    Pre-Bid Queries

    Sr.

    NoDescription Clause No

    Page

    No.Tender Condition

    A GENERAL QUERIES:

    1 Time for completion of workNIT 27 months

    2 RMC

    AOW 12 Mixing of flyash is not permitted.

    3 Price

    RQF 13 Rate m ust b e quoted lump-sum on turnkey b asis expressed in R s per sqm for each

    multistoried building (project) including complete internal campus development

    works as detailed in the drawing to make the flats ready for living conditions

    BGENERAL CONDITION OF

    CONTRACT

    1 MOBILIZATION ADVANCE 8 21

    Recovery of Mobilization

    Advance

    The recovery commenced after 20% of work and shall be recovered at the rate of

    20% of workdone from all running payments till full recovery of advances

    Equipment Advance5% of CV or 90% of price of new Eqpmnt or 50% of Depriciated value of Eqmnt,

    whichever is lower

    Release of Equipment

    Advance

    75% on delivery & 25% on commissioning

    Recovery of Equipment

    Advance

    The recovery commenced after 20% of work and shall be recovered at the rate of

    20% of workdone from all running payments till full recovery of advances

    2SECURITY DEPOSIT /

    RETENTION MONEY

    10 23

    Recovery of Security Deposit/

    Retention Money

    50% on issue of Completion certificate, next 25% on issue of Defect liability

    certificate, next 25% after 3years ie warranty period from completion of work

    3 Performance Security 9 23 5% of CV against submission of BG

    4 Facilities at site

    28 33 Contractor to arrange his own arrangements & get the clearance from local

    authorities.

    5 Liquidated Damages 72 58 Nil upto 3 months, 1% per month beyond 3 months, max 10% of CV

    6 Defect Liability Period 74 70 24 Months

    7

    Warranty Period & Warranty

    Money

    10 23 warranty period shall b e 36 months from t he d ate o f completion c ertificate, 2 5% o f

    security deposit will be withheld for the said period. if contractor fails to rectify the

    defects, this general security deposit shall be forfeited and the contractor shall be

    blacklisted

    8Handing over and clearing of

    site

    2.2.1 18 Traffic diversion,if required, is to be done and maintained as per specification by

    the contractor at his own cost and th contractor shall not be entitled for any extra

    payment,whatsoever,in this regard.

    9Handing over and clearing of

    site

    2.2.2 18 The efforts will be made by the UPHDB to handover the site to the Contractor

    free of encumbrances. However, in case of any encumbrances found

    under-ground at site by the Contractor, the UPHDB shall not consider any

    revision in contract price or any other compensation whatsoever viz. towards

    idleness of Contractors labour, equipment etc.

    10

    BBS,Shop & Fabrication

    drawings

    11.9 25 Contractor shall have to prepare the Bar Bending Schedule, shop and fabrication

    drawings free of cost, if required for anyof the items of work. Five copies of these

    drawings each including for revision will be submitted to UPHDB forapproval. Before executing the item, shop drawings should be approved by

    UPHDB.

    Er.R.K.Mishra

    Minutes of Pre Bid Meeting held on dated 03.12.13 at 3:00 p.m. at Neelgiri Complex, Indira Nagar, L

    In this meeting the following officers of UPHDB a

    Er. Rajeev Kumar

    Er. Anil Kumar Mishra

    Er. K.C.Srivastava

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    2/28

    1.

    2.

    3.

    4.

    5. Er. K.K.Suri

    6 Er. Ajay Kumar Saxena

    Pre-Bid Queries

    Sr.

    No Description Clause No

    Page

    No. Tender Condition

    Er.R.K.Mishra

    Er. Rajeev Kumar

    Er. Anil Kumar Mishra

    Er. K.C.Srivastava

    1 External development

    2 Pump Room & Service Room

    3 Soil Investigation Report

    4 Contour Survey Report

    5 Water Proofing I

    Electrical

    1 Electrical2 Electrical

    3 Electrical

    4 Electrical

    5 Electrical

    6 Electrical

    7 Electrical

    PHE & FPS

    1 PHE & FPS

    2 PHE & FPS

    3 PHE & FPS

    4 PHE & FPS

    5 PHE & FPS

    Pre-Bid Queries

    Sr.

    NoDescription Clause No

    Page

    No.Tender Condition

    1

    2

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    3/28

    1.

    2.

    3.

    4.

    5. Er. K.K.Suri

    6 Er. Ajay Kumar Saxena

    Pre-Bid Queries

    Sr.

    No Description Clause NoPage

    No. Tender Condition

    Er.R.K.Mishra

    Er. Rajeev Kumar

    Er. Anil Kumar Mishra

    Er. K.C.Srivastava

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    4/28

    1. Su

    2. Ex

    3. Ass

    4. Ass

    5. Er. K.K.Suri Ass

    6 Er. Ajay Kumar Saxena Ass

    Pre-Bid Queries Su

    Sr.

    NoDescription Clause No

    Page

    No.Tender Condition

    Er.R.K.Mishra

    Er. Rajeev Kumar

    Er. Anil Kumar Mishra

    Er. K.C.Srivastava

    Ext

    su

    req

    Plu

    de

    pre

    De

    by

    ca

    Pre-Bid Queries SuSr.

    NoDescription Clause No

    Page

    No.Tender Condition

    1 Ple

    ins

    2 Th

    kin

    va

    Ple

    pe

    Ple

    su

    ret

    ba

    Ple

    Ple

    go

    Ple

    Kin

    Ple

    Pre-Bid Queries Su

    Sr.

    NoDescription Clause No

    Page

    No.Tender Condition

    Volume II m. 2 6 Wapip

    we

    gu

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    5/28

    1.

    2.

    3.

    4.

    5. Er. K.K.Suri

    6 Er. Ajay Ku

    Pre-Bid Queries

    Sr. No Description Clause NoPage

    No.

    A GENERAL QUERIES:

    1 Time for completion of workNIT

    2 RMCAOW 12

    3 Price

    RQF 13

    BGENERAL CONDITION OF

    CONTRACT1 MOBILIZATION ADVANCE 8 21

    Recovery of Mobilization

    Advance

    Equipment Advance

    Release of Equipment

    Advance

    Recovery of Equipment

    Advance

    2SECURITY DEPOSIT /

    RETENTION MONEY

    10 23

    Recovery of Security Deposit/

    Retention Money

    3 Performance Security 9 23

    Minutes of

    Er. Rajeev

    Er. Anil Ku

    Er.R.K.Mis

    Er. K.C.Sri

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    6/28

    4 Facilities at site

    28 33

    5 Liquidated Damages 72 58

    6 Defect Liability Period 74 70

    7 Warranty Period & WarrantyMoney

    10 23

    8Handing over and clearing of

    site

    2.2.1 18

    9Handing over and clearing of

    site

    2.2.2 18

    10BBS,Shop & Fabrication

    drawings

    11.9 25

    Technical Queries:

    1 External development

    2 Pump Room & Service Room

    3 Soil Investigation Report

    4 Contour Survey Report

    5 Water Proofing I

    Electrical

    1 Electrical

    2 Electrical

    3 Electrical

    4 Electrical

    5 Electrical

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    7/28

    6 Electrical

    7 Electrical

    PHE & FPS

    1 PHE & FPS

    2 PHE & FPS

    3 PHE & FPS

    4 PHE & FPS

    5 PHE & FPS

    Pre-Bid Queries

    Sr. No Description Clause NoPage

    No.

    1

    2

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    8/28

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    9/28

    Pre-Bid Queries

    Sr. No Description Clause NoPage

    No.1

    2

    Pre-Bid Queries

    Sr. No Description Clause NoPage

    No.Volume II m. 2 6

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    10/28

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    11/28

    i

    mar Saxena

    Tender Condition

    27 months

    Mixing of flyash is not permitted.

    Rate must be quoted lump-sum on turnkey basis expressed in Rs per sqm for each

    multistoried building (project) including complete internal campus development

    works as detailed in the drawing to make the flats ready for living conditions

    The recovery commenced after 20% of work and shall be recovered at the rate of

    20% of workdone from all running payments till full recovery of advances

    5% of CV or 90% of price of new Eqpmnt or 50% of Depriciated value of Eqmnt,

    whichever is lower

    75% on delivery & 25% on commissioning

    The recovery commenced after 20% of work and shall be recovered at the rate of

    20% of workdone from all running payments till full recovery of advances

    50% on issue of Completion certificate, next 25% on issue of Defect liability

    certificate, next 25% after 3years ie warranty period from completion of work

    5% of CV against submission of BG

    Pre Bid Meeting held on dated 03.12.13 at 3:00 p.m. at Neelgiri Complex, Indira Nagar, Lu

    In this meeting the following officers of UPHDB an

    Kumar

    ar Mishra

    ra

    astava

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    12/28

    Contractor to arrange his own arrangements & get the clearance from local

    authorities.

    Nil upto 3 months, 1% per month beyond 3 months, max 10% of CV

    24 Months

    warranty period shall be 36 months from the date of completion certificate, 25% of

    security deposit will be withheld for the said period. if contractor fails to rectify thedefects, this general security deposit shall be forfeited and the contractor shall be

    blacklisted

    Traffic diversion,if required, is to be done and maintained as per specification by the

    contractor at his own cost and th contractor shall not be entitled for any extra

    payment,whatsoever,in this regard.

    The efforts will be made by the UPHDB to handover the site to the Contractor

    free of encumbrances. However, in case of any encumbrances found

    under-ground at site by the Contractor, the UPHDB shall not consider any

    revision in contract price or any other compensation whatsoever viz. towards

    idleness of Contractors labour, equipment etc.

    Contractor shall have to prepare the Bar Bending Schedule, shop and fabrication

    drawings free of cost, if required for any of the items of work. Five copies of these

    drawings each including for revision will be submitted to UPHDB for

    approval. Before executing the item, shop drawings should be approved by

    UPHDB.

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    13/28

    Tender Condition

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    14/28

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    15/28

    Tender Condition

    Tender Condition

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    16/28

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    17/28

    Superintending Engineer Head Quarter Circle

    Executive Engineer Construction Division-14

    Assistant Engineer Head Quarter Circle

    Assistant Engineer Construction Division-14

    Assistant Engineer Construction Division-14

    Assistant Engineer Construction Division-14

    Submitted By: Larsen and Toubro Limited.,

    Queries/ Request.

    We request to kindly accept the completion period as 36 months.

    We are proposing Shear wall concept for the project, In order to improve the durability &

    workability of concrete, We request to permit Concrete with flyash .

    We request to revise the price /sqm in following format -

    Rate / sqm for Superstructure on superstructure Area.

    Rate /sqm for Stilt on Stilt area.

    Rate /sqm for basement on Basement Area.

    We request to revise as follows

    The recovery will be commenced after 20% of work done on pro-rata basis till 90% invoice

    completion.

    5% of CV towards P&M & aluminium formwork

    along with agreement, submission of PS, submission of BG

    The recovery will be commenced after 20% of work done on pro-rata basis till 90% invoice

    completion.

    We request to revise as follows

    50% on of Completion of work, next 50% on completion of Defect liability period.

    We request to consider BG submitted for Security Deposit as performance security.

    cknow for multi-storeyed Alakhananda Enclave in Sector-3, Avadh Vihar Yojna respectively.

    d Builders/Representative are participated.

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    18/28

    The necessary permissions, clearance from local authorities & Statutory approvals required for

    establishment of batching plant, Labour colony, yards and stores shall be arranged by client.

    Nil upto 3 months, 1% per month beyond 3 months, max 5% of CV

    We request to revise the Defect Liability period as 12 Months

    We request to remove Warranty period & warranty money.

    We request you to clarify what kind of diversion will be required at site.

    Site will be handover to contractor without any encumbrances. If any encumbrances found under

    ground, proper rate revision will be provided to contractor and the required time extension will

    also be provided.The idleness of labour ,P&M,Staff will be paid accordingly.

    Contractor shall have to prepare the Bar Bending Schedule, shop and fabrication drawings free of

    cost, if required for any of the items of work. Three copies of these drawings each including

    for revision will be submitted to UPHDB for approval. Before executing the item, shop

    drawings should be approved by UPHDB.

    We request to provide Details & drawings for UGR, Community Centre, Boundary wall, Parking,Roads, Entrance/Exit Gates, Guard Room, Landscape & Hardscape works in Autocad format.

    We request to provide details & drawings for Pump Room & Services Room

    We request to provide Soil Investigation Report.

    We request to Share Surveying Report showing Contour plans, FRL, NGL, FGL & FFL of Buildings.

    We request to revise basement waterproofing as Cementitious crystalline concrete water

    proofing instead of DSR item no 22.1.1 & 22.2.1

    Please confirm Scope of External Street Lighting & landscape lighting.

    Kindly provide point of Supply from Grid with Voltage Level & Location.

    Please clarify, Whether 100% D.G Back-up power is to be proposed for Towers.

    Please confirm the scope of Conduiting from ELV shaft to flats points.

    Please clarify whether Floor wise Metering Required or All meter Boards will be located on the

    Stilt/Ground Floor.

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    19/28

    Please clarify the scope of telephone system/data points from ELV room to flats with wiring and

    intermediate equipments or only conduiting up to ELV shaft from telephone points.

    Please provide all the necessary Electrical drawings

    Kindly confirm source of water. If tube well then provide water test report for water treatment

    plant consideration.Kindly clarify the requirement of sewage treatment plant for the project.

    Please clarify the scope of Solar water Heater/ solar lighting and hot water supply system.

    As per specification received external sewerage pipe shall be PVC SWR as per IS-13592, which is

    not suitable for underground application, hence we are considering UPVC pipe as per IS 15328 for

    underground application. Kindly Confirm.

    Please provide Fire NOC & PHE drawings.

    Submitted By: Unity Infraprojects Ltd.,

    Queries/ Request.

    Architectural Drawing Approval: We understand that the Approval of Architectural Drawings is in

    the scope of Uttar Pradesh Housing & Development Board. Please confirm.

    Environmental Clearance. We understand that the Environmental clearance for the Development

    of the Project Group 1 & 2 is already obtained by UPHDB. Our scope is to obtain the adherences/

    conformations to Environmental requirements for the group housing units being developed underthe scope of contract.

    Construction Period: The scope consists of Construction & Development of Project to be

    completed in 27 Months including Design Development & Services Drawing Approvals from

    Authorities. We request you to please provide additional 6 months for the Design Development &

    Approvals and this 27 Months to be excluslvelv for Construction work after approval.

    Architectural Drawing: Please refer clause 13, Page No. 9 "The drawings with tender Document ---

    ---. "we do not find any drawings with the tender document. Kindly confirm and request you to

    please issue the same.

    Soft Copy of the Proposed site for Group 1 & Group 2 i.e. Schematic Drawings planed for

    development and Units plantor 3 BHK & 2 BHK: We request you to please issue us the soft copy of

    Plot for Group 1 & Group 2 each for exactly fittings the Blocks, Plan the Basement area, Parking

    area/ setback area etc and also provide us a Unit Plan for 3 BHK & 2 BHK Units, so that we are able

    to develop the same into actual, for developing the details. This will save time in preparation of

    Bid.

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    20/28

    Soil investigation Report: We request you to provide the soil report for the site for Group 1 & 2 if

    available. This witt help us to estimate the projects more accurately with respect to foundations

    at this tendering stage. Also please provide us, depth of water table & soil parameters in the Area.

    Excavated. Earth & Disposal: Please confirm who will be the owner of the Excavated Earth. Will

    the Department provide a land for disposal of the excavated earth from the

    basement, and the contractor will bear the royalty on the Earth.WTP &STP:We understand that the STP & WTP is not in the scope of this Tender. We

    have to design for Storm water / Sewer /Rainwater lines only within the Boundary of the site.

    Connections to the Municipality lines are not in the scope. All Extra items shall be as per CPWD

    Norms.

    Contour Plan: Request you to kindly provide us the Contour plan for sites and the level of Plinth to

    me maintained.

    Benchmark reference for the levels: We request you to please confirm the reference bench marks

    based on which the natural ground level, 00 is to be fixed.

    Service Tax: Re! clause 13.7, Page 26, Volume 1; as Service tax is reimbursable on actual basis.

    Please permit us to quote our rates without Service Tax.

    Electrical Fittings: We understand that scope of Internal Electrical works does not include

    electrtcal fittings like fan, Tube light, Bulbs, exhaust, bell etc. please confirm.

    External Electrifications Works: We request to please elaborate the scope under External

    Electrifications work. We understand that it is limited only to External Street Lightening and

    generators for the common area services only. Please confirm.

    Tax Variation!/Future Tax: We understand that if any new taxes is introduced, after the

    submission of bid is payable to the contractor. Please confirm.

    Space for labour Hutment, Temporarv Structures & Plants: We request you to permit us space for

    temporary structures like project office, stores, batching plant site, sock yard & bar bending Yard

    etc and labour hutment within the site premises free of cost.

    Water and Electricitv: We assume that we will be allowed to draw underground water for

    construction purpose and use the state electricity supply, free of cost for the entire duration of

    the project.

    Escalation Clause: we request to introduce an escalation clause in this project, as it is being a

    common clause in all government projects for the projects more than 18 months.

    Base Prices: We request you to fix the Basic Rates for finishing materials like Vitrified Tiles,

    Antiskid Ceramics, Glazed Ceramics Tiles and Stoneslike Marble & Granite etc.

    Retention Money :(Re! Clause 10, Page 23, Volume 1) We request you to please allow us to

    submit a Bank Guarantee for the total value of 5 of the contract, in the beginning of the project

    valid up to completion period, instead of cash retention @ 5 from the running b!11. This will

    improve the Cash-in Flow of the project and enable to maintain a better health of project and

    progress.

    Defect liability Period: We request you to reduce the Defect Liability Period to 12

    Months instead of 24 Months as being followed in the CPWD Projects.

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    21/28

    Extension for the date of submission: This being a Turnkey Project and to be quoted on Lump sum

    basis (per sqft of built area) after development of Design & Services Drawings based on the

    requirements of the tender. We are to engage an Architect & Service Consultants for Electrical,

    Plumbing, landscaping, Flreflghting Works etc. for development of Service Scheme and other

    details, so that we arrive on actual quantities and put our most competitive offer for your

    prestigious Projects. The architects and consultants are taking time in the development of the

    Design and Scheme. In this contest we request you to please extend the date of submission of Bidby at least 30 Oays from 13.12.13. You will appreciate if the bidders are given more time now, we

    can work out the tender in detail and submit our most competitive Bid.

    Submitted By: Ramky Infrastructure Ltd.,

    Queries/ Request.

    Please reduce the recovery of the mobilisation advance @ 10% of the work done from RA Bills

    instead of 20%

    There is ambiguity regarding price variation clause mentioned on Pg 27,28 ( for cement & steel )

    kindly clarify & also provide escalation on all materials, POL, Labour etc., being this tender is high

    value & also completion period is more than 2 years.

    Please reduce the DLP period from 24 Months to 12 Months and delete the clause warranty

    period and warrenty money.

    Please delete the Service Tax clause & allow us to reimbursement the same at actuals against

    submission of invoices

    retained from RA Bills should be released 100 after completion of work against submission of

    bank guarantee to make easy cash flow

    Please accept EMD issued from scheduled bank also.

    Please let us know the source of funds and also whether 100% funds allocated to client by the

    govt.

    Please extend the date of submission for atleast 30 days from the original date of submission

    Kindly arrange soil test report

    Please allow any reputed ISI vendor other than mentioned in the approved list.

    Submitted By: N.C.C. Ltd.,

    Queries/ Request.

    Water supply external areas out side the block or in service shafts- we request you to change D.I.

    pipes to U.P.V.C. pipes.

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    22/28

    we request you to accept bank guaranties from scheduled bank also for E.M.D., performance

    guarantee, mobilisation guarantee and security deposit guarantee.

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    23/28

    Clarifications

    not allowed

    Design mix as per IS-456 duly approved by any

    IIT

    already in corporated on page no-13 of price

    bid

    not allowed

    not allowed

    not allowed

    not allowed

    not allowed

    not allowed

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    24/28

    clarified

    not allowed

    not allowed

    not allowed

    not allowed

    as per documents

    as per documents

    will be provided

    will be provided

    soil investigation report is being uploaded only

    for guidance

    as per documents

    already being in corporated in (volume-II) price

    bid

    it is limited within the campus

    as per documents

    as per documents

    as per documents

    as per documents

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    25/28

    as per documents

    being uploaded

    water source will be provided by UPHDB

    not in the scope of contractor

    as per documents

    Not allowed

    being uploaded

    Clarifications

    clarified,to be approved by UPHDB

    Clarified,

    to be Provided by UPWDB

    Not allowed

    up loaded

    already uploaded

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    26/28

    Soil investigation repair will be uploaded for

    guidance only

    Connection to the main Water supply &

    Sewerage system will be done by the

    contractor.

    Not required

    vertical sectional drawing showing top level of

    basement will be uploaded

    as per documents

    Fixing of Electrical fixtures such as fan tube light

    etc not in the scope of contractor.

    With in campus it is required

    Clarified as per clause No. 13.1 G.C.C.

    Space will be provided as per requirement

    Clarified

    for cement and steel necessary clause has been

    incarporated

    May not be considered

    Clarified

    Not allowed

  • 8/12/2019 Prebid Querie.answers- Alakananda Enclave Lucknow

    27/28

    Not allowed

    Clarifications

    Not Allowed

    Clarified,

    not allowed for other materials.

    Not Allowed

    Clarified

    Not Allowed

    Not Allowed

    Clarified

    Not Allowed

    being uploaded only for guidance

    Not Allowed

    Clarifications