Presentation Of PT Bara Ria Sukses

Promoted By Bapak H. Daniel Candra

JAMBI COAL TERMINAL 1

SUPPORTED BY PT. JALDHI MARINE SERVICES

Page 2: ppt jambi copy

Graphs Of Coal Production In Jambi Province In 2007 - 2013

2007 2008 2009 2010 2011 2012 20130.00

2,000,000.00

4,000,000.00

6,000,000.00

8,000,000.00

JAMBI COAL TERMINAL 2

Coal production in the period 2007-2013 showed an increase

•2007 total production reached 2,215,496.24 MT•2008 total production reached 4,216,057.27 MT•2009 total production reached 3,198,868.39 MT•2010 total production reached 7,011,018.13 MT•2012 total production reached 6,565,306.28 MT•2013 total production reached 3,500,000.00 MT

Page 3: ppt jambi copy

JAMBI COAL TERMINAL 3

JAMBI - SUMATRACOAL TERMINAL AND

TRANSPORTATIONLOGISTIC

THROUGH BATANG HARI RIVER SYSTEM

SUPPORTED BY PT. JALDHI MARINE

SERVICESPromoted By Bapak Haji Daniel Candra

Page 4: ppt jambi copy

JAMBI COAL TERMINAL 4

DISTANCE COMPARATION

PADANG PORT RIAU PORT TALANG DUKU JCT TENAM

M.BUNGO SITE 287 KM 376 KM 309 KM 205 KM

SAROLANGOON SITE 361 KM 536 KM 269 KM 196 KM

TEBO SITE 331 KM 335 KM 261 KM 124 KM

Page 5: ppt jambi copy

JAMBI COAL TERMINAL 5

Parameter Typical Rej.Total Moisture (ARB) 39% >41%

Inherent Moisture (ADB) 12-14%  

Gross Calorific Value (ARB) 3500 Kcal/Kg. < 3400 Kcal/kg

Ash Content (ADB) 6% >8%Sulphur (ADB) 0.50% > 0.80%Volatile Matter (ADB) 40-44%  

Fixed Carbon (ADB) By diff.  Size (0 to 50 mm) 90% Min  HGI 55  

Technical Specifications as per ASTM/ISO Standard.   (ARB – As Received Basis)(ADB – Air Dry Basis) 

Full spec of GAR 3500

Page 6: ppt jambi copy

JAMBI COAL TERMINAL 6

Parameter Typical Rej.

Total Moisture (ARB) 20%>22%

Inherent Moisture (ADB) 12-14% 

Gross Calorific Value (ARB) 5200 Kcal/Kg.< 5000 Kcal/kg

Ash Content (ADB) 3,73% >5%Sulphur (ADB) 0.57% > 0.80%

Volatile Matter (ADB) 36,10% 

Fixed Carbon (ADB) 47,58  Size (0 to 50 mm) 90% Min  HGI 55  

Technical Specifications as per ASTM/ISO Standard.   (ARB – As Received Basis)(ADB – Air Dry Basis) 

Full Spec Gar 5200

Page 7: ppt jambi copy

JAMBI COAL TERMINAL 7

Full spec of gar

Customer Sample ID

unit

Pit 427

Lab Sample IDPg14

00337Weight Of Sample 4,880 g

Analysis 1.As Received Basis (Ar) Total Moisture ( % ) 23.29Ash Content ( % ) 1.66Volatille Matter ( % ) 32.46Fixed Carbon ( % ) 42.6Total Sulphur ( % ) 0.5Gross Calorific Value cal/gr 59022.Air Dried Basis (Adb) Moisture In The Analysis Sample ( % ) 11.04Ash Content ( % ) 1.92Volatille Matter ( % ) 37.64Fixed Carbon ( % ) 49.4Total Sulphur ( % ) 0.58Gross Calorific Value cal/gr 6845

Page 8: ppt jambi copy

JAMBI COAL TERMINAL 8

Coal Mining Company In Jambi

in Jambi have 347 of coal mining company already have permit from Government206 coal mining company already do exploration and 141 company have legal permit from Government for production and exploitation

Coal Resource In Jambi

coal resources in Provinces Jambi as per declare from Jambi government is big which total sources reaching up to 1,5 billion tons have yet exploration and total coal has been produced up to now about 50 million tons.

Page 9: ppt jambi copy

JAMBI COAL TERMINAL 9

The Project Highlights

PT.Bara Ria Sukses is committed to offer a Total Coal LogisticsSolution from Jambi Mine hinterlands, Sumatera to overseasDestination by

Establishing coal loading river terminal at tenam area

Establishing a REALIABLE,SUSTANIABLE and COMMON USER terminal and river transport system in batang hari river

Establishing of coal transshipment Terminal at sukombong to add flexibility to barge logistics chain.

Page 10: ppt jambi copy

JAMBI COAL TERMINAL 10

The Bothra Group

Since its formation in 1977, Bothra Group has evolved from aConventional Stevedoring, clearing and Forwading agency to a multidimensional shipping and port logistics group of companies including cargo terminal operations

Bothra Group enjoys a reputation beyond the shipping sector by his group in indonesia namely PT.Jaldhi Marine Services for a competent an reliable end to end logistics service provider with shipping and overland logistic solutions tailored to customer needs.and in keeping with its philosophy, PT.Jaldhi Marine Services is now commited to established a Coal Transport logistics in jambi through Batang Hari River Syatem

Page 11: ppt jambi copy

JAMBI COAL TERMINAL 11

Today’s situation – The dificulties for Coal Miners to export the produce

The mines located in the coal consession areas of jambi face great difficulties and challenges to move the mined coal to a mother vessel anchored at the nearest sea anchorage – Muara Sabak

This is due to inadequate road infrastructure from mines to talang duku a distance of nesrly 150 km, the nearest point to reach the barge loading facility

governmental restrictions in use of public roads for coal haulage purpose

social problem as public protest due to daily traffic jams , pollutions and daily accidents until some deaths due to inexperience and illegal truckings

Page 12: ppt jambi copy

JAMBI COAL TERMINAL 12

Some accidents of coal trucking

Page 13: ppt jambi copy

JAMBI COAL TERMINAL 13

PT.Bara Ria Sukses – Jaldhi’s Project intends to achieve…

The aim of this projects is to increase the Reliability andAvaliability of Logistics Service in this region by using the Batang Hari river system and thus open up the abundant resources of this region to the world

Page 14: ppt jambi copy

JAMBI COAL TERMINAL 14

Page 15: ppt jambi copy

JAMBI COAL TERMINAL 15

Page 16: ppt jambi copy

JAMBI COAL TERMINAL 16

Page 17: ppt jambi copy

JAMBI COAL TERMINAL 17

Barging Line Up

Page 18: ppt jambi copy

JAMBI COAL TERMINAL 18

Page 19: ppt jambi copy

JAMBI COAL TERMINAL 19

Page 20: ppt jambi copy

JAMBI COAL TERMINAL 20

Page 21: ppt jambi copy

JAMBI COAL TERMINAL 21

Page 22: ppt jambi copy

JAMBI COAL TERMINAL 22

Page 23: ppt jambi copy

JAMBI COAL TERMINAL 23

Jambi Coal Terminal –Work in progress

Page 24: ppt jambi copy

JAMBI COAL TERMINAL 24

---THANK YOU---

The TimelineThe Project is estimated to be Commissioned before the mid of 2015

And with this Jaldhi , Bothra Group shall be setting a new , efficient and eco-friendly logistics solution for Cola Mining hinterland of Jambi