    ProfessionalPractice Agreement'Mechatronics'

  • 8/13/2019 Professional Practice 2005 417

    2/14

    Festo Didactic GmbH & Co. World Skills Competition Mechatronics 2005 2

    Published: 12 / 2005Authors: Eckhard von Terzi, Festo Didactic

    2005 by Festo Didactic GmbH & Co.,

    Rechbergstrae 3, D-73770 Denkendorf

  • 8/13/2019 Professional Practice 2005 417

    3/14

  • 8/13/2019 Professional Practice 2005 417

    4/14

    Festo Didactic GmbH & Co. World Skills Competition Mechatronics 2005

    The mechatronics competition reflects reality on theshop-floor:

    People working under pressure to design andimplement solutions and to maintain and constantlyimprove production.

  • 8/13/2019 Professional Practice 2005 417

    5/14

    Festo Didactic GmbH & Co. World Skills Competition Mechatronics 2005 5

    Team-Briefing

    The whistle starts each task.

    The exercises cover the topics design, assembly,commissioning, programming and troubleshooting.

    All exercises are translated in the native languages ofthe competitors.

  • 8/13/2019 Professional Practice 2005 417

    6/14

    Festo Didactic GmbH & Co. World Skills Competition Mechatronics 2005

    Assembly of components.

    Production and adaptation of modules.

    Integration of modules into the production line.

    Wiring, tubing and commissioning of mechatronicproduction lines.

  • 8/13/2019 Professional Practice 2005 417

    7/14

    Festo Didactic GmbH & Co. World Skills Competition Mechatronics 2005 7

    Praxis orientiet exercises have to be mastered:

    ...troubleshooting...

    ...Teamwork...

    ...precision...

    To succeed in mechatronics the combination of skillsexcellence with team skills is necessary!

  • 8/13/2019 Professional Practice 2005 417

    8/14

    Festo Didactic GmbH & Co. World Skills Competition Mechatronics 2005

    Wiring and tubing

    Description OK not OK

    Aderendhlsen /

    End sleeves

    metall visible

    Lnge der Aderendhlsen /

    Length of end sleeves

    metall visibleAlle Verbindungen mit

    Aderendhlsen /

    Endsleeves are necessary on

    all wire connections

    no end sleeves used

    Kabellnge: Mindestens 10

    cm Reserve im Kabelkanal /

    Cable lenghth: a minimum of

    10 cm reserve in the cableduct

    less than 10 cm reserve

    Verlegung: Elektrische Kabel

    und Schluche getrennt /

    Layout: electrical cable and

    tubes separated

    tubes and cables not separated

    Professional Practice

  • 8/13/2019 Professional Practice 2005 417

    9/14

    Festo Didactic GmbH & Co. World Skills Competition Mechatronics 2005 9

    Verlegung: Keine Schluche im

    Kabelkanal /

    Layout: no tubes inside or

    through cable ducts.

    tubes are going through the cable

    duct

    Ablngen von Kabelbindern:

    Kabelbinder mssen bndig

    abgelngt werden. /

    Cutting cable binders: Cable

    binders have to be cut flush

    cut too long, danger of injury!

    Abstand zwischen

    Kabelbindern: Der Abstand

    zwischen Kabelbindern muss

    kleiner 40mm betragen /

    Distance between cable

    binders: less than 40 mm.

    distance more than 40mm

    Abstand zwischen

    Anschlssen und

    Kabelbindern: Der Abstand

    vom Anschluss zum ersten

    Kabelbinder kann max. 60 mm

    betragen /

    Distance between cable

    binders and connectors: The

    distance from e.g. valve orcylinder connection to the

    first cable binder must be less

    than 60 mm.

  • 8/13/2019 Professional Practice 2005 417

    10/14

    Festo Didactic GmbH & Co. World Skills Competition Mechatronics 2005

    Kabel isolierung: /

    cable insulation

    insulation not completly removed

    Beschdigung von Kabeln:

    Kabel und Adern drfen nicht

    beschdigt werden. /

    Damage of cables: Cables and

    wires have to be undamaged.

    insulation of wire destroyed

    Kabellnge: Kabel

    entsprechend abgelngt, KeineKabel die aus dem Kabelkanal

    herausragen. /

    Cable lenghth: Cables have to

    be shortened in order that they

    fit into the cable ducts.

    cables not completely inside the

    cable duct

  • 8/13/2019 Professional Practice 2005 417

    11/14

    Festo Didactic GmbH & Co. World Skills Competition Mechatronics 2005 11

    Mechanical assembly

    Description OK not OK

    Kollisionsfreie Bewegung aller

    Aktoren und Werstcke /

    Collision free movements of

    all actuators and workpieces

    collisions between cables

    actuators or workpieces during

    the evaluation

    Kein Werkzeug auf der Anlage

    /

    No tools on the system

    Kein Verdrahtungs- oder

    Verschlauchungsmaterial auf

    der Anlage /

    No wiring or tubing material

    on the system

    Alle Elemente, Module

    befestigt (keine lockeren

    Schrauben) /

    All elements, modules fixed

    (no screws loose)

    Keine Teile oder Module

    beschdigt oder verloren /

    No parts or modules broken,

    damaged or lost

  • 8/13/2019 Professional Practice 2005 417

    12/14

    Festo Didactic GmbH & Co. World Skills Competition Mechatronics 2005

    Stationslayout: Stationen

    bndig (max. Versatz 5mm) /

    Station layout: Station flush

    (max. misalignment of 5 mm)

    more than 5 mm

    Verbindung von Stationen:Stationen mit mind. 2

    Verbindern verbunden /

    Connection of stations:

    Stations have to be

    connected by a mimimum of 2

    connectors.

    Stationslayout: MaximalerAbstand zwischen Stationen

    5mm /

    Station layout:Maximum

    distance between stations 5

    mm

    Alle pneumatischenVerbindungen dicht /

    All pneumatc connections

    leakproof

  • 8/13/2019 Professional Practice 2005 417

    13/14

    Festo Didactic GmbH & Co. World Skills Competition Mechatronics 2005 13

    Kabelkanle geschlossen /

    Cable ducts closed

    Kein Mll im Kabelkanal /

    No rubbish in the cable ducts

    Beschriftung von Baugruppen

    ist nicht erforderlich /

    Label ing of components and

    modules is not necessary

    Endkappen auf Profilen /

    End caps on profiles

    Befestigung und Aufbau der

    Module: Kabelkanal mit mind.

    2 Schrauben und Unterleg-

    scheibe befestigt.

    Module mssen entsprechend

    der Zeichnungen aufgebaut

    sein, wenn Zeichnungen wennin Aufgaben enthalten

    Use min. 2 screws and

    washers to fix cable ducts.

    If drawings are provided,

    modules have to be built and

    fixed as shown on drawings

  • 8/13/2019 Professional Practice 2005 417

    14/14

    Festo Didactic GmbH & Co World Skills Competition Mechatronics 2005

    Schraubenkpfe

    unbeschdigt /

    Bold heads

    undamaged