BOM addition.
Work flows:
IWO10027 User exit: Generate user-defined settlement rule
Only Planned Cost when no goods movement for PO involved.
After GR for PO the Actual costs were updated.
New material requirements for VJ_PART1 and VJ_PART2 were added to the WO.
TECO was performed.
The open reservations, PR for the non stock material and the reservation for the stock material got automatically deleted, not visible in MD04.
The planned costs didn’t reflect the deletion of the reservations, but the actuals are correct according to the Goods movement completed.
Additional Points:
Incase of Non stock material required for the maintenance opr processing.
Only GR step is performed, No GI.
GR assigns the costs to Maintenance order and issues the material for the operation.
Document flw :
Example:
IN the PM order
Below is the PR generated for external services
For Control key PM03 –
The above will be ending procurement of services via purchase orders.
Revise from page 215:
Example tested to check how actual are updated if there is an order with a component requirement
1) Released the order2) Component used is a stock material 3) Final time confirmed the operation 0010 which has the material requirement (No actual
costs were updated)4)
5) Perform TECO,(no goods movement yet )
6) Reservation not visible in MD047)
8) Remove TECO to complete the pending goods movement
Deletion Flag on the reservation which happened on the previous TECO got reset.
9)
Reservation is now read in MIGO as the deletion flag of the reservation is removed.
Actual Costs still not updated in the order… (Need to check when the materials arec updated in the order)
Settlement rules are derived from the technical object they are linked.
Customizing is performed at the Order type Level
:
Read again the Unit 4 – Lesson 8
Do Exercise 17