met with respect to the additional

needs created by such development. (For public facilities such as Police, Fire, Library, etc.)

APPLICABLE TO: All new development projects.

Page 13: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 7-01-2014

FEES APPLICABLE TO BUILDING PERMIT ISSUANCE

DEVELOPMENT FEES CONTINUED

FEE AMOUNT

PARK FEE ............................................................ $6,715 per sfd, $6,405 mfd

PURPOSE: To ensure that the park land and recreational facility standards established by the City are met with

respect to the additional needs created by such development.

APPLICABLE TO: Residential projects only.

FEE AMOUNT

DRAINAGE FACILITIES FEE ...................................... Residential: Single-family dwelling - $1,092/unit

Multi-family dwelling - $451/unit

All Other Uses: $0.71/sq. ft. of building roof area

PURPOSE: To ensure that storm water drainage facilities meet the requirements established by the City's Drainage

Master Plan.

APPLICABLE TO: All new development projects (unless a Storm Drain Basin Fee was previously paid).

FEE AMOUNT

REGION OF INFLUENCE

INFRASTRUCTURE DEPOSIT FEE .................... $1,500 - single family dwelling

PURPOSE: To cover development’s forecasted fair share costs of new infrastructure related to the impacts created

by such development.

APPLICABLE TO: New single family dwelling units, on existing lots of record as of June 6, 1990, in the Region of

Influence (see map, page 32).

AUTHORITY: Local Resolution No. 95-211

REGIONAL FEES

FEE AMOUNT

TRAFFIC FEE REGIONAL (RTCIP) .................... Residential: Single-family dwelling, $2,483.48

(see page 18 for other residential

uses)

PURPOSE: To ensure local agency participation in circulation improvements to allow quality of life standards to be

achieved and allow new development to proceed.

APPLICABLE TO: All new residential dwelling units.

AUTHORITY: Resolution No. 2013-42.

FEE AMOUNT

SAN DIEGO COUNTY WATER AUTHORITY

(SDCWA) CAPACITY CHARGE .......................... Based on water meter size (see page 19) (Currently

collected with water meter charges)

PURPOSE: Pass-thru fee to the SDCWA to finance capital improvements.

APPLICABLE TO: All new projects served by City water.

AUTHORITY: Local Ordinance.

Page 14: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 11-30-2010

FEES APPLICABLE TO BUILDING PERMIT ISSUANCE

STATE FEES

FEE AMOUNT

STRONG MOTION INSTRUMENTATION

PROGRAM (SMIP) FEE ........................................... $.50 MINIMUM

.0001 x Building Valuation - Residential < 3 stories

.00021 x Building Valuation - Hotels, motels and

all other buildings and structures

PURPOSE: Pass-thru fee to the state to finance monitoring and mapping programs for seismic activity.

APPLICABLE TO: All building permits.

AUTHORITY: State law - Public Resources Code Section 2705-2709.1 (1971)

GREEN BUILDING FEE ........................................... $1.00 MINIMUM

$4.00 PER $100,000 of Building Valuation

PURPOSE: Pass-thru fee to the State to finance Green Building Standards through the California Building Standards

Commission (CBSC) with a portion retained locally for administering the program, education, enforcement and voluntary

construction inspector certification.

APPLICABLE TO: All building permits.

AUTHORITY: SB1473 State law – Health & Safety Code, Division 13, Part 2.5. Sections 18931.6 & 18931.7

OTHER CITY FEES

FEE AMOUNT

ART IN PUBLIC PLACES (AIPP) FEE .................... $.30 per sq. ft. of building area (first 2000 sq. ft.

exempt) (see page 17)

PURPOSE: To fund a program designed to promote the arts in public places. The program provides art education and

experiences which enhance economic vitality, commemorates local values, history and progress, develops community

pride and identity and improves the general welfare and quality of life in the city and is intended to mitigate adverse

impacts to those resources and opportunities which are caused by new development.

APPLICABLE TO: All new projects.

FEE AMOUNT

CITYWIDE FACILITIES PLAN

REIMBURSEMENT FEE...................................... $58 per residential unit

PURPOSE: To provide a reimbursement fund for individual developers who advanced funds for the preparation of the

Subarea Facilities Plans.

APPLICABLE TO: Residential only.

AUTHORITY: Local Resolution No. 94-173

FEE AMOUNT

MICROFILMING FEE ............................................... $.50 each - 8 1/2 x 11 sheets

$2.00 each - larger sheets

PURPOSE: To cover City costs related to converting your approved project documents to permanent public records.

APPLICABLE TO: All new projects.

Page 15: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 7-1-2014

- 11 -

OTHER CITY FEES CONTINUED

FEE AMOUNT

CATV FEE ................................................................ $1.00 per dwelling unit or mobilehome pad - $10 min.

PURPOSE: To cover City administrative and inspection costs related to new CATV systems.

APPLICABLE TO: Multifamily residential, including, but not limited to, apartments, duplex units, condos,

townhouses and mobilehome parks.

AUTHORITY: Local Ordinances

SCHOOL FEES

School fees are applicable to all new projects and are payable to the school district prior to Building Permit issuance.

See page 16 for additional information.

SEPTIC TANK AND WELLS – Contact the County Health Department

DEMOLITION PERMITS - may be issued to the owner, licensed demolition contractor, or general contractor

who has contract to replace the building on the property. Permit fee is $30 per permit. (No plumbing

permit required.) Must have San Diego Gas & Electric service removal information slip before issuance.

See Demolition Permit Guideline #14.

The recycling of Construction and Demolition Debris to the maximum extent possible for all

projects is highly encouraged.

CHANGE OF OCCUPANCY INSPECTION - provide plot plan and indicate intended new use - $86.00 fee

(Property owner's request.)

PLAN CHECK AND BUILDING PERMIT FEES/VALUATION MULTIPLIERS - Plan Check and Building

Permit fees are based on the value of the proposed work. The Escondido Municipal Code requires that

the Building Official make the determination of the value. It also requires that the value be the total

value of all the construction work for which the permit is issued as well as all finish work, painting,

roofing, electrical, plumbing, heating, air-conditioning, elevators, fire extinguishing systems and other

permanent equipment.

Building Valuation Multipliers are updated periodically and may be adopted by each jurisdiction in San

Diego County.

Actual construction cost estimates may be used in lieu of the multipliers only for additions and tenant

improvements.

RESEARCH FEES – To cover City costs related to the research of records and documents- $86.00hr.

Page 16: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 7-1-95

SAN DIEGO AREA CHAPTER I.C.B.O. 1995-96 VALUATION MULTIPLIERS

Value per sq. ft. Value per sq. ft. Value per sq. ft.

- 12 -

RESIDENTIAL

APARTMENT HOUSES/Condominium Bldgs.:

*Type I-or II-F.R. 93.00

Type V or III (Masonry) 75.00

Type V-1-hour 78.00

Type V-Wood Frame 69.00

Type I-Basement

Garage

32.00

**DWELLINGS (single family & duplex):

Type V-Adobe 99.00

Type V-Masonry 82.00

Type V-Wood Frame 78.00

Basements (Non-Hab.) 20.00

***Additions V-Wood Frame 94.00

PRIVATE GARAGES:

Wood Frame

(Unfinished)

21.00

Wood Frame (Finished)) 23.00

Masonry 23.00

Open Carports 14.00

COMMERCIAL/INDUSTRIAL

BANKS:

*Type I-or II-F.R. 127.00

Type III-1-hour 102.00

Type III-N 98.00

Type V-1-hour 92.00

Type V-N 88.00

CHURCHES:

Type I-or II-F.R. 85.00

Type III-1-hour 69.00

Type III-N 66.00

Type V-1-hour 64.00

Type V-N 60.00

CONVALESCENT HOSPITALS:

*Type I-or-II-F.R. 119.00

Type III-1-hour 84.00

Type V-1-hour 79.00

FIRE STATIONS:

Type I or II-F.R.

Type II 1-hour

97.00

64.00

Type II-N 60.00

Type III 1 hour

Type III-N

70.00

67.00

Type V - 1-hour

Type V-N

65.00

62.00

FITNESS CENTERS:

Type III-1-hour 65.00

Type III-N 62.00

Type V-1-hour 61.00

Type V-N 57.00

HOSPITALS:

*Type I-or II-F.R. 140.00

Type III-1-hour 114.00

Type V-1-hour 109.00

HOTELS AND MOTELS:

*Type I-or II-F.R. 86.00

Type III-1-hour 74.00

Type III-N 71.00

Type V-1-hour 66.00

Type V-N 63.00

INDUSTRIAL PLANTS:

Type I-or II-F.R. 49.00

Type III-1-hour 37.00

Type III-N 35.00

Tilt-up 25.00

Type II-1-hour 34.00

Type II-(Stock) 31.00

Type V-1-hour 35.00

Type V-N 32.00

MEDICAL OFFICES:

*Type I-or II-F.R. 102.00

Type III-1-hour 82.00

Type III-N 79.00

Type V-1-hour 76.00

Type V-N 73.00

OFFICES:

*Type 1-or II-F.R. 91.00

Type III-1-hour 65.00

Type III-N 62.00

Type V-1-hour 61.00

Type V-N 57.00

PUBLIC BUILDINGS:

*Type I or II-F.R. 105.00

Type II 1-hour 85.00

Type II-N 81.00

Type III 1-hour 88.00

Type III-N 85.00

Type V - 1-hour 80.00

Type V-N 77.00

PUBLIC GARAGES:

*Type I- or II-F.R. 42.00

*Type I- or II-Open

Parking

Type III-1-hour

31.00

31.00

Type III-N 28.00

Type II-N 24.00

Type V-1-hour 28.00

RESTAURANTS:

Type III-1-hour 82.00

Type III-N 80.00

Type V-1-hour 75.00

Type V-N 72.00

SCHOOLS:

*Type I-or II-F.R. 95.00

Type III-1-hour 69.00

Type III-N 65.00

Type V-1-hour 64.00

SERVICE STATIONS/CAR WASHES:

Type III-1-hour 59.00

Type III-N 56.00

Type II-N 57.00

Type V-1-hour 50.00

Type V-N 47.00

Canopies 24.00

STORES:

*Type I-or II-F.R. 70.00

Type III-1-hour 52.00

Type III-N 49.00

Type V-1-hour 44.00

Type V-N 40.00

THEATERS:

Type I-or II-F.R. 94.00

Type III-1-hour 68.00

Type III-N 64.00

Type V-1-hour 63.00

Type V-N 60.00

WAREHOUSES:

Type I-or II F.R. 42.00

Type III-1-hour 28.00

Type III-N 27.00

Type II or V-1-hour 25.00

Type II or V-N 23.00

(Deduct 11% for mini-warehouse)

EQUIPMENT

Air Conditioning (Comm.) 3.60

Air Conditioning (Res.) 3.00

Fire Sprinkler Systems 1.80

(Use to increase Val. for new construction)

TENANT IMPROVEMENTS

***Banks, Medical Offices/Churches 37.00

***Restaurants 37.00

***"H" Occupancies 37.00

***Stores, Offices, All Others 27.00

COMM./IND. ADDITIONS

*** Use multiplier for new building and increase

by 20%

SHELL BUILDING: A shell building is defined as a building for which HVAC, lighting, suspended ceilings, plumbing and electrical systems, partition layouts and interior finish are not shown on the plans and for which separate tenant improvement plans will be submitted for plan check at a later date showing these items. Warehouses and industrial buildings shall not be considered shell buildings. The valuation for shell buildings shall be taken as 80 percent of the valuation for the completed building. *Add 0.5% to the total cost for each story over three. **For subdivisions with 10 or more single-family dwellings which have building permit issuances in groups of 10 or more, the production unit building permit fees will be decreased by 10%. (Resolution

Page 17: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 7-1-95

SAN DIEGO AREA CHAPTER I.C.B.O. 1995-96 VALUATION MULTIPLIERS

Value per sq. ft. Value per sq. ft. Value per sq. ft.

- 18 -

#99-199, August 26, 1999) Plan check fees for all subdivision production, repeat units shall be $70/unit. (Resolution #2002-100, May 1, 2002). ***Or an actual itemized construction cost estimate.

Page 18: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

- 13 -

VALUATION MULTIPLIERS–ALTERATIONS (Applicable to existing structure with no addition of floor area)

Change in Occupancy or Change in Use: Example: Convert warehouse to office(s), change house to a

restaurant, enclose porch, or convert garage, etc.

Use difference in valuation between existing use and new use.

No Change in Occupancy and No Additional Floor Area

Interior Partitions .................................................................................. @ $39.00 per L.F.

Install Windows or Sliding Glass Doors ............................................... @ $12.25 per S.F. of opening

Add Fireplace: Concrete or Masonry .................................................. @ $2,800.00 each

Prefabricated Metal ....................................................... @ $1,900.00 each

Close Exterior Wall Openings .............................................................. @ $11.50 per S.F. of opening

Aluminum Siding .................................................................................. @$4.50 per S.F.

VALUATION MULTIPLIERS–MISCELLANEOUS (Applicable to both new construction & alterations)

Plastering: VALUE PER S.F. VALUE PER S.F.

Inside $2.25 Retaining Walls: (Conc. or Masonry) $ 14.00

Outside 2.25 Spa (in ground only) 5,775.00/spa

Roofing: Pools:

Built-up 1.08 Gunite 29.50

Comp. Shing. (and Fiberglass) 1.00 Vinyl pools (in ground only) 27.00

Asb. Shing. 2.37 Awnings and Canopies: (Supported by Building)

Wood Shing. 2.37 Aluminum 16.75

Wood Shakes 2.37 Canvas 7.00

Alum. Shakes 3.58 Comm. Canopies/Arcades 24.00

Clay Tile 3.00 Patio Enclosures:

Conc. Tile 2.54 Wood Frame 10.25

Fences or Freestanding Wall: Metal Frame 11.50

Wood & Chain-link 1.50 Solariums: (or actual itemized 78.00

Wire 1.50 construction cost estimate.)

Masonry 7.00 Patios:

Wrought Iron 4.50 Wood Frame with Cover 7.00

Stucco 4.50 Metal Frame with Cover 9.00

Balcony/Stairs/Walking Decks

(Wood)

11.50 Agricultural:

Stone-Brick Veneer 7.00 Buildings (General) 15.25

Pile Foundations: Greenhouses (Horticulture) 4.50

Cast-in Place Concrete 17.25 per L.F. Detached Residential Accessory Structures:

Steel & Pre-Cast 41.75 per L.F. Workshop, Hobby Shop, Etc. 23.00

(or actual itemized construction cost

estimate)

SIGNS AND BILLBOARDS

Non-Illuminated Illuminated

ROOF, MONUMENT, POLE, BILLBOARD 1 Face $20.75/sq. ft. $34.00/sq. ft.

(Add support structure for pole and billboard.) 2 Face 29.50/sq. ft. 48.00/sq. ft.

WALL 1 Face 14.00/sq. ft. 29.50/sq. ft.

PROJECTING 1 Face 20.00/sq. ft. 41.50/sq. ft.

2 Face 29.50/sq. ft. 48.00/sq. ft.

SUPPORTING STRUCTURE

(Add to value of pole and billboard signs.) 48.00/lin. ft. 48.00/lin. ft.

Page 19: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

08-30-87

- 14 -

TABLE NO. 3-A - BUILDING PERMIT FEES

TOTAL VALUATION BUILDING PERMIT FEE

$1.00 to $500.00 $15.00

$501.00 to $2,000.00 $15.00 for the first $500.00 plus $2.00 for each

additional $100.00 or fraction thereof, to and

including $2,000.00

$2,001.00 to $25,000.00 $45.00 for the first $2,000.00 plus $9.00 for each

additional $1,000.00 or fraction thereof, to and

including $25,000.00

$25,001.00 to $50,000.00 $252.00 for the first $25,000.00 plus $6.50 for each

additional $1,000.00 or fraction thereof, to and

including $50,000.00

$50,001.00 to $100,000.00 $414.50 for the first $50,000.00 plus $4.50 for each

additional $1,000.00 or fraction thereof, to and

including $100,000.00

$100,001.00 to $500,000.00 $639.50 for the first $100,000.00 plus $3.50 for

each additional $1,000.00 or fraction thereof

$500,001.00 to $1,000,000.00 $2039.50 for the first $500,000.00 plus $3.00 for

each additional $1,000.00 or fraction thereof, to

and including $1,000,000.00.

$1,000,001.00 and up $3539.50 for the first $1,000,000.00 plus $2.00 for

each additional $1,000.00 or fraction thereof.

Other Inspections and Fees:

1. Inspections outside of normal business hours

(minimum charge–two hours) ................................................................................ $86.00/hour*

2. Reinspection fees assessed under provisions of Section 305(h) .........................

............................................................................................................................... $86.00/inspection

3. Inspections for which no fee is specifically indicated

(minimum charge–one-half hour) .......................................................................... $86.00/hour*

4. Additional plan review required by changes, additions or revisions to

approved plans (minimum charge–one-half hour) ................................................ $86.00/hour*

*Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision,

overhead, equipment, hourly wages and fringe benefits of the employees involved.

ESCONDIDO MUNICIPAL CODE - SECTION 6-16

PLAN CHECK FEES: Permit Fee (determined above) x 65%

Page 20: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

12-23-04

PERMIT FEE SCHEDULE/WORKSHEET CITY OF ESCONDIDO (760) 839-4647

PROJECT DATA Job Address: New Elec. Service Size:

Tract No.: Lot/Plan No.: Plan Check No.: New Water Meter Size:

-15-

PLUMBING

Fee Description No. Fee Total

Issuance Fee (for each permit) $30.00

Bathtub 3.50 ea

Dental Unit/Cuspidor 3.50 ea

Floor Drain 3.50 ea

Gas System (First Outlet) 10.00 ea

Gas Outlets (Each Addtl.) 1.00 ea

Building Sewer 12.00 ea

Grease Trap 3.00 ea

Interceptors/Pump 3.00 ea

Lavatory (First Fixture) 6.00 ea

Lavatory (Each Addtl.) 3.50 ea

Laundry Tubs 3.50 ea

Backflow Prev. (First 5 devices) 4.00 ea

Backflow Prev. (> than 5 devices) 1.00 ea

Receptor & Floor Sink 3.50 ea

Shower Drain 3.50 ea

Sink - Kitchen 3.50 ea

Sink - Other 3.50 ea

Urinal 3.50 ea

Washing Machine Drain 3.50 ea

Water Closet (First Fixture) 6.00 ea

Water Closet (Each Addtl.) 3.50 ea

Water Heater (First Heater) 6.00 ea

Water Heater (Each Addtl.) 3.50 ea

Solar Water Heater 3.50 ea

Water Pipe Repair/Replacement 6.00 ea

Water Softener 3.50 ea

Drain Vent Repair/Alterations 6.00 ea

Hose Bib 3.50 ea

Drinking Fountain 3.50 ea

Other Plumbing & Gas Fees 10.00 ea

Total

OTHER FEES (Also applies to Building Permit Inspections)

Fee Description Fee

Inspections outside of normal business

hours (min. two hrs.)

$86.00/hr

Reinspections $86.00/insp

Inspections for which no fee is specifically

indicated (min. 1/2 hr.)

$86.00/hr

ELECTRICAL - NEW APARTMENTS - 3 OR MORE UNITS (MULTI-

FAMILY): Enter the ampere rating of the service main breaker or fuse

(includes all wiring)

Fee Description Amp Fee Total

Issuance Fee (for each permit) $30.00

Single Phase Service/per Amp .60 ea

Three Phase Service/per Amp .90 ea

Total

Contact Person's Name: ____________________________________________

ELECTRICAL - SINGLE-FAMILY DWELLING, COMMERCIAL and

INDUSTRIAL, ALL REMODELS & ADDITIONS: Enter the number of

circuits to be installed in each size of fuse or breaker, counting each

feeder and service as a circuit.

Fee Description No. Fee Total

Issuance Fee (for each permit) $30.00

15 or 20 Amp - First 5 Circuits 5.00 ea

15 or 20 Amp - Second 5 Circuits 4.00 ea

15 or 20 Amp - Next 90 Circuits 3.00 ea

15 or 20 Amp - Over 100 Circuits 1.50 ea

25 to 45 Amp Circuits 7.00 ea

50 to 175 Amp Circuits 10.00 ea

200 Amp and Larger Circuits 16.00 ea

Temporary Service 35.00 ea

Temporary Pole 35.00 ea

Other Electrical Fees 10.00 ea

Total

MECHANICAL

Fee Description No. Fee Total

Issuance Fee (for each permit) $30.00

Furnaces up to 100,000 BTU 12.00 ea

Furnaces > 100,000 BTU 15.00 ea

Floor Furnace & Vent 12.00 ea

Heater (Wall or Floor) 12.00 ea

Appliance Vent (Only) 6.50 ea

Refr Comp up to 15hp 25.00 ea

Refr Comp to 15hp (Each Addtl.) 10.00 ea

Refr Comp More Than 15hp 45.00 ea

Boiler up to 100k BTU 12.00 ea

Boiler > 100k - 500k BTU 23.00 ea

Boiler >500k - 1,000k BTU 32.00 ea

Boiler >1,000k - 1,750 BTU 47.00 ea

Boiler More Than 1,750 BTU 78.00 ea

Fan Coil Unit 9.00 ea

Heat Pump (Package Unit) 9.00 ea

Air Handler w/ducts to 10k CFM 9.00 ea

Air Handler More Than 10k CFM 15.00 ea

Duct Work Only 15.00 ea

Evaporative Cooler 9.00 ea

Make-up Air System 9.00 ea

Vent Fan (Single Duct) 6.00 ea

Vent System 9.00 ea

Exhaust Hood & Duct 20.00 ea

Non-residential Incinerator 60.00 ea

Refr Condenser Remote 9.00 ea

Walk-in Box/Refrig Coil 9.00 ea

Other Mechanical Fees 10.00 ea

Total

Phone: _________________________________________________________

Page 21: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

SCHOOL FEES

-16-

November 2006

Government Code 65995 and Education Code 17620 permit School Districts to collect developer fees for residential buildings and commercial or industrial buildings. School fee payment forms are available at the City of Escondido Building Division. These forms must be signed by Building Division staff prior to payment of fees at the School District office. Validated receipts must be returned to the Building Division prior to issuance of Building Permit.

ESCONDIDO UNION SCHOOL DISTRICT AND

ESCONDIDO UNION HIGH SCHOOL DISTRICT

For further information as to the amount of fees and school of residence for your project, please contact The Carilyn Gilbert Education Center, Facilities Department, 2310 Aldergrove Ave, Escondido, CA 92029, (760) 432-2382.

Form of payment of these fees will be by cashier’s check, official bank check or cash. These are the only forms of payment accepted. (Personal or business checks are not acceptable and cash must be in the exact amount. Change is not available at the education center office). Suggest applicant contact the Education Center for the most current information.

Please contact the Education Center for Hours of collection.

Page 22: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 9-02-06

ART IN PUBLIC PLACES FEE (PUBLIC ART)

Please refer to Page A1 for Important Fee information

-17-

All development projects, both residential and nonresidential, are subject to the payment of the Art Fee at

Building Permit issuance.

In lieu of paying the fee, applicants are encouraged to place public art on their property following the Public

Art Commission guidelines. Applicants interested in this approach should contact the Public Art Consultant,

Susan Pollack, Community Services Department, at (760) 839-4331 in the early design stages of their

projects.

The Art Fee is currently $0.30/sq. ft. of building area, with the following exceptions:

1. Tenant improvements with no added building area.

2. The first 2000 sq. ft. of any structure. This exception shall not apply on an individual basis to structures

which are part of a larger integrated complex (commercial, industrial and multi-family residential), but

shall apply only to the first 2000 sq. ft. of the complex.

3. For a new SFD, the 2000 sq. ft. exemption shall apply to each detached structure.

4. Residential additions, patio covers, gazebos, etc. (except for work which results in an additional

dwelling unit)

For additions to existing buildings, the following shall apply:

If the existing building is 2,000 sq. ft. or greater, all of the new addition is subject to the fee.

If the existing building is less than 2,000 sq. ft., add the area of the existing to the area of the new

addition. That portion of the total over 2,000 sq. ft. is subject to the fee.

If this were part of an existing complex of buildings (commercial, industrial and multi-family residential) and

one of the buildings was 2,000 sq. ft. or larger, exception #2 above would be utilized and the addition would

be subject to fees for the full square footage.

For existing multi-building (commercial, industrial and multi-family residential) complexes in which a new

building is being added, exception #2 would again be utilized with the 2,000 sq. ft. being applied to one of

the existing buildings.

Page 23: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Traffic Fee –Local & Regional 7-20-2017

TRAFFIC FEE LOCAL/TRAFFIC FEE RTCIP SCHEDULE

-18-

RTCIP

TRAFFIC FEE

REGIONAL

TRAFFIC

FEE

LOCAL

RESIDENTIAL (Fee Per Unit)

Single Family $2,483.48 $ 4,029

Duplex $2,483.48 $ 2,014

Triplex $2,483.48 $ 2,014

Apartment $2,483.48 $ 2,014

Senior Apartment $2,483.48 $ 2,014

Condo/Townhouse $2,483.48 $ 2,014

Mobilehome/Family $2,483.48 $ 2,014

Mobilehome/Adult $2,483.48 $ 2,014

Retirement Community $2,483.48 $ 2,014

LODGING (Fee per square feet)

Hotel (w/convention facilities/restaurant)

$ 9.30

Motel $ 9.30

Resort Hotel $ 9.30

COMMERCIAL/RETAIL

Grocery, discount/club store, specialty retail, lumber,hardware,garden,car sales, auto repair,day care,bowling center, theatre, health club

sf $ 9.30

Bank sf $15.50

Sit down restaurant sf $13.95

High turnover restaurant or deli sf

$15.50

Fast food/with or w/o drive-through

sf $46.49

Convenience market sf $31.00

Convenience market with fueling Fueling space

$13,946

Car wash each $69,728

Office, education sf $3.10

Medical/dental sf $5.42

Hospital/care facility sf $3.87

Industrial, business park,warehouse,storage,science research & development

sf $2.32

$

Church sf $1.39

Refer to Sandag’s “Not So Brief Guide to Traffic Generation” using $150 per average daily trip (ADT) for non-residential uses not listed in this table.

Page 24: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 2-04-16

CONNECTION AND REGIONAL FEE SCHEDULE

-19-

RESIDENTIAL

WATER

CONNECTION

WASTEWATER

CONNECTION

Detached SFD ............................................................... See schedule below

(based on water

meter size)4

$7,500

Attached Dwelling Units (Includes single family

dwellings, town houses, condos, apartments, triplexes

& duplexes)

Units with 3 or more bedrooms (per unit) .......... 3,5104 7,500

Units with less than 3 bedrooms (per unit) ........ 3,5104 5,625

Mobilehome (in mobilehome park) ................................ 3,5104 5,625

Senior Apartment (per unit) ........................................... 2,3404 3,750

Hotel (per room) ............................................................ See schedule below

(based on water meter size)

2,250

Motel (per room) ............................................................ 2,925

Convalescent Home (per bed) ...................................... 938

Assisted Care Facility (per bed) .................................... 1,875

R. V. Park (per space) ................................................... 1,875

FEE PER SQ. FT.

COMMERCIAL/INDUSTRIAL

WATER

CONNECTION

*WASTEWATER

CONNECTION

Retail ............................................................................. See schedule

below (based on

water meter size)4

$1.28

Retail (one tenant over 10,000 sq. ft.) ........................... .42

Office ............................................................................. 1.28

Medical/Dental............................................................... 3.00

Industrial ........................................................................ .63

Industrial (one tenant over 10,000 sq. ft.) ..................... .42

*The minimum fee for new building construction is 1 EDU - $7,500

WATER METER

WATER

CONNECTION FEE

**SDCWA

CAPACITY CHARGE

WATER METER

DROP IN FEE

SEE UTILITIES

3/4" meter $ 4,690 $ 5,099

1" meter $ 7,930 $ 8,158

1-1/2" meter $ 15,640 $ 15,297

2" meter $ 25,340 $ 26,515

3” meter $ 46,780 $ 48,950

4" meter $ 78,940 $ 83,624

6" meter $157,890 $152,970

8" meter $252,620 $265,148

NOTES:

1. For sewer lateral charges contact the Engineering Department at 839-4651.

2. For water meter charges contact the Finance Department, Utility Billing, at 839-4682.

3. One Wastewater (sewer) Connection Right = 1 EDU (Equivalent Dwelling Unit, 250 GPD) = $7,500

One Water Connection Right = 1 EDU (Equivalent Dwelling Unit, 750 GPD) = $4,690

4. Based upon a common meter installation. If a separate meter is proposed for each dwelling unit,

tenant, or business, connection fee is determined by the meter size.

5. SFD with domestic fire sprinklers usually require a minimum 1” meter with an approved RP device.

Page 25: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 2-04-16

CONNECTION AND REGIONAL FEE SCHEDULE

-20-

** Currently collected by Utilities with water meter charges and drop in fees.

Page 26: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 7-01-2012

CONNECTION AND REGIONAL FEE SCHEDULE

-21-

HIGH USE/SPECIAL USE (Fee Per Seat unless otherwise noted)

WATER

CONNECTION

*WASTEWATER

CONNECTION

Full Service Restaurant ......................... $436.00

Family Restaurant ................................. 391.00

Cafe ....................................................... 329.00

Specialty Restaurant (china service) .... 256.00

Pizza (paper service) ............................ 211.00

Deli ........................................................ 211.00

Fast Food (paper service) ..................... 540.00

Donut/Ice Cream/Specialty Shops ........ 256.00

Bars/Pubs/Lounges ............................... 436.00

Theaters ................................................ 45.00

Assembly: General ................................ 45.00

Church/Sanctuary................ 15.00

Day Care/School (no cafeteria or gym) . 346.00/student

Day Care, School with Gym/Showers ... 495.00/student

Supermarket .......................................... 0.87/sq. ft.

Convenience Market ............................. 1.70/sq. ft.

Convenience Market (with Deli) ............ 2.11/sq. ft.

Laundry for Apts./Condos ..................... -0-

INTENSIVE USE EXAMPLES:

Laundry .................................................

5,371.00/machine3

Car Wash:

Self-Serve .......................................... 17,129.00/bay

Automatic ........................................... 157,618.00/site

* The minimum fee for new building construction is 1 EDU - $7,500

NOTE:

1. High or Intensive use facilities not listed, such as breweries, will be determined on an individual

basis.

2. Car wash fees may be adjusted if a recycle system is installed.

3. Calculation of fees for Laundromats based on EDU's in addition to per-machine rate.

See schedule on page 19

(based on water meter size)

Page 27: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 7/20-2017

-22-

EXAMPLE #1 – “DETACHED” SINGLE-FAMILY DWELLING with air conditioning

PROJECT DATA: PROJECT VALUATION

2,600 sq. ft., 3 bedroom house (w/Fire Sprinklers, City Ord.) 2,600 sq. ft. x $82.80/sq. ft. = $215,280

600 sq. ft. garage 600 sq. ft. x $22.80/sq. ft. = 13,680

(Applies to individual detached SFD’s on a single lot or parcel Valuation = $228,960

and one-lot condos w/detached SFD’s)

FEES DUE AT BUILDING PLAN CHECK SUBMITTAL

Plan Check Fee ..................................................................................................................... $850.98

State Disabled Access Regulation Plan Check Surcharge Fee ........................................... N/A

State Energy Regulation Plan Check Surcharge Fee (included in Plan Check Fee) ........... --------

Planning Division - Building Plan Review Fee ...................................................................... 195.00

Fire Department - Building Plan Review Fee ........................................................................ 150.00

FEES DUE AT BUILDING PERMIT ISSUANCE

Building Permit Fee ............................................................................................................... 1,309.20

State Disabled Access Regulation Inspection Surcharge Fee ............................................. N/A

State Energy Regulation Inspection Surcharge Fee (included in Permit Fee) ..................... --------

Plumbing Permit Fee (estimate) ........................................................................................... 110.00

Electrical Permit Fee (estimate) ............................................................................................ 111.00

Mechanical Permit Fee (estimate) ........................................................................................ 83.00

Water Connection Fee (based on a minimum 1” meter for fire sprinklers) ........................... 7,930.00 Wastewater Connection Fee ................................................................................................. 7,500.00

Traffic-Fee Regional (RTCIP) ............................................................................................... 2,483.48

Traffic-Fee Local .................................................................................................................. 4,029.00

Public Facility Fee ................................................................................................................. 4,777.00

Park Fee ................................................................................................................................ 6,715.00

Drainage Facilities Fee ......................................................................................................... 1,092.00

Region of Influence Infrastructure Deposit Fee (if in Region of Influence) ........................... 1,500.00

SMIP Fee .............................................................................................................................. 22.90

GREEN BUILDING FEE (California State Fee) ................................................................... 10.00

Art in Public Places Fee ........................................................................................................ 180.00

Citywide Facilities Plan Reimbursement Fee ........................................................................ 58.00

Microfilming Fee (estimate) ................................................................................................... 25.00

CATV Fee.............................................................................................................................. N/A

School Fees (School District) ................................................................................................ --------

SDCWA Capacity Charge (based on 1” water meter. Paid at time of meter purchase) 8,158

TOTAL FEES $47,289.56

NOTE: This is only an estimate. Exact fees can only be determined for a specific project in a specific

location in the city. FINAL PROJECT FEES ARE THOSE FEES IN EFFECT AT THE TIME OF

PERMIT ISSUANCE.

Page 28: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 7/20-2017

-23-

EXAMPLE #2 - DUPLEX

PROJECT DATA: PROJECT VALUATION

Duplex - 2 units @ 1,100 sq. ft. each, 2 bedroom, 2 bath 2,200 sq. ft. x $78/sq. ft. = $171,600

800 sq. ft. garage 800 sq. ft. x $21/sq. ft. = 16,800

Valuation = $188,400

FEES DUE AT BUILDING PLAN CHECK SUBMITTAL

Plan Check Fee ..................................................................................................................... $741.48

State Disabled Access Regulation Plan Check Surcharge Fee ........................................... N/A

State Energy Regulation Plan Check Surcharge Fee (included in Plan Check Fee) ........... --------

Planning Division - Building Plan Review Fee ...................................................................... 195.00

Fire Department - Building Plan Review Fee ........................................................................ 150.00

FEES DUE AT BUILDING PERMIT ISSUANCE

Building Permit Fee ............................................................................................................... 1,141.20

State Disabled Access Regulation Inspection Surcharge Fee ............................................. N/A

State Energy Regulation Inspection Surcharge Fee (included in Permit Fee) ..................... --------

Plumbing Permit Fee (estimate) ........................................................................................... 222.00

Electrical Permit Fee (estimate) ............................................................................................ 155.00

Mechanical Permit Fee (estimate) ........................................................................................ 104.00

Water Connection Fee ($3,510 x 2) ...................................................................................... 7,020.00

Wastewater Connection Fee ($5,625 x 2) ............................................................................ 11,250.00

Traffic Fee-Regional (RTCIP) ($2,483.48 x 2) ...................................................................... 4,966.96

Traffic Fee-Local ($2,014 x 2) ............................................................................................... 4,028.00

Public Facility Fee ($4,777 x 2) ............................................................................................. 9,554.00

Park Fee ($6405 x 2) ............................................................................................................ 12,810.00

Drainage Facilities Fee ($451 x 2) ........................................................................................ 902.00

Region of Influence Infrastructure Deposit Fee .................................................................... N/A

SMIP Fee .............................................................................................................................. 18.84

GREEN BUILDING FEE ...................................................................................................... 8.00

Art in Public Places Fee ........................................................................................................ 60.00

Citywide Facilities Plan Reimbursement Fee ($58 x 2) ........................................................ 116.00

Microfilming Fee (estimate) ................................................................................................... 25.00

CATV Fee.............................................................................................................................. 10.00

School Fees (School District) ................................................................................................ --------

SDCWA Capacity Charge (based on 1” water meter. Paid at time of meter purchase) 8,158

TOTAL FEES $61,629.48

NOTE: This is only an estimate. Exact fees can only be determined for a specific project in a specific

location in the city. FINAL PROJECT FEES ARE THOSE FEES IN EFFECT AT THE TIME OF

PERMIT ISSUANCE.

Page 29: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 7/20-2017

-24-

EXAMPLE #3 - APARTMENT BUILDING

PROJECT DATA: PROJECT VALUATION

6 unit apartment building - 850 sq. ft. /unit, 2 bedroom, 850 sq. ft. x 6 x ($69+$3+$1.80)

= $376,380

1 bath, (w/AC & Fire Sprinklers)

1,200 sq. ft. attached carport 1,200 sq. ft. x $14 = 16,800

Valuation = $393,180

FEES DUE AT BUILDING PLAN CHECK SUBMITTAL

Plan Check Fee ..................................................................................................................... $1,409.88

State Disabled Access Regulation Plan Check Surcharge Fee (included in Plan Check Fee) --------

State Energy Regulation Plan Check Surcharge Fee (included in Plan Check Fee) ........... --------

Planning Division - Building Plan Review Fee ...................................................................... 1,100.00

Fire Department - Building Plan Review Fee ........................................................................ 275.00

FEES DUE AT BUILDING PERMIT ISSUANCE

Building Permit Fee ............................................................................................................... 2,169.05

State Disabled Access Regulation Inspection Surcharge Fee (included in Permit Fee) ...... --------

State Energy Regulation Inspection Surcharge Fee (included in Permit Fee) ..................... --------

Plumbing Permit Fee (estimate) ........................................................................................... 216.00

Electrical Permit Fee (estimate) ............................................................................................ 390.00

Mechanical Permit Fee (estimate) ........................................................................................ 213.00

Water Connection Fee ($3,510 x 6) ...................................................................................... 21,060.00

Wastewater Connection Fee ($5,625 x 6) ............................................................................ 33,750.00

Traffic Fee-Regional (RTCIP) ($2,483.48 x 6) ...................................................................... 14,900.88

Traffic Fee-Local ($2,014 x 6) ............................................................................................... 12,084.00

Public Facility Fee ($4,777 x 6) ............................................................................................. 28,662.00

Park Fee ($6405 x 6) ............................................................................................................ 38,430.00

Drainage Facilities Fee ($451 x 6) ........................................................................................ 2,706.00

Region of Influence Infrastructure Deposit Fee .................................................................... N/A

SMIP Fee .............................................................................................................................. 39.32

GREEN BUILDING FEE ...................................................................................................... 16.00

Art in Public Places Fee ........................................................................................................ 930.00

Citywide Facilities Plan Reimbursement Fee ($58 x 6) ........................................................ 348.00

Microfilming Fee (estimate) ................................................................................................... 75.00

CATV Fee.............................................................................................................................. 10.00

School Fees (School District) ................................................................................................ --------

SDCWA Capacity Charge (based on 1 1/2” water meter. Paid at time of meter purchase) 15,297

TOTAL FEES $171,467,746

NOTE: This is only an estimate. Exact fees can only be determined for a specific project in a specific

location in the city. FINAL PROJECT FEES ARE THOSE FEES IN EFFECT AT THE TIME OF

PERMIT ISSUANCE.

Page 30: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 7/20-2017

-25-

EXAMPLE #4 - CONDOMINIUM PROJECT

PROJECT DATA: PROJECT VALUATION

32 unit condominium project 1,200 sq. ft. x 4 x $69 = $331,200

8 buildings/4 units each building @ 1,200 sq. ft./unit 400 sq. ft. x 4 x $21 = 33,600

3 bedrooms, & 2 baths/unit

Attached garages @ 400 sq. ft./unit Building Valuation = $364,800

This example does not apply to detached single family dwellings Project Valuation (x 8) = $2,918,400

on a “one lot-condo map”. Please refer to Example No.1 for fees.

FEES DUE AT BUILDING PLAN CHECK SUBMITTAL

Plan Check Fee ..................................................................................................................... $10,592.96

State Disabled Access Regulation Plan Check Surcharge Fee (included in Plan Check Fee)

.............................................................................................................................................. --------

State Energy Regulation Plan Check Surcharge Fee (included in Plan Check Fee) ........... --------

Planning Division - Building Plan Review Fee ...................................................................... 1,100.00

Fire Department - Building Plan Review Fee ($275x8) ........................................................ 2,200.00

FEES DUE AT BUILDING PERMIT ISSUANCE

Building Permit Fee ............................................................................................................... 16,296.80

State Disabled Access Regulation Inspection Surcharge Fee (included in Permit Fee) ...... --------

State Energy Regulation Inspection Surcharge Fee (included in Permit Fee) ..................... --------

Plumbing Permit Fee (estimate - $202 x 8) .......................................................................... 1,616.00

Electrical Permit Fee (estimate - $270 x 8) ........................................................................... 2,160.00

Mechanical Permit Fee (estimate - $133 x 8) ....................................................................... 1,064.00

Water Connection Fee ($3,510 x 32) .................................................................................... 112,320.00

Wastewater Connection Fee ($7,500 x 32) .......................................................................... 240,000.00

Traffic Fee-Regional (RTCIP) ($2,483.48 x 32) .................................................................... 79,471,36

Traffic Fee-Local ($2,014 x 32) ............................................................................................. 64,448.00

Public Facility Fee ($4,777x 32) ............................................................................................ 152,864.00

Park Fee ($6405 x 32) …………………………………………………………………………… 204,960.00

Drainage Facilities Fee ($451 x 32) ...................................................................................... 14,432.00

Region of Influence Infrastructure Deposit Fee .................................................................... N/A

SMIP Fee .............................................................................................................................. 291.84

GREEN BUILDING FEE ...................................................................................................... 117.00

Art in Public Places Fee ........................................................................................................ 2,580.00

Citywide Facilities Plan Reimbursement Fee ($58 x 32) ...................................................... 1,856.00

Microfilming Fee (estimate) ................................................................................................... 150.00

CATV Fee.............................................................................................................................. 32.00

School Fees (School District) ................................................................................................ --------

SDCWA Capacity Charge (based on 2” water meter. Paid at time of meter purchase 26,515

TOTAL FEES $921,188,912

NOTE: This is only an estimate. Exact fees can only be determined for a specific project in a specific

location in the city. FINAL PROJECT FEES ARE THOSE FEES IN EFFECT AT THE TIME OF

PERMIT ISSUANCE.

Page 31: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 2-4-16

-26-

EXAMPLE #5 - INDUSTRIAL BUILDING

PROJECT DATA: PROJECT VALUATION

4,000 sq. ft. industrial building (manufacturing/assembly) 4,000 sq. ft. x $35 = $140,000

Valuation = $140,000

FEES DUE AT BUILDING PLAN CHECK SUBMITTAL

Plan Check Fee ..................................................................................................................... $658.68

State Disabled Access Regulation Plan Check Surcharge Fee (included in Plan Check Fee)

.............................................................................................................................................. --------

State Energy Regulation Plan Check Surcharge Fee (included in Plan Check Fee) ........... --------

Planning Division - Building Plan Review Fee ...................................................................... 1,100.00

Fire Department - Building Plan Review Fee ........................................................................ 275.00

FEES DUE AT BUILDING PERMIT ISSUANCE

Building Permit Fee ............................................................................................................... $1,013.35

State Disabled Access Regulation Inspection Surcharge Fee (included in Permit Fee) ...... --------

State Energy Regulation Inspection Surcharge Fee (included in Permit Fee) ..................... --------

Plumbing Permit Fee ............................................................................................................. *

Electrical Permit Fee ............................................................................................................. *

Mechanical Permit Fee ......................................................................................................... *

Water Connection Fee (based on 3/4” meter) ...................................................................... 4,690.00

Wastewater Connection Fee (minimum 1 EDU) ................................................................... 7,500.00

Traffic Fee-Regional (RTCIP) ............................................................................................... N/A

Traffic Fee-Local ($2.32 x 4,000 sq. ft.) ................................................................................ 9,280.00

Public Facility Fee ($1.64 x 4,000 sq. ft.) .............................................................................. 6,560.00

Park Fee ................................................................................................................................ N/A

Drainage Facilities Fee ($0.71 x 4,000 sq. ft.) ...................................................................... 2,840.00

Region of Influence Infrastructure Deposit Fee .................................................................... N/A

SMIP Fee .............................................................................................................................. 29.40

GREEN BUILDING FEE ...................................................................................................... 6.00

Art in Public Places Fee ........................................................................................................ 600.00

Citywide Facilities Plan Reimbursement Fee ........................................................................ N/A

Microfilming Fee (estimate) ................................................................................................... 75.00

CATV Fee.............................................................................................................................. N/A

School Fees (School District) ................................................................................................ --------

SDCWA Capacity Charge (based on 1” water meter. Paid at time of meter purchase) 8,158

TOTAL FEES $42,785.43

NOTE: This is only an estimate. Exact fees can only be determined for a specific project in a specific

location in the city. FINAL PROJECT FEES ARE THOSE FEES IN EFFECT AT THE TIME OF

PERMIT ISSUANCE.

*Fee based on specific plumbing, electrical and mechanical work involved. (See pg. 15)

Page 32: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 2-4-16

-27-

EXAMPLE #6 - OFFICE BUILDING

PROJECT DATA: PROJECT VALUATION

5,000 sq. ft. office building 5,000 sq. ft. x $57 = $285,000

Valuation = $285,000

FEES DUE AT BUILDING PLAN CHECK SUBMITTAL

Plan Check Fee ..................................................................................................................... $1,087.52

State Disabled Access Regulation Plan Check Surcharge Fee (included in Plan Check Fee)

.............................................................................................................................................. --------

State Energy Regulation Plan Check Surcharge Fee (included in Plan Check Fee) ........... --------

Planning Division - Building Plan Review Fee ...................................................................... 1,100.00

Fire Department - Building Plan Review Fee ........................................................................ 275.00

FEES DUE AT BUILDING PERMIT ISSUANCE

Building Permit Fee ............................................................................................................... 1,673.10

State Disabled Access Regulation Inspection Surcharge Fee (included in Permit Fee) ...... --------

State Energy Regulation Inspection Surcharge Fee (included in Permit Fee) ..................... --------

Plumbing Permit Fee ............................................................................................................. *

Electrical Permit Fee ............................................................................................................. *

Mechanical Permit Fee ......................................................................................................... *

Water Connection Fee (based on 3/4” meter) ...................................................................... 4,690.00

Wastewater Connection Fee (1 EDU minimum) ................................................................... 7,500.00

Traffic Fee-Regional (RTCIP) ............................................................................................... N/A

Traffic Fee ($3.10 x 5,000 sq. ft.) .......................................................................................... 15,500.00

Public Facility Fee ($2.17 x 5,000 sq. ft.) .............................................................................. 10,850.00

Park Fee ................................................................................................................................ N/A

Drainage Facilities Fee ($0.71x 5,000 sq. ft.) ....................................................................... 3,550.00

Region of Influence Infrastructure Deposit Fee .................................................................... N/A

SMIP Fee .............................................................................................................................. 59.85

GREEN BUILDING FEE ...................................................................................................... 12.00

Art in Public Places Fee (5,000 sq. ft. - 1,800 sq. ft. x $0.30) ............................................... 900.00

Citywide Facilities Plan Reimbursement Fee ........................................................................ N/A

Microfilming Fee (estimate) ................................................................................................... 75.00

CATV Fee.............................................................................................................................. N/A

School Fees (School District) ................................................................................................ --------

SDCWA Capacity Charge (based on 1” water meter. Paid at time of meter purchase) 8,158

TOTAL FEES $61,355.52

NOTE: This is only an estimate. Exact fees can only be determined for a specific project in a specific

location in the city. FINAL PROJECT FEES ARE THOSE FEES IN EFFECT AT THE TIME OF

PERMIT ISSUANCE.

*Fee based on specific plumbing, electrical and mechanical work involved. (See pg. 15)

Page 33: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 2-4-16

-28-

EXAMPLE #7 - MEDICAL/DENTAL OFFICE BUILDING

PROJECT DATA: PROJECT VALUATION

4,000 sq. ft. Medical/Dental Office Building 4,000 sq. ft. x $76.60 = $306,400

Valuation = $306,400

FEES DUE AT BUILDING PLAN CHECK SUBMITTAL

Plan Check Fee ..................................................................................................................... $1,152.58

State Disabled Access Regulation Plan Check Surcharge Fee (included in Plan Check Fee)

.............................................................................................................................................. --------

State Energy Regulation Plan Check Surcharge Fee (included in Plan Check Fee) ........... --------

Planning Division - Building Plan Review Fee ...................................................................... 1,100.00

Fire Department - Building Plan Review Fee ........................................................................ 275.00

FEES DUE AT BUILDING PERMIT ISSUANCE

Building Permit Fee ............................................................................................................... 1,773.20

State Disabled Access Regulation Inspection Surcharge Fee (included in Permit Fee) ...... --------

State Energy Regulation Inspection Surcharge Fee (included in Permit Fee) ..................... --------

Plumbing Permit Fee ............................................................................................................. *

Electrical Permit Fee ............................................................................................................. *

Mechanical Permit Fee ......................................................................................................... *

Water Connection Fee (based on 3/4” meter) ...................................................................... 4,690.00

Wastewater Connection Fee ($3.00 x 4,000 sq. ft.) ............................................................. 12,000.00

Traffic Fee-Regional (RTCIP) ............................................................................................... N/A

Traffic Fee-Local ($5.42 x 4,000 sq. ft.) ................................................................................ 21,680.00

Public Facility Fee ($2.17 x 4,000 sq. ft.) .............................................................................. 8,680.00

Park Fee ................................................................................................................................ N/A

Drainage Facilities Fee ($0.71 x 4,000 sq. ft.) ...................................................................... 2,840.00

Region of Influence Infrastructure Deposit Fee .................................................................... N/A

SMIP Fee .............................................................................................................................. 64.34

GREEN BUILDING FEE ...................................................................................................... 13.00

Art in Public Places Fee ........................................................................................................ 600.00

Citywide Facilities Plan Reimbursement Fee ........................................................................ N/A

Microfilming Fee (estimate) ................................................................................................... 75.00

CATV Fee.............................................................................................................................. N/A

School Fees (School District) ................................................................................................ --------

SDCWA Capacity Charge (based on 1” water meter) . Paid at time of meter purchase 8,158

TOTAL FEES $63,101.12

NOTE: This is only an estimate. Exact fees can only be determined for a specific project in a specific

location in the city. FINAL PROJECT FEES ARE THOSE FEES IN EFFECT AT THE TIME OF

PERMIT ISSUANCE.

*Fee based on specific plumbing, electrical and mechanical work involved. (See pg. 15)

Page 34: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 11-30-2010

-29-

EXAMPLE #8 - INDUSTRIAL BUILDING ADDITION

PROJECT DATA: PROJECT VALUATION

1,000 sq. ft. addition to an existing 8,000 sq. ft. building 1,000 sq. ft. x $35 = $35,000

Development Fees apply to the added building area only. Valuation = $35,000

(See page 5) (This example does not require a larger

water meter).

FEES DUE AT BUILDING PLAN CHECK SUBMITTAL

Plan Check Fee ..................................................................................................................... $267.87

State Disabled Access Regulation Plan Check Surcharge Fee (included in Plan Check Fee)

.............................................................................................................................................. --------

State Energy Regulation Plan Check Surcharge Fee (included in Plan Check Fee) ........... --------

Planning Division - Building Plan Review Fee ...................................................................... 380.00

Fire Department - Building Plan Review Fee ........................................................................ 100.00

FEES DUE AT BUILDING PERMIT ISSUANCE

Building Permit Fee ............................................................................................................... 412.10 State Disabled Access Regulation Inspection Surcharge Fee (included in Permit Fee) ...... -------- State Energy Regulation Inspection Surcharge Fee (included in Permit Fee) ..................... -------- Plumbing Permit Fee (no additional plumbing) ..................................................................... 0 Electrical Permit Fee (estimate - 4 circuits) .......................................................................... 50.00 Mechanical Permit Fee (no additional mechanical) .............................................................. 0

Water Connection Fee (no increase in meter size) .............................................................. 0 Wastewater Connection Fee ($0.63/sf x 1000 sf) ................................................................. 630.00

Traffic Fee-Regional (RTCIP) ............................................................................................... N/A Traffic Fee- Local ($2.32sf x 1000 sf) ................................................................................... 2,320.00 Public Facility Fee ($1.64/sf x 1000 sf) ................................................................................. 1640.00 Park Fee ................................................................................................................................ N/A Drainage Facilities Fee ($0.71/sf x 1000 sf) ......................................................................... 710.00 Region of Influence Infrastructure Deposit Fee .................................................................... N/A

SMIP Fee .............................................................................................................................. 7.35

GREEN BUILDING FEE ...................................................................................................... 2.00

Art in Public Places Fee ........................................................................................................ 00.00 Citywide Facilities Plan Reimbursement Fee ........................................................................ N/A Microfilming Fee (estimate) ................................................................................................... 25.00 CATV Fee.............................................................................................................................. N/A

School Fees (School District) ................................................................................................ --------

SDCWA Capacity Charge ..................................................................................................... 0

TOTAL FEES $6,544.22

NOTE: This is only an estimate. Exact fees can only be determined for a specific project in a specific

location in the city. FINAL PROJECT FEES ARE THOSE FEES IN EFFECT AT THE TIME OF

PERMIT ISSUANCE.

Page 35: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 11-30-2010

-30-

EXAMPLE #9 - TENANT IMPROVEMENT

PROJECT DATA: PROJECT VALUATION

60 seat pizza restaurant in existing 1,800 sq. ft. retail

tenant space; FEE INCENTIVE - see page 5 Valuation = $30,000 (contractor

estimate)

FEES DUE AT BUILDING PLAN CHECK SUBMITTAL

Plan Check Fee ..................................................................................................................... $240.40

State Disabled Access Regulation Plan Check Surcharge Fee (included in Plan Check Fee)

.............................................................................................................................................. --------

State Energy Regulation Plan Check Surcharge Fee (included in Plan Check Fee) ........... --------

Planning Division - Building Plan Review Fee ...................................................................... 380.00

Fire Department - Building Plan Review Fee ........................................................................ 100.00

FEES DUE AT BUILDING PERMIT ISSUANCE

Building Permit Fee ............................................................................................................... 369.85

State Disabled Access Regulation Inspection Surcharge Fee (included in Permit Fee) ...... --------

State Energy Regulation Inspection Surcharge Fee (included in Permit Fee) ..................... --------

Plumbing Permit Fee ............................................................................................................. *

Electrical Permit Fee ............................................................................................................. *

Mechanical Permit Fee ......................................................................................................... *

Water Connection Fee (no increase in water meter or sewer line sizes) ............................. 0

Wastewater Connection Fee (no increase in water meter or sewer line sizes) .................... 0

Traffic Fee-Regional (RTCIP) (no added parking) ................................................................ N/A

Traffic Fee- Local (no added parking) ................................................................................... 0

Public Facility Fee ................................................................................................................. N/A

Park Fee ................................................................................................................................ N/A

Drainage Facilities Fee ......................................................................................................... 0

Region of Influence Infrastructure Deposit Fee (if in Region of Influence) ........................... N/A

SMIP Fee .............................................................................................................................. 6.30

GREEN BUILDING FEE ...................................................................................................... 2.00

Art in Public Places Fee ........................................................................................................ N/A

Citywide Facilities Plan Reimbursement Fee ........................................................................ N/A

Microfilming Fee (estimate) ................................................................................................... 5.00

CATV Fee.............................................................................................................................. N/A

School Fees (School District) ................................................................................................ --------

SDCWA Capacity Charge (no increase in water meter size) ............................................... 0

TOTAL FEES $1,103.55**

NOTE: This is only an estimate. Exact fees can only be determined for a specific project in a specific

location in the city. FINAL PROJECT FEES ARE THOSE FEES IN EFFECT AT THE TIME OF

PERMIT ISSUANCE.

*Fee based on specific plumbing, electrical and mechanical work involved. (See pg. 15)

**Plus plumbing, electrical and mechanical permit fees, if applicable.

Page 36: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

Revised 7-01-09

FEE WORKSHEET

PROJECT DATA: PROJECT VALUATION

-31-

Note: If you are unsure of the applicable fees please contact Building Division counter staff for assistance.

FEES DUE AT BUILDING PLAN CHECK SUBMITTAL

Plan Check Fee ........................................................................................................ _________________

State Disabled Access Regulation Plan Check Surcharge Fee .............................. _________________

State Energy Regulation Plan Check Surcharge Fee .............................................. _________________

Planning Division - Building Plan Review Fee ......................................................... _________________

Fire Department - Building Plan Review Fee ........................................................... _________________

FEES DUE AT BUILDING PERMIT ISSUANCE

Building Permit Fee .................................................................................................. _________________

State Disabled Access Regulation Inspection Surcharge Fee ................................ _________________

State Energy Regulation Inspection Surcharge Fee ................................................ _________________

Plumbing Permit Fee ................................................................................................ _________________

Electrical Permit Fee ................................................................................................ _________________

Mechanical Permit Fee ............................................................................................ _________________

Water Connection Fee ............................................................................................. _________________

Wastewater Connection Fee .................................................................................... _________________

Traffic Fee-Regional (RTCIP) .................................................................................. _________________

Traffic Fee-Local ...................................................................................................... _________________

Public Facility Fee .................................................................................................... _________________

Park Fee ................................................................................................................... _________________

Drainage Facilities Fee ............................................................................................ _________________

Region of Influence Infrastructure Deposit Fee ....................................................... _________________

SMIP Fee ................................................................................................................. _________________

GREEN BUILDING FEE .........................................................................................

_________________

Art in Public Places Fee ........................................................................................... _________________

Citywide Facilities Plan Reimbursement Fee ........................................................... _________________

Microfilming Fee ....................................................................................................... _________________

CATV Fee................................................................................................................. _________________

School Fees (payable to School District) ................................................................. _________________

SDCWA Capacity Charge ........................................................................................ _________________

TOTAL FEES $_________________

Page 37: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

-32-

Page 38: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

-33-

Page 39: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

-34-

Permit Processing Fee Waivers

for Targeted Commercial Areas

The South Escondido Boulevard and East Valley Parkway Commercial Corridors and

the Downtown Revitalization Area*

The following processing and permit fees will be waived to encourage improvement and enhancements of existing and expanding businesses located in the above areas:

Minor Plot Plan Review – $250

Plan Project Review – Up to $200

Landscape Plan Check – Up to $250

Sign Permit – $25

Façade Improvements (façade renovation, exterior lighting, awning, etc.) – Up to $200

Design Review Fee – $100

Engineering/Public Works Department Encroachment Permit – $100

Building Division Sign Permit Fee – Up to $50

Building Division Awning Permit Fee – Up to $100

Criteria for granting the waivers:

The cumulative fee waiver for any single business shall not exceed $500

Fee waivers shall involve exterior (street visible) improvements only

Waivers for new construction shall be limited to additions and expansions to existing businesses

*Please contact the Planning Division if you have any questions 760-839-4671.

Page 40: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

-35-

San Diego County Water Authority

CAPACITY CHARGE

WHO

The San Diego County Water Authority (the "Authority") was organized on June 9, 1944 for the primary purpose of importing water from the Colorado River to San Diego to augment local water supplies. The Water Authority's service area encompasses 920,472 acres (1,438 square miles). It consists of six cities, 16 special districts, one federal agency (Camp Pendleton Military Reservation), and a member of the County of San Diego Board of Supervisors also serves as a representative to the Water Authority Board of Directors. It is governed by a 34-member Water Authority Board of Directors representing the member agencies. The primary function of the Water Authority is to develop, store and transport water for use by its member agencies for delivery to each residence and business. The Water Authority supplies up to 90% of the water used within the County.

WHAT

On May 26, 2005, the Board of Directors of the Water Authority adopted Ordinance No. 2005-03. This ordinance fixes Capacity Charges on all meters purchased on or after August 1, 2005, within the boundaries of the Water Authority.

The System Capacity Charge for a meter size of one (1) inch or greater shall be the basic charge of $3,985 multiplied by a Factor that is based upon additional meter capacity:

The System Capacity Charge is the cost for the conveyance and storage facilities necessary to operate the delivery system.

The Water Treatment Capacity Charge is the cost for the connection to the 50-mgd (million gallons per day) regional water treatment facility. The Water Treatment Capacity Charge is an additional charge of $153 for each new meter of a size less than one inch and a corresponding increase for larger meters. The Water Treatment Capacity Charge excludes customers from the City of Escondido, the member agency whose jurisdiction cannot be serviced by the 50-mgd regional water treatment facility. The member agency shall determine the size of the water meter to serve any property within its jurisdiction. In the event an agency calculates the water demand by the Equivalent Dwelling Unit ("EDU") method, the Water Authority's System Capacity Charge and Water Treatment Capacity Charge will be collected based on the size of meter actually installed to meet flow demand.

Page 41: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

-36-

WHY

The assessment of the System Capacity Charge and Water Treatment Capacity Charge on new development is a part of the overall Long Range Financing Plan to fund the Capital Improvement Program. The other major revenue sources are water rates, infrastructure access charges, property taxes and the water standby availability charges.

The System Capacity Charge and Water Treatment Capacity Charge represent a reasonable basis for recovery of costs associated with providing service to new connections in the Water Authority's service area through each member agency. Each member agency's rules and regulations governing the establishment of new or expanded services within its service area will be applicable to the collection of the System Capacity Charge and Water Treatment Capacity Charge for the Water Authority.

WHERE

The Water Authority's System Capacity Charge and Water Treatment Capacity Charge are to be collected from new or expanded water service on all lands within the boundaries of the Water Authority to which water is made available by the Water Authority.

The implementation of the System Capacity Charge and Water Treatment Capacity Charge is discussed in detail in Ordinance No. 2005-03, adopted on May 26, 2005. A copy of this document may be obtained from your water agency or from the San Diego County Water Authority, 4677 Overland Avenue, San Diego, CA 92123.

WHEN Ordinance 90-2 was adopted by the Water Authority's Board of Directors with an effective date of October 1, 1990, with the provision to periodically review the rate based upon changes in the Water Authority's Capital Improvement Program. All meters for new or expanded service on or after that date are subject to Capacity Charges. The charges are collected by member agencies at the time they process and collect charges imposed by their rules and regulations for new or expanded water service. Rate adjustment, which established the current rates, was approved by the Water Authority's Board of Directors on November 30, 2006, with an effective date of January 1, 2007. Rates will increase on January 1, 2007.

FOR FURTHER INFORMATION

If you have questions that have not been answered by this fact sheet, please contact: Finance Department

San Diego County Water Authority 4677 Overland Avenue San Diego, CA 92123

(858) 522-6673

Please visit the website at www.sdcwa.org for current information

Page 42: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

-37-

City of Escondido Nonprofit Organization Fee Reduction Policy

The City of Escondido recognizes the importance of community based service organizations and the contributions that they make to the quality of life for its citizens. In support of the services provided by these organizations, reductions in fees associated with building permits will be granted as follows:

Qualifications:

Must be a charitable, public benefit or religious organization. Mutual benefit organizations benefit their members and would not qualify.

Promotes the common good and general welfare of the people of Escondido as a whole. Services provided contribute to the quality of life of the citizens of Escondido.

Has an established history of City of Escondido community based service activities and/or will provide City of Escondido based services.

Characteristics of community based organizations Worship, spiritual growth & development Day care (nonprofit) Senior care (nonprofit) Private schools (elementary & secondary) Social service providers such as Boy Scouts, Girl Scouts, YMCA, Boys & Girls Club, Community

Clinics, Family social services

Application:

Submit a summary of all qualifications as noted above, to the Building Official, with a copy of IRS status as a 501 (c) 3 Non-profit organization.

Fee Reductions:

For qualified organizations, a 50% reduction, with a maximum total allowable reduction not to exceed $10,000, as applicable, will be given for connection fees (wastewater and water), development fees (public facility, Local traffic, park, drainage facility) and the art fee.

Reductions of staff hard costs or pass-through fees will not be given. Examples include, but are not limited to, all processing fees, permit fees, state seismic fee, microfilming fee, San Diego County Water Authority Capacity Charge, etc.

Where a property is eligible for multiple fee credits, the credit generating the greater amount shall be used.

For an estimate of project fees, please contact Building Division staff. Please provide a description of the proposed project, location, building areas & uses, etc.

Authority: City Council Resolution 2008-21(R) October 22, 2008

Page 43: PLEASE NOTE: THIS DOCUMENT WAS UPDATED ON 2-19-2019 ...€¦ · 2. Assignment of a fast track interdepartmental City staff project processing and permitting team. FEE DEFERRAL On

-38-

September, 2001

City of Escondido Community Energy Partnership Program

Incentives for Increased Energy Efficiencies

On September 19, 2001 the Escondido City Council approved Resolution No. 2001-209 which provides incentives for projects with increased energy efficiencies that are above current State Title 24. The incentives are:

• Expedited processing • Reduced Plan Check and/or Permit fees

Community Energy Partnership Program (CEPP) projects requesting incentives from the City of Escondido shall submit information detailing how they meet the required criteria. Building Division staff must be notified either prior to or at submittal for building permits if a project is requesting these incentives. Once it is determined that the criteria are met, consideration may be given at the discretion of the Planning and Building Department/Building Division. No City Council action is required for individual projects.

For Commercial and Residential Projects: Project owners or sponsors shall submit to the City building energy performance (Title 24) calculations completed and certified by a Certified Energy Analyst* using an acceptable computer model such as Energy Pro, MICROPAS, EQuest, DOE-2, Power DOE, HAP 3.22 etc. and present the summary data to the City with plans.

For Commercial Projects: Projects shall exceed current California Title 24 Energy Standards by a minimum of 10%. Incentives are expedited processing and elimination of the Plan Check Fee Energy Surcharge.

For Residential Projects: Multi-Family Projects shall exceed current California Title 24 (Residential) by a minimum of 10%. Incentives are expedited processing and elimination of the Plan Check Fee Energy Surcharge.

Single Family Homes must be ENERGY STAR compliant. Incentives are expedited processing and elimination of Plan Check and Building Permit Fee Energy Surcharges. Project developers must provide evidence that the homes built have been issued a Home Energy Ratings (HERS)** Report and Certificate meeting these requirements, prior to final inspection approval.

*The Certified Energy Analyst Program is managed by the California Association of Building Energy Consultants (CABEC), a private, nonprofit organization that was founded in 1986 to foster the professional development of energy analysts who prepare compliance documentation for the California Code of Regulations, Title 24, Part 6. The Certified Energy Analyst (CEA) Program is officially recognized by the California Energy Commission (CEA) as the professional standard for energy compliance.

**The Home Energy Rating System (HERS) Program was established by the California Energy Commission (CEC) as required by Public Resources Code Section 25942 to establish regulations to certify home energy rating services in California. These services include field verification and diagnostic testing available through Commission-certified providers and their raters. The goal of the program is to provide reliable information to differentiate the energy efficiency levels among California homes and to guide investment in cost-effective home energy efficiency measures. More information on the Home Energy Rating System (HERS) can be found at http://www.energy.ca.gov/HERS/index.html. More information on home energy rating and certification services can be found at http://www.cheers.org.

City of Escondido – Community Development Department/Building Division

201 North Broadway, Escondido CA 92025 (760) 839-4647