PROJECT PURPOSEThe C-111 Spreader Canal Western Project is an enhancement to the 1994 C-111 General Reevaluation Report. Its goal is to improve ENP conditions by establishing more natural water flows in Taylor Slough. This, in turn, will improve the timing, distribution and quantity of water in Florida Bay. Both the slough and bay are within ENP. The western project also begins features that will jumpstart environmental restoration in the Southern Glades and Model Lands. These areas form a contiguous habitat corridor with Everglades National Park, Biscayne National Park, Crocodile Lakes National Wildlife Refuge, the north Key Largo Conservation and Recreational Lands (CARL) purchases, John Pennekamp State Park and the National Marine Sanctuary. It is estimated that about 252,000 acres of wetlands and coastal habitat may be affected by the proposed project.
PROJECT DESCRIPTIONThe C-111 Spreader Canal Western Project will create a six-mile hydraulic ridge adjacent to ENP that will keep more of the natural rainfall and water flows within Taylor Slough. The hydraulic ridge will be created by constructing a 590-acre above-ground detention area in the Frog Pond area, installing two 225 cubic feet per second pump stations, and integrating other project features. The project will also begin restoration of the Southern Glades and Model Lands with an operable structure in the lower C-111 canal, incremental operational changes at the S-18C structure, a plug at S-20A, operational changes at the S-20 structure, and construction of earthen plugs at the C-110 canal.
The C-111 canal in south Miami-Dade County is the southernmost canal of the Central and South Florida (C&SF) Flood Control Project. The canal was constructed under the authority of the Flood Control Act of 1962 to extend flood protection while improving conservation and distribution of available water. The canal provides several critical functions, including flood damage reduction for the roughly 100-square-mile C-111 basin.
PROJECT BACKGROUNDCongress recognized that Everglades National Park (ENP) is a nationally and internationally significant resource, and has and continues to be adversely affected by external factors that have altered the ecosystem including the natural hydrologic conditions within the park. Congress enacted the Everglades National Park Protection and Expansion Act in 1989. The Act directed the Secretary of the Army to take all measures feasible and consistent with the purposes of the C&SF Project to protect natural values associated with ENP. As a result, the U.S. Army Corps of Engineers completed the C-111 General Reevaluation Report (GRR) in 1994.
The GRR recommended construction of bridge crossings, pump stations, levees and canals to restore the ecosystem in Taylor Slough and the eastern panhandle of ENP. Included in the recommended plan were pump station 332E, a spreader canal, and plugs in the C-110. These elements of the GRR recommended plan were later made part of the Comprehensive Everglades Restoration Plan (CERP). The C-111 Spreader Canal project is being evaluated via two Project Implementation Reports (PIR). The western PIR focuses on the restoration of flows to Florida Bay via Taylor Slough as well as the restoration of the Southern Glades and Model Lands. The eastern PIR will address restoration of the remainder of the project area through features such as a spreader canal and backfilling of the C-111 canal.
MICHAEL DROGUSACE Project ManagerP.O. Box 4970Jacksonville, FL 32232-0019 [email protected] 904-232-1784
BRENDA MILLSSFWMD Project Manager 3301 Gun Club Road West Palm Beach, FL 33406 [email protected] 561-682-6536
U.S. ARMY CORPS OF ENGINEERS
C-111 | Spreader Canal Western Project
FOR MORE INFORMATION
PROJECT STATUSOn June 10, 2014, the project received congressional authorization in the Water Resources Reform and Development Act (WRRDA) of 2014. Congressional authorization now makes the project eligible for funding during the appropriations process.
In February 2012, SFWMD completed construction of the C-111 Spreader Canal Western Project as part of its state-expedited program. The C-111 Spreader Canal Western Project includes the Frog Pond Detention Area, Aerojet Canal features, plugs in the C-110, a plug at S-20A, and operational changes at S-18C and S-20. A new structure in the lower C-111 Canal is scheduled for construction in the future.
FPLCoolingCanals
FLORIDA TURNPIKE
GULF OFMEXICO
SFWMD
Area ofInterest
ATLANTICOCEAN
LEGENDRecommended Plan Features
Proposed Pump Station
Weir
Stage Trigger Changes
S-198 Operable Structure
L-31E Plug
C-110 Plugs
Proposed Conveyance Features
Proposed Current Flow
Frog Pond Detention Areas
(*Not to Scale)Everglades National Park
SD
IXIE
HY
OLDCARD
SOUND
RD
ING
RAHA
MHY
SW 328TH ST
SW
137T
SW 320TH ST
SW 360TH ST
SW 344TH ST
SW
192N
DAV
SW 304TH ST
SW 312TH ST
LUCY ST
SW 392ND ST
SE 24TH ST
NFL
AGLER
AV
E PALM DRW PALM DR
NW
6TH
AV
NW 8TH ST
PALMDR
SW
117T
HAV
SW
202N
DAV
W MOWRY DR
NW 15TH ST
SW 376TH ST
SW 7TH ST
SE
12TH
AV
SE
6TH
AV
SE
1ST
AV
SW 352ND ST
SE 8TH ST SW152N
DAV
NW
MOWRY DR
NE
12TH
SW 336TH ST
N CANAL DR
SW
14TH
AV
NE
18TH
AV
SW 312TH ST
SW 320TH ST
SW
192N
D
INGRAHAM
HY
SW
SW 328TH ST
SW
137T
HAV
NK
RO
M SW 30
SW 344TH STS
W19
7TH
AV
SDIX
IEHY
SW
152N
DAV
SW
187T
HAV
SW
162N
DAV
Aero
jet C
anal
Card Sound
Barnes Sound
FloridaCity
Homestead
Miami-Dade County
Card Sound
Barnes Sound
FloridaCity
Homestead
1
Frog PondDetention Areas*
(FPDA)
S-20TriggersRaised
S-18C IncrementalTrigger Increases
S-199Pump Station
S-200Pump Station
S-198 OperableStructure
L-31E Plug
FLORIDA CITY CANAL
NORTH CANALC
-111
L-31
E
L-31
C-1
10
C-1
11E
C-113
C-1
10P
lugs
EvergladesNational Park Miami-Dade County
ATLANTICOCEAN
N