project completion report

24
(Standard PCR Form) - Name of the Project : - EDCF Loan Agreement No. - Name of Borrower : Date : Economic Development Cooperation Fund (EDCF) (102(C)/012) Project Completion

Upload: rovita-triyambudi

Post on 13-Aug-2015

179 views

Category:

Documents


3 download

DESCRIPTION

Project Completion Report.doc

TRANSCRIPT

Page 1: Project Completion Report

(Standard PCR Form)

- Name of the Project :

- EDCF Loan Agreement No.

- Name of Borrower :

Date :

Economic Development Cooperation Fund(EDCF)

(102(C)/012)

Project Completion Report

Page 2: Project Completion Report

CONTENTS

Page

I. Project Description ......................................................... 11. Project Objectives .......................................................................................................................................... 1

2. Project Scope ...................................................................................................... 2

II. Project Implementation ............. 51. Organization for Implementation Project.......................................................................................................................................... 5

2. Implementation Period ....................................................................................... 63. Project Cost ........................................................................................................ 84. Comments of Performance of Consultant/Supplier and/or Consultant............. 125. Other Matters..................................................................................................... 13

III. Action Taken by Borrower and/or Executing Agency

relating to Recommendation(s) .......... 141. Recommendation(s) made by EDCF ........................................................................................................................................ 14

2. Action Taken and Results ................................................................................. 14IV. Initial Operation and Maintenance of Project...... 151. Present Condition of

Facilities............................................. 152. Organization for Operation and Maintenance. . . 163. Annual Budget or Actual Expenditure for Operation and Maintenance of Project Facilities (by Year) .................................................................. 184. Maintenance Method........................................................................................................................................ 19V. Benefits Derived from Project................................................................................ 20

1. Direct Effects (by Year) ................................................................................. 202. Indirect Effects.................................................................................................. 21

VI. Conclusion.............................................................................................................. 22

VII. Others.................................................................................................................... 22

Page 3: Project Completion Report

PROJECT COMPLETION REPORT

on

( Name of the Project )

Loan Agreement No.:

Ⅰ. Project Description

1. Project Objectives

(1) Original (At the time of EDCF appraisal)

(2) Modification

① Please Check : thus

This paragraph is ( applicable or not applicable. There has been no modification).

② If "applicable", please state :

a. Modified Project Objectives

b. Reasons for the modification(with detailed explanation of the discrepancy between the original and modified basic plans, where applicable)

- 1 -

Page 4: Project Completion Report

2. Project Scope

(1) Comparison of Original and Actual Scope

① Please Check : There has been ( revision and/or modification or no revision and/or modification) of the Project scope and dimensions.

② If "revision and/or modification", please complete the Table.

- 2 -

ItemOriginal Scope

(At the time of EDCF appraisal)Revised/Modified

Page 5: Project Completion Report

(2) Reasons for Revision/Modification of Scope

① Where there has been "revision/modification" of the Project scope, please choose the reasons(s) from the following list and check.

Revision of the superior plan (e.g. sector development plan, etc.)

Revision of the supply-and-demand estimate

Large fluctuation in the Project cost

Substantial revision of design due to the unforeseeable physical condition at the time of the original design (e.g. poor soil condition, etc.)

Natural disaster/unseasonable weather

Unusual circumstances beyond the control of the Executing Agency (e.g. lack of staff, inadequate coordination with other agencies, etc.)

Availability of funds (e.g. lack of funds, use of contingency, fluctuation of the exchange rate, etc.)

Unrealistic initial plan/Technical problems

Procurement problems

Performance of contractor/supplier

Performance of consultant

Change in construction period

Others

② Detailed statement of reasons (with background)

- 3 -

Page 6: Project Completion Report

(3) Contribution of Project to Relevant (Sub) Sector(s)

① (Sub)Sector(s) to which the Project belongs

Electric Power and Gas Telecommunications Social Services

(Multipurpose) Dams Telecommunications Water supply

Power plants Broadcasting Sewerage

Transmission lines Irrigation and Flood Education

Transportation Health Ports

Gas Irrigation Tourism

Others Flood control Others

Roads Bridges Fisheries

Railways Airport Mining and Manufacturing

Mining Manufacturing Marine Transportation

Agriculture, Forestry and Fisheries Distribution systems control

Agriculture and Forestry Others

② Original (At the time of EDCF appraisal)

③ Present situation and outlook for the future

- 4 -

Item Description

Item Description

Page 7: Project Completion Report

Ⅱ. Project Implementation

1. Organization for Implementing Project

Please state and check

① Reasons for the change

② Problems arising, countermeasures adopted and results

③ The latest organization chart (or equivalent) for the implementation of the Project is ( attached or not available).

④ If the organization chart (or equivalent) is not available, please state the reason.

- 5 -

Function in the Project Implementation

Name of Organization

(1) Original Plan (2) Changed

Page 8: Project Completion Report

2. Implementation Period

(1) Comparison of Original Schedule and Actual Period

Pleas fill in the following blanks with actual period for each item.

Notes: Completion of the Project was defined as ( completion ceremony or

commissioning or commencement of commercial operation or final

disbursement or other than the above. It was defined as ).

The completion date was scheduled for (at the time of EDCF appraisal),

and is indicated (thus ◎) in the above Table.

- 6 -

ItemOriginal Schedule

(At the time of EDCF appraisal)Actual Period

Page 9: Project Completion Report

(2) Reasons for Delay or Early Completion

① In the case of delay or early completion, please choose the reason(s) from the following list and check.

Change in scope/dimensions

Natural disaster/Unseasonable weather (e.g. earthquake, typhoon, etc.)

Shortage of funds/Fluctuation of the exchange rate

Problems in procurement

Inflation

Unusual circumstances beyond the control of the Executing Agency

Structural and organizational problems of the agencies concerned (e.g. lack of staff, inadequate coordination with other agencies, etc.)

Legislative matters

Unrealistic initial plan/Technical problems

Performance of contractor/supplier

Performance of consultant

Others

② Reasons and background for delay or early completion

(3) Remedial Action Taken in Each Case of Delay

- 7 -

Page 10: Project Completion Report

3. Project Cost

(1) Comparison of Original Estimated Expenditure and Actual Expenditure (by Component)

① Original Estimated Expenditure

(Unit : )

(Exchange Rate : )

- 8 -

Breakdownof Cost

Item

Foreign Local Total

TotalCost

EDCF LoanPortion

TotalCost

EDCF LoanPortion

TotalCost

EDCF LoanPortion

Total

Page 11: Project Completion Report

② Actual Expenditure

(Unit : )

③ Please indicate whether the above figures are based on :

( current price as of or actual fixed price reassessed on )

The exchange rate between and Won(₩) used : (Exchange rate as of : )

(2) Reasons for Difference between Original Estimated Cost and Actual Expenditure

① If there is any difference between Table ① and Table ② in Paragraph (1), - 9 -

Breakdownof Cost

Item

Foreign Local Total

TotalCost

EDCF LoanPortion

TotalCost

EDCF LoanPortion

TotalCost

EDCF LoanPortion

G-Total

Page 12: Project Completion Report

please choose the reason(s) from the following list and check.

Increase in reconstruction cost arising from natural disaster/ unseasonable weather (e.g. earthquake, typhoon, etc.)

Increase or decrease arising from a change in construction period

Increase or decrease arising from inflation

Increase or decrease arising from fluctuation in the exchange rate

Increase or decrease arising from a change in the scope/work volume of the Project

Decrease arising from keen competition in tender

Unusual circumstances beyond the control of the Executing Agency

Unrealistic cost estimates/Technical problems

Others

② Description of the detailed reason(s) and background

(3) Action Taken in Case of Cost Overrun and Results

- 10 -

Page 13: Project Completion Report

(4) Comparison of Original Estimated Expenditure and Actual Expenditure (by Year)

① Original Estimated Expenditure(Unit : )

(Exchange Rate : )

② Actual Expenditure(Unit : )

(Exchange Rate : )

- 11 -

Breakdownof Cost

Fiscal Year

Foreign Local Total

TotalCost

EDCF LoanPortion

TotalCost

EDCF LoanPortion

TotalCost

EDCF LoanPortion

Total

Breakdownof Cost

Fiscal Year

Foreign Local Total

TotalCost

EDCF LoanPortion

TotalCost

EDCF LoanPortion

TotalCost

EDCF LoanPortion

Total

Page 14: Project Completion Report

4. Comments on Performance of Contractor/Supplier and/or Consultant

Please describe the performance of each organization after checking the item(s) in the relevant lists on which you have any comment.

(1) Performance of Contractor/Supplier

① Overall Performance Compliance with Contracts and Specifications

Workmanship Quality control

Schedule control Safety control

Repair of defective works during maintenance period, if any

Others

Performance related to any area other than the Project scope, if any.

② Description (in detail)

(2) Performance of Consultant

① Overall Performance Design

Contract administration Construction supervision

Expertise Staff qualifications

Coordinating ability Others

Performance related to any area other than the Project scope, if any.

② Description (in detail)

- 12 -

Page 15: Project Completion Report

5. Other Matters

Please choose the item(s) from the following list on which you have any comment, check it(them), and describe it (them) with measures and results in (2) below.

(1) Technical Financial Institutional

Economic Social/distributional Others

(2) Description (in detail)

- 13 -

Page 16: Project Completion Report

Ⅲ. Action Taken by Borrower and/or Executing Agency relating to Recommendation(s)

1. Recommendation(s) made by EDCF

EDCF's check: This article is ( Applicable. The recommendations are given in Annex-I

herewith or not applicable. There has been no recommendation with

regard to the Project)

2. Action Taken and Results

- 14 -

Page 17: Project Completion Report

Ⅳ. Initial Operation and Maintenance of Project

1. Present Condition of Facilities

(1) Please check: This article is ( applicable due to problem(s) or not applicable. No

particular problem has occurred since the initial operation started.)

If there have been any problems, please check the relevant space in the Table.

(2) Please check: The problem(s) has arisen owing to the following reasons(s).

Technical Financial Institutional

Economic Social/Distributional Others

(3) Description (in detail)

- 15 -

StatusItem

InitialOperation

Maintenance Management Others

Page 18: Project Completion Report

(4) Aspect of utilizing the Project facilities

2.

Organization for Operation and Maintenance

(1) Name of Agency and/or Section

① Please give the name of Agency and/or Section in charge of O/M

② The latest organization chart (or equivalent) for O/M of the Project facilities is ( attached or not available).

③ If the organization chart (or equivalent) is not available, please state the reason.

(2) Number of Engineers and Workers in above Agency and/or Section for Operation and Maintenance of Project Facilities.

(3) Please Check and explain the following.

- 16 -

Item Original Plan Actual Operation

Page 19: Project Completion Report

① The number of staff is currently ( sufficient or insufficient).If "Insufficient", please describe your estimate of the optimum number of staff and your plan for providing them.

② Average employment period of the present staff.

③ Availability of training program to promote the vocational ability of the staff, its contents and expected effects.

- 17 -

Page 20: Project Completion Report

3. Annual Budget or Actual Expenditure for Operation and Maintenance of Project facilities (by Year)

(1) Actual and Currently Expected Expenditure

①(Unit: )

* Note: Actual and currently expected expenditure for expansion, replacement or any

other improvement purposes

② Please describe the basis for the above estimate and your financing plan for the same.

4. Maintenance Method

- 18 -

ItemFiscal Year

Maintenance OperationMaintenance & Operation(For expanded portion *)

Total

Page 21: Project Completion Report

(1) Contents of Method

(2) Frequency

(3) Spare parts supply system

(4) Others, if any

- 19 -

Page 22: Project Completion Report

Ⅴ. Benefits derived from Project

1. Direct Effect (by Year)

(1) Original Expected Benefits(Unit : )

Note: Basis of calculation :

(2) Actual and Currently Expected Benefits

①(Unit : )

② Please describe background, reasons and results of the analysis for the discrepancy between (1) Original and (2) Actual above.

- 20 -

ItemFiscal Year

ItemFiscal Year

Page 23: Project Completion Report

2. Indirect Effects

(1) Please choose and check the item(s) which are dealt with in this Article by you.

Technological transfer (e.g. application of technology used in the Project to other similar Projects)

Employment creation (e.g. during construction, contribution to the sector(s) after completion)

Income-raising (e.g. income of the residents int eh region)

WID

Environmental evaluation

Other intended or unintended effects on the relevant sector(s) and/or the region concerned

(2) Please give details for each of the item(s) you checked.

- 21 -

Page 24: Project Completion Report

Ⅵ. Conclusion

Ⅶ. Other Remarks

- 22 -