presentation

Upload: akshey-shukla

Post on 07-Jan-2016

2 views

Category:

Documents


0 download

DESCRIPTION

Questions for revision

TRANSCRIPT

Revision Round

Revision Round 1.Milestone chart is very useful when the planning need is simple and _________

Answer Following Questions2.Generally 80% of the defects are cause by a ______________in the Pareto Analysis.

3.What is the next step in PDCA cycle after Deciding the objectives and targets?

4.Dr. Deming himself said that the idea behind PDCA cycle was given by ___________.

5. Hitchhiking takes place in the ______________________.

6.Stratification is the process of separation of data in to ______________.

7. What is CEDAC ? 8. The identification of problem is to be done by using _______________method of Brainstorming.9. Number Defective (np) Control chart is used when sample size is ________Pictorial Round UserPurchaseManufacturerStoresInspection Identify the Figure -Quotation Obtain MaterialOrdered MaterialMade MaterialReceivedInspectedUser Sends Indent User Obtains

Identify the Figure -Identify the Figure -Calculation Round

1.Calculate the number of the class interval [K], if the value of N is 64 and Log is 1.8062

2. Calculate the value of Lower Control Limit for Defect C chart if the Total number of Defects are 25 for 10 times reading.3. What is the angle of Health and Education in Pie diagram if the expenditure of Government in the health and education was Rs1,000 out of Total expenditure Rs 7,200? 4. Calculate the percentage of variation in Y, influenced by X, if the value of r = 0.7555. Calculate the value of Lower Control Limit [Range] LCL , if the value of average range is = 1.94

6. Calculate the value of Sigma () if the difference between Upper Control Limit and Lower Control Limit is 12 and C =2

Thanks Chart115102535153515251015

Series 1Series 2Series 3Series 4Series 5

Sheet1Series 1Series 2Series 3Series 4Series 5Towns1510253515Villages3515251015To resize chart data range, drag lower right corner of range.