realizing rosslyn - amazon web services...farr associates | w-zha meeting objectives 1. introduce...

44
GOODY CLANCY WITH KITTELSON & ASSOCIATES | RHODESIDE & HARWELL FARR ASSOCIATES | W-ZHA Realizing Rosslyn: a new era of opportunity 1

Upload: others

Post on 23-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

Realizing

Rosslyn: a new era of opportunity

1

Page 2: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

Meeting Objectives

1. Introduce First Draft of Rosslyn Sector Plan for public review

2. Provide High Level Overview of Plan Organization and Structure;

cover what’s in the plan

3. Highlight updates on key items

4. Address Next Steps, Process, and Opportunities for Input

2

Page 3: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 3

3

Page 4: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 44

Spring:

Page 5: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 5

5

Month Meetings Milestones

February • Rosslyn Process Panel (2/2)

March • County Board Work Session (3/4)

April • RAFOM C.A.(4/15)

May • Process Panel (5/13)

• E2C2 (5/18)

• LRPC (5/20, 5/21) (and 5/27, if needed)

• Park and Recreation Comm. (5/26)

• Urban Forestry Comm. (5/28)

• Transportation Comm. (5/28)

June • Planning Commission (RTA)

• Open House (6/2)*

• Housing Commission (6/4)*

• County Board (RTA) (6/13 or 6/16)

July• Planning Commission

• County Board (Action) (7/18 or 7/21)

Rosslyn Sector Plan Update Adoption

1st Draft Plan for Public Review

Staff revisits Advisory Commissions as requested

Page 6: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

2. A walk through

the Draft Rosslyn

Sector Plan

6

Page 7: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

2. Walking through the plan

7

Page 8: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

2. Walking through the plan

8

• Purpose of Study• Document Organization• Planning Process• Rosslyn Plan Framework• Relationship to Other

Planning Documents and Policies

• Relationship to Other Planning Efforts

• How to Use This Document

Page 9: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

2. Walking through the plan

9

• Rosslyn Today• Regional Context• People• Economics• Existing Planning Framework• Planning Assessment of

Rosslyn Today• Parks and Open Space• Transportation

Page 10: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

2. Walking through the plan

10

• Plan Framework• Goals and Policies• Illustrative Concept Plan• Sustainability• Land Use• Transportation• Parks and Open Space• Urban Design, Building

Height and Form

Page 11: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

2. Walking through the plan

11

Vision Statement

Vision Principles

Policy Directives by Theme

Rosslyn Plan Framework

Rosslyn Sector Plan Vision Statement

Vision Principles

Policies by Goal

Planning Recommendations

Implementation Actions NEW

Page 12: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

2. Walking through the plan

12

COMMON ELEMENTS ACROSS ALL SECTIONS• Introductory Text Summarizing

Key Items/Approach

• Listing of Key Considerations

• Recommendations

• Policies Included in Sidebarwhere Relevant

Page 13: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

2. Walking through the plan

13

• Approach to Community Benefits

• Timing and Priorities for Planned Improvements

• Implementation Matrix

Page 14: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

2. Walking through the plan

14

A Two-way Streets

B 18th Street Extension

C Metro Plaza

D New Ped/Bike BridgeConnections

E Gateway Park

Page 15: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

2. Walking through the plan

15

F Freedom Park

G 18th Street Corridor of Parks and Plazas

H Rosslyn Plaza Park

I Esplanade

Page 16: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 16

Project Schedule Two Way Streets (Lynn, Fort Myer, and Kent)

Page 17: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 17

Project Schedule

17

18th Street Extension / Parks

Page 18: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 18

Project Schedule

18

Metro Plaza/Station Enhancements

Page 19: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 19

Project Schedule

19

Gateway Park Revitalization

Page 20: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 20

Project Schedule

20

Freedom Park Expansion/Enhancement

Page 21: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 21

Project Schedule

21

Esplanade

Esplanade

I

Page 22: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 22

Project Schedule

22

Esplanade

Page 23: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 23

Project Schedule

23

Building Height & Form

Peaks & Valleys Approach

Page 24: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan

recommendations

24

Page 25: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

25

Page 26: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

26

Page 27: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

27

Page 28: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

28

Uses depicted here are

illustrative only and do not

reflect site-specific

recommendations

Page 29: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

29

Uses depicted here are

illustrative only and do not

reflect site-specific

recommendations

Page 30: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

30

Page 31: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

31

Page 32: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

32

Page 33: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

33

Page 34: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

34

Page 35: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

35

Page 36: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

36

Page 37: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

3. Updated plan recommendations

37

Page 38: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

4. Updated

schedule

and next

steps

38

Page 39: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 39

4. Schedule / Next Steps

Month Meetings Milestones

February • Rosslyn Process Panel (2/2)

March • County Board Work Session (3/4)

April • RAFOM C.A.(4/15)

May • Process Panel (5/13)

• E2C2 (5/18)

• LRPC (5/20, 5/21) (and 5/27, if needed)

• Park and Recreation Comm. (5/26)

• Urban Forestry Comm. (5/28)

• Transportation Comm. (5/28)

June • Planning Commission (RTA)

• Open House (6/2)*

• Housing Commission (6/4)*

• County Board (RTA) (6/13 or 6/16)

July• Planning Commission

• County Board (Action) (7/18 or 7/21)

Rosslyn Sector Plan Update Adoption

1st Draft Plan for Public Review

Staff revisits Advisory Commissions as requested

Page 40: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 40

4. Schedule / Next Steps

• Community Open House (TBD)

Midday and early evening sessions

• Planning Commission Hearings

(RTA: Early June, TBD)

(Action: Early July, TBD)

• County Board Hearings

(RTA: Mid June, TBD)

(Action: Mid July, TBD)

Page 41: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 41

4. Schedule / Next Steps

Page 42: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 42

4. Schedule / Next Steps

Page 43: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA 43

4. Schedule / Next Steps

Page 44: Realizing Rosslyn - Amazon Web Services...FARR ASSOCIATES | W-ZHA Meeting Objectives 1. Introduce First Draft of Rosslyn Sector Plan for public review 2. Provide High Level Overview

GOODY CLANCY WITHKITTELSON & ASSOCIATES | RHODESIDE & HARWELLFARR ASSOCIATES | W-ZHA

DISCUSSION

44