Area III Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan Working Papers Andersen Elementary Years Old 37 Facility Renewal District Needs Assessment $1,897,039 Electrical retrofit for infrastructure Replace, Mechanical Chiller, VAV System upgrade, chilled water piping system, cabinetry, complete minor repairs and upgrades. ADA deficiencies list Upgrades District Wide Add Parking/Lighting Upgrades/Circulation Improvement $52,000 Add additional 40 parking spaces Educational Technology Infrastructure/Equipment Upgrades $151,470 Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations. Furniture Refurbishment / Replacement Program $130,000 Playground Equipment $59,000 Install one pre-k and one 5-12 year old playground. Roof Replacement & Preventative Maintenance Program $461,291 Security Fencing Additions $13,300 $2,764,100 Total Andersen Elementary Brevard Public Schools Page 1 of 29 April 4, 2005 Report #4

Upload: others

Post on 19-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Andersen Elementary Years Old37Facility Renewal

District Needs Assessment $1,897,039Electrical retrofit for infrastructureReplace, Mechanical Chiller, VAV System upgrade, chilled water piping system, cabinetry, complete minor repairs and upgrades.ADA deficiencies list

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $52,000

Add additional 40 parking spaces

Educational Technology Infrastructure/Equipment Upgrades $151,470Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $130,000

Playground Equipment $59,000Install one pre-k and one 5-12 year old playground.

Roof Replacement & Preventative Maintenance Program $461,291

Security Fencing Additions $13,300

$2,764,100 TotalAndersen Elementary

Brevard Public SchoolsPage 1 of 29April 4, 2005Report #4

Page 2: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Area III Years OldCost Sharing for Volunteer Projects

Cost Sharing for Volunteer Projects $500,000

New SchoolsElementary School in Viera $14,000,000

Middle School on Viera High School Site $20,000,000

RelocatablesCovered walkways for relocatables $1,006,664

Site AcquistionSite Acquisition $0

$35,506,664 TotalArea III

Brevard Public SchoolsPage 2 of 29April 4, 2005Report #4

Page 3: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Audubon Elementary Years Old41Core Facility Upgrades

Equity projects list $1,690,928MediaMulti PurposeCovered PE

Facility RenewalDistrict Needs Assessment $2,039,097

Electrical retrofit for infrastructureReplace unit ventilators, fire alarm system, painting, cabinetry, asphalt parking and bus loop, floor covering and minor repairs and upgrades.ADA deficiencies list

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $19,500

Add additional 15 parking spaces

Educational Technology Infrastructure Upgrades $561,776Infrastructure technology upgrade

Educational Technology Infrastructure/Equipment Upgrades $149,940Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $120,000

Playground Equipment $64,000Install one pre-k and one 5-12 year old playground.

Security Fencing Additions $7,990

$4,653,231 TotalAudubon Elementary

Brevard Public SchoolsPage 3 of 29April 4, 2005Report #4

Page 4: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Cambridge Elementary Years Old46Core Facility Upgrades

Equity projects list $1,678,499Expand MediaCovered PEMulti PurposeExpand Administration

Facility RenewalDistrict Needs Assessment $2,451,818

Electrical retrofit for infrastructureADA deficiencies listReplace chiller, air handler ductwork and install new fire alarm system, replace vinyl floor tile with ceramic floor tile and complete minor upgrades and repairs.

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $62,400

Add additional 48 parking spaces

Educational Technology Infrastructure/Equipment Upgrades $120,717Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Food Service Upgrades $500,000Kitchen Enlargement Modifications

Furniture Refurbishment / Replacement Program $125,000

$4,938,434 TotalCambridge Elementary

Brevard Public SchoolsPage 4 of 29April 4, 2005Report #4

Page 5: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Clearlake Middle Years Old46Competitive Sports Facility Improvements

A/C Additions/Upgrades to Secondary-Gymnasiums $250,000Install CHW air handlers with dedicated chiller

Core Facility UpgradesEquity projects list $1,039,069

Music

Facility RenewalDistrict Needs Assessment $1,987,901

Electrical retrofit for infrastructureReplace air handlers and upgrade intercom. Replace fence and re-surface asphalt areas. Replace doors and painting required throughout the campus and minor repairs and upgrades..ADA deficiencies list

Upgrades District WideApplied Technology Program Upgrades $355,000

Tech Program - reinstate programMultipurpose business computer lab replacement equipment and softwareMultipurpose lab replacement equipment

Educational Technology Infrastructure/Equipment Upgrades $116,892Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $30,000

Science Laboratory Upgrades $289,968Renovate/Remodel science demonstration lab, music and purchase research program equipment

Security Fencing Additions $15,285

$4,084,115 TotalClearlake Middle

Brevard Public SchoolsPage 5 of 29April 4, 2005Report #4

Page 6: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Cocoa High Years Old36Competitive Sports Facility Improvements

Remodel/Renovate/Replace locker room, gym,fields,lights,ADA $833,842Replace lockers, lighting, ADA and irrigation and upgrade locker room.

Core Facility UpgradesEquity projects list $2,197,032

Expand MusicMulti Purpose/Stage

Facility RenewalDistrict Needs Assessment $2,014,612

Replace ceiling and lights throughout the campus. Replace fire alarm and intercom. Replace floor covering with ceramic tile and complete repairs and upgrades.Electrical retrofit for infrastructureADA deficiencies list

New Building AdditionsMusic Program Addition at Cocoa High School $5,000,000

Scope definition required.

Upgrades District WideApplied Technology Program Upgrades $620,000

Food and nutrition - reinstate programDrafting - replace computer and softwareCommunications Tech - replace computers and softwareMultipurpose business computer lab replacement equipment and software room 910Culinary Arts - replace equipmentMultipurpose business computer lab Cisco system room 141Auto collision and repair - add equipment and renovate labComputers and software

Educational Technology Infrastructure Upgrades $1,654,018Infrastructure technology upgrade

Educational Technology Infrastructure/Equipment Upgrades $280,449Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $310,000

Roof Replacement & Preventative Maintenance Program $1,859,512

Science Laboratory Upgrades $1,091,796Renovate biology, chemistry, physics and science demonstration labs and purchase program equipment

Security Fencing Additions $25,315

Brevard Public SchoolsPage 6 of 29April 4, 2005Report #4

Page 7: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

$15,886,576 TotalCocoa High

Brevard Public SchoolsPage 7 of 29April 4, 2005Report #4

Page 8: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Cogswell Site Years OldUpgrades District Wide

Educational Technology Infrastructure/Equipment Upgrades $15,453Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

$15,453 TotalCogswell Site

Brevard Public SchoolsPage 8 of 29April 4, 2005Report #4

Page 9: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Edgewood Jr./Sr Years Old46Competitive Sports Facility Improvements

Remodel/Renovate/Replace locker room, gym,fields,lights,ADA $250,000Competitive soccer facility seating and lighting to compliment Parks and Recs. Project.

Facility RenewalDistrict Needs Assessment $180,566

Electrical retrofit for infrastructure

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $440,000

Add additional 400 parking spaces

Applied Technology Program Upgrades $245,000Multipurpose business computer lab replacement equipment and softwareMulti-media lab - replace equipment and software

Furniture Refurbishment / Replacement Program $120,000

Science Laboratory Upgrades $60,000Purchase research program equipment

Security Fencing Additions $15,400

$1,310,966 TotalEdgewood Jr./Sr

Brevard Public SchoolsPage 9 of 29April 4, 2005Report #4

Page 10: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Edgewood Middle Years Old46Upgrades District Wide

Educational Technology Infrastructure/Equipment Upgrades $138,465Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

$138,465 TotalEdgewood Middle

Brevard Public SchoolsPage 10 of 29April 4, 2005

Report #4

Page 11: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Endeavour Elementary Years Old47Core Facility Upgrades

Equity projects list $1,574,995Covered PEExpand MediaMusicExpand AdministrationMulti Purpose/Stage

Facility RenewalDistrict Needs Assessment $1,037,352

Replace the fire alarm system. Replace doors and floor covering. Replace the chilled water piping and complete repairs and upgrades.ADA deficiencies listElectrical retrofit for infrastructure

Upgrades District WideEducational Technology Infrastructure/Equipment Upgrades $128,061

Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $48,500

Playground Equipment $29,000Install one pre-K playground

$2,817,908 TotalEndeavour Elementary

Brevard Public SchoolsPage 11 of 29April 4, 2005

Report #4

Page 12: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Fairglen Elementary Years Old39Core Facility Upgrades

Equity projects list $1,012,095Expand MediaMulti Purpose/Stage

Facility RenewalDistrict Needs Assessment $1,187,058

Electrical retrofit for infrastructureADA deficiencies listUpgrade to a VAV system. Replace the fire alarm. Replace fencing and complete repairs and upgrades.

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $26,000

Add additional 20 parking spaces

Educational Technology Infrastructure/Equipment Upgrades $161,721Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Food Service Upgrades $150,000Kitchen Enlargement Modifications

Furniture Refurbishment / Replacement Program $40,000

Playground Equipment $32,000Install one pre-K playground

$2,608,874 TotalFairglen Elementary

Brevard Public SchoolsPage 12 of 29April 4, 2005

Report #4

Page 13: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Gardendale Elementary Years Old39Core Facility Upgrades

Equity projects list $808,797MediaCovered PE

Facility RenewalDistrict Needs Assessment $1,629,530

Add outside air and ductwork. Replace the intercom system. Re-surface asphalt and replace fencing. Replace cabinetry and minor repairs and upgrades.ADA deficiencies listElectrical retrofit for infrastructure

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $15,600

Add additional 15 parking spaces

Educational Technology Infrastructure/Equipment Upgrades $133,569Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $190,000

Playground Equipment $32,000Install one pre-K playground

Security Fencing Additions $15,445

$2,824,941 TotalGardendale Elementary

Brevard Public SchoolsPage 13 of 29April 4, 2005

Report #4

Page 14: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Golfview Elementary Years Old42Core Facility Upgrades

Equity projects list $1,336,160MediaExpand Administration

Facility RenewalDistrict Needs Assessment $1,463,953

Electrical retrofit for infrastructureReplace doors and painting of campus. Floor covering and cabinetry replacement. Complete minor repairs and upgrades.ADA deficiencies list

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $58,500

Add additional 45 parking spaces

Educational Technology Infrastructure/Equipment Upgrades $114,291Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $112,500

Security Fencing Additions $13,515

$3,098,919 TotalGolfview Elementary

Brevard Public SchoolsPage 14 of 29April 4, 2005

Report #4

Page 15: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Jefferson Middle Years Old39Competitive Sports Facility Improvements

A/C Additions/Upgrades to Secondary-Gymnasiums $250,000Install CHW air handlers with dedicated chiller

Core Facility UpgradesEquity projects list $1,581,281

Multi Purpose/StageExpand AdministrationExpand Music

Facility RenewalDistrict Needs Assessment $2,892,224

ADA deficiencies listReplace chiller, air handlers, metal duct and chilled water piping. Replace intercom, fencing and upgrade interior masonry corridor walls.Electrical retrofit for infrastructure

Upgrades District WideApplied Technology Program Upgrades $305,000

Multipurpose business computer lab replacement equipment and software room 703Food lab - replace equipment and renovateSewing - replace equipment and renovateTechnology systems - replace equipment

Educational Technology Infrastructure Upgrades $629,861Infrastructure technology upgrade

Educational Technology Infrastructure/Equipment Upgrades $142,290Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $60,000

Security Fencing Additions $32,850

$5,893,506 TotalJefferson Middle

Brevard Public SchoolsPage 15 of 29April 4, 2005

Report #4

Page 16: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Kennedy Middle Years Old39Competitive Sports Facility Improvements

A/C Additions/Upgrades to Secondary-Gymnasiums $250,000Install CHW air handlers with dedicated chiller

Core Facility UpgradesEquity projects list $1,398,908

Multi Purpose/StageExpand AdministrationExpand Music

Facility RenewalDistrict Needs Assessment $1,506,386

Replace unit ventilators and air handlers. Complete minor interior and exterior repairs and upgrade interior masonry corridor walls.Electrical retrofit for infrastructureADA deficiencies list

Upgrades District WideApplied Technology Program Upgrades $200,000

Multipurpose business computer lab replacement equipment and software room 704Technology systems - replace equipmentMulti-purpose lab - replace equipment and renovate

Educational Technology Infrastructure Upgrades $772,079Infrastructure technology upgrade

Educational Technology Infrastructure/Equipment Upgrades $149,940Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $110,000

Science Laboratory Upgrades $457,236Renovate/Remodel general science, demonstration lab, ESE vocational and purchase program equipment

Security Fencing Additions $35,935

$4,880,484 TotalKennedy Middle

Brevard Public SchoolsPage 16 of 29April 4, 2005

Report #4

Page 17: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Lewis Carroll Elementary Years Old9Core Facility Upgrades

Equity projects list $317,812Covered PEExpand Administration

Facility RenewalDistrict Needs Assessment $1,213,057

ADA deficiencies listElectrical retrofit for infrastructureUpgrade existing fire alarm system. Mechanical unit ventilators need to be replaced. Complete minor repairs and upgrades.

Upgrades District WideEducational Technology Infrastructure Upgrades $477,004

Infrastructure technology upgrade

Educational Technology Infrastructure/Equipment Upgrades $188,343Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $20,000

Playground Equipment $32,000Install one pre-K playground

$2,248,216 TotalLewis Carroll Elementary

Brevard Public SchoolsPage 17 of 29April 4, 2005

Report #4

Page 18: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Manatee Elementary Years Old2Facility Renewal

District Needs Assessment $175,486Electrical retrofit for infrastructure

New Building Additions10 Classroom addition Manatee $1,650,000

$1,825,486 TotalManatee Elementary

Brevard Public SchoolsPage 18 of 29April 4, 2005

Report #4

Page 19: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

McLarty Stadium Years Old39Facility Renewal

District Needs Assessment $192,658ADA deficiencies listRepair and/or replace bleacher system and fencing to extend use until competitive football program is relocated per line 48.

$192,658 TotalMcLarty Stadium

Brevard Public SchoolsPage 19 of 29April 4, 2005

Report #4

Page 20: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

McNair Magnet Years Old46Competitive Sports Facility Improvements

A/C Additions/Upgrades to Secondary-Gymnasiums $225,000Install air handlers and install dedicated chiller

New track at McNair Middle School $100,000Installation of new track at facility.

Core Facility UpgradesEquity projects list $738,570

Multi PurposeExpand Administration

Facility RenewalDistrict Needs Assessment $3,057,476

Replace chiller, air handler, VAV system, metal duct work and chilled water piping. Replace floor covering throughout campus. Complete interior and exterior repairs and upgrades.ADA deficiencies listElectrical retrofit for infrastructure

New Building AdditionsMagnet Performing Arts / Science Addition at McNair Magnet $900,000

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $96,000

Add additional 80 parking spaces

Applied Technology Program Upgrades $175,000Multipurpose business computer lab replacement equipment and software room 61Technology systems - replace systemsMulti-purpose lab - replace equipment and renovate

Educational Technology Infrastructure/Equipment Upgrades $73,287Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $90,000

Science Laboratory Upgrades $478,248Renovate/Remodel general science, classrooms, and research purchase program/magnet equipment

$5,933,581 TotalMcNair Magnet

Brevard Public SchoolsPage 20 of 29April 4, 2005

Report #4

Page 21: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Merritt Island High Years Old40Competitive Sports Facility Improvements

Remodel/Renovate/Replace locker room, gym,fields,lights,ADA $1,117,202Remove portables and replace concession stand and restrooms at baseball and softball fields. Complete locker-room renovation and upgrade.

Core Facility UpgradesEquity projects list $3,752,461

Expand MusicMedia

Facility RenewalDistrict Needs Assessment $4,469,600

ADA deficiencies listElectrical retrofit for infrastructureReplace pool filter system and replace plumbing supply lines.Replace chiller, air handler, metal duct work and chilled water piping. Replace bleacher and fencing. Complete interior and exterior repairs and upgrades.

New Building Additions16 Classrooms/Parking Area at Merritt Island High $6,500,000

Eliminates 16 existing relocatable classrooms. Remodel 4 existing science labs in 8 classrooms and remodel/renovate 7 existing labs included in Item 34.

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $220,000

Add additional 200 parking spaces

Applied Technology Program Upgrades $370,000Automotive service - renovate and replace equipmentMultipurpose business computer lab replacement equipment and software rooms 103, 101 and 112Drafting - replace computers and softwareFood and nutrition and family child careTechnology studies - add equipment

Educational Technology Infrastructure Upgrades $1,465,018Infrastructure technology upgrade

Educational Technology Infrastructure/Equipment Upgrades $349,605Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $460,000

Science Laboratory Upgrades $1,348,878Remodel/Renovate Home Ec, chem., biology, physics, tech, business labs and purchase equipment.

$20,052,764 TotalMerritt Island High

Brevard Public SchoolsPage 21 of 29April 4, 2005

Report #4

Page 22: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Mila Elementary Years Old52Core Facility Upgrades

Equity projects list $1,529,790Expand AdministrationMulti Purpose/StageExpand Media

Facility RenewalDistrict Needs Assessment $1,613,299

Replace VAV system and air handlers. Replace fire alarm and intercom. Complete interior and exterior repairs and upgrades.Electrical retrofit for infrastructureUpgrade pool pumps and filters.ADA deficiencies list

Upgrades District WideEducational Technology Infrastructure/Equipment Upgrades $99,603

Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $40,000

Playground Equipment $32,000Install one 5-12 year old playground

Security Fencing Additions $10,350

$3,325,042 TotalMila Elementary

Brevard Public SchoolsPage 22 of 29April 4, 2005

Report #4

Page 23: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Rockledge Elementary Years Old35Facility Renewal

District Needs Assessment $0To be demolished as part of line 48

$0 TotalRockledge Elementary

Brevard Public SchoolsPage 23 of 29April 4, 2005

Report #4

Page 24: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Rockledge High Years Old46Competitive Sports Facility Improvements

Competitive Sports Facilities Upgrades at Rockledge $6,500,000Includes the construction of a new Maintenance Compound on land donated by the City of Rockledge.

Core Facility UpgradesEquity projects list $805,912

Expand Music and upgrade Auditorium

Facility RenewalDistrict Needs Assessment $3,932,631

Electrical retrofit for infrastructureADA deficiencies listReplace pool filter system and minor upgrades to the deckReplace chiller, unit ventilators, and add outside air. Replace fire alarm system. Upgrade locker room and complete interior repairs to Cafeteria, and complete exterior repairs and upgrades.

New Building AdditionsScience Laboratory Addition at Rockledge High $1,650,000

General science lab and support space. (Add third floor addition to current Rockledge Project).

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $440,000

Add additional 400 parking spaces

Applied Technology Program Upgrades $915,000Allied Heath - replace equipmentFood and nutrition - replace equipmentReplace computers and softwareMultipurpose business computer lab replacement equipment and software rooms 54 and 55Computers and softwareDrafting - replace computers, software and furnitureAdd technology studies programReplace equipment

Educational Technology Infrastructure Upgrades $1,295,480Infrastructure technology upgrade

Educational Technology Infrastructure/Equipment Upgrades $291,465Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $395,000

Roof Replacement & Preventative Maintenance Program $309,124

Science Laboratory Upgrades $899,564Renovate biology, chemistry, physics and science demonstration labs and purchase program equipment

Security Fencing Additions $27,350Brevard Public Schools

Page 24 of 29April 4, 2005Report #4

Page 25: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

$17,461,526 TotalRockledge High

Brevard Public SchoolsPage 25 of 29April 4, 2005

Report #4

Page 26: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Saturn Elementary Years Old38Core Facility Upgrades

Equity projects list $1,649,534MediaMulti Purpose/Stage

Facility RenewalDistrict Needs Assessment $2,765,964

ADA deficiencies listElectrical retrofit for infrastructureReplace chiller, air handler, add outside air. Replace fire alarm system. Replace underground plumbing and complete interior and exterior repairs and upgrades.

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $66,300

Add additional 51 parking spaces

Educational Technology Infrastructure/Equipment Upgrades $161,721Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Food Service Upgrades $500,000Kitchen Enlargement Modifications

Furniture Refurbishment / Replacement Program $40,000

Security Fencing Additions $5,900

$5,189,419 TotalSaturn Elementary

Brevard Public SchoolsPage 26 of 29April 4, 2005

Report #4

Page 27: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Stevenson Elementary Years Old37Core Facility Upgrades

Equity projects list $52,000Covered PE

Facility RenewalDistrict Needs Assessment $460,769

ADA deficiencies listElectrical retrofit for infrastructureReplace system with new VAV system. Complete minor repairs and upgrades

New Building Additions10 Classroom Add / Classroom Upgrades at Stevenson $2,150,000

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $130,000

Add additional 100 parking spaces

Educational Technology Infrastructure Upgrades $232,736Infrastructure technology upgrade

Educational Technology Infrastructure/Equipment Upgrades $78,642Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $20,000

Playground Equipment $67,000Install one pre-k and one 5-12 year old playground.

Security Fencing Additions $19,975

$3,211,122 TotalStevenson Elementary

Brevard Public SchoolsPage 27 of 29April 4, 2005

Report #4

Page 28: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Tropical Elementary Years Old44Core Facility Upgrades

Equity projects list $1,812,920MediaCovered PEMulti Purpose/Stage

Facility RenewalDistrict Needs Assessment $3,030,992

Replace chiller, controls and add outside air system. Replace fire alarm and intercom system. Repair and/or replace security fencing. Replace all exterior doors and underground plumbing. Complete minor repairs and upgrades.ADA deficiencies listElectrical retrofit for infrastructure

Upgrades District WideEducational Technology Infrastructure Upgrades $557,879

Infrastructure technology upgrade

Educational Technology Infrastructure/Equipment Upgrades $168,300Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $65,000

Playground Equipment $32,000Install one pre-K playground

Security Fencing Additions $8,580

$5,675,671 TotalTropical Elementary

Brevard Public SchoolsPage 28 of 29April 4, 2005

Report #4

Page 29: Proposed Detailed Project List By Area by School FY2006 ...facilities.brevard.k12.fl.us/old_ppm.brevard.k12.fl.us_pdfs/Capital... · Teacher/Other modern workstation ratio, and five

Area III

Proposed Detailed Project List By Area by School FY2006 thru FY2012 Facility Improvement Plan

Working Papers

Williams Elementary Years Old7Core Facility Upgrades

Equity projects list $238,777Covered PEExpand Administration

Facility RenewalDistrict Needs Assessment $256,122

Repair interior walls, paint and complete minor repairs.ADA deficiencies listElectrical retrofit for infrastructure

Upgrades District WideAdd Parking/Lighting Upgrades/Circulation Improvement $539,000

Add additional 30 parking spaces and improve on-site traffic circulation.

Educational Technology Infrastructure/Equipment Upgrades $153,612Includes five years to reach District goal of Student 5:1 workstation ratio Includes five years to reach 1:1 Teacher/Other modern workstation ratio, and five year obsolescent replenishment of current modern workstations.

Furniture Refurbishment / Replacement Program $15,000

Playground Equipment $67,000Install one pre-k and one 5-12 year old playground.

Security Fencing Additions $8,925

$1,278,436 TotalWilliams Elementary

Total $157,816,559IIIArea

Brevard Public SchoolsPage 29 of 29April 4, 2005