prebid querie.answers- alakananda enclave lucknow
TRANSCRIPT
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
1/28
1.
2.
3.
4.
5. Er. K.K.Suri
6 Er. Ajay Kumar Saxena
Pre-Bid Queries
Sr.
NoDescription Clause No
Page
No.Tender Condition
A GENERAL QUERIES:
1 Time for completion of workNIT 27 months
2 RMC
AOW 12 Mixing of flyash is not permitted.
3 Price
RQF 13 Rate m ust b e quoted lump-sum on turnkey b asis expressed in R s per sqm for each
multistoried building (project) including complete internal campus development
works as detailed in the drawing to make the flats ready for living conditions
BGENERAL CONDITION OF
CONTRACT
1 MOBILIZATION ADVANCE 8 21
Recovery of Mobilization
Advance
The recovery commenced after 20% of work and shall be recovered at the rate of
20% of workdone from all running payments till full recovery of advances
Equipment Advance5% of CV or 90% of price of new Eqpmnt or 50% of Depriciated value of Eqmnt,
whichever is lower
Release of Equipment
Advance
75% on delivery & 25% on commissioning
Recovery of Equipment
Advance
The recovery commenced after 20% of work and shall be recovered at the rate of
20% of workdone from all running payments till full recovery of advances
2SECURITY DEPOSIT /
RETENTION MONEY
10 23
Recovery of Security Deposit/
Retention Money
50% on issue of Completion certificate, next 25% on issue of Defect liability
certificate, next 25% after 3years ie warranty period from completion of work
3 Performance Security 9 23 5% of CV against submission of BG
4 Facilities at site
28 33 Contractor to arrange his own arrangements & get the clearance from local
authorities.
5 Liquidated Damages 72 58 Nil upto 3 months, 1% per month beyond 3 months, max 10% of CV
6 Defect Liability Period 74 70 24 Months
7
Warranty Period & Warranty
Money
10 23 warranty period shall b e 36 months from t he d ate o f completion c ertificate, 2 5% o f
security deposit will be withheld for the said period. if contractor fails to rectify the
defects, this general security deposit shall be forfeited and the contractor shall be
blacklisted
8Handing over and clearing of
site
2.2.1 18 Traffic diversion,if required, is to be done and maintained as per specification by
the contractor at his own cost and th contractor shall not be entitled for any extra
payment,whatsoever,in this regard.
9Handing over and clearing of
site
2.2.2 18 The efforts will be made by the UPHDB to handover the site to the Contractor
free of encumbrances. However, in case of any encumbrances found
under-ground at site by the Contractor, the UPHDB shall not consider any
revision in contract price or any other compensation whatsoever viz. towards
idleness of Contractors labour, equipment etc.
10
BBS,Shop & Fabrication
drawings
11.9 25 Contractor shall have to prepare the Bar Bending Schedule, shop and fabrication
drawings free of cost, if required for anyof the items of work. Five copies of these
drawings each including for revision will be submitted to UPHDB forapproval. Before executing the item, shop drawings should be approved by
UPHDB.
Er.R.K.Mishra
Minutes of Pre Bid Meeting held on dated 03.12.13 at 3:00 p.m. at Neelgiri Complex, Indira Nagar, L
In this meeting the following officers of UPHDB a
Er. Rajeev Kumar
Er. Anil Kumar Mishra
Er. K.C.Srivastava
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
2/28
1.
2.
3.
4.
5. Er. K.K.Suri
6 Er. Ajay Kumar Saxena
Pre-Bid Queries
Sr.
No Description Clause No
Page
No. Tender Condition
Er.R.K.Mishra
Er. Rajeev Kumar
Er. Anil Kumar Mishra
Er. K.C.Srivastava
1 External development
2 Pump Room & Service Room
3 Soil Investigation Report
4 Contour Survey Report
5 Water Proofing I
Electrical
1 Electrical2 Electrical
3 Electrical
4 Electrical
5 Electrical
6 Electrical
7 Electrical
PHE & FPS
1 PHE & FPS
2 PHE & FPS
3 PHE & FPS
4 PHE & FPS
5 PHE & FPS
Pre-Bid Queries
Sr.
NoDescription Clause No
Page
No.Tender Condition
1
2
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
3/28
1.
2.
3.
4.
5. Er. K.K.Suri
6 Er. Ajay Kumar Saxena
Pre-Bid Queries
Sr.
No Description Clause NoPage
No. Tender Condition
Er.R.K.Mishra
Er. Rajeev Kumar
Er. Anil Kumar Mishra
Er. K.C.Srivastava
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
4/28
1. Su
2. Ex
3. Ass
4. Ass
5. Er. K.K.Suri Ass
6 Er. Ajay Kumar Saxena Ass
Pre-Bid Queries Su
Sr.
NoDescription Clause No
Page
No.Tender Condition
Er.R.K.Mishra
Er. Rajeev Kumar
Er. Anil Kumar Mishra
Er. K.C.Srivastava
Ext
su
req
Plu
de
pre
De
by
ca
Pre-Bid Queries SuSr.
NoDescription Clause No
Page
No.Tender Condition
1 Ple
ins
2 Th
kin
va
Ple
pe
Ple
su
ret
ba
Ple
Ple
go
Ple
Kin
Ple
Pre-Bid Queries Su
Sr.
NoDescription Clause No
Page
No.Tender Condition
Volume II m. 2 6 Wapip
we
gu
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
5/28
1.
2.
3.
4.
5. Er. K.K.Suri
6 Er. Ajay Ku
Pre-Bid Queries
Sr. No Description Clause NoPage
No.
A GENERAL QUERIES:
1 Time for completion of workNIT
2 RMCAOW 12
3 Price
RQF 13
BGENERAL CONDITION OF
CONTRACT1 MOBILIZATION ADVANCE 8 21
Recovery of Mobilization
Advance
Equipment Advance
Release of Equipment
Advance
Recovery of Equipment
Advance
2SECURITY DEPOSIT /
RETENTION MONEY
10 23
Recovery of Security Deposit/
Retention Money
3 Performance Security 9 23
Minutes of
Er. Rajeev
Er. Anil Ku
Er.R.K.Mis
Er. K.C.Sri
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
6/28
4 Facilities at site
28 33
5 Liquidated Damages 72 58
6 Defect Liability Period 74 70
7 Warranty Period & WarrantyMoney
10 23
8Handing over and clearing of
site
2.2.1 18
9Handing over and clearing of
site
2.2.2 18
10BBS,Shop & Fabrication
drawings
11.9 25
Technical Queries:
1 External development
2 Pump Room & Service Room
3 Soil Investigation Report
4 Contour Survey Report
5 Water Proofing I
Electrical
1 Electrical
2 Electrical
3 Electrical
4 Electrical
5 Electrical
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
7/28
6 Electrical
7 Electrical
PHE & FPS
1 PHE & FPS
2 PHE & FPS
3 PHE & FPS
4 PHE & FPS
5 PHE & FPS
Pre-Bid Queries
Sr. No Description Clause NoPage
No.
1
2
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
8/28
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
9/28
Pre-Bid Queries
Sr. No Description Clause NoPage
No.1
2
Pre-Bid Queries
Sr. No Description Clause NoPage
No.Volume II m. 2 6
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
10/28
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
11/28
i
mar Saxena
Tender Condition
27 months
Mixing of flyash is not permitted.
Rate must be quoted lump-sum on turnkey basis expressed in Rs per sqm for each
multistoried building (project) including complete internal campus development
works as detailed in the drawing to make the flats ready for living conditions
The recovery commenced after 20% of work and shall be recovered at the rate of
20% of workdone from all running payments till full recovery of advances
5% of CV or 90% of price of new Eqpmnt or 50% of Depriciated value of Eqmnt,
whichever is lower
75% on delivery & 25% on commissioning
The recovery commenced after 20% of work and shall be recovered at the rate of
20% of workdone from all running payments till full recovery of advances
50% on issue of Completion certificate, next 25% on issue of Defect liability
certificate, next 25% after 3years ie warranty period from completion of work
5% of CV against submission of BG
Pre Bid Meeting held on dated 03.12.13 at 3:00 p.m. at Neelgiri Complex, Indira Nagar, Lu
In this meeting the following officers of UPHDB an
Kumar
ar Mishra
ra
astava
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
12/28
Contractor to arrange his own arrangements & get the clearance from local
authorities.
Nil upto 3 months, 1% per month beyond 3 months, max 10% of CV
24 Months
warranty period shall be 36 months from the date of completion certificate, 25% of
security deposit will be withheld for the said period. if contractor fails to rectify thedefects, this general security deposit shall be forfeited and the contractor shall be
blacklisted
Traffic diversion,if required, is to be done and maintained as per specification by the
contractor at his own cost and th contractor shall not be entitled for any extra
payment,whatsoever,in this regard.
The efforts will be made by the UPHDB to handover the site to the Contractor
free of encumbrances. However, in case of any encumbrances found
under-ground at site by the Contractor, the UPHDB shall not consider any
revision in contract price or any other compensation whatsoever viz. towards
idleness of Contractors labour, equipment etc.
Contractor shall have to prepare the Bar Bending Schedule, shop and fabrication
drawings free of cost, if required for any of the items of work. Five copies of these
drawings each including for revision will be submitted to UPHDB for
approval. Before executing the item, shop drawings should be approved by
UPHDB.
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
13/28
Tender Condition
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
14/28
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
15/28
Tender Condition
Tender Condition
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
16/28
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
17/28
Superintending Engineer Head Quarter Circle
Executive Engineer Construction Division-14
Assistant Engineer Head Quarter Circle
Assistant Engineer Construction Division-14
Assistant Engineer Construction Division-14
Assistant Engineer Construction Division-14
Submitted By: Larsen and Toubro Limited.,
Queries/ Request.
We request to kindly accept the completion period as 36 months.
We are proposing Shear wall concept for the project, In order to improve the durability &
workability of concrete, We request to permit Concrete with flyash .
We request to revise the price /sqm in following format -
Rate / sqm for Superstructure on superstructure Area.
Rate /sqm for Stilt on Stilt area.
Rate /sqm for basement on Basement Area.
We request to revise as follows
The recovery will be commenced after 20% of work done on pro-rata basis till 90% invoice
completion.
5% of CV towards P&M & aluminium formwork
along with agreement, submission of PS, submission of BG
The recovery will be commenced after 20% of work done on pro-rata basis till 90% invoice
completion.
We request to revise as follows
50% on of Completion of work, next 50% on completion of Defect liability period.
We request to consider BG submitted for Security Deposit as performance security.
cknow for multi-storeyed Alakhananda Enclave in Sector-3, Avadh Vihar Yojna respectively.
d Builders/Representative are participated.
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
18/28
The necessary permissions, clearance from local authorities & Statutory approvals required for
establishment of batching plant, Labour colony, yards and stores shall be arranged by client.
Nil upto 3 months, 1% per month beyond 3 months, max 5% of CV
We request to revise the Defect Liability period as 12 Months
We request to remove Warranty period & warranty money.
We request you to clarify what kind of diversion will be required at site.
Site will be handover to contractor without any encumbrances. If any encumbrances found under
ground, proper rate revision will be provided to contractor and the required time extension will
also be provided.The idleness of labour ,P&M,Staff will be paid accordingly.
Contractor shall have to prepare the Bar Bending Schedule, shop and fabrication drawings free of
cost, if required for any of the items of work. Three copies of these drawings each including
for revision will be submitted to UPHDB for approval. Before executing the item, shop
drawings should be approved by UPHDB.
We request to provide Details & drawings for UGR, Community Centre, Boundary wall, Parking,Roads, Entrance/Exit Gates, Guard Room, Landscape & Hardscape works in Autocad format.
We request to provide details & drawings for Pump Room & Services Room
We request to provide Soil Investigation Report.
We request to Share Surveying Report showing Contour plans, FRL, NGL, FGL & FFL of Buildings.
We request to revise basement waterproofing as Cementitious crystalline concrete water
proofing instead of DSR item no 22.1.1 & 22.2.1
Please confirm Scope of External Street Lighting & landscape lighting.
Kindly provide point of Supply from Grid with Voltage Level & Location.
Please clarify, Whether 100% D.G Back-up power is to be proposed for Towers.
Please confirm the scope of Conduiting from ELV shaft to flats points.
Please clarify whether Floor wise Metering Required or All meter Boards will be located on the
Stilt/Ground Floor.
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
19/28
Please clarify the scope of telephone system/data points from ELV room to flats with wiring and
intermediate equipments or only conduiting up to ELV shaft from telephone points.
Please provide all the necessary Electrical drawings
Kindly confirm source of water. If tube well then provide water test report for water treatment
plant consideration.Kindly clarify the requirement of sewage treatment plant for the project.
Please clarify the scope of Solar water Heater/ solar lighting and hot water supply system.
As per specification received external sewerage pipe shall be PVC SWR as per IS-13592, which is
not suitable for underground application, hence we are considering UPVC pipe as per IS 15328 for
underground application. Kindly Confirm.
Please provide Fire NOC & PHE drawings.
Submitted By: Unity Infraprojects Ltd.,
Queries/ Request.
Architectural Drawing Approval: We understand that the Approval of Architectural Drawings is in
the scope of Uttar Pradesh Housing & Development Board. Please confirm.
Environmental Clearance. We understand that the Environmental clearance for the Development
of the Project Group 1 & 2 is already obtained by UPHDB. Our scope is to obtain the adherences/
conformations to Environmental requirements for the group housing units being developed underthe scope of contract.
Construction Period: The scope consists of Construction & Development of Project to be
completed in 27 Months including Design Development & Services Drawing Approvals from
Authorities. We request you to please provide additional 6 months for the Design Development &
Approvals and this 27 Months to be excluslvelv for Construction work after approval.
Architectural Drawing: Please refer clause 13, Page No. 9 "The drawings with tender Document ---
---. "we do not find any drawings with the tender document. Kindly confirm and request you to
please issue the same.
Soft Copy of the Proposed site for Group 1 & Group 2 i.e. Schematic Drawings planed for
development and Units plantor 3 BHK & 2 BHK: We request you to please issue us the soft copy of
Plot for Group 1 & Group 2 each for exactly fittings the Blocks, Plan the Basement area, Parking
area/ setback area etc and also provide us a Unit Plan for 3 BHK & 2 BHK Units, so that we are able
to develop the same into actual, for developing the details. This will save time in preparation of
Bid.
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
20/28
Soil investigation Report: We request you to provide the soil report for the site for Group 1 & 2 if
available. This witt help us to estimate the projects more accurately with respect to foundations
at this tendering stage. Also please provide us, depth of water table & soil parameters in the Area.
Excavated. Earth & Disposal: Please confirm who will be the owner of the Excavated Earth. Will
the Department provide a land for disposal of the excavated earth from the
basement, and the contractor will bear the royalty on the Earth.WTP &STP:We understand that the STP & WTP is not in the scope of this Tender. We
have to design for Storm water / Sewer /Rainwater lines only within the Boundary of the site.
Connections to the Municipality lines are not in the scope. All Extra items shall be as per CPWD
Norms.
Contour Plan: Request you to kindly provide us the Contour plan for sites and the level of Plinth to
me maintained.
Benchmark reference for the levels: We request you to please confirm the reference bench marks
based on which the natural ground level, 00 is to be fixed.
Service Tax: Re! clause 13.7, Page 26, Volume 1; as Service tax is reimbursable on actual basis.
Please permit us to quote our rates without Service Tax.
Electrical Fittings: We understand that scope of Internal Electrical works does not include
electrtcal fittings like fan, Tube light, Bulbs, exhaust, bell etc. please confirm.
External Electrifications Works: We request to please elaborate the scope under External
Electrifications work. We understand that it is limited only to External Street Lightening and
generators for the common area services only. Please confirm.
Tax Variation!/Future Tax: We understand that if any new taxes is introduced, after the
submission of bid is payable to the contractor. Please confirm.
Space for labour Hutment, Temporarv Structures & Plants: We request you to permit us space for
temporary structures like project office, stores, batching plant site, sock yard & bar bending Yard
etc and labour hutment within the site premises free of cost.
Water and Electricitv: We assume that we will be allowed to draw underground water for
construction purpose and use the state electricity supply, free of cost for the entire duration of
the project.
Escalation Clause: we request to introduce an escalation clause in this project, as it is being a
common clause in all government projects for the projects more than 18 months.
Base Prices: We request you to fix the Basic Rates for finishing materials like Vitrified Tiles,
Antiskid Ceramics, Glazed Ceramics Tiles and Stoneslike Marble & Granite etc.
Retention Money :(Re! Clause 10, Page 23, Volume 1) We request you to please allow us to
submit a Bank Guarantee for the total value of 5 of the contract, in the beginning of the project
valid up to completion period, instead of cash retention @ 5 from the running b!11. This will
improve the Cash-in Flow of the project and enable to maintain a better health of project and
progress.
Defect liability Period: We request you to reduce the Defect Liability Period to 12
Months instead of 24 Months as being followed in the CPWD Projects.
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
21/28
Extension for the date of submission: This being a Turnkey Project and to be quoted on Lump sum
basis (per sqft of built area) after development of Design & Services Drawings based on the
requirements of the tender. We are to engage an Architect & Service Consultants for Electrical,
Plumbing, landscaping, Flreflghting Works etc. for development of Service Scheme and other
details, so that we arrive on actual quantities and put our most competitive offer for your
prestigious Projects. The architects and consultants are taking time in the development of the
Design and Scheme. In this contest we request you to please extend the date of submission of Bidby at least 30 Oays from 13.12.13. You will appreciate if the bidders are given more time now, we
can work out the tender in detail and submit our most competitive Bid.
Submitted By: Ramky Infrastructure Ltd.,
Queries/ Request.
Please reduce the recovery of the mobilisation advance @ 10% of the work done from RA Bills
instead of 20%
There is ambiguity regarding price variation clause mentioned on Pg 27,28 ( for cement & steel )
kindly clarify & also provide escalation on all materials, POL, Labour etc., being this tender is high
value & also completion period is more than 2 years.
Please reduce the DLP period from 24 Months to 12 Months and delete the clause warranty
period and warrenty money.
Please delete the Service Tax clause & allow us to reimbursement the same at actuals against
submission of invoices
retained from RA Bills should be released 100 after completion of work against submission of
bank guarantee to make easy cash flow
Please accept EMD issued from scheduled bank also.
Please let us know the source of funds and also whether 100% funds allocated to client by the
govt.
Please extend the date of submission for atleast 30 days from the original date of submission
Kindly arrange soil test report
Please allow any reputed ISI vendor other than mentioned in the approved list.
Submitted By: N.C.C. Ltd.,
Queries/ Request.
Water supply external areas out side the block or in service shafts- we request you to change D.I.
pipes to U.P.V.C. pipes.
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
22/28
we request you to accept bank guaranties from scheduled bank also for E.M.D., performance
guarantee, mobilisation guarantee and security deposit guarantee.
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
23/28
Clarifications
not allowed
Design mix as per IS-456 duly approved by any
IIT
already in corporated on page no-13 of price
bid
not allowed
not allowed
not allowed
not allowed
not allowed
not allowed
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
24/28
clarified
not allowed
not allowed
not allowed
not allowed
as per documents
as per documents
will be provided
will be provided
soil investigation report is being uploaded only
for guidance
as per documents
already being in corporated in (volume-II) price
bid
it is limited within the campus
as per documents
as per documents
as per documents
as per documents
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
25/28
as per documents
being uploaded
water source will be provided by UPHDB
not in the scope of contractor
as per documents
Not allowed
being uploaded
Clarifications
clarified,to be approved by UPHDB
Clarified,
to be Provided by UPWDB
Not allowed
up loaded
already uploaded
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
26/28
Soil investigation repair will be uploaded for
guidance only
Connection to the main Water supply &
Sewerage system will be done by the
contractor.
Not required
vertical sectional drawing showing top level of
basement will be uploaded
as per documents
Fixing of Electrical fixtures such as fan tube light
etc not in the scope of contractor.
With in campus it is required
Clarified as per clause No. 13.1 G.C.C.
Space will be provided as per requirement
Clarified
for cement and steel necessary clause has been
incarporated
May not be considered
Clarified
Not allowed
-
8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow
27/28
Not allowed
Clarifications
Not Allowed
Clarified,
not allowed for other materials.
Not Allowed
Clarified
Not Allowed
Not Allowed
Clarified
Not Allowed
being uploaded only for guidance
Not Allowed
Clarifications
-