8/10/2019 Report to CESC on Variables and Concepts of PVSYST
1/14
REPORT TO CLARIF TO CESC
THE SIMLATION ARIABLES AND CONCEPTS
SED IN CMI OFFER 13.10.0021 (PSST)
1/09/2010
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
2/14
INDE
1. DEFINITIONS:............................................................... 3
2. PSST DATA............................................................... 6
3. DIAGRAM OF FLES OF ENERG ............................... 7
4. PERFORMANCE RATIO: C ............................. 9
ANNE: PSST SIMLATION: 1.05 M
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
3/14
1.
B PSST (
PSST ):
I . I:
I ( )
(/2). T ()
(/2)
G H : (/2/)
T '
. G H I (GHI)
. T
D N I (DNI)
D H I (DIF).
I :
I .
N S
N = GS / GI. I
IAM
T ( IAM, "I A M")
P ' ,
.
( PSS)FIAM = 1 (1/ 1), = ,
= PSST P 0.05.
E :
I
IAM.
E STC
T STC
STC.
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
4/14
I
I 1000 /2 (STC).T P "E .
I". I
.
T
T . I
'
.
O
T ( R I )
. T
R
M
I P '
. , P
.
N, ""
, . M
,
, .
M
L ""
I/ .
STC: S T C
I . STC :
1. ( ),
. T 1 . . (1,000 /2)
2.
( ). T 1.5.
3. . STC
25 C.
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
5/14
N O C T (NOCT): T
P 800 /2 , 20C
1 . NOCT
.
MPP: :
P (I)
() . T
, /I O' L. A P
,
(MPP) ,
(/I = /I)
P R
T , E C (JRC/I),
() ,
"" STC
(I G ).
T PR (S, P , , , )
( ). "S "
, //,
,
.
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
6/14
2.
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
7/14
3.
N: T .
) 1 2
G H I (/2/)
GH = 1,905.8 /2/
FT= +7.3% ( )
(T=20)
I (/2/)
(T=20)
GI= 2,045.7 /2/
N = 2 %
IAM = 2,8 %
"E"
IAM (/2/)
GE = 1,947.7 /2/
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
8/14
) 1,05
"E" (/)
GE = G2 GE = 8,217 1,947.7 = 16,004,251 /
G2 = A
GE = 16,004,251 /
= 12.8 %
G (/)
2,054,231 /
I L = 3.6 %
T L = 9.2 %
A S = 0.5 %
M Q L = 3.2 %
M L = 2.2 %
O L = 2 %
G (/)
1,658,828 /
I = 2.8 %
A E I O (/)1,612,294 /
N S P (/(K))
= EI/PP = 1,612,294 / 1,048 = 1,538
= 1,538 /(K)
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
9/14
4.
R I E = GI /() STC
N S P = EOI /()
/
= GI ( 3.) = 2,045.7
= ( 3.) = 1,538
PR = 75.2 %
( 1 2 1 )
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
10/14
ANNE:
PSST SIMLATION: 1.05 M
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
11/14
Page 1/402/09/10PVSYST V4.37
Grid-Connected System: Simulation parameters
Project : Gajner
Geographical Site Gajner Country India
Situation Latitude 27.9N Longitude 73.0ETime defined as Legal Time Time zone UT+6 Altitude 232 m
Albedo 0.20
Meteo data : Gajner , synthetic hourly data
Simulation variant : Gajner Policristalino 1,05 MWp
Simulation date 02/09/10 11h35
Simulation parameters
Collector Plane Orientation Tilt 20 Azimuth 0
Horizon Free Horizon
Near Shadings according to module
PV Array Characteristics
PV module Si-poly Model XL24195Manufacturer XL TELECOM & ENERGY LIMITED
Number of PV modules In series 24 modules In parallel 224 stringsTotal number of PV modules Nb. modules 5376 Unit Nom. Power 195 WpArray global power Nominal (STC) 1048 kWp At operating cond. 945 kWp (50C)Array operating characteristics (50C) U mpp 574 V I m pp 1648 ATotal area Module area 8217 m
PV Array loss factorsHeat Loss Factor ko (const) 29.0 W/mK kv (wind) 0.0 W/mK / m/s
=> Nominal Oper. Coll. Temp. (800 W/m, Tamb=20C, wind 1 m/s) NOCT 45 CWiring Ohmic Loss Global array res. 11.4 mOhm Loss Fraction 3.0 % at STCSerie Diode Loss Voltage Drop 0.7 V Loss Fraction 0.1 % at STCArray Soiling Losses Loss Fraction 0.5 %Module Quality Loss Loss Fraction 3.0 %Module Mismatch Losses Loss Fraction 2.0 % at MPPIncidence effect, ASHRAE parametrization IAM = 1-bo (1/cos i - 1) bo Parameter 0.05
System Parameter System type Grid-Connected System
Inverter Model JEMA IF 1000KWManufacturer Data sheetInverter Characteristics Operating Voltage 410-850 V Unit Nom. Power 1000 kW AC
User's needs : Unlimited load (grid)
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
12/14
Page 2/402/09/10PVSYST V4.37
Grid-Connected System: Near shading definition
Project : Gajner
Simulation variant : Gajner Policristalino 1,05 MWp
Main system parameters System type Grid-ConnectedNear Shadings according to modulePV Field Orientation tilt 20 azimuth 0PV modules Model XL24195 Pnom 195 WpPV Array Nb. of modules 5376 Pnom total 1048 kWpInverter Model JEMA IF 1000KW Pnom 1000 kW acUser's needs Unlimited load (grid)
Perspective of the PV-field and surrounding shading scene
West South
Zenith
East
Iso-shadings diagram
-120 -90 -60 -30 0 30 60 90 120Azim uth []
0
15
30
45
60
75
90
Sunheight[]
Gajner: 1,1MW 8.5 m_xltelenergy
Beam shading factor (according to module) : Iso-shadings curves
1: 22 june
2: 22 may - 23 july3: 20 apr - 23 aug4: 20 mar - 23 sep5: 21 feb - 23 oct6: 19 jan - 22 nov7: 22 december
7h
8h
9h
10h
11h
12h
13h
14h
15h
16h
17h
18h
19h
1
2
3
4
5
6
7
Behindthe plane
Behindthe plane
Shading loss: 1 %Shading loss: 5 %
Shading loss: 10 %Shading loss: 20 %Shading loss: 40 %
Attenuation for diffuse: 0.969and albedo: 0.292
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
13/14
Page 3/402/09/10PVSYST V4.37
Grid-Connected System: Main results
Project : Gajner
Simulation variant : Gajner Policristalino 1,05 MWp
Main system parameters System type Grid-ConnectedNear Shadings according to modulePV Field Orientation tilt 20 azimuth 0PV modules Model XL24195 Pnom 195 WpPV Array Nb. of modules 5376 Pnom total 1048 kWpInverter Model JEMA IF 1000KW Pnom 1000 kW acUser's needs Unlimited load (grid)
Main simulation resultsSystem Production Produced Energy 1612 MWh/year Specific 1538 kWh/kWp/year
Performance Ratio PR 75.2 %
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec0
1
2
3
4
5
6
7
8
NormalizedEnergy[kWh/kWp/day]
Normalized productions (per installed kWp): Nominal power 1048 kWp
Yf : Produced useful energy (inverter output) 4.21 kWh/kW p/dayLs : System Loss (inverter, ...) 0.12 kWh/kWp/dayLc : Collection Loss (PV-array losses) 1.27 kWh/kWp/day
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
PerformanceRatioPR
Performance Ratio PR
PR : Performance Ratio (Yf / Yr) : 0.752
Gajner Policristalino 1,05 MWp
Balances and main results
GlobHor T Amb GlobInc GlobEff EArray EOutInv EffArrR EffSysR
kWh/m C kWh/m kWh/m kWh kWh % %
January 113.1 14.70 146.5 137.7 123325 119874 10.24 9.96
February 128.5 17.40 154.4 147.1 129413 125824 10.20 9.92March 167.4 23.50 183.7 176.0 151505 147328 10.04 9.76
April 195.0 28.30 199.0 190.9 160241 155864 9.80 9.53
May 216.1 31.30 206.7 197.8 163345 158792 9.62 9.35
June 206.7 31.10 192.3 183.6 151842 147581 9.61 9.34
July 185.7 29.50 176.3 167.6 140049 136087 9.67 9.39
August 174.2 28.50 172.7 164.6 138000 134088 9.73 9.45
September 161.1 28.30 170.4 162.9 136379 132533 9.74 9.47
October 138.6 26.20 158.9 151.4 128964 125343 9.88 9.60
November 114.3 21.40 144.8 137.2 118890 115591 9.99 9.72
December 105.1 16.70 140.1 131.0 116621 113390 10.13 9.85
Year 1905.8 24.77 2045.7 1947.7 1658576 1612294 9.87 9.59
Legends: GlobHor Horizontal global irradiat ion
T Amb Ambient Temperature
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
EArray Effective energy at the output of the array
EOutInv Available Energy at Inverter Output
EffArrR Effic. Eout array / rough area
EffSysR Effic. Eout system / rough area
-
8/10/2019 Report to CESC on Variables and Concepts of PVSYST
14/14
Page 4/402/09/10PVSYST V4.37
Grid-Connected System: Loss diagram
Project : Gajner
Simulation variant : Gajner Policristalino 1,05 MWp
Main system parameters System type Grid-ConnectedNear Shadings according to modulePV Field Orientation tilt 20 azimuth 0PV modules Model XL24195 Pnom 195 WpPV Array Nb. of modules 5376 Pnom total 1048 kWpInverter Model JEMA IF 1000KW Pnom 1000 kW acUser's needs Unlimited load (grid)
Loss diagram over the whole year
Horizontal global irradiation1906 kWh/m
+7.3% Global incident in coll. plane
-2.0% Near Shading Factor on global
-2.8% IAM factor on global
Effective irradiance on collectors1948 kWh/m * 8217 m coll.
efficiency at STC = 12.8% PV conversion
efficiency at STC = 12.8%2054231 kWh
-3.6% PV loss due to irradiance level
-9.2% PV loss due to temperature
-0.5% Array Soiling loss
-3.2% Module quality loss
-2.2% Module array mismatch loss-2.0% Ohmic wiring loss
Array virtual energy at MPP1658828 kWh
-2.8% Inverter Loss during operation (efficiency)
0.0% Inverter Loss over nominal inv. power
-0.0% Inverter Loss due to power threshold
0.0% Inverter Loss over nominal inv. voltage
-0.0% Inverter Loss due to voltage threshold
Available Energy at Inverter Output1612294 kWh