R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping 1:00pm Objectives and scope 1:10pm Background Public Utilities Code 399.2.5 1:15pm Renewable Energy Transmission Initiative 1:30pm Facilitated discussion 1:45pm Break 3:00pm Facilitated discussion (cont’d) 3:15pm Summary and next steps 4:30pm

Upload: clyde-marshall

Post on 02-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

R.08-03-009 / I.08-03-010Workshop Agenda

Introductions and housekeeping 1:00pm

Objectives and scope 1:10pm

Background

Public Utilities Code 399.2.5 1:15pm

Renewable Energy Transmission Initiative 1:30pm

Facilitated discussion 1:45pm

Break 3:00pm

Facilitated discussion (cont’d) 3:15pm

Summary and next steps 4:30pm

Page 2: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Objectives and Scope

Today: Explore whether the output of the RETI process can be used to support cost recovery for IOUs in planning new transmission projects to serve renewable resources What is RETI providing?

What are the implications for CPUC responsibilities under Public Utilities Code 399.2.5?

Later workshop: How to incorporate the output of the RETI and LTPP processes in proceedings for individual applications for transmission Certificates of Public Convenience and Necessity

Page 3: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Backstop Cost Recovery

Statute and Implementation

February 26, 2009

Page 4: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Public Utilities Code 399.2.5

(a) “…Transmission facilities shall be deemed to be necessary…if the commission finds that the new facility is necessary to facilitate achievement of the renewable power goals established in Article 16…”

(b) “With respect to a transmission facility described in subdivision (a)…” the Commission shall take several actions, including: (4) “Allowing recovery in retail rates of any increase in

transmission costs incurred by an electrical corporation resulting from the construction of the transmission facilities that are not approved for recovery in transmission rates by the Federal Energy Regulatory Commission after the commission determines that the costs were prudently incurred…”

Page 5: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

CPUC Implementation

D.03-07-033 – Adopted general framework

D.06-06-034 – Modified D.03-07-033, established eligibility criteria: High-voltage, bulk-transfer transmission facilities, whether

classified as network or gen-tie, that are designed to serve multiple RPS-eligible generators where it has been established that the amount of added transmission capacity will likely be utilized by RPS-eligible generation projects within a reasonable period of time

New network transmission facilities needed to interconnect an RPS-eligible resource whose developer has entered into a Commission-approved power purchase agreement

Page 6: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

CPUC Implementation

D.07-03-012 – Established three-pronged test for “necessary to facilitate achievement” of RPS goals:

(1) that a project would bring to the grid renewable generation that would otherwise remain unavailable;(2) that the area within the line's reach would play a critical role in meeting the RPS goals; and(3) that the cost of the line is appropriately balanced against the certainty of the line's contribution to economically rational RPS compliance.

D.07-03-012 and D.07-03-045 used above test to justify the first 3 segments of the Tehachapi upgrades and guarantee backstop cost recovery for segment 3

Page 7: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

CPUC Implementation

E-3969 (2006) – Commission approved recovery costs of environmental studies identified by Tehachapi Collaborative Study Group – no mention of 399.2.5 D.06-06-034: “We adopted Resolution E-3969 because

studies had already demonstrated that Tehachapi is an especially rich resource area for renewable and development of that area is almost certainly necessary to meet the 20% RPS goal. We are unwilling to open the ratepayers’ pockets for transmission facilities in areas that do not rise to this level of certainty, since study and permitting costs for facilities in unexplored areas will be large.”

E-4052 (2007) – Commission declined to discuss whether 399.2.5 recovery applied to studies performed before a specific project was identified

Page 8: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Questions to consider

Should the Commission clarify whether studies performed before a project is identified could qualify for 399.2.5 cost recovery?

Can RETI serve as a quick check of the three-pronged test for purposes of 399.2.5 cost recovery and/or need determination?

(1) that a project would bring to the grid renewable generation that would otherwise remain unavailable;(2) that the area within the line's reach would play a critical role in meeting the RPS goals; and(3) that the cost of the line is appropriately balanced against the certainty of the line's contribution to economically rational RPS compliance.

Page 9: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

California’s Renewable EnergyTransmission Initiativehttp://www.energy.ca.gov/reti/

Overview

February 26, 2009

Page 10: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Renewable Energy Transmission Initiative

Statewide collaborative study effort to identify and facilitate the development of the transmission needed to access the most cost-effective and environmentally-preferable renewable resources in CA and neighboring states

Three-Phased Process Phase 1 – Identification and ranking of Competitive

Renewable Energy Zones (CREZs)

Phase 2 – Refinement of analysis for priority CREZs and development of statewide conceptual transmission plan

Phase 3 – Detailed transmission planning for priority CREZs

Page 11: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm
Page 12: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

RETI Organization / Roles

Coordinating Committee Oversees the overall RETI

process Ensures development of

needed information Keeps the process on

schedule

Stakeholder Steering Committee Primary working group Key stakeholder

representatives ~30 members

Plenary Stakeholder Group Reviews Steering Committee

work Provides feedback, “ground-

truthing” All stakeholders and the

public

Page 13: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Phase 1

Identify developable renewable resources in California and neighboring areas – engineering review and consideration of environmentally sensitive areas

Rank CREZs according to cost-competitiveness

Rate CREZs according to environmental concerns

Final Phase 1 Report completed in December 2008

Page 14: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Phase 1B Report - Results

Black & Veatch, in consultation with Phase 1B working group > 2,100 individual “pre-identified” and “proxy” generation

projects > 80,000 MW within 29 CREZs in California; 6 CREZs were

split at “breaks” in their supply curves, resulting in total of 37 distinct, ranked areas

40,000 MW outside of CA with potential to deliver energy to CA.

Environmental Working Group CREZs identified by Black & Veatch are rated according to

environmental concerns associated with the projected generation

Page 15: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

CREZ and non-CREZ resources identified throughout the study area

Page 16: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm
Page 17: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Phase 2

Refine and verify priority CREZs

Develop conceptual transmission plans for the highest ranking CREZs – group co-led by CAISO and LADWP

Draft report – end of March 2009

Final report – end of April 2009

Page 18: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Phase 3

Existing transmission planning organizations collaboratively design plans of service that result in applications to construct new transmission infrastructure to meet RPS goals

~ 8 month-long process; may be iterative

Explore joint projects as appropriate

Final result = Statewide Plan

Page 19: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm
Page 20: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Discussion

February 26, 2009

Page 21: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Discussion

Does current status present a barrier to planning for a 33% by 2020 RPS target and applying 399.2.5 provision to transmission projects needed for 33%, but perhaps not 20%?

Does the Commission need to clarify whether early-stage project study costs – not jus those associated with identified projects – are eligible for 3992.5 cost recovery?

What is RETI producing in terms of high priority CREZs or transmission projects that might facilitate CPUC decisions on backstop cost recovery or “need” determination?

Page 22: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Discussion

To what exactly might the CPUC defer from RETI’s Phase 1, 2 and 3 results, and for what purposes (recovery of pre-siting costs, CPCN determination of need, recovery of construction costs)? If pre-siting study costs are eligible, could and should

authority to record and recover studies of RETI projects be granted an expedited advice letter process, i.e Tier 1 or Tier 2?

Is SCE’s proposal that cost recovery should be granted for obtaining rights-of-way for RETI-identified projects that have not yet been granted CPCNs appropriate?

Page 23: R.08-03-009 / I.08-03-010 Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code 399.2.51:15pm

Summary and Next Steps