présentation de mirom

27
27-06-2022 1 EXPERIENCES WITH AN ORC TO INCREASE THE ENERGY EFFICIENCY IN A MUNICIPAL WASTE INCINERATOR Jeroen Vanwalleghem

Upload: clustertweed

Post on 26-Jun-2015

1.390 views

Category:

Technology


3 download

TRANSCRIPT

Page 1: Présentation de Mirom

13-04-20231

EXPERIENCES WITH AN ORC TO INCREASE THE ENERGY EFFICIENCY IN

A MUNICIPAL WASTE INCINERATOR

Jeroen Vanwalleghem

Page 2: Présentation de Mirom

13-04-20232

Summary

The waste incinerator of MIROM. Extension of the heat recovery with electricity. The organic rankine cycle. Application in MIROM Roeselare. Some data, graphs and results. Calculation of expenses. Conclusion and future.

Page 3: Présentation de Mirom

13-04-20233

MIROM Roeselare

Is a union of 15 municipalities established for collecting and treating municipal waste. The region counts 270.000 inhabitants.

The waste is collected separately: residual waste, paper, PMD (plastic and metal cans, bricks).

20 recycling parks. Own waste incinerator – only residual waste.

Page 4: Présentation de Mirom

13-04-20234

The waste incinerator of MIROM

Two lines, each with a furnace, boiler, ESP, dry gascleaning with injection of bicar and active coal. Baghouse with Remedia catalytic filters and a shell denox system.

2 * 4 ton/h or 62.000 ton/year. Boilers with superheated water of 180°C.

2 * 7 MW or 115.000 MWh/y. Since 2010 extra Economizers: 2 * 0,75 MW

Page 5: Présentation de Mirom

13-04-20235 13-04-20235

18MW-180°C

110°C1986

180°C

3,1MWe

2008

1976

Gas : 7MW

2004

Page 6: Présentation de Mirom

13-04-20236

Heat recovery

Primary circuit of 180 °C, pression 15 bar and heat exchanger.

Town heating system of 110 °C, 5 bar. 21 customers with a heat demand around 25.000

MWh. 5.000 MWh for preheating of combustion air. Expansion of the distance heating is not possible.

Forced to look for other systems to increase energy recovery.

Page 7: Présentation de Mirom

13-04-20237

Page 8: Présentation de Mirom

District heating

8

• Circuit to city centre: 4,5 km(x2)

• Circuit to greenhouses: 2,5 km(x2)

• 21 customers

MIROM

Page 9: Présentation de Mirom

13-04-20239

Choice for electricity

MIROM did not find other customers who needed lots of energy.

Production of electricity was the only option. Primary temperature of 180 °C is far too low

to make electricity with steam.

Page 10: Présentation de Mirom

13-04-202310

Why did MIROM choose an ORC

Boilers are still in perfect condition. The town heating system stays primary, so

energy to ORC will fluctuate. ORC is easily adjustable. Organic fluid evaporates at low temperature.

Page 11: Présentation de Mirom

13-04-202311

Property of solkatherm

Looks like water, smells like solvent. Heavier than water: 1,36 kg/l. Boils at 35,6 °C. Not toxic. Not explosive or flammable. Self-ignition temp.: 580 °C.

Page 12: Présentation de Mirom

13-04-202312

Page 13: Présentation de Mirom

13-04-202313

Page 14: Présentation de Mirom

13-04-202314

Page 15: Présentation de Mirom

13-04-202315

Some data

Installed: input = 17 MWth, output = 3,1MWe. Design conditions: input 15 MW, T amb. 15°C

gives output 2,4 MWe. Average efficiency: 15,6%. Range: 2.900 kW – 100 kW.

Page 16: Présentation de Mirom

13-04-202316

Investment in EUR

ORC: 5.300.000Heat connection: 725.000Building: 900.000

Total: 6.925.000

Page 17: Présentation de Mirom

13-04-202317

Heat recovery in 2011 in MWh

Produc-tion

boilersMWhth

Town heating

MWhth

PreheatPrim.

AirMWhth

Energy to ORC

MWhth

Produ-ced

electr.Mwhe

Total Recov.

MWh

142.525 24.100 5.200 107.000 16.930 46.230

Page 18: Présentation de Mirom

13-04-202318

Production of electricity

See next slide. ORC runs since july 2008. Even in winter there is still production.

Page 19: Présentation de Mirom

13-04-202319 jan feb mar apr may jun jul aug sep oct nov dec jan feb mar apr may jun jul aug sep oct nov dec

0

200

400

600

800

1000

1200

1400

1600

1800

Energy balance '08 - '09 Electricity - BOUGHT [MWh] Electricity - SOLD [MWh]

Total Electricity Production [MWh] Own consumption [MWh]MWh/month

Page 20: Présentation de Mirom

13-04-202320Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0

200

400

600

800

1000

1200

1400

1600

1800

Balans elektriciteit 2011Aankoop - Totaal 195 MWh

Verkoop - Totaal 8814 MWh

Productie - Totaal 16930 MWh

Eigen verbruik - Totaal 8325 MWhMWh/maand

Page 21: Présentation de Mirom

13-04-2023211/Ja

n/08

1/Feb

/08

1/M

ar/0

8

1/Apr

/08

1/M

ay/0

8

1/Ju

n/08

1/Ju

l/08

1/Aug

/08

1/Sep

/08

1/Oct

/08

1/Nov

/08

1/Dec

/08

1/Ja

n/09

1/Feb

/09

1/M

ar/0

9

1/Apr

/09

1/M

ay/0

9

1/Ju

n/09

1/Ju

l/09

1/Aug

/09

1/Sep

/09

1/Oct

/09

1/Nov

/09

1/Dec

/09

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

2200

2300

2400

2500

Power '08 - '09Electricity - BOUGHT [kW]

Electricity - SOLD [kW]

Total Electricity Production [MWh]

kW

Page 22: Présentation de Mirom

13-04-202322

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

2200

2300

2400

2500

Vermogens 2011

Gemiddelde Injectie actief vermogen

Gemiddelde Afname actief vermogen

Gemiddeld opgewekt vermogen ORC

Eigen verbruik

kW

Page 23: Présentation de Mirom

13-04-202323

Efficiency

ORC follows thermal load between full range Guaranteed average gross efficiency =

15,6% Gross efficiency varies between 15% and

17% depending on outside temperature conditions and thermal load

Page 24: Présentation de Mirom

13-04-202324

Page 25: Présentation de Mirom

13-04-202325

Reliability - Availability

Total amount of running hours during 2011 8364 hours (total availibility = 95,5%)

Total amount of running hours incinerators : 8396 hours

Page 26: Présentation de Mirom

13-04-202326

Conclusion.

An ORC is a real added value for our heat recovery.

Even in winter we still have production of electricity.

Thanks to the GEC, the system is profitable. After the typical start-up problems, the ORC

runs smoothly with high availibility Little supervision necessary

Page 27: Présentation de Mirom

04/13/202327

Future

There is a plan to build greenhouses of about 200.000 m² next to our ORC. We’ll use the cooling system to warm up the greenhouses.

There are plans to enlarge the town heating system: Up to 30 more industrial clients and 50 residential clients.

In this case, efficiency will decrease by a certain percentage, but the total recovery of energy will be very important.